CN203080773U - Whole archaized building main ridge - Google Patents

Whole archaized building main ridge Download PDF

Info

Publication number
CN203080773U
CN203080773U CN 201320009833 CN201320009833U CN203080773U CN 203080773 U CN203080773 U CN 203080773U CN 201320009833 CN201320009833 CN 201320009833 CN 201320009833 U CN201320009833 U CN 201320009833U CN 203080773 U CN203080773 U CN 203080773U
Authority
CN
China
Prior art keywords
ridge
positive
royal
concrete
emperor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320009833
Other languages
Chinese (zh)
Inventor
张喜平
唐纪军
顾水根
徐永芳
张华�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU GARDEN DEVELOPMENT Co Ltd
Original Assignee
SUZHOU GARDEN DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU GARDEN DEVELOPMENT Co Ltd filed Critical SUZHOU GARDEN DEVELOPMENT Co Ltd
Priority to CN 201320009833 priority Critical patent/CN203080773U/en
Application granted granted Critical
Publication of CN203080773U publication Critical patent/CN203080773U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model discloses a whole archaized building main ridge. The whole archaized building main ridge comprises a rafter, a shedthinstile, a waterproof layer, an old dripping eave, a rotary cylinder, a batten, royal ridge nails, a royal chain, a word plate, a bright cylinder and a cover cylinder. The rafter, the shedthinstile, the waterproof layer, the old dripping eave, the rotary cylinder, the battern, the royal ridge nails, the royal chain, the word plate, the bright cylinder and the cover cylinder are arranged above a wooden joist or a concrete joist. The whole archaized building main ridge is more than 2 m in total height, particularly the royal ridge nails of the main ridge are 10cm*10cm stainless steel square tubes, and concrete are poured outside the square tubes to form concrete columns. Reinforced concrete beams are respectively arranged in the rotary cylinder and the cover cylinder, and the royal ridge nails poured by the concrete, an upper reinforced concrete beam and a lower reinforced concrete beam are integrally connected into a concrete frame. A plurality of royal ridge nails are embedded on the wooden joist or the concrete joist in a vertically upward mode in the construction process, one reinforced concrete beam is arranged in the rotary cylinder of the whole archaized building main ridge, and the reinforced concrete beam combines with one reinforced concrete beam built on the top of the royal ridge nails to form the concrete frame. With adoption of the technical scheme, not only can ancient flavor of an ancient building be reserved, but also capability resisting horizontal wind of a tall main ridge of a large-scale building is improved, and solid technical foundation is provided for persistently reserving the large-scale building.

