CN203080518U - Self-drilling type recoverable anchor wire - Google Patents

Self-drilling type recoverable anchor wire Download PDF

Info

Publication number
CN203080518U
CN203080518U CN 201220713574 CN201220713574U CN203080518U CN 203080518 U CN203080518 U CN 203080518U CN 201220713574 CN201220713574 CN 201220713574 CN 201220713574 U CN201220713574 U CN 201220713574U CN 203080518 U CN203080518 U CN 203080518U
Authority
CN
China
Prior art keywords
drill bit
bearing plate
self
drilling
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220713574
Other languages
Chinese (zh)
Inventor
孙康
晏晓彤
王巧南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Dibo Building Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220713574 priority Critical patent/CN203080518U/en
Application granted granted Critical
Publication of CN203080518U publication Critical patent/CN203080518U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model mainly relates to a self-drilling type recoverable anchor wire. The self-drilling type recoverable anchor wire comprises a drill, a pressure bearing plate, a bending semi-circle plate, a steel stranded wire and a drilling rod, wherein the drill is connected with the pressure bearing plate and the bending semi-circle plate, the bending semi-circle plate is arranged on the front portion of the pressure bearing plate, the steel stranded wire is encircled in a groove in the edge of the bending semi-circle plate in a U shape, and the tail portion of the drill penetrates through the middle of the pressure bearing plate and is connected with the drilling rod in a bearing inserting mode and in a meshing mode. The self-drilling type recoverable anchor wire has the advantages of being simple in structure, convenient to use, firm in fixing effect, low in batch cost and the like, and is suitable for popularization and application.

