CN204531421U - A kind of concrete support mould and fixing templates - Google Patents

A kind of concrete support mould and fixing templates Download PDF

Info

Publication number
CN204531421U
CN204531421U CN201520229930.4U CN201520229930U CN204531421U CN 204531421 U CN204531421 U CN 204531421U CN 201520229930 U CN201520229930 U CN 201520229930U CN 204531421 U CN204531421 U CN 204531421U
Authority
CN
China
Prior art keywords
template
hole
hold
briquetting
screw mandrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520229930.4U
Other languages
Chinese (zh)
Inventor
王金明
陈向尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201520229930.4U priority Critical patent/CN204531421U/en
Application granted granted Critical
Publication of CN204531421U publication Critical patent/CN204531421U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of concrete support mould and fixing templates, comprise template I and the template II of two pieces of opposing parallel settings, template I is provided with for the wood strip of support shuttering I and the briquetting for fixing wood strip back to the side of template II, also comprise some sleeve pipes passing perpendicularly through template I and template II, template I and template II are provided with the through hole passed for sleeve pipe separately, through hole is positioned at briquetting in the projection perpendicular to template I direction, screw mandrel is equipped with in sleeve pipe, screw mandrel passes briquetting movably towards one end of template I and is equipped with the locking nut for making briquetting compress wood strip, template II is provided with some hold-down nuts coordinated with wire rod thread back to the side of template I, connector is provided with and the two ends of connector are fixedly connected with template II with hold-down nut respectively between hold-down nut with template II.The utility model structure is simple, and easy construction, not only reduces the consumption to wire drawing bar, reduce cost, also shorten the construction period, improve efficiency.

