CN203270608U - 预制综合管廊 - Google Patents
预制综合管廊 Download PDFInfo
- Publication number
- CN203270608U CN203270608U CN 201320210467 CN201320210467U CN203270608U CN 203270608 U CN203270608 U CN 203270608U CN 201320210467 CN201320210467 CN 201320210467 CN 201320210467 U CN201320210467 U CN 201320210467U CN 203270608 U CN203270608 U CN 203270608U
- Authority
- CN
- China
- Prior art keywords
- plate
- side plate
- top board
- side plates
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Abstract
本实用新型公开了一种预制综合管廊,包括围成一个整体的顶板、侧板和底板,侧板对称立于底板的两侧,顶板位于侧板上,两侧板之间有与顶板或者底板平行的中板。将综合管廊拆分成顶板,侧板、中板和底板来作为单个构件预制,便于运输。现场组装时,顶板和侧板之间采用插筋灌浆的连接固定方式,侧板和底板之间采用预制插件和预留凹缺的嵌合连接方式拼装成一个整体管廊。跟现有技术相比,单个构件的重量轻,最重构件的重量都小于8吨,降低了工厂预制和现场施工的难度,也降低了对现场吊装设备的要求,具有节约生产成本、运输成本和现场施工成本的优势。
Description
技术领域
本实用新型涉及一种市政工程领域的预制综合管廊,具体涉及一种预制综合管廊的组装结构。
背景技术
随着城市的发展,人们生活水平的提高,城市道路网络也是越来越发达,而电缆、光缆等线路的铺设必须有配套的综合管廊,以前都是在修路的时候现浇,不但费时费力,往往还质量不好,尤其是在赶工期的时候。目前也有了一种先将综合管廊预制好的做法,但是这种做法是将预制综合管廊预制成一个整体,因综合管廊的截面尺寸较大,所以每节管廊的重量达30吨左右,这样不仅工厂预制生产难度大,还对现场吊装设备的要求高,一般需要50吨的吊车,从而导致生产与施工成本较高。
实用新型内容
本实用新型的目的在于提供一种生产成本低、施工方便的预制综合管廊。
本实用新型提供的这种预制综合管廊,包括围成一个整体的顶板、侧板和底板,侧板对称立于底板的两侧,顶板位于侧板上,两侧板之间有与顶板或者底板平行的中板。
所述底板和侧板之间的连接方式为嵌合式,底板上对应侧板位置处有卡槽,卡槽的纵向中心线上均布有往上凸出的插件,侧板的底面上对应插件处有相应的凹缺;侧板和顶板之间通过限位架定位,通过钢筋固定,侧板的上端面均布有竖直方向的盲孔,顶板的内表面上对应侧板的内表面位置处有往下凸出的所述限位架,限位架的外侧对应盲孔处有相应的通孔,通孔和盲孔中有所述钢筋;侧板的内表面上对应所述中板位置处有支撑架,底板和中板之间有支承件。
所述顶板的外表面上预埋有用于起吊的吊钉。
所述中板的上表面上均布有用于起吊的吊环。
本实用新型将综合管廊拆分成顶板,侧板、中板和底板来作为单个构件预制,便于运输。现场组装时,顶板和侧板之间采用插筋灌浆的连接固定方式,侧板和底板之间采用预制插件和预留凹缺的嵌合连接方式拼装成一个整体管廊。跟现有技术相比,单个构件的重量轻,最重构件的重量都小于8吨,降低了工厂预制和现场施工的难度,也降低了对现场吊装设备的要求,具有节约生产成本、运输成本和现场施工成本的优势。
附图说明
图1为本实用新型的横截面结构示意图。
图2为图1中侧板的主视示意图。
图3为图2中的A-A示意图。
图4为图1中顶板的俯视示意图。
具体实施方式
如图1至图3所示,本实用新型提供的这种预制综合管廊,包括围成整体管廊的顶板1、侧板2和底板3,两侧板2之间有与顶板1或者底板3平行的中板4。侧板2对称立于底板3的两侧,顶板1盖于侧板2上。底板3和侧板2之间的连接方式为嵌合式,底板3上对应侧板2的安装位置处有卡槽31,卡槽31的纵向中心线上均布有往上凸出的插件32,侧板2的底面上对应插件32处有相应的凹缺21,插件32可以和底板3一起预制,凹缺21可以在侧板2预制时留出。侧板2的上端面均布有竖直方向的盲孔22,顶板1的内表面上对应侧板2的内表面位置处有往下凸出的限位架11,限位架11的外侧对应盲孔22处有相应的通孔12,通孔12和盲孔22中有钢筋5,侧板2和顶板1之间通过限位架11定位,通过钢筋5固定。侧板2的内表面上对应中板4的位置处有支撑架23,底板3和中板4之间有支承件6。顶板1的外表面上均布有用于起吊的吊钉13。中板4的上表面上均布有用于起吊的吊环41。
具体操作步骤如下:
1、将底板3定位好,在卡槽31中间位置的插件32上抹浆,然后分别将两块侧板2上的凹缺21对中插件32将侧板2与底板3嵌合好;
2、将中板4置于两侧板2的支撑架21上,中板4有吊环41的一面朝上;
3、将顶板1置于两侧板2上,将它们之间的相应孔对正,在孔中插入相应大小的钢筋6,然后灌浆抹平。
本实用新型的底板3也可以现浇。
Claims (3)
1.一种预制综合管廊,它包括围成一个整体的顶板、侧板和底板,侧板对称立于底板的两侧,顶板位于侧板上,两侧板之间有与顶板或者底板平行的中板,其特征在于:所述底板和侧板之间的连接方式为嵌合式,底板上对应侧板位置处有卡槽,卡槽的纵向中心线上均布有往上凸出的插件,侧板的底面上对应插件处有相应的凹缺;侧板和顶板之间通过限位架定位,通过钢筋固定,侧板的上端面均布有竖直方向的盲孔,顶板的内表面上对应侧板的内表面位置处有往下凸出的所述限位架,限位架的外侧对应盲孔处有相应的通孔,通孔和盲孔中有所述钢筋;侧板的内表面上对应所述中板位置处有支撑架,底板和中板之间有支承件。
