CN203080926U - Reserved hole device of concrete floor slab - Google Patents

Reserved hole device of concrete floor slab Download PDF

Info

Publication number
CN203080926U
CN203080926U CN2012207114419U CN201220711441U CN203080926U CN 203080926 U CN203080926 U CN 203080926U CN 2012207114419 U CN2012207114419 U CN 2012207114419U CN 201220711441 U CN201220711441 U CN 201220711441U CN 203080926 U CN203080926 U CN 203080926U
Authority
CN
China
Prior art keywords
concrete floor
hole
metal sleeve
metal cover
cover board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012207114419U
Other languages
Chinese (zh)
Inventor
杨永春
李振兴
王伟岩
张红林
孙献豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Construction Group Tianchen Construction Engineering Co., Ltd.
Hebei Construction Group Corp Ltd
Original Assignee
HEBEI CONSTRUCTION GROUP TIANCHEN CONSTRUCTION ENGINEERING Co Ltd
Hebei Construction Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI CONSTRUCTION GROUP TIANCHEN CONSTRUCTION ENGINEERING Co Ltd, Hebei Construction Group Corp Ltd filed Critical HEBEI CONSTRUCTION GROUP TIANCHEN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN2012207114419U priority Critical patent/CN203080926U/en
Application granted granted Critical
Publication of CN203080926U publication Critical patent/CN203080926U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a reserved hole device of a concrete floor slab. The device comprises a metal sleeve, a metal cover plate and a hook bolt. The metal cover plate is arranged on the upper portion of the metal sleeve. A through hole is formed in the center of the metal cover plate. A hook end of the hook bolt is connected with a template of a top plate, and the other end of the hook bolt is fixed in the through hole through a nut. According to the reserved hole device of the concrete floor slab, a reserved position of a reserved hole can be precisely located, disassembly and cleaning are easy, cycling frequency of the device is increased, and meanwhile after the device is detached, attractiveness of the reserved hole can be well guaranteed.

Description

Concrete floor hole to be provided device
Technical field
The utility model relates to building field, especially relates to a kind of concrete floor hole to be provided device.
Background technology
At building field, upper and lower conduit road, heating pipe and the fire protection pipeline of cast-in-place concrete floor all needs to keep somewhere in advance hole to be provided.The form that adopts in work progress of concrete floor hole to be provided was varied in the past, often adopted simple device such as steel bushing, pvc pipe material sleeve.But in use, locate inaccurately, riding position easily is offset; The sleeve root is reinforced not firm, is offset in concreting process easily; Easily concrete is scattered as in the sleeve in the concreting process, causes cleaning and remove inconvenience, reduce the number of turnover; Build when removing after finishing and pound with a hammer, destroy the corner of hole to be provided easily, cause the impression of corner not attractive in appearance.
The utility model content
The purpose of this utility model provides a kind of concrete floor hole to be provided device, the accurately reserved location of hole to be provided, and dismounting cleaning easily, and the number of turnover of increase device after the device dismounting, can guarantee the attractive in appearance of hole to be provided simultaneously preferably.
For achieving the above object, the utility model provides a kind of concrete floor hole to be provided device, comprise metal sleeve, metal cover board and gib headed bolt, described metal cover board is arranged at described metal sleeve top, described metal cover board center is provided with open-work, the gib head end of described gib headed bolt is connected with roof plate template, and the other end is fixed in described through-hole position by nut.
Preferably, be connected for spot welding between described metal sleeve and the described metal cover board.
Preferably, be welded with bale handle on the described metal sleeve.
Preferably, be welded with backing pin on the described gib headed bolt.
Therefore, the utility model adopts the concrete floor hole to be provided device of said structure, the accurately reserved location of hole to be provided, and dismounting cleaning easily, and the number of turnover of increase device after the device dismounting, can guarantee the attractive in appearance of hole to be provided simultaneously preferably.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is the structural representation of the utility model concrete floor hole to be provided device embodiment;
Fig. 2 is the plan structure schematic diagram of the utility model concrete floor hole to be provided device embodiment;
Fig. 3 is the mounting structure schematic diagram of the utility model concrete floor hole to be provided device embodiment.
The specific embodiment
Embodiment
Fig. 1 is the structural representation of the utility model concrete floor hole to be provided device embodiment, Fig. 2 is the plan structure schematic diagram of the utility model concrete floor hole to be provided device embodiment, as shown in the figure, comprise metal sleeve 1, metal cover board 2 and gib headed bolt 3, metal cover board 2 is arranged at metal sleeve 1 top, is the spot welding syndeton between metal sleeve 1 and the metal cover board 2.Metal cover board 2 centers are provided with open-work 4, and the gib head end of gib headed bolt 3 is connected with roof plate template 5, and Fig. 3 is the mounting structure schematic diagram of the utility model concrete floor hole to be provided device embodiment, for clear statement, have also marked concrete floor 9 among Fig. 3.The other end of gib headed bolt 3 is fixed in open-work 4 places by nut 6.Metal sleeve 1 is the main body of hole to be provided pore-forming, and diameter needs big two specifications of pipe laying generally speaking, and its surface should be smooth as much as possible, in use should the brushing remover.Metal cover board 2 is welded in the top of steel sleeve, and predominant use is to prevent that in concreting process concrete is scattered in the metal sleeve 1, and open-work 4 is used to wear gib headed bolt 3, thus location and reinforce metal sleeve.After roof plate template 5 installs and finishes, survey and establish pipeline location, and punch, penetrate gib headed bolt 3, metal sleeve 1 is installed then at the center line of pipe laying, and fastening nut 6, location and reinforcing finish, and process is simple to operation.Be welded with backing pin 7 on the gib headed bolt 3, prevent that gib headed bolt 3 is shed to below the work plane in gib headed bolt 3 installations and metal sleeve 1 demolishing process.
Also be welded with bale handle 8 on the metal sleeve 1, be welded in metal sleeve 1 external surface, with rotating bale handle 8 and taking out metal sleeve 1, can not destroy the exterior appearance of hole to be provided after the concreting final set.
Therefore, the utility model adopts the concrete floor hole to be provided device of said structure, the accurately reserved location of hole to be provided, and dismounting cleaning easily, and the number of turnover of increase device after the device dismounting, can guarantee the attractive in appearance of hole to be provided simultaneously preferably.
It should be noted that at last: above embodiment is only in order to explanation the technical solution of the utility model but not limit it, although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that: it still can make amendment or be equal to replacement the technical solution of the utility model, and these modifications or be equal to replacement and also can not make amended technical scheme break away from the spirit and scope of technical solutions of the utility model.

