CN203131214U - Well site lighting cable supporting device - Google Patents

Well site lighting cable supporting device Download PDF

Info

Publication number
CN203131214U
CN203131214U CN 201220755016 CN201220755016U CN203131214U CN 203131214 U CN203131214 U CN 203131214U CN 201220755016 CN201220755016 CN 201220755016 CN 201220755016 U CN201220755016 U CN 201220755016U CN 203131214 U CN203131214 U CN 203131214U
Authority
CN
China
Prior art keywords
cable
steel cable
rope sheave
wire
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220755016
Other languages
Chinese (zh)
Inventor
秦海滨
魏培文
王行国
孙纪红
蔡秀云
赵红
陈艺璇
Original Assignee
王建锋
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王建锋 filed Critical 王建锋
Priority to CN 201220755016 priority Critical patent/CN203131214U/en
Application granted granted Critical
Publication of CN203131214U publication Critical patent/CN203131214U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

Disclosed is a well site lighting cable supporting device. According to the well site lighting cable supporting device, horizontal supports are fixed at the upper end of a vertical support, a fixed pulley is hung at the outer end of each horizontal support, wire cables are led out from wire cable rollers and then bypass gears of cable releasing wheels of the fixed pulleys to be meshed with gears on the wire cable rollers, gears on cable reeling wheels are meshed with the gears on the wire cable rollers through middle gears, the wire cables, the fixed pulleys, the horizontal supports, the vertical support, the cable reeling wheels, the cable releasing wheels and the wire cable rollers are arranged outside the lateral wall of a duty room, the cable reeling wheels, the cable releasing wheels and the wire cable rollers are fixed on the duty room, two sets of the wire cables, two sets of the fixed pulleys, two sets of the horizontal supports, two sets of the cable reeling wheels, two sets of the cable releasing wheels and two sets of the wire cable rollers are arranged symmetrically, one wire cable is fixed at the position of a transformer, the other wire cable is fixed at the position of the mouth of a well, the wire cables are supported at a height meeting safety requirements, and a cable is hung on the wire cables. Therefore, the cable is supported in the air without falling onto the ground or making contact with equipment on a well site, people walking through will not touch the cable, potential safety hazards are avoided, and accidents are avoided.

Description

Well site lighting cable support device
Technical field
The utility model is the equipment that the oil field operation well site is used, and is a kind of well site lighting cable support device.
Background technique
During the oil/water well operation in oil field, connect electricity to night shift room from transformer, connect electricity to well head, so that night lighting and night shift room household electricity from night shift room again.Therefore, the transformer place to night shift room, night shift room to well head cloth cable.At present these two cables all are random layouts, drop on undergroundly sometimes, contact with equipment on the well site sometimes, and the holdee also can touch cable sometimes, and is very dangerous, has major safety risks, and accident repeatedly took place, and brought heavy economic losses.
Summary of the invention
The purpose of this utility model provides a kind of well site lighting cable support device, makes erecting cable aloft, avoids taking place security incident.
The purpose of this utility model is achieved in that and comprises night shift room, also comprise steel cable, static pulley, lateral frame, perpendicular support, receive rope sheave, put rope sheave, the steel cable cylinder, lateral frame is fixed on the upper end of perpendicular support, static pulley is suspended on the outer end of lateral frame, steel cable involves from the steel cable cylinder and walks around gear and the engagement of the gear on the steel cable cylinder that static pulley is put rope sheave, the gear of receiving on the rope sheave meshes by the gear on intermediate gear and the steel cable cylinder, steel cable, static pulley, lateral frame, perpendicular support, receive rope sheave, put rope sheave, the steel cable cylinder is in outside the sidewall of night shift room, receive rope sheave, put rope sheave, the steel cable cylinder is fixed on the night shift room, steel cable, static pulley, lateral frame, receive rope sheave, put rope sheave, the steel cable cylinder is symmetrical arranged two covers, steel cable is walked around static pulley and is led to the transformer place and fix, and another root steel cable is walked around another static pulley and led to the well head place and fix.
Perpendicular support is connected with nut on being installed in sleeve, and perpendicular support passes sleeve, erects support bottom installation crank.
The beneficial effects of the utility model are: the steel cable frame is at the height that overhead satisfies safety requirement, cable hangs on the steel cable, thereby cable is supported in the air, cable can not land, can not contact with the equipment on the well site, the holdee can not touch cable, does not have potential safety hazard, security incident can not take place, have remarkable economic efficiency and social benefit.
Description of drawings
Accompanying drawing is the utility model embodiment erection drawing.
Embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is described further:
As seen from the figure, embodiment of the present utility model comprises steel cable 1, hook 2, static pulley 3, lateral frame 4, perpendicular support 5, nut 6, sleeve 7, receive rope sheave 8, put rope sheave 9, steel cable cylinder 10, night shift room 12, lateral frame 4 is fixed on the upper end of perpendicular support 5, static pulley 3 is suspended on the outer end of lateral frame 4, steel cable 1 involves from steel cable cylinder 10 and walks around static pulley 3, put gear and the engagement of the gear on the steel cable cylinder 10 on the rope sheave 8, the gear of receiving on the rope sheave 8 meshes by the gear on intermediate gear and the steel cable cylinder 10, steel cable 1, static pulley 3, lateral frame 4, perpendicular support 5, receive rope sheave 8, put rope sheave 9, steel cable cylinder 10 is in outside the sidewall of night shift room 12, receive rope sheave 8, put rope sheave 9, steel cable cylinder 10 is fixed on the night shift room 12, steel cable 1, static pulley 3, lateral frame 4, receive rope sheave 8, put rope sheave 9, steel cable cylinder 10 is symmetrical arranged two covers, steel cable 1 is walked around static pulley 3 and is led to the transformer place and fix, another root steel cable 1 is walked around static pulley 3 and is led to the well head place and fix, perpendicular support 5 is connected with nut 6 on being installed in sleeve 7, perpendicular support 5 passes sleeve 7, and crank 11 is installed in perpendicular support 5 bottoms.Hook 2 is arranged on the steel cable 1.
When installing sleeve 7, sleeve 7 maintains static, and shakes crank 11, and perpendicular support 5 can raise up and down or reduce, and when installing sleeve 7 not, it is outer motionless that perpendicular 5 on support is fixed on night shift room 12.Increase nut 6, sleeve 7, crank 11 are for the perpendicular support 5 of lifting, if do not need lifting to erect support 5, can not establish nut 6, sleeve 7, crank 11, will erect support 5 and be fixed to certain altitude just.
A lot of hooks 2 are arranged on the steel cable 1.The cable that extracts from transformer is through on the hook 2 and is introduced in the night shift room 12 along the steel cable 1 that is led transformer, and the cable that extracts from night shift room 12 is through to link up with on 2 and is introduced to well head along the steel cable 1 that is led the well head place.