2.如权利要求1所述的预制综合管廊,其特征在于:所述顶板的外表面上预埋有用于起吊的吊钉。
3.如权利要求1所述的预制综合管廊,其特征在于:所述中板的上表面上均布有用于起吊的吊环。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320210467 CN203270608U (zh) | 2013-04-24 | 2013-04-24 | 预制综合管廊 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320210467 CN203270608U (zh) | 2013-04-24 | 2013-04-24 | 预制综合管廊 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203270608U true CN203270608U (zh) | 2013-11-06 |
Family
ID=49501049
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320210467 Expired - Fee Related CN203270608U (zh) | 2013-04-24 | 2013-04-24 | 预制综合管廊 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203270608U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105908775A (zh) * | 2016-04-25 | 2016-08-31 | 安徽砼宇特构科技有限公司 | 拼接式管涵 |
CN106013240A (zh) * | 2016-07-12 | 2016-10-12 | 中国电建集团昆明勘测设计研究院有限公司 | 组装式综合管廊 |
CN109208638A (zh) * | 2018-10-17 | 2019-01-15 | 中交第航务工程局有限公司 | 一种新型装配式管廊及其设计施工方法 |
-
2013
- 2013-04-24 CN CN 201320210467 patent/CN203270608U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105908775A (zh) * | 2016-04-25 | 2016-08-31 | 安徽砼宇特构科技有限公司 | 拼接式管涵 |
CN106013240A (zh) * | 2016-07-12 | 2016-10-12 | 中国电建集团昆明勘测设计研究院有限公司 | 组装式综合管廊 |
CN109208638A (zh) * | 2018-10-17 | 2019-01-15 | 中交第航务工程局有限公司 | 一种新型装配式管廊及其设计施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203834739U (zh) | 端部钢板连接定位装配式剪力墙结构 | |
CN103215894B (zh) | 移动式临时预应力张拉锚块 | |
CN205637106U (zh) | 一种全装配式钢结构的房屋结构体系 | |
CN203768946U (zh) | 装配式预制综合管廊 | |
CN103912063B (zh) | 由预制板构建的装配式房屋体系 | |
CN203270608U (zh) | 预制综合管廊 | |
CN103556648B (zh) | 可移动装配式钢箱独立基础 | |
CN110984224A (zh) | 一种地铁车站的预制轨顶风道及其吊运安装方法 | |
CN209040349U (zh) | 一种便于安装的环筋扣合剪力墙结构 | |
CN204475529U (zh) | 一种装配式外墙与梁的连接结构 | |
CN205171994U (zh) | 用于清水混凝土施工的模板组件 | |
CN203821596U (zh) | 由预制板构建的装配式房屋体系 | |
CN206053079U (zh) | 一种装配式梁板集成组合楼盖 | |
CN205369299U (zh) | 一种拼装式预制钢筋混凝土管廊 | |
CN206352348U (zh) | 一种型钢混凝土板墙与型钢混凝土叠合楼板的连接结构 | |
CN103552911A (zh) | 一种活动式起吊装置及其使用的施工安装方法 | |
CN104295089A (zh) | 一种现浇混凝土gbf蜂巢芯密肋楼盖的支撑系统 | |
CN203891066U (zh) | 地下结构预制装配肋板式构件 | |
CN103498512B (zh) | 一种装配式建筑墙梁稳定连接结构 | |
CN204418558U (zh) | 一种分离式预制空心楼梯平台 | |
CN209798465U (zh) | 一种装配式混凝土板 | |
CN203546908U (zh) | 一种装配式建筑墙梁稳定连接结构 | |
CN203213022U (zh) | 一种移动式临时预应力张拉锚块 | |
CN102888934A (zh) | 装配式空腹网格板楼盖结构用剪力预制构件 | |
CN102888929A (zh) | 装配式空腹网格板楼盖结构用剪力预制构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131106 Termination date: 20170424 |