Description

The recyclable anchor cable of self-drilling
Technical field
The utility model is a kind of anchor cable, and the recyclable anchor cable of a kind of specifically self-drilling belongs to anchor field of fixation devices in the geotechnical engineering.
Background technology
Present stage engineering construction scale progressively enlarges, and the excavation of foundation pit degree of depth strengthens gradually, and also more and more to the demand of prestress anchorage cable, single anchor cable length is also more and more longer.Anchor cable is used very extensive in China's underground engineering construction as a kind of support anchoring structure.It has the reliability height, and bearing capacity is big, and construction cost is low, and speed of application is fast, technology maturation, and the operation element face is little, the many-sided advantage of the little grade of structure exposed parts.But there is following shortcoming simultaneously:
1. anchor cable need take a large amount of underground spaces (more than 40 meter of up) in the supporting and protection structure outside, and outside regular meeting occupied the construction land red line, this was unallowed legally, brings obstacle and difficulty also for simultaneously neighbouring entry purpose underground engineering construction.
2. the foundation ditch stream line belongs to temporary works, has just lost use value after pit backfill, and wherein steel strand are embedded in the underground meaning that loses, if do not remove the waste that recycling just causes resource.
Therefore inventing a kind of dismountable prestress anchorage cable just seems that realistic meaning is arranged very much.
Present recyclable anchor cable needs pore-forming in advance mostly, and steel strand and detachable anchor device such as JCE type, U type etc. are put in the back.To require hole wall to stablize smooth for pore-forming in advance, and it is straight to hole, and only in this way could guarantee that follow-up steel strand etc. lay that everything goes well with your work carries out.Hole wall is stablized smooth common needs with sleeve pipe or mud off, and the straight requirement of holing is difficult to guarantee fully at sand soft rock layer.These measurements for construction assurance and actual conditions have increased the cost of recyclable anchor cable, are unfavorable for large-scale promotion.Therefore invent a kind of recyclable anchor cable of self-drilling that just can finish pore-forming, lay steel strand, lay operation such as anchor device that once creeps into and just seem that realistic meaning is arranged very much.
Summary of the invention
Goal of the invention
The purpose of this utility model is to develop a kind of safe and reliable, detachable, tension bearing capacity height of finishing using, construction cost is low, environmental pollution is little, be convenient to the anchor cable that large-scale promotion is used.
Technical scheme
The recyclable anchor cable of a kind of self-drilling is characterized in that: comprise drill bit, bearing plate, crooked semi-circular plate, steel strand, drilling rod; Drill bit and bearing plate and crooked semi-circular plate link together, and crooked semi-circular plate places the bearing plate front portion, and steel strand are looped around in the crooked semi-circular plate edge groove with the U type, and the drill bit afterbody is connected with the drilling rod socket joint in the middle of passing bearing plate.
The drill bit socket joint is snapped at drill rod end, and the drill bit afterbody is provided with the parallel longitudinal tenon, and the drill rod end correspondence position is provided with groove, the mutual interlock of tenon groove during socket joint.
The drill bit middle part is provided with oblique slurry outlet.
Drill bit middle part is provided with movable filler ring, and movable filler ring is between bearing plate and parallel tenon.
Steel strand adopt non-bending steel cable.
By the loop slurry retaining wall, utilize clear water replacement cycles slurries after the pore-forming when creeping into, the flushing hole wall injects the anchoring slurries then.
Anchor cable reaches after the design length, simultaneous tension steel strand two ends, and pulling force acts on the anchoring body end by crooked semi-circular plate and bearing plate, forms the pressure-type anchor cable.
After anchor cable is finished using, unclamp ground tackle, utilize drawing equipment to clamp steel strand one end and steel strand are reclaimed by root.
Advantage and effect
Advantage of the present utility model and good effect are as follows:
1. drill bit creeps into and disposablely finishes pore-forming, lays operations such as bearing plate and steel strand, has avoided secondary to lay, and has saved the time, has improved efficiency of construction;
2. steel strand are present within the boring with the U type, changing tension of steel strand into pressure by crooked semi-circular plate and bearing plate during stretch-draw affacts in the middle of the anchoring body, give full play to being anchored at present three-dimensional restrained condition and the high advantage of compressive strength in the soil layer, can increase substantially the anchor cable bearing capacity; Steel strand U type state stability is good in addition, the reliability height;
3. utilize clear water wash boring sidewall, replacement cycles is with night.Can reduce mud balance in the hole, be convenient to inject the discharge of anchoring slurries process mud, anchoring body be purified, not because of doping mud impurity effect compressive strength.Remove hole wall mud skin anchoring body is contacted fully with soil layer, improve frictional force.Oblique slurry outlet and push-and-pull rotary drill rod are set on the drill bit in addition can make current wash hole wall mud skin comprehensively.Treat that the mud skin will certainly cause partial collapse in the hole after coming off, injecting anchoring slurries and secondary grouting then can make the part of caving in the hole all be full of slurries, formed like this anchoring body will become " sugarcoated haws " type, further strengthen the friction area of anchoring body and soil layer, improve the anchor cable bearing capacity.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the anchor cable construction schematic diagram;
Fig. 4 reclaims schematic diagram for anchor cable;
Fig. 5 reclaims back remainder schematic diagram for anchor cable.
Description of reference numerals:
1, drill bit, 2, bearing plate, 3, crooked semi-circular plate, 4, parallel tenon, 5, steel strand, 6, drilling rod, 7, rig, 8, filling system, 9, the steel strand drawing equipment, 10, anchoring body, 11, movable filler ring.
The specific embodiment:
Below in conjunction with accompanying drawing the utility model is described further:
The utility model proposes the recyclable anchor cable of a kind of self-drilling, as shown in Fig. 1 and Fig. 2, comprise drill bit 1, bearing plate 2, crooked semi-circular plate 3, steel strand 5, drilling rod 6 etc.; Drill bit 1 links together with bearing plate 2 and crooked semi-circular plate 3, crooked semi-circular plate 3 places bearing plate 2 front portions, steel strand 5 are looped around in crooked semi-circular plate 3 edge groove with the U type, drill bit 1 afterbody passes in the middle of the bearing plate 2 and drilling rod 6 socket joints are connected (drill bit 1 socket joint is snapped at drilling rod 6 ends), guiding drilling rod 6 creeps in the lump bearing plate 2, steel strand 5 etc. to be carried simultaneously and places foot of hole, in the hole, inject the anchoring slurries after arriving projected depth, simultaneous tension steel strand two ends during locking, use the ground tackle anchoring, finish anchor cable construction.Treat anchor cable finish using after removing anchorage device, clamp steel strand one end and reclaim steel strand by root.