Claims (4)

1. concrete floor hole to be provided device, it is characterized in that: comprise metal sleeve, metal cover board and gib headed bolt, described metal cover board is arranged at described metal sleeve top, described metal cover board center is provided with open-work, the gib head end of described gib headed bolt is connected with roof plate template, and the other end is fixed in described through-hole position by nut.
2. concrete floor hole to be provided device according to claim 1 is characterized in that: be connected for spot welding between described metal sleeve and the described metal cover board.
3. concrete floor hole to be provided device according to claim 2 is characterized in that: be welded with bale handle on the described metal sleeve.
4. concrete floor hole to be provided device according to claim 3 is characterized in that: be welded with backing pin on the described gib headed bolt.
CN2012207114419U 2012-12-21 2012-12-21 Reserved hole device of concrete floor slab Expired - Fee Related CN203080926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012207114419U CN203080926U (en) 2012-12-21 2012-12-21 Reserved hole device of concrete floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012207114419U CN203080926U (en) 2012-12-21 2012-12-21 Reserved hole device of concrete floor slab

Publications (1)

Publication Number Publication Date
CN203080926U true CN203080926U (en) 2013-07-24

Family

ID=48826777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012207114419U Expired - Fee Related CN203080926U (en) 2012-12-21 2012-12-21 Reserved hole device of concrete floor slab

Country Status (1)

Country Link
CN (1) CN203080926U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695705A (en) * 2015-03-25 2015-06-10 中国建筑第八工程局有限公司 Reserved hole sleeve and method for constructing reserved hole by using same
CN106836799A (en) * 2017-04-06 2017-06-13 成都市第三建筑工程公司 Reserved sleeve pipe and formwork for placing can be had enough to meet the need

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695705A (en) * 2015-03-25 2015-06-10 中国建筑第八工程局有限公司 Reserved hole sleeve and method for constructing reserved hole by using same
CN106836799A (en) * 2017-04-06 2017-06-13 成都市第三建筑工程公司 Reserved sleeve pipe and formwork for placing can be had enough to meet the need

Similar Documents

Publication Publication Date Title
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN202627475U (en) Scaffold wall connecting member
CN203856202U (en) Simple pullable sizing device of reserved holes
CN204081445U (en) To encorbelment i iron anchor device
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN203080926U (en) Reserved hole device of concrete floor slab
CN204225471U (en) A kind of cantilever steel girder structure through walls
CN203808501U (en) Early-removing jacking support based on existing fastener-type scaffold
CN207569004U (en) A kind of hanger fixing device of a Preembedded
CN204676890U (en) A kind of portable through-flooring pipeline preformed hole sleeve pipe
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN203891470U (en) Fastening bolt for shear wall formwork
CN206616842U (en) Recyclable pre-embedded bolt for builder's jack
CN203285056U (en) Stair formwork supporting base
CN203891449U (en) Wall connecting piece for wall connection of scaffold
CN208650519U (en) The flooring de-molding device of concrete surface is pried away from for internal corner formwork
CN201633099U (en) Wallboard machine with upper end capable of clamping leakage-proof material
CN201620602U (en) Preburied sleeve
CN207499155U (en) The Core Walls Structure formwork erecting structure of built-in reinforcing bar
CN203160666U (en) Wall-connecting assembly of scaffold
CN203320939U (en) Tool type overhanging scaffold anchoring structure
CN202108244U (en) Pulling fixing piece
CN103723243B (en) Fixing end section location fixture components and the using method thereof of pipe pillar
CN206581602U (en) A kind of civil engineering bridge construction template link

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Lu Gang Road Show in 071000 districts in Hebei city of Baoding province No. 125

Co-patentee after: Hebei Construction Group Tianchen Construction Engineering Co., Ltd.

Patentee after: Hebei construction group Limited by Share Ltd

Address before: 071000 Hebei City, Baoding new city road, No. 54, No. 139

Co-patentee before: Hebei Construction Group Tianchen Construction Engineering Co., Ltd.

Patentee before: Heibei Construction Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130724

Termination date: 20161221