Description

A kind of concrete support mould and fixing templates
Technical field
The utility model relates to a kind of concreting mould, is specifically related to a kind of concrete support mould and fixing templates.
Background technology
Along with the fast development of domestic economy, heavy construction sharply increases, and the overwhelming majority is reinforced concrete structure, in work progress, needs to lay template as temporary supporting structure.Template is the important tool of concrete structure engineering construction, in Cast-in-situ Concrete Structural Engineering, form work engineering generally accounts for 20% ~ 30% of concrete structure engineering cost, account for 30% ~ 40% of the engineering amount of labour used, account for about 50% of the duration, mould plate technique directly affects the quality of engineering construction, cost and benefit.At present in the middle of engineering construction, job site common templates reinforcement system mostly is steel pipe and is combined with fastener, recycles and reinforces wire drawing bar.But under the environment that some are narrow, installing space is not enough to constructor and installs wood strip and briquetting, cannot support template, common way be exactly in narrow space the material such as filled and process to shuttering supporting, be so just unfavorable for the control to construction cost.In addition after concrete work completes, concrete setting is just followed therein to wire drawing bar, then need to cut exposed part outside concrete structure.Which increase the consumption to wire drawing bar, improve construction cost, constructor also will be arranged simultaneously to process to wire drawing bar bared end, have impact on construction speed, extend the construction period, also add the burden of constructor simultaneously.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is: how to provide a kind of structure simple, easy construction, the concrete support mould that the construction period is short, cost is low and fixing templates.
In order to solve the problems of the technologies described above, the utility model have employed following technical scheme:
A kind of concrete support mould, comprise template I and the template II of two pieces of opposing parallel settings, template I is provided with for the wood strip of support shuttering I and the briquetting for fixing wood strip back to the side of template II, also comprise some sleeve pipes passing perpendicularly through described template I and described template II, described template I and described template II are provided with the through hole passed for described sleeve pipe separately, described through hole is positioned at described briquetting in the projection perpendicular to described template I direction, the screw mandrel extended along described casing length direction is equipped with in described sleeve pipe, screw mandrel passes described briquetting movably towards one end of described template I and is equipped with the locking nut for making described briquetting compress described wood strip, described template II is provided with the concentric and hold-down nut that is that coordinate with described wire rod thread of some and described through hole back to the side of described template I, connector is provided with and the two ends of connector are fixedly connected with described template II with described hold-down nut respectively between hold-down nut with described template II.
In the utility model, sleeve pipe passes two pieces of templates by through hole, through hole is positioned at briquetting in the projection perpendicular to described template direction, and in sleeve pipe, one end of screw mandrel is first passed template II and is connected with hold-down nut threaded engagement, and such screw mandrel has just linked together with template II.Then the other end of screw mandrel is through briquetting, and recycling locking nut is fixed briquetting, can complete the supporting to template, and the size of installing space is just no longer limited in template II side, relies on screw mandrel to be fixed support to template.After concrete work completes form removable, directly extracted out from sleeve pipe by screw mandrel, screw mandrel can be made to reuse, relative to sleeve pipe, reduce construction cost, its structure is simple, and easy construction, shortens the construction period, improves efficiency of construction.
As optimization, described briquetting is two steel pipes be set up in parallel, and be provided with gap between two steel pipes, described screw mandrel passes described steel pipe by described gap, the described screw mandrel between described steel pipe and described locking nut is also arranged with mountain type card.Two deep-slotted chip breakers of mountain type card more fit in the profile of steel pipe, fixing more firm to steel pipe, make wood strip compress template simultaneously, reduce concrete in casting process, occur burst-mode phenomenon.
As optimization, the internal diameter of described through hole matches with the external diameter of described sleeve pipe.Reduce the spillage amount that concrete flows out from gap, too increase the aesthetic property after concrete setting simultaneously.
As optimization, described sleeve pipe is connected and composed by many tube connectors, and one end of described tube connector is provided with external screw thread, and the other end is provided with the internal thread matched with described external screw thread.Can for the building of different-thickness, increase and decrease tube connector reaches the object of adjusting sleeve pipe length, improves compliance, too increases the convenience of construction simultaneously.
As optimization, the end face at described sleeve pipe two ends flushes with the external surface back to side of described template I and described template II respectively.Concrete work complete and stripping time, interference would not be played to template in the end of sleeve pipe, makes form removable more smooth and easy, increases work efficiency.
As optimization, described connector entirety is in shaped hollow round table, and the osculum end of hollow round table is communicated with the screw of described hold-down nut, and the big opening end of hollow round table is communicated with described through hole.Screw mandrel is after passing template II, and connector provides guide effect for screw mandrel, conveniently makes the screw centering of screw mandrel and described hold-down nut, improves installation effectiveness.
The invention also discloses a kind of fixing templates, comprise template, template is provided with some through holes passed for screw mandrel, the side being positioned at described template is provided with some hold-down nuts corresponding to described through hole, hold-down nut comprises screw that is concentric with described through hole and that coordinate with described wire rod thread, is provided with the connector that two ends are fixedly connected with it respectively between described template with described hold-down nut.Screw mandrel is connected with hold-down nut threaded engagement through after through hole, and because the two ends of connector are fixedly connected with hold-down nut with template respectively, described screw mandrel and template also just link together, and are fixed template.
As optimization, described connector comprises the described screw mandrel of confession and passes and the pilot hole axially arranged along described through hole, the diameter of pilot hole is along reducing gradually away from described template direction, and one end of described pilot hole is communicated with described through hole, and the other end is communicated with the screw of described hold-down nut.Connector provides guide effect for screw mandrel, conveniently makes the screw centering of screw mandrel and described hold-down nut.
In sum, the beneficial effects of the utility model are: the utility model structure is simple, and easy construction, not only reduces the consumption to wire drawing bar, reduce cost, also shorten the construction period, improve efficiency.
Accompanying drawing explanation
In order to make the object of utility model, technical scheme and advantage clearly, below in conjunction with accompanying drawing, the utility model is described in further detail, wherein:
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, a kind of concrete support mould in this detailed description of the invention, comprise template I 1 and the template II 2 of two pieces of opposing parallel settings, template I 1 is provided with for the wood strip 3 of support shuttering I 1 and the briquetting 4 for fixing wood strip 3 back to the side of template II 2, also comprise some sleeve pipes 5 passing perpendicularly through described template I 1 and described template II 2, described template I 1 and described template II 2 are provided with the through hole passed for described sleeve pipe 5 separately, described through hole is positioned at described briquetting 4 in the projection perpendicular to described template I 1 direction, the screw mandrel 6 extended along described sleeve pipe 5 length direction is equipped with in described sleeve pipe 5, screw mandrel 6 passes described briquetting 4 movably towards one end of described template I 1 and is equipped with the locking nut 7 for making described briquetting 4 compress described wood strip 3, described template II 2 be provided with back to the side of described template I 1 some and described through hole concentric and with the hold-down nut 8 of described screw mandrel 6 threaded engagement, connector 9 is provided with and the two ends of connector 9 are fixedly connected with described template II 2 with described hold-down nut 8 respectively between hold-down nut 8 with described template II 2.
In this detailed description of the invention, described briquetting 4 is two steel pipes be set up in parallel, be provided with gap between two steel pipes, described screw mandrel 6 passes described steel pipe by described gap, the described screw mandrel between described steel pipe and described locking nut 7 is also arranged with mountain type card 10.
In this detailed description of the invention, the internal diameter of described through hole matches with the external diameter of described sleeve pipe 5.
In this detailed description of the invention, described sleeve pipe 5 is connected and composed by many tube connectors, and one end of described tube connector is provided with external screw thread, and the other end is provided with the internal thread matched with described external screw thread.
In this detailed description of the invention, the end face at described sleeve pipe 5 two ends flushes with the external surface back to side of described template I 1 and described template II 2 respectively.
In this detailed description of the invention, described connector 9 entirety is in shaped hollow round table, and the osculum end of hollow round table is communicated with the screw of described hold-down nut 8, and the big opening end of hollow round table is communicated with described through hole.
As shown in Figure 1, a kind of fixing templates in this detailed description of the invention, comprise template 1, template 1 is provided with some through holes passed for screw mandrel, the side being positioned at described template 1 is provided with some hold-down nuts 8 corresponding to described through hole, hold-down nut 8 comprise concentric with described through hole and with the screw of described screw mandrel 6 threaded engagement, be provided with the connector 9 that two ends are fixedly connected with it respectively between described template 1 with described hold-down nut 8.
In this detailed description of the invention, described connector 9 comprises the described screw mandrel of confession 6 and passes and the pilot hole axially arranged along described through hole, the diameter of pilot hole is along reducing gradually away from described template 1 direction, one end of described pilot hole is communicated with described through hole, and the other end is communicated with the screw of described hold-down nut 8.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described the utility model by referring to preferred embodiment of the present utility model, but those of ordinary skill in the art is to be understood that, various change can be made to it in the form and details, and not depart from the spirit and scope of the present utility model that appended claims limits.