Drill bit 1 socket joint is snapped at drilling rod 6 ends, and drill bit 1 afterbody is provided with parallel longitudinal tenon 4, and drilling rod 6 end correspondence positions are provided with groove, and the mutual interlock of tenon groove during socket joint guarantees that drilling rod drives drill bit and creeps into together.
Drill bit 1 middle part is provided with some oblique slurry outlets, can make current wash hole wall mud skin when construction so comprehensively.
Between drill bit 1 middle part bearing plate and the parallel tenon movable filler ring 11 is set, is provided with like this and can guarantees that drill bit 1 freely rotates when bearing plate 2 creeps into.
Steel strand 5 adopt non-bending steel cable.
As shown in Fig. 3 ~ Fig. 5, rig 7 drives drilling rod 6, and drill bit 1 drilling and forming hole in side slope creeps into while drill bit 1 and carries bearing plate 2, and crooked semi-circular plate 3 and steel strand 5 together advance.Filling system 8 injects the loop slurry retaining wall by drilling rod 6 to foot of hole when creeping into.Treat that pore-forming injects the residual mud skin of clear water displacement mud cleaning hole wall by filling system 8 and drilling rod 6 to projected depth in the hole, inject the anchoring slurries by filling system 8 drilling rod internal high pressures afterwards, form anchoring body 10.Withdraw from drilling rod gradually, drill bit, bearing plate and steel strand etc. are kept somewhere in the hole.If need secondary grouting, then embedding Grouting Pipe treats that anchoring body intensity reaches design load, carries out secondary grouting.By the time anchoring body carries out the stretch-draw grappling after reaching design strength, finishes anchor cable construction.Treat anchor cable finish using after the removal ground tackle, utilize steel strand drawing equipment 9 to clamp steel strand 5 one ends, progressively reclaim steel strand.
The utility model job practices realizes as follows:
1. making anchor cable: bearing plate etc. is linked together with drill bit, utilize the steel strand bending machine that steel strand are bent, be looped around with the U type in the groove at pressure-bearing semi-circular plate edge.Steel strand adopt non-bending steel cable.The drill bit afterbody is provided with the parallel longitudinal tenon, and the drill rod end correspondence position is provided with groove, and the mutual interlock of tenon groove during the two socket joint guarantees that drilling rod drives drill bit and creeps into together.The drill bit middle part is provided with some oblique slurry outlets.
2. creep into: rig is in place, and the drilling rod front end is connected with the drill bit socket joint, and drilling rod drives drill bit rotary drilling.Drill bit carries bearing plate, crooked semi-circular plate and steel strand etc. and enters together in the hole, until projected depth.
3. mud off: with the drilling rod rear end be connected the loop slurry injected system and connect, by the hollow channel of filling system and drilling tool inside, go into the cycle of higher pressure slurries when creeping into to the hole rising pouring.
4. clear hole: inject clear water by drilling rod inner hollow passage to the hole inner high voltage after the pore-forming.Utilize mud in the clear water displacement hole, wash boring sidewall mud skin.The push-and-pull drilling rod is rotated in water filling simultaneously.
5. slip casting: treat that the mud displacement finishes in the hole, inject pure anchoring slurries to the hole inner high voltage, till pure water mud is exposed in the aperture.Withdraw from drilling rod, finish anchor cable construction.If need secondary grouting, then pre-buried secondary grouting pipe treats that anchoring body reaches after the design strength secondary grouting.Be mainly argillic horizon, powder soil horizon, farinose argillic horizon etc. in the scope and can adopt clear water circulation to creep into if creep into, still can be after the pore-forming according to 4. clear holes, 5. step such as slip casting is carried out; Creep in the circulation of the specific stratum of certain type available water mud liquid, so can omit the clear hole of step 4, directly enter the construction of step 5 slip casting link.
6. stretch-draw: treat that anchoring body compressive strength reaches designing requirement, steel strand two ends of simultaneous tension utilize the ground tackle anchoring, finish anchor cable construction, and the anchor cable stress form is a pressure-type.
7. reclaim: this anchor cable is recyclable anchor cable, and after finishing using, removing anchorage device etc. utilize drawing equipment to clamp steel strand one end, split out steel strand by root, dismantle waist rail etc., finish the recovery operation of anchor cable.
Just can construct by above working measure and to finish and to remove the recyclable anchor cable of this novel self-drilling.
Below in conjunction with description of drawings most preferred embodiment of the present utility model:
The utility model is connected with drilling rod 5 socket joints in the middle of at first drill bit 1 afterbody being passed bearing plate 2.Drill bit 1 afterbody is provided with several roads parallel longitudinal tenon 4, and drilling rod 6 end correspondence positions are provided with groove, the mutual interlock of tenon groove when guaranteeing socket joint, and co-rotation is crept into.Crooked semi-circular plate 3 places bearing plate 2 front portions, and around in crooked semi-circular plate 3 edge groove, drill bit 1 middle part is provided with movable filler ring and freely rotates when bearing plate 2 creeps into to guarantee drill bit 1 steel strand 5 with the U type.
Rig 7 drives drilling rods 6, and drill bit 1 drilling and forming hole in side slope creeps into simultaneously drill bit 1 and carries bearing plate 2, crooked semi-circular plate 3 and steel strand 5 and together advance; Filling system 8 injects the boring that suspends out of loop slurry retaining wall and the residue of will holing by drilling rod 6 to foot of hole when creeping into.Treat that pore-forming injects the residual mud skin of clear water displacement mud cleaning hole wall by filling system 8 and drilling rod 6 to projected depth in the hole, inject the anchoring slurries by filling system 8 drilling rod internal high pressures afterwards, form anchoring body 10.Withdraw from drilling rod 6 gradually, drill bit 1, bearing plate 2 and steel strand 5 etc. are kept somewhere in the hole.If need secondary grouting, then embedding Grouting Pipe, treat that anchoring body 10 intensity reach design load after, carry out secondary grouting.By the time anchoring body carries out tensioning fixation after reaching design strength, finishes anchor cable construction.Treat anchor cable finish using after the removal ground tackle, utilize steel strand drawing equipment 9 to clamp steel strand 5 one ends, progressively reclaim steel strand.Finally stay only remaining anchoring body, drill bit, bearing plate, crooked semi-circular plate etc. in the side slope soil layer, can not impact, reached recyclable purpose, realized the recycling of resource the neighboring buildings excavation.

