CN203066476U - 一种用于钢框胶合板墙体模板的可调式三角支撑架 - Google Patents
一种用于钢框胶合板墙体模板的可调式三角支撑架 Download PDFInfo
- Publication number
- CN203066476U CN203066476U CN 201320010315 CN201320010315U CN203066476U CN 203066476 U CN203066476 U CN 203066476U CN 201320010315 CN201320010315 CN 201320010315 CN 201320010315 U CN201320010315 U CN 201320010315U CN 203066476 U CN203066476 U CN 203066476U
- Authority
- CN
- China
- Prior art keywords
- supporting leg
- screw mandrel
- steel frame
- triangular support
- support bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型涉及一种用于钢框胶合板墙体模板的可调式三角支撑架,包括上支腿和下支腿,所述上支腿和下支腿的尾端共同活动连接于支撑托座上,两者的前端均设有上调节丝杆。所述上调节丝杆上设丝杆顶托和丝杆调节手柄。所述上、下支腿的尾端均设下调节丝杆,两者通过下调节丝杆活动连接在支撑托座的连接扣上。使用时,在基本安装好模板和三角支撑架后,通过调节丝杆的长度并固定以控制墙体钢框胶合板的竖直度和水平位置,将上下支腿连接部的支撑托座用Φ12mm螺栓将其固定在混凝土基础上。本实用新型固定后,不会产生竖向移位,加上支腿端部的丝杆顶托的锁紧作用,从而使钢框胶合板墙体模板定位准确牢固。达到控制现浇剪力墙混凝土钢框胶合板模板的安装质量的目的。
Description
技术领域
本实用新型涉及建筑领域,具体涉及一种用于钢框胶合板墙体模板的可调式三角支撑架。
背景技术
目前,在进行剪力墙混凝土结构施工中,使用的现浇混凝土竖向模板支撑体系多采用模板背楞配合钢管支撑的形式构成支撑系统。钢管支撑分为水平支撑和斜撑,通过使用钢管扣件拧紧连接,以支撑现浇墙板的浇筑施工。由于混凝土剪力墙采用钢框胶合板通过钢管或方木次楞拼接,再通过钢管支撑控制模板位置,往往模板竖直度和水平度控制不能保证,且由于扣件不紧整体性差的缺点,使钢筋混凝土剪力墙模板定位不准、牢固性差和浇筑混凝土时易出现位移误差,且在出现误差时纠正不便,从而造成大模板定位不准的问题。
发明内容
为了克服现有钢管支撑控制方法不能有效固定和控制剪力墙钢框胶合板模板位置的不足, 本实用新型的目的在于提供一种用于钢框胶合板墙体模板的可调式三角支撑架,其不仅能有效支撑钢框胶合板的施工荷载,而且在可调丝杆的调节下,利用可调丝杆的调节能保证墙体钢框模板的垂直及水平定位准确,且刚度高,稳定性好,在混凝土浇筑时支撑不易产生位移,提高墙体混凝土成型质量,很好地解决剪力墙混凝土易出现的水平位移和涨缩模现象。
本实用新型解决其技术问题所采用的技术方案:一种用于钢框胶合板墙体模板的可调式三角支撑架,包括上支腿和下支腿,所述上支腿和下支腿的尾端共同活动连接于支撑托座上,两者的前端均设有上调节丝杆。
所述上调节丝杆上设丝杆顶托和丝杆调节手柄。
所述上支腿和下支腿的尾端均设下调节丝杆,两者通过下调节丝杆活动连接在支撑托座的连接扣上。
所述下调节丝杆上设丝杆调节手柄。
所述上支腿和下支腿采用Φ48-50mm的钢管制作,所述上调节丝杆插入支腿的钢管中,其插入长度大于150mm。
使用时,在基本安装好模板和三角支撑架后,通过调节丝杆的长度并固定以控制墙体钢框胶合板的竖直度和水平位置,将上下支腿连接部的支撑托座用Φ12 mm螺栓将其固定在混凝土基础上,固定后,不会产生竖向移位,加上支腿端部的丝杆顶托的锁紧作用,从而使钢框胶合板墙体模板定位准确牢固。达到控制现浇剪力墙混凝土钢框胶合板模板的安装质量的目的。
本实用新型的有益效果:可以在控制剪力墙钢框胶合板的位移的同时,定位钢框胶合板模板的竖向以及水平位置使其与三角钢管支撑形成牢固的整体,在混凝土施工时限制位移的产生。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1为本实用新型使用状态的侧视结构示意图;
图2为支腿尾端的调节丝杆与支撑托座活动连接结构示意图。
图3为丝杆调节手柄示意图。
图4为丝杆顶托示意图。
图中 1.上支腿 ,2.下支腿,3.下调节丝杆,4.固定螺丝,5.支撑托座。