Claims (8)

1. a concrete support mould, comprise template I and the template II of two pieces of opposing parallel settings, template I is provided with for the wood strip of support shuttering I and the briquetting for fixing wood strip back to the side of template II, it is characterized in that: also comprise some sleeve pipes passing perpendicularly through described template I and described template II, described template I and described template II are provided with the through hole passed for described sleeve pipe separately, described through hole is positioned at described briquetting in the projection perpendicular to described template I direction, the screw mandrel extended along described casing length direction is equipped with in described sleeve pipe, screw mandrel passes described briquetting movably towards one end of described template I and is equipped with the locking nut for making described briquetting compress described wood strip, described template II is provided with the concentric and hold-down nut that is that coordinate with described wire rod thread of some and described through hole back to the side of described template I, connector is provided with and the two ends of connector are fixedly connected with described template II with described hold-down nut respectively between hold-down nut with described template II.
2. a kind of concrete support mould according to claim 1, it is characterized in that: described briquetting is two steel pipes be set up in parallel, gap is provided with between two steel pipes, described screw mandrel passes described steel pipe by described gap, the described screw mandrel between described steel pipe and described locking nut is also arranged with mountain type card.
3. a kind of concrete support mould according to claim 1, is characterized in that: the internal diameter of described through hole matches with the external diameter of described sleeve pipe.
4. a kind of concrete support mould according to claim 1, it is characterized in that: described sleeve pipe is connected and composed by many tube connectors, one end of described tube connector is provided with external screw thread, and the other end is provided with the internal thread matched with described external screw thread.
5. a kind of concrete support mould according to claim 1, is characterized in that: the end face at described sleeve pipe two ends flushes with the external surface back to side of described template I and described template II respectively.
6. a kind of concrete support mould according to claim 1, is characterized in that: described connector entirety is in shaped hollow round table, and the osculum end of hollow round table is communicated with the screw of described hold-down nut, and the big opening end of hollow round table is communicated with described through hole.
7. a fixing templates, comprise template, template is provided with some through holes passed for screw mandrel, rise and be characterised in that: the side being positioned at described template is provided with some hold-down nuts corresponding to described through hole, hold-down nut comprises screw that is concentric with described through hole and that coordinate with described wire rod thread, is provided with the connector that two ends are fixedly connected with it respectively between described template with described hold-down nut.
8. fixing templates according to claim 7, it is characterized in that: described connector comprises the described screw mandrel of confession and passes and the pilot hole axially arranged along described through hole, the diameter of pilot hole is along reducing gradually away from described template direction, one end of described pilot hole is communicated with described through hole, and the other end is communicated with the screw of described hold-down nut.
CN201520229930.4U 2015-04-16 2015-04-16 A kind of concrete support mould and fixing templates Expired - Fee Related CN204531421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520229930.4U CN204531421U (en) 2015-04-16 2015-04-16 A kind of concrete support mould and fixing templates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520229930.4U CN204531421U (en) 2015-04-16 2015-04-16 A kind of concrete support mould and fixing templates