Claims (5)

1. the recyclable anchor cable of self-drilling is characterized in that: comprise drill bit (1), bearing plate (2), crooked semi-circular plate (3), steel strand (5), drilling rod (6); Drill bit (1) links together with bearing plate (2) and crooked semi-circular plate (3), crooked semi-circular plate (3) places bearing plate (2) front portion, steel strand (5) are looped around in crooked semi-circular plate (3) edge groove with the U type, and drill bit (1) afterbody is connected with drilling rod (6) socket joint in the middle of passing bearing plate (2).
2. the recyclable anchor cable of self-drilling according to claim 1, it is characterized in that: drill bit (1) socket joint is snapped at drilling rod (6) end, drill bit (1) afterbody is provided with parallel longitudinal tenon (4), and drilling rod (6) end correspondence position is provided with groove, the mutual interlock of tenon groove during socket joint.
3. the recyclable anchor cable of self-drilling according to claim 1 and 2 is characterized in that: drill bit (1) middle part is provided with oblique slurry outlet.
4. the recyclable anchor cable of self-drilling according to claim 2 is characterized in that: drill bit (1) middle part is provided with movable filler ring (11), is positioned between bearing plate (2) and the parallel tenon (4).
5. the recyclable anchor cable of self-drilling according to claim 1 and 2 is characterized in that: steel strand (5) adopt non-bending steel cable.
CN 201220713574 2012-12-21 2012-12-21 Self-drilling type recoverable anchor wire Expired - Lifetime CN203080518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220713574 CN203080518U (en) 2012-12-21 2012-12-21 Self-drilling type recoverable anchor wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220713574 CN203080518U (en) 2012-12-21 2012-12-21 Self-drilling type recoverable anchor wire

Publications (1)

Publication Number Publication Date
CN203080518U true CN203080518U (en) 2013-07-24

Family

ID=48826374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220713574 Expired - Lifetime CN203080518U (en) 2012-12-21 2012-12-21 Self-drilling type recoverable anchor wire

Country Status (1)

Country Link
CN (1) CN203080518U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314076A (en) * 2014-10-13 2015-01-28 安徽湖滨建设集团有限公司 Recycled type prestressed anchor cable structure for soft soil foundation and construction method
CN104452759A (en) * 2014-11-18 2015-03-25 黄水森 Bending type recoverable anchor rod
CN104895073A (en) * 2015-05-08 2015-09-09 霍炳旭 Anchor rope construction system capable of being disassembled for many times and construction method thereof
CN105089048A (en) * 2015-08-24 2015-11-25 山西省交通科学研究院 Double-end pressure type prestressed anchor cable and anchoring method
CN105952381A (en) * 2016-06-17 2016-09-21 中国建筑东北设计研究院有限公司 Anchor rod drill bit capable of recycling anchor cable
CN106168026A (en) * 2016-08-31 2016-11-30 黄水森 Churning reaming type sub warhead recoverable anchor rod stake and manufacture method thereof
CN106351219A (en) * 2016-08-30 2017-01-25 十四冶建设云南勘察设计有限公司 Sleeve type recoverable anchor rope
CN111206593A (en) * 2020-01-20 2020-05-29 一山(北京)岩土工程有限公司 Recoverable anchor rod and construction process and auxiliary device thereof
CN111648803A (en) * 2020-05-13 2020-09-11 河南理工大学 Anchor cable self-drilling and rapid anchoring construction method based on water jet technology

