- CN203049600U CN203049600U CN 201220735262 CN201220735262U CN203049600U CN 203049600 U CN203049600 U CN 203049600U CN 201220735262 CN201220735262 CN 201220735262 CN 201220735262 U CN201220735262 U CN 201220735262U CN 203049600 U CN203049600 U CN 203049600U
- Authority
- CN
- China
- Prior art keywords
- plate body
- building
- band drain
- utility
- concave holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a drainage device, in particular to a drainage plate. The drainage plate comprises a plate body (1), concave holes are formed in the plate body (1) in a spaced mode, and the bottom ends of the concave holes (2) protrude out of the plate body (1) to form a boss (3). The drainage plate has the advantages of guaranteeing stability between buildings and the bottom most layer underground, guaranteeing effective use of underground and parking space through perfect waterproof effects, and reducing maintenance cost.
Description
Technical field
The utility model relates to a kind of dewatering installation, relates in particular to a kind of band drain.
Background technology
Usually, during the building construction subterranean layer, in the bottom of building, can assemble from the outside water that generates of building.Existing common way is to form ground mortar waterproofing course in the building bottom, and outside the building portion forms waterproof construction methods such as metope mortar waterproofing course, SBS complex waterproof layer, even but take all waterproof measures, before the unresolved root problem, infiltration also can appear in inside.So, be necessary to take essential measure, solve the water that the building bottom generates, thereby obtain stable waterproof effect, improve utilization rate, the building service efficiency of the underground space.
The utility model content
Technique effect of the present utility model can overcome above-mentioned defective, and a kind of band drain is provided, and it effectively improves basement ground waterproof effect.
For achieving the above object, the utility model adopts following technical scheme: it comprises plate body, and shrinkage pool is set on the plate body at interval, and the bottom of shrinkage pool protrudes from plate body and forms boss.
Use the product in the utility model, after the building completion, be installed to base plate top, building foundation, the various water of interior of building generation are concentrated be induced to collecting well.The method is divided in sole plate completion and subterranean layer building completion back lays band drain in sole plate upper strata integral body, building foundation base plate top one side forms french drain, lay cement panel, the water that interior of building takes place is concentrated by band drain and french drain and is induced to collecting well.
The top is communicated with by groove between the adjacent concave holes.
Be communicated with by groove along top between the diagonal adjacent concave holes.
The reinforcing rib that the outside of boss is interval with outstanding its surperficial arc plays the support reinforcing effect.
Effect of the present utility model is to ensure the stable of building and the underground bottom, guarantees effective utilization of underground and parking space to reduce maintenance cost by perfect waterproof effect.
Description of drawings
Fig. 1 is that band drain of the present utility model is combined schematic diagram with building;
Fig. 2 is perspective view of the present utility model;
Fig. 3 is side structure schematic diagram of the present utility model;
Fig. 4 looks up structural representation for the utility model;
Fig. 5 is A portion partial enlarged drawing among Fig. 4.
Among the figure: 1. plate body; 2. shrinkage pool; 3. boss; 4. groove; 5. groove; 6. reinforcing rib; 7. concrete cover; 8. sole plate; 9. collecting well.
The specific embodiment
Band drain of the present utility model comprises plate body 1, and shrinkage pool 2 is set on the plate body 1 at interval, and the bottom of shrinkage pool 2 protrudes from plate body 1 and forms boss 3.
Above-mentioned band drain is laid in fabric structure completion back, shape such as Fig. 2, and material is selected soft and hard material.
The top is communicated with by groove 4 between the adjacent concave holes 2.Be communicated with by groove 5 along top between the diagonal adjacent concave holes 2.The outside of boss 3 is interval with the reinforcing rib 6 of outstanding its surperficial arc.
In the building completion, before concrete cover 7 is laid, evenly lay band drain on sole plate 8 upper stratas, focus on the water that interior of building generates.
In the band drain construction of building foundation base plate, concentrated collecting well 9 places that are induced to of the various water of interior of building generation.The method is divided into the stage of the whole laying band drain on sole plate 8 upper stratas in sole plate completion and subterranean layer building completion back; Building foundation base plate 8 tops one side forms french drain, lays the stage of concrete cover 7; The water that interior of building takes place is concentrated the underground ground waterproof job practices in the stage that is induced to collecting well 9 by band drain and french drain.
Claims (4)
1. a band drain is characterized in that, comprises plate body (1), and plate body (1) is gone up shrinkage pool (2) is set at interval, and the bottom of shrinkage pool (2) protrudes from plate body (1) and forms boss (3).
2. band drain according to claim 1 is characterized in that, the top is communicated with by groove (4) between the adjacent concave holes (2).
3. band drain according to claim 1 and 2 is characterized in that, is communicated with by groove (5) along top between the diagonal adjacent concave holes (2).
4. band drain according to claim 3 is characterized in that, the outside of boss (3) is interval with the reinforcing rib (6) of outstanding its surperficial arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220735262 CN203049600U (en) | 2012-12-28 | 2012-12-28 | Drainage plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220735262 CN203049600U (en) | 2012-12-28 | 2012-12-28 | Drainage plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203049600U true CN203049600U (en) | 2013-07-10 |
Family
ID=48732571
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220735262 Expired - Fee Related CN203049600U (en) | 2012-12-28 | 2012-12-28 | Drainage plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203049600U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080259A (en) * | 2019-03-19 | 2019-08-02 | 上海三彩科技发展有限公司 | The method that gutter does hollow floor is cut in underground engineering base surface |
-
2012
- 2012-12-28 CN CN 201220735262 patent/CN203049600U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080259A (en) * | 2019-03-19 | 2019-08-02 | 上海三彩科技发展有限公司 | The method that gutter does hollow floor is cut in underground engineering base surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201217811Y (en) | Advanced water-stop post-pouring zone of base exterior wall | |
CN203546762U (en) | Triple waterproof advance water stop structure for post-cast strip | |
CN203188225U (en) | Novel dewatering-well sealing structure | |
CN203741869U (en) | Connection node structure of underground diaphragm wall top beam and basement structure top plate | |
CN209145323U (en) | Balcony is transformed in the low energy consumption of existing building | |
CN208137967U (en) | A kind of composite lining supporting construction of tunnel slope test section | |
CN203049600U (en) | Drainage plate | |
CN203961624U (en) | A kind of prefabricated windowsill bears down on one | |
CN101906775A (en) | Multifunctional precast arch piece | |
CN103216102A (en) | Construction method for tremie guiding pouring inside steel pipe column | |
CN204715364U (en) | A kind of foundation pit support device | |
CN207794333U (en) | A kind of stealthy aseismic joint construction being combined with gutter | |
CN201679008U (en) | Rigid water drainage device for foundation pit | |
CN203320576U (en) | Waterproof and drainage system for basement external wall of super high-rise buildings | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN206769023U (en) | A kind of outer wall of basement waterproof construction | |
CN206635786U (en) | Prefabricated assembled transformer substation foundation structure | |
CN205530345U (en) | Modular many storehouses utility tunnel structure | |
CN109098307A (en) | Brick output enters the wall body structure and wall building method of stone | |
CN204781820U (en) | Flue structure | |
CN204941552U (en) | A kind of subway station of parallel shield method enlarging construction | |
CN103556764A (en) | Self-balancing extra-large-area roof reservoir and building method thereof | |
CN208415810U (en) | A kind of caisson type accomodation ground assembling mounting structure | |
CN203174908U (en) | Siphon-type rainwater hopper | |
CN203034470U (en) | Caisson device applied to water foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130710 Termination date: 20151228 |
|
EXPY | Termination of patent right or utility model |