Description

The positive ridge of a kind of whole building in the style of the ancients
Technical field
The utility model relates to a kind of innovation structure of building in the style of the ancients, relates in particular to a kind of development and constructure scheme of positive ridge globality structure of medium-and-large-sized building in the style of the ancients.
Background technology
Along with the succession of history culture, ancient architecture is preserved so far in large quantities, becomes the valuable source of various places tourism, and this has deep meaning to educating the Chinese national culture of grasping of future generation.In numerous ancient architectures, " main palace in a temple " is the key construction in each person with religious faith building.
Many newly-built temple buildings are also arranged, and wherein buildings such as " main palace in a temple " breaks through the scale of construction and the span of traditional building in the style of the ancients especially, has reached a new peak on the scale.The new difficult problem that this has also brought technical needs to capture simultaneously.Relatively outstanding is: for the scale of construction with building matches, the positive ridge of building in the style of the ancients is greatly improved, have in addition up to 2.5m.So the requirement of the anti-horizontal wind lotus of the positive ridge of height is just quite high, and the positive ridge structure of traditional building in the style of the ancients will be challenged.Evidence, the skeleton of the positive ridge of tradition can't meet the demands.
Summary of the invention
In view of the defective that above-mentioned prior art exists, the purpose of this utility model is to propose the positive ridge of a kind of whole building in the style of the ancients, solves the anti-more weak problem of horizontal wind lotus of positive ridge of existing large-scale building in the style of the ancients.
The positive ridge of a kind of whole building in the style of the ancients of above-mentioned first purpose of the present utility model, comprise rafter, sheathing tile, waterproofing course, the old hanging edge of a dripping tile, cylinder, watt bar, emperor's ridge nail, emperor's chain, word board, imperial waist, bright cylindrical fireworks and the cup be located on wooden purlin or the concrete purlin, more than the described positive ridge height overall 2m; It is characterized in that: emperor's ridge nail of described positive ridge is the stainless steel square tube of 10cm*10cm, the outer placing of concrete of square tube; Be respectively equipped with reinforced concrete beam in the described cylinder and in the cup, emperor's ridge nail of concrete pouring formation reinforced concrete frame that links to each other with two reinforced concrete beams up and down.
Further, described positive chi chung comprises several emperor's ridge nails, and positive chi chung heart symmetry is laid in the positive horizontal standard width of a room in an old-style house direction of ridge upper edge.
Further, described emperor's ridge nail overlaps with word board, the imperial waist position of positive ridge.
Use the technical solution of the utility model, not only kept the patina local flavor of building in the style of the ancients, and improved the ability of the anti-horizontal wind lotus of positive ridge of large-scale building in the style of the ancients, provide solid technical foundation for large-scale building in the style of the ancients is able to lasting the reservation.
Description of drawings
Fig. 1 is the front elevational schematic of the positive ridge of the whole building in the style of the ancients of the utility model.
Fig. 2 is the generalized section of the positive ridge of the whole building in the style of the ancients of the utility model.
The specific embodiment
At the anti-more weak problem of horizontal wind lotus of the positive ridge of existing large-scale building in the style of the ancients, the utility model disclosed the positive ridge of a kind of whole building in the style of the ancients and provide in detail should the positive ridge of integral body building in the style of the ancients construction technology.By aligning ridge concrete frame is set, thereby has improved the ability of the anti-horizontal wind lotus of positive ridge of large-scale building in the style of the ancients.
At first understand from the structure of the positive ridge of this integral body building in the style of the ancients, the positive ridge of the whole building in the style of the ancients of this kind, comprise rafter, sheathing tile, waterproofing course, the old hanging edge of a dripping tile 4, cylinder, watt bar, emperor's ridge nail 2, emperor's chain, word board 5, imperial waist, bright cylindrical fireworks and the cup 6 be located on the wooden purlin (or concrete purlin), more than the positive ridge height overall 2m; Especially, emperor's ridge of this positive ridge nail 2 adopts the stainless steel square tube of 10cm*10cm specification, and the outer placing of concrete of square tube is reinforced, and is formed strong intermediate studdle; Be provided with a reinforced concrete beam 1 in the cylinder, the cup inboard also is provided with reinforced concrete beam 3, emperor's ridge of concrete pouring nail formation concrete frame that links to each other with two reinforced concrete beams up and down, this concrete frame makes the positive ridge of building in the style of the ancients form an integral body, make the positive ridge globality of building in the style of the ancients reinforce, improved the ability of the anti-horizontal wind lotus of the positive ridge of building in the style of the ancients.In addition, positive chi chung comprises complex root emperor ridge nail and kiss stake, and positive chi chung heart symmetry is laid in positive ridge horizontal span direction upper edge, makes that the positive ridge overall structure of building in the style of the ancients is attractive in appearance.Emperor's ridge nail is put with the thin word memorial tablet of brick of positive ridge and is overlapped, and does not have influence on the outward appearance of building in the style of the ancients.
From construction technology: the construction technology of the positive ridge of this integral body building in the style of the ancients comprises step: I, upwards bury several emperor's ridges nails underground based on the wooden purlin of building in the style of the ancients is vertical, because more than the positive ridge height overall 2m, so the preferred square tube that adopts 10cm*10cm of emperor's ridge nail; II, in the cylinder of positive ridge, establish reinforced concrete beam, coat the contact of emperor's ridge nail and wooden purlin, make emperor's ridge nail be connected firmly, strengthen globality with wooden purlin; III, at the outer placing of concrete of emperor's ridge nail, the thin word board of laying bricks outward, bright cylindrical fireworks, dark cylindrical fireworks etc., emperor's ridge nail overlaps with just word board, the imperial waist position of ridge, does not have influence on the outward appearance of ancient building; IV, along positive ridge horizontal span a reinforced concrete beam is set, makes reinforced concrete frame, form the frame construction of the positive ridge of whole building in the style of the ancients, build cup at last by laying bricks or stones, finish construction at emperor's ridge screw top end.Wherein bury five of quantity, two of the kiss stakes of emperor's ridge nail in the step I underground, positive ridge dragon waist symmetry is laid in the positive horizontal standard width of a room in an old-style house direction of ridge upper edge, makes that the positive ridge overall structure of building in the style of the ancients is attractive in appearance.
Under the introduction of above detailed specific embodiment, the technical solution of the positive ridge of the whole building in the style of the ancients of the utility model is very clear and definite.And the proposition of this scheme, its technical scheme is obvious: not only kept the patina local flavor of building in the style of the ancients, and improved the ability of the anti-horizontal wind lotus of positive ridge of large-scale building in the style of the ancients, provide solid technical foundation for large-scale building in the style of the ancients is able to lasting the reservation.

