CN204676890U - A kind of portable through-flooring pipeline preformed hole sleeve pipe - Google Patents

A kind of portable through-flooring pipeline preformed hole sleeve pipe Download PDF

Info

Publication number
CN204676890U
CN204676890U CN201420852692.8U CN201420852692U CN204676890U CN 204676890 U CN204676890 U CN 204676890U CN 201420852692 U CN201420852692 U CN 201420852692U CN 204676890 U CN204676890 U CN 204676890U
Authority
CN
China
Prior art keywords
split bolt
sleeve pipe
portable
composite board
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420852692.8U
Other languages
Chinese (zh)
Inventor
孔斯文
王理
翟光耀
刘智泉
杜宝贺
王冠
崔忠民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201420852692.8U priority Critical patent/CN204676890U/en
Application granted granted Critical
Publication of CN204676890U publication Critical patent/CN204676890U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of portable through-flooring pipeline preformed hole sleeve pipe, this utility model is formed primarily of portable steel sleeve, split bolt, composite board three part.Portable steel sleeve is formed by steel sleeve and the butt welding of steel handle; Split bolt adopts φ 14 plain bar one end and Plate Welding, position, other end termination car silk 100mm, adopts locked with bolts; φ 16 circular hole is worn in composite board centre position, facilitates split bolt to pass fixing.At its vicinity brushing release agent before using, before the colligation of plate muscle, split bolt is adopted composite board on sleeve pipe and template to be fixed together.Wait having built concrete, its intensity has been when having reached and can require above, extracts sleeve pipe and cleans out, conveniently have enough to meet the need use.The utility model adopts and makes simply, fixation, convenient disassembly, operating efficiency improves greatly, time saving and energy saving, and adopts split bolt fastening, whole reservation procedure can reach does not run mould, indeformable, smooth, the smooth rule again of shaping rear hole, repeatedly can recycle, have very high promotional value.

Description

A kind of portable through-flooring pipeline preformed hole sleeve pipe
Technical field
The utility model relates to the joint of plate perforating pipe cave entrance reservation of structure floor construction.
Background technology
In building pipe engineering construction, it is one important operation all the time that hole is reserved.What the quality of reserving hole directly affected subsequent handling normally carries out the presentation quality with concrete slab.Traditional method is after treating that civil engineering slab form lays complete, end muscle colligation, ordinary steel is overlapped effective iron nail and is wound around iron wire and is fixed in template.The series of problems such as traditional method often occurs to run mould, distortion and concrete pour in sleeve pipe.
Utility model content
In order to solve the problems such as conventional steel casing tube reserved pre-burying, the utility model provides a kind of novel portable through-flooring pipeline preformed hole sleeve pipe, and structure is simple, and cheap, widely applicable, mounting or dismounting easily, turnover is convenient, safe and reliable.The hole that the utility model can be used for various structure types building floor is reserved.
The technical solution realizing above-mentioned purpose is as follows:
A kind of portable through-flooring pipeline preformed hole sleeve pipe, include through floor bottom mould split bolt, be embedded in the steel sleeve of floor concrete layer in advance, steel sleeve upper end is fixedly connected with composite board, described split bolt upper end is through described composite board, steel sleeve upper end is fixedly connected with steel handle, split bolt lower end is provided with baffle plate, and split bolt upper end is screwed with locking nut.
Described steel sleeve and the butt welding of steel handle fixedly form.
Described boring hole, composite board centre, split bolt is through described hole.
Useful technique effect of the present utility model is:
1, portable through-flooring pipeline preformed hole sleeve pipe, integrates portable steel sleeve, split bolt, steel handle, and the hole being applicable to various structure types building floor is reserved;
2, the utility model adopts split bolt fastening, can ensure that whole reservation procedure does not run mould, indeformable, smooth, the smooth rule again of shaping rear hole.
3, the utility model makes simple, and fixation, convenient disassembly, operating efficiency improves greatly, time saving and energy saving, for structure construction has won the time.
4, the utility model can repeatedly recycle, and has very high promotional value.
5, the environmental protection of the utility model profit, neither produces rubbish, maintains on-the-spot clean and tidy, effectively make use of on-the-spot waste material again, turn waste into wealth.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, by embodiment, the utility model is further described.
See accompanying drawing, a kind of portable through-flooring pipeline preformed hole sleeve pipe, include through floor bottom mould 7 split bolt 3, be embedded in the steel sleeve 1 of floor concrete layer 8 in advance, steel sleeve 1 upper end is fixedly connected with composite board 2, split bolt 3 upper end is through composite board 2, steel sleeve 1 upper end is fixedly connected with steel handle 6, split bolt 3 lower end is provided with baffle plate 4, split bolt 3 upper end is screwed with locking nut 5, steel sleeve 1 and steel handle 6 butt welding fixedly form, boring hole, composite board 2 centre, split bolt is through described hole.
Portable steel sleeve by steel sleeve can be carried, split bolt, waste and old composite board three part form.Portable steel sleeve adopts steel sleeve 1 two ends and steel handle 2 butt welding to form.Split bolt is connected with steel plate 4 by φ 14 reinforcing bar 3 one end, other end car silk 100mm, adopts bolt 5 to lock.Complete until formwork, plate muscle is when not yet starting colligation, in template, indicate the plan-position of reserved sleeve pipe with bright red paint, and electricity consumption is drilled on relevant position and holes.Before muscle at the bottom of colligation, with split bolt, composite board on sleeve pipe and template are fixed together.
Bore φ 16 circular hole in waste and old composite board 2 middle part, split bolt locks through floor bottom mould and waste and old composite board 2, can ensure that portable sleeve pipe is not shifted.