Publications (1)

Publication Number Publication Date
CN204531421U true CN204531421U (en) 2015-08-05

Family

ID=53745450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520229930.4U Expired - Fee Related CN204531421U (en) 2015-04-16 2015-04-16 A kind of concrete support mould and fixing templates

Country Status (1)

Country Link
CN (1) CN204531421U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907004A (en) * 2017-04-28 2017-06-30 成都建筑工程集团总公司 Tear-away split bolt
CN110409827A (en) * 2019-08-15 2019-11-05 中国建筑第八工程局有限公司 For fixed form to drawing device and its construction method
CN110748158A (en) * 2019-10-09 2020-02-04 石丽 Concrete formwork structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907004A (en) * 2017-04-28 2017-06-30 成都建筑工程集团总公司 Tear-away split bolt
CN106907004B (en) * 2017-04-28 2019-01-15 成都建筑工程集团总公司 Tear-away split bolt
CN110409827A (en) * 2019-08-15 2019-11-05 中国建筑第八工程局有限公司 For fixed form to drawing device and its construction method
CN110748158A (en) * 2019-10-09 2020-02-04 石丽 Concrete formwork structure and construction method

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN204531421U (en) A kind of concrete support mould and fixing templates
CN204531419U (en) A kind of concrete-pouring template to wire drawing bar fixed structure
CN104196239A (en) Method for installing concealed installation distribution box in block wall and applied fixing device
CN201679231U (en) Template clamp for construction
CN204531420U (en) Concreting plate device
CN204590571U (en) A kind of concrete construction mould
CN204510792U (en) A kind of steel form
CN204343677U (en) Detachable sleeve pipe die with reserved holes in construction site
CN207538460U (en) A kind of post template bracing means
CN205587889U (en) Hydraulic pressure connecting rod is with assembling mould
CN203230178U (en) Column formwork and column hoop
CN203654747U (en) Tapered opposite-pull screw apparatus
CN102912977A (en) Mold used for pouring shaped stair
CN203222994U (en) Detachable embedded piece for outer wall formwork
CN202416869U (en) Novel building engineering basement exterior wall split bolt
CN204282551U (en) A kind of rubber fastening band installation and positioning structure
CN204343550U (en) Washroom water stopping thresholds jig
CN201714093U (en) Turn-around tie bolt used in construction of concrete wall form
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN204879048U (en) Novel pipeline support
CN103089007A (en) Cast-in-place concrete floor punching pipe seal template device and using method
CN209723610U (en) A kind of pipeline that adjustable recycles hangs mould
CN207620379U (en) A kind of side mould fixing device
CN106545158B (en) A kind of square column concrete component Wood-plastic formwork reinforces fixture and its application method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

Termination date: 20160416