6.上调节丝杆,7.丝杆顶托,8. 丝杆调节手柄。
具体实施方式
如图1所示,本实用新型包括上支腿1和下支腿2,上、下支腿的尾端共同活动连接于支撑托座5上。上、下支腿的前端均设有上调节丝杆6。上调节丝杆6上设丝杆顶托7和丝杆调节手柄8。为保证支撑强度,丝杆顶托采用100×100×3钢板加工制作。上调节丝杆6的前端活动连接在丝杆顶托7上。上、下支腿采用Φ50mm的钢管制作,钢管端部设内螺纹。上调节丝杆6插入支腿的钢管中的插入长度大于150mm。上调节丝杆6上设有用于调节其长度的丝杆调节手柄8。丝杆调节手柄8设有内螺纹,其套置于上调节丝杆6上。
在图2中,上支腿1与下支腿2的尾端设有下调节丝杆3。下调节丝杆3活动连接在支撑托座5的连接扣上。支撑托座5通过Φ12地脚固定螺丝固定,以控制三角支撑的位移。上支腿1与下支腿2的尾端也可不设下调节丝杆3,直接与支撑托座5活动连接。
使用时,在基本安装好模板和支撑后,通过调节丝杆的长度并固定以控制墙体钢框胶合板的竖直度和水平位置。本实用新型解决了现有技术中存在的整体剪力墙钢框胶合板模板不易固定控制,模板竖直度、结构中尺寸不精确等问题。且在出现支撑偏差时不好调整纠偏,从而使墙体竖向钢框模板定位不牢靠而造成剪力墙混凝土成型质量差的问题。
上述仅为本实用新型的实施例而已,对本领域的技术人员来说,本实用新型有多种更改和变化。凡在本实用新型的发明思想和原则之内,作出任何修改,等同替换,改进等,均应包括在本实用新型的保护范围之内。
Claims (5)
1.一种用于钢框胶合板墙体模板的可调式三角支撑架,其特征在于:包括上支腿和下支腿,所述上支腿和下支腿的尾端共同活动连接于支撑托座上,两者的前端均设有上调节丝杆。
2.根据权利要求1所述的用于钢框胶合板墙体模板的可调式三角支撑架,其特征在于:所述上调节丝杆上设丝杆顶托和丝杆调节手柄。
3.根据权利要求1所述的用于钢框胶合板墙体模板的可调式三角支撑架,其特征在于:所述上支腿和下支腿的尾端均设下调节丝杆,两者通过下调节丝杆活动连接在支撑托座的连接扣上。
4.根据权利要求3所述的用于钢框胶合板墙体模板的可调式三角支撑架,其特征在于:所述下调节丝杆上设丝杆调节手柄。
5.根据权利要求1所述的用于钢框胶合板墙体模板的可调式三角支撑架,其特征在于:所述上支腿和下支腿采用Φ48-50mm的钢管制作,所述上调节丝杆插入支腿的钢管中,其插入长度大于150mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320010315 CN203066476U (zh) | 2013-01-09 | 2013-01-09 | 一种用于钢框胶合板墙体模板的可调式三角支撑架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320010315 CN203066476U (zh) | 2013-01-09 | 2013-01-09 | 一种用于钢框胶合板墙体模板的可调式三角支撑架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203066476U true CN203066476U (zh) | 2013-07-17 |
Family
ID=48765286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320010315 Expired - Fee Related CN203066476U (zh) | 2013-01-09 | 2013-01-09 | 一种用于钢框胶合板墙体模板的可调式三角支撑架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203066476U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104155062A (zh) * | 2014-08-04 | 2014-11-19 | 当代节能置业股份有限公司 | 屋面结构立面闭水方法 |
CN104279369A (zh) * | 2014-09-02 | 2015-01-14 | 华信咨询设计研究院有限公司 | 一种可调型综合支架 |
CN106481085A (zh) * | 2016-12-14 | 2017-03-08 | 绍兴明煌建材科技有限公司 | 一种新型装配式结构带刻度调节的斜支撑及其施工方法 |
CN107060323A (zh) * | 2017-02-24 | 2017-08-18 | 中国有色金属工业第六冶金建设有限公司 | 一种拉片结构铝合金模板早拆系统及施工方法 |