Claims (3)

1. well site lighting cable support device, comprise night shift room (12), it is characterized in that: also comprise steel cable (1), static pulley (3), lateral frame (4), perpendicular support (5), receive rope sheave (8), put rope sheave (9), steel cable cylinder (10), lateral frame (4) is fixed on the upper end of perpendicular support (5), static pulley (3) is suspended on the outer end of lateral frame (4), steel cable (1) involves from steel cable cylinder (10) and walks around static pulley (3), put gear and the engagement of the gear on the steel cable cylinder (10) on the rope sheave (9), the gear of receiving on the rope sheave (8) meshes by the gear on intermediate gear and the steel cable cylinder (10), steel cable (1), static pulley (3), lateral frame (4), perpendicular support (5), receive rope sheave (8), put rope sheave (9), steel cable cylinder (10) is in outside the sidewall of night shift room (12), receive rope sheave (8), put rope sheave (9), steel cable cylinder (10) is fixed on the night shift room (12), steel cable (1), static pulley (3), lateral frame (4), receive rope sheave (8), put rope sheave (9), steel cable cylinder (10) is symmetrical arranged two covers, a steel cable (1) is walked around static pulley (3) and is led to the transformer place and fix, and another root steel cable (1) is walked around another static pulley (3) and led to the well head place and fix.
2. well site according to claim 1 lighting cable support device is characterized in that: perpendicular support (5) is connected with nut (6) on being installed in sleeve (7), and perpendicular support (5) passes sleeve (7), erects support (5) bottom installation crank (11).
3. well site according to claim 1 and 2 lighting cable support device is characterized in that: hook (2) is arranged on the steel cable (1).
CN 201220755016 2012-12-31 2012-12-31 Well site lighting cable supporting device Expired - Fee Related CN203131214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220755016 CN203131214U (en) 2012-12-31 2012-12-31 Well site lighting cable supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220755016 CN203131214U (en) 2012-12-31 2012-12-31 Well site lighting cable supporting device

Publications (1)

Publication Number Publication Date
CN203131214U true CN203131214U (en) 2013-08-14

Family

ID=48939193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220755016 Expired - Fee Related CN203131214U (en) 2012-12-31 2012-12-31 Well site lighting cable supporting device

Country Status (1)

Country Link
CN (1) CN203131214U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105186356A (en) * 2015-10-21 2015-12-23 杨忠桃 Cable fixing device for petroleum wellhead fishing operation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105186356A (en) * 2015-10-21 2015-12-23 杨忠桃 Cable fixing device for petroleum wellhead fishing operation
CN105186356B (en) * 2015-10-21 2018-08-14 合肥智慧龙图腾知识产权股份有限公司 A kind of cable fixture for oil well head fishing

Similar Documents

Publication Publication Date Title
CN202913758U (en) Platform lifting type single tube communicating tower
CN105226560B (en) A kind of crossing frame and its construction method
CN205429566U (en) Crossing structure
CN203794533U (en) Light portable mobile lifting equipment
CN203128099U (en) Slipping type pipeline lifting device
CN203131214U (en) Well site lighting cable supporting device
CN205114843U (en) Prefabricated post hoist device with unhook function
CN206784958U (en) A kind of encorbelmented across metal greatly decorates prefabricated roof and air translation splicing structure
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN205145443U (en) Transformer upper portion construction safety belt hanging device
CN103318745A (en) Lightweight special-purposed spreader and mounting method thereof
CN202731270U (en) Movable platform for aerial installation operation of space steel structure
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN203699783U (en) Hanging bracket fixed with wire pole
CN102226959B (en) Transformer lifting method
CN203462739U (en) Double-hook upside down type electric chain hoist
CN202657877U (en) Circuit equipment construction lifting frame
CN203320415U (en) Novel large-scale pier coating operation hanging basket
CN203428878U (en) Post top lifting hoisting device
CN203060661U (en) Children development exploration device
CN202373258U (en) Vertical banner hanging device
CN201678398U (en) High-rise indoor object-suspending device
CN201634307U (en) Hoisting lug and wind power generator adopting same
CN208039981U (en) Self-tipping type multisystem shares self-support overhead torch tower
CN204474184U (en) One just climbs formula tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20141231

EXPY Termination of patent right or utility model