Claims (3)

1. a portable through-flooring pipeline preformed hole sleeve pipe, it is characterized in that: include through floor bottom mould split bolt, be embedded in the steel sleeve of floor concrete layer in advance, steel sleeve upper end is fixedly connected with composite board, described split bolt upper end is through described composite board, steel sleeve upper end is fixedly connected with steel handle, split bolt lower end is provided with baffle plate, and split bolt upper end is screwed with locking nut.
2. through-flooring pipeline preformed hole sleeve pipe according to claim 1, is characterized in that: described steel sleeve and the butt welding of steel handle fixedly form.
3. through-flooring pipeline preformed hole sleeve pipe according to claim 1, is characterized in that: described boring hole, composite board centre, and split bolt is through described hole.
CN201420852692.8U 2014-12-29 2014-12-29 A kind of portable through-flooring pipeline preformed hole sleeve pipe Expired - Fee Related CN204676890U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420852692.8U CN204676890U (en) 2014-12-29 2014-12-29 A kind of portable through-flooring pipeline preformed hole sleeve pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420852692.8U CN204676890U (en) 2014-12-29 2014-12-29 A kind of portable through-flooring pipeline preformed hole sleeve pipe

Publications (1)

Publication Number Publication Date
CN204676890U true CN204676890U (en) 2015-09-30

Family

ID=54176595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420852692.8U Expired - Fee Related CN204676890U (en) 2014-12-29 2014-12-29 A kind of portable through-flooring pipeline preformed hole sleeve pipe

Country Status (1)

Country Link
CN (1) CN204676890U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043030A (en) * 2019-04-30 2019-07-23 中国建筑第八工程局有限公司 Universal floor reserves the fixation device of casing
CN112576031A (en) * 2020-11-30 2021-03-30 中国核工业第二二建设有限公司 Reusable reserved hole reservation device and construction method
CN113513156A (en) * 2021-04-27 2021-10-19 山东恒信建业集团有限公司 Beam-penetrating sleeve structure and mounting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043030A (en) * 2019-04-30 2019-07-23 中国建筑第八工程局有限公司 Universal floor reserves the fixation device of casing
CN112576031A (en) * 2020-11-30 2021-03-30 中国核工业第二二建设有限公司 Reusable reserved hole reservation device and construction method
CN113513156A (en) * 2021-04-27 2021-10-19 山东恒信建业集团有限公司 Beam-penetrating sleeve structure and mounting method

Similar Documents

Publication Publication Date Title
CN106088537B (en) Window auxiliary frame pre-embedding construction method
CN204676890U (en) A kind of portable through-flooring pipeline preformed hole sleeve pipe
CN104047419A (en) Wall linking method of scaffold and wall-linking member used by scaffold
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN206722377U (en) A kind of external scaffolding drawknot node structure
CN204343649U (en) A kind of tool-type wire rope draw ring
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN202391092U (en) U-shaped anchor bolt fixing device of overhanging steel beam
CN204753583U (en) Recoverable anchor rope type of high pressure jet soil cement stock bears head
CN204282819U (en) A kind of through-flooring pipeline preformed hole casing bit
CN103556813B (en) Steel pipe scaffold wall-connecting piece
CN204112736U (en) Formwork steel wooden construction back cord linkage
CN202108244U (en) Pulling fixing piece
CN209308283U (en) A kind of non-post bar planting formula constructional column reinforcing steel bar connecting device and structure
CN108729643A (en) A kind of overhanging type discharging platform steel wire rope drawknot tool
CN209339585U (en) High-intensitive outrigger drawknot mechanism can be recycled in one kind
CN207829909U (en) A kind of power tunnel telescoping steel form locking plug template installation ruggedized construction
CN206545384U (en) A kind of lateral template clamping of tool-type
CN205132954U (en) Novel dismouting tower machine adheres to frame device
CN205591545U (en) Instrument is consolidated to log template
CN205063039U (en) Infilled wall draws and connects pre -buried thin wall sleeve of muscle
CN204098471U (en) A kind of detachable suspension scaffold fastening devices

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20191229

CF01 Termination of patent right due to non-payment of annual fee