CN203741869U - Connection node structure of underground diaphragm wall top beam and basement structure top plate - Google Patents

Connection node structure of underground diaphragm wall top beam and basement structure top plate Download PDF

Info

Publication number
CN203741869U
CN203741869U CN201320806398.9U CN201320806398U CN203741869U CN 203741869 U CN203741869 U CN 203741869U CN 201320806398 U CN201320806398 U CN 201320806398U CN 203741869 U CN203741869 U CN 203741869U
Authority
CN
China
Prior art keywords
ring beam
diaphragm wall
basement
basement structure
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320806398.9U
Other languages
Chinese (zh)
Inventor
邸国恩
黄炳德
王卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Jiangbei New Area Underground Space Research Institute Co ltd
Original Assignee
East China Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Architectural Design and Research Institute Co Ltd filed Critical East China Architectural Design and Research Institute Co Ltd
Priority to CN201320806398.9U priority Critical patent/CN203741869U/en
Application granted granted Critical
Publication of CN203741869U publication Critical patent/CN203741869U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model belongs to the field of foundation pit supporting, and provides a connection node structure of an underground diaphragm wall top beam and a basement structure top plate. The top beam is positioned at the top of an underground diaphragm wall which adopts a wall body form of two walls into a whole; a pilaster is attached to the inner side of the underground diaphragm wall; a ring beam adopting a reinforced concrete structure is arranged between the top beam and the basement structure top plate adopting the reinforced concrete structure and is fixed together with the top beam and the basement structure top plate; the ring beam is inverted L-shaped, and an inner notch of the ring beam is buckled to the top beam; a vertical limb of the ring beam is erected on the pilaster, and is as thick as the pilaster; the surface level of the ring beam is equal to that of the basement structure top plate; the height of the cross section of the vertical limb of the ring beam is not less than that of the cross section of a frame beam of the basement structure top plate. According to the utility model, effective connection between the top beam and the basement structure top plate structure is realized, cutting of the top beam is avoided, and a lot of manpower and physical resources are saved, so that higher efficiency is realized in the construction of foundation pit engineering and an underground structure.