CN109296199A (zh) * | 2018-10-12 | 2019-02-01 | 上海宝冶集团有限公司 | 一种加固组件 |
CN109964725A (zh) * | 2019-05-10 | 2019-07-05 | 福州乐亿生态科技股份有限公司 | 一种树木固定装置及方法 |
-
2013
- 2013-01-09 CN CN 201320010315 patent/CN203066476U/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104155062A (zh) * | 2014-08-04 | 2014-11-19 | 当代节能置业股份有限公司 | 屋面结构立面闭水方法 |
CN104279369A (zh) * | 2014-09-02 | 2015-01-14 | 华信咨询设计研究院有限公司 | 一种可调型综合支架 |
CN104279369B (zh) * | 2014-09-02 | 2016-05-25 | 华信咨询设计研究院有限公司 | 一种可调型综合支架 |
CN106481085A (zh) * | 2016-12-14 | 2017-03-08 | 绍兴明煌建材科技有限公司 | 一种新型装配式结构带刻度调节的斜支撑及其施工方法 |
CN107060323A (zh) * | 2017-02-24 | 2017-08-18 | 中国有色金属工业第六冶金建设有限公司 | 一种拉片结构铝合金模板早拆系统及施工方法 |
CN107060323B (zh) * | 2017-02-24 | 2019-02-22 | 中国有色金属工业第六冶金建设有限公司 | 一种拉片结构铝合金模板早拆系统及施工方法 |
CN109296199A (zh) * | 2018-10-12 | 2019-02-01 | 上海宝冶集团有限公司 | 一种加固组件 |
CN109964725A (zh) * | 2019-05-10 | 2019-07-05 | 福州乐亿生态科技股份有限公司 | 一种树木固定装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203066476U (zh) | 一种用于钢框胶合板墙体模板的可调式三角支撑架 | |
CN106088587A (zh) | 一种组合式模板支撑体系 | |
CN206722404U (zh) | 一种窄端墙单侧支模水平加固装置 | |
CN104196055B (zh) | 地下室外墙下部模板施工方法 | |
CN203394052U (zh) | 一种侧墙模板支撑结构 | |
CN102677895B (zh) | 混凝土基础台阶的吊模浇筑方法 | |
CN209585630U (zh) | 建筑施工模板可调节支撑架 | |
CN204081485U (zh) | 梁底模板支撑架 | |
CN201817814U (zh) | 立面钢模板的可调式固定支撑 | |
CN205742998U (zh) | 直插盘销式模板支架边梁支模体系 | |
CN106567538B (zh) | 一种卫生间混凝土翻边的定位模具 | |
CN113445739A (zh) | 一种可调式单侧模板支撑装置 | |
CN204370803U (zh) | 一种可调节柱模板加固模具 | |
CN204343319U (zh) | 索道管柱基础预埋地脚螺栓定位模具 | |
CN206428565U (zh) | 一种混凝土定型钢模板支撑系统 | |
CN201367730Y (zh) | 一种方便拆卸模板的模板支撑装置 | |
CN204081475U (zh) | 一种可调式楼板整体龙骨结构 | |
CN103669566B (zh) | 大跨度网架屋顶的钢骨混凝土基座的施工方法 | |
CN216428709U (zh) | 建筑幕墙预埋件工装结构及建筑幕墙 | |
CN215055273U (zh) | 一种用于安装支撑牛腿预埋盒的组装式模板 | |
CN201679232U (zh) | 一种可调式支撑模板顶杆 | |
CN204876558U (zh) | 一种用于现浇上反梁侧模板的定位支架 | |
CN205134291U (zh) | 可调式大型钢模板 | |
CN202899643U (zh) | 满堂钢管可调顶杆支撑 | |
CN203238945U (zh) | 混凝土构造柱模板支撑定型装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130717 Termination date: 20220109 |