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314076B (en) * 2014-10-13 2016-03-30 安徽湖滨建设集团有限公司 A kind of soft foundation recoverable prestressed anchor Cable Structure and construction method
CN104314076A (en) * 2014-10-13 2015-01-28 安徽湖滨建设集团有限公司 Recycled type prestressed anchor cable structure for soft soil foundation and construction method
CN104452759A (en) * 2014-11-18 2015-03-25 黄水森 Bending type recoverable anchor rod
CN104895073A (en) * 2015-05-08 2015-09-09 霍炳旭 Anchor rope construction system capable of being disassembled for many times and construction method thereof
CN105089048A (en) * 2015-08-24 2015-11-25 山西省交通科学研究院 Double-end pressure type prestressed anchor cable and anchoring method
CN105952381A (en) * 2016-06-17 2016-09-21 中国建筑东北设计研究院有限公司 Anchor rod drill bit capable of recycling anchor cable
CN106351219B (en) * 2016-08-30 2019-03-12 云南建投第一勘察设计有限公司 A kind of telescopic Recyclable anchor rope
CN106351219A (en) * 2016-08-30 2017-01-25 十四冶建设云南勘察设计有限公司 Sleeve type recoverable anchor rope
CN106168026A (en) * 2016-08-31 2016-11-30 黄水森 Churning reaming type sub warhead recoverable anchor rod stake and manufacture method thereof
CN111206593A (en) * 2020-01-20 2020-05-29 一山(北京)岩土工程有限公司 Recoverable anchor rod and construction process and auxiliary device thereof
CN111206593B (en) * 2020-01-20 2021-05-11 一山(北京)岩土工程有限公司 Recoverable anchor rod and construction process thereof
CN111648803A (en) * 2020-05-13 2020-09-11 河南理工大学 Anchor cable self-drilling and rapid anchoring construction method based on water jet technology
WO2021228004A1 (en) * 2020-05-13 2021-11-18 河南理工大学 Water jet technology-based anchor cable self-drilling and rapid anchoring construction method
CN111648803B (en) * 2020-05-13 2022-04-05 河南理工大学 Anchor cable self-drilling and rapid anchoring construction method based on water jet technology

Similar Documents

Publication Publication Date Title
CN203080518U (en) Self-drilling type recoverable anchor wire
CN102606162B (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN103758123B (en) The construction method of manually digging hole filling pile retaining wall lining
CN104047623B (en) A kind of big across cavern excavation construction method
CN107165652A (en) A kind of tunnel monoblock type collapse after construction method
CN102979535B (en) Draining type section of jurisdiction is used in a kind of tunnel lining
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN105274998B (en) Construction method of assembled pile-plate-anchor-beam combination type batholith support
CN110878696B (en) Method for reinforcing surrounding rock of tunnel section at junction of upper soft and lower hard stratum shield method and mine method
CN105178979A (en) Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN110924959B (en) Construction method of water-rich weak surrounding rock tunnel penetrating fault fracture zone
CN211258623U (en) Water-rich weak surrounding rock tunnel supporting system crossing fault fracture zone
CN110905530A (en) Stability control construction method for water-rich soft rock tunnel penetrating fault fracture zone
CN107165661A (en) A kind of high-ground stress weak surrounding rock large deformation tunnel overlength enlarged footing anchor cable construction method
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN107514266A (en) Shield export & import bolt anchorage soil body construction method
CN103911993A (en) PHA (preliminary hazard analysis) anchor rod and construction method thereof
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN104863613A (en) High-side-wall anchored primary support structure for rock strata underground excavation underground structure, and construction method of high-side-wall anchored primary support structure
CN201406687Y (en) Deep foundation pit supporting structure
CN202989919U (en) Pressure-bearing water-sand-layer anchor rod mounting structure
CN103883339B (en) A kind of cable bolting method repeating Shi Hanzhang
CN105064334A (en) Construction method for cast-in-situ bored pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180604

Address after: 110032 six, floor 7, COFCO Plaza, 56 the Yellow River North Street, Huanggu District, Shenyang, Liaoning.

Patentee after: Yan Keqi

Address before: 110032 Yufeng Building, No. 42 Ning Shan Road, Huanggu District, Shenyang, Liaoning, 1-20-5

Co-patentee before: Sun Kang

Patentee before: Yan Xiaotong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180809

Address after: 110032 No. 56-39 the Yellow River North Street, Huanggu District, Shenyang, Liaoning 604

Patentee after: SHENYANG DIBO BUILDING ENGINEERING Co.,Ltd.

Address before: 110032 six, floor 7, COFCO Plaza, 56 the Yellow River North Street, Huanggu District, Shenyang, Liaoning.

Patentee before: Yan Keqi

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130724