Description

The connected node structure of a kind of diaphragm wall Guan Liang and basement structure top board
Technical field
The utility model belongs to a kind of connected node structure of diaphragm wall and basement structure top board, can be applied to adopting in the foundation pit supporting project of " two wall unifications " diaphragm wall.
Background technology
Diaphragm wall have anti-side rigidity large, can effectively control the many advantages such as foundation pit deformation protection surrounding enviroment and construction technology maturation, require to have obtained a large amount of application in base pit engineering high and that the excavation of foundation pit degree of depth is darker in surrounding enviroment protection in recent years.Consider from the angle of saving construction costs, the overwhelming majority selects diaphragm wall all to adopt " two wall unifications " pattern as the engineering of supporting and protection structure, and diaphragm wall, in the Foundation Pit Construction stage as supporting and protection structure, plays the object of gear soil and sealing; As main body basement structure outer wall, outer wall of underground structure is set no longer in addition in the permanent operational phase of structure.For strengthening the integral rigidity of basement structure, meet stressed and waterproof requirement, " two wall unifications " diaphragm wall is effectively connected with main body underground structure inner horizontal beam slab, structural stud and sole plate by corresponding structure node is set.In the base pit engineering of implementing along the practice, because diaphragm wall and top Guan Liang thereof constructed in the excavation of foundation pit stage, and basement structure top board is construction in later period, conventional way is the basement construction stage to connect body of wall or beam on Guan Liang, and basement structure top board reinforcing bar is anchored into and connect in body of wall or beam.When basement structure top board framework bottom elevation is during lower than hat beam face absolute altitude, way is watered and is connect in body of wall or structural beams after structural beams bottom surface reinforcing bar cannot being anchored into routinely, in common engineering, adopt Guan Liang is partly or entirely cut, together again build with basement structure beam slab, so that basement roof Bar Anchorage.For the larger engineering of foundation ditch area, this huge loss that first cuts the method for reforming afterwards and not only cause manpower and materials, also can cause the delay of programming.
Utility model content
Technical problem to be solved in the utility model has been to provide the connected node structure of a kind of diaphragm wall Guan Liang and basement structure top board, this connection is configured to arrange inverted L-shaped structure ring beam between diaphragm wall Guan Liang and structure roof, the two is effectively connected by inverted L-shaped ring beam, avoid Guan Liang to cut.
For solving the problems of the technologies described above, basic scheme of the present utility model is: Guan Liang is positioned at the top of diaphragm wall, pilaster is affixed on the inner side of described diaphragm wall, diaphragm wall is " two wall unifications " body of wall, reinforced concrete structure ring beam is arranged between described Guan Liang and steel concrete basement structure top board and is fixed together, described ring beam is inverted L-shaped, interior breach tips upside down on described Guan Liang, the vertical limb frame of described ring beam is in described pilaster, and with described pilaster uniform thickness, the face absolute altitude of described ring beam is with the face absolute altitude of described basement structure top board, the vertical limb depth of section of described ring beam is not less than the Vierendeel girder depth of section of described basement structure top board.
In the utility model, the sectional dimension of ring beam is determined jointly by Vierendeel girder height, hat beam cross sectional dimensions and the pilaster thickness of basement structure top board, the beam reinforced steel bar of basement structure top board anchor in ring beam and with ring beam synchronous construction, ring beam can be connected with Guan Liang by reserved steel bar, and the connected mode between each member belongs to prior art.In the basement roof construction stage, reserved steel bar is stripped out and anchored in ring beam.Between hat back portion and ring beam, rubber fastening band can be set, guarantee the stagnant water effect between constuction joint.
Due to the use of above-mentioned diaphragm wall Guan Liang and basement structure top board connected node structure, realizing Guan Liang is connected with the effective of basement structure top board, avoid cutting of Guan Liang, saved a large amount of man power and materials, make base pit engineering and Underground Construction more efficient.
Brief description of the drawings
Below in conjunction with accompanying drawing and example and application construction method, the utility model will be further described.
Fig. 1 is the cross-sectional view that the utility model has been implemented.
Fig. 2 is the cross-sectional view of the utility model in the hat beam construction stage.
Fig. 3 is the connection detail of the utility model at the reserved vertical connecting reinforcement of hat back portion.
Fig. 4 is the utility model is met the reserved horizontal connecting reinforcement of hole side connection detail at Guan Liang.
Fig. 5 is the connection detail that the utility model Guan Liang is connected with ring beam.
Fig. 6 is the cross-sectional view of the utility model ring beam.
Detailed description of the invention
The utility model is applied in the foundation pit supporting project of employing " two wall unifications " diaphragm wall, by being set, inverted L-shaped structure ring beam diaphragm wall Guan Liang effectively can be connected with basement structure top board, avoid cutting Guan Liang, play the effect of convenient construction, saving cost.By reference to the accompanying drawings, specific descriptions are as follows:
As shown in Figure 1, inverted L-shaped structure ring beam 3 is arranged between the hat beam 1 and basement structure top board 4 on diaphragm wall 2 wall tops, the beam reinforced steel bar 8 of basement structure top board 4 anchor in ring beam 3 and with ring beam 3 synchronous constructions, ring beam 3 is by vertical connecting reinforcement 6, level connection joint reinforcing bar 7 and be preced with beam 1 and be connected.
As shown in Figure 2, Figure 3 and Figure 4, the hat beam 1 of diaphragm wall can be reserved vertical connecting reinforcement 6 and level connection joint reinforcing bar 7 in the time of construction; Vertical connecting reinforcement 6 is arranged at hat beam 1 top, and its bottom, top anchor into respectively in hat beam 