Claims (3)

1. the positive ridge of whole building in the style of the ancients comprises rafter, sheathing tile, waterproofing course, the old hanging edge of a dripping tile, cylinder, watt bar, emperor's ridge nail, emperor's chain, word board, imperial waist, bright cylindrical fireworks and the cup be located on wooden purlin or the concrete purlin, more than the described positive ridge height overall 2m; It is characterized in that: emperor's ridge nail of described positive ridge is the stainless steel square tube of 10cm*10cm, the outer placing of concrete of square tube; Be respectively equipped with reinforced concrete beam in the described cylinder and in the cup, emperor's ridge nail of concrete pouring is connected to reinforced concrete frame with two reinforced concrete beam one.
2. the positive ridge of a kind of whole building in the style of the ancients according to claim 1 is characterized in that: described positive chi chung comprises several emperor's ridge nails, and positive chi chung heart symmetry is laid in the positive horizontal standard width of a room in an old-style house direction of ridge upper edge.
3. the positive ridge of a kind of whole building in the style of the ancients according to claim 2 is characterized in that: described emperor's ridge nail overlaps with word board, the imperial waist position of positive ridge.
CN 201320009833 2013-01-09 2013-01-09 Whole archaized building main ridge Expired - Lifetime CN203080773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320009833 CN203080773U (en) 2013-01-09 2013-01-09 Whole archaized building main ridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320009833 CN203080773U (en) 2013-01-09 2013-01-09 Whole archaized building main ridge

Publications (1)

Publication Number Publication Date
CN203080773U true CN203080773U (en) 2013-07-24

Family

ID=48826624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320009833 Expired - Lifetime CN203080773U (en) 2013-01-09 2013-01-09 Whole archaized building main ridge

Country Status (1)

Country Link
CN (1) CN203080773U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031919A (en) * 2013-01-09 2013-04-10 苏州园林发展股份有限公司 Integral main ridge of pseudo-classic architecture and construction process thereof
CN105421671A (en) * 2015-10-29 2016-03-23 中建八局第四建设有限公司 Antique zhengwen and installation method thereof
CN114349414A (en) * 2021-01-18 2022-04-15 陕西古锦园林古建工程有限公司 Pseudo-classic architecture reinforced concrete beam plate column ground layer material and preparation and use method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031919A (en) * 2013-01-09 2013-04-10 苏州园林发展股份有限公司 Integral main ridge of pseudo-classic architecture and construction process thereof
CN103031919B (en) * 2013-01-09 2016-02-10 苏州园林发展股份有限公司 The construction technology of the positive ridge of a kind of overall building in the style of the ancients
CN105421671A (en) * 2015-10-29 2016-03-23 中建八局第四建设有限公司 Antique zhengwen and installation method thereof
CN114349414A (en) * 2021-01-18 2022-04-15 陕西古锦园林古建工程有限公司 Pseudo-classic architecture reinforced concrete beam plate column ground layer material and preparation and use method thereof

Similar Documents

Publication Publication Date Title
CN104631665B (en) Construction method for anti-seismic rammed earth wall with reinforced surface skin and core columns
CN203821961U (en) Assembled-type wall
CN203080773U (en) Whole archaized building main ridge
CN103046644B (en) Cold-formed thin-walled steel column and beam structural system for multistoried building
CN206157903U (en) Pure part plate combination industrialization house assembly structure that can build fast
CN103031919B (en) The construction technology of the positive ridge of a kind of overall building in the style of the ancients
CN107165346A (en) A kind of sparrow place eaves roof structure and its construction method
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN216893180U (en) Decorative pitched roof eaves gutter outer slope type green plant node structure
CN201810005U (en) Simple steel structure car parking shed
CN201128980Y (en) V-shaped folded plate split eaves gutter
CN205894270U (en) Light steel timber structural system
CN110206332B (en) Ancient-imitating transformation method for local residences
CN203394094U (en) Reinforced and reconstructed masonry structure using external gallery bridge and external elevator
CN201657661U (en) Muhispan greenhouse with cement prefabricated components
CN205653905U (en) Building wall face of heat preservation core is filled at scene
CN206752680U (en) A kind of timber structure parapet
CN206157767U (en) Utility tunnel
CN206971570U (en) A kind of modularization timber structure parapet
CN205617793U (en) Window prefabricating formwork wafts
CN206971384U (en) A kind of timber structure parapet
CN204919803U (en) Big board pin -connected panel architectural construction
CN206625352U (en) A kind of timber structure parapet for being easy to keep wall surface levelling
CN204001469U (en) Hollow double structure layer water-proof roofing
CN107130691A (en) A kind of overhead type modular house and its production method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130724

CX01 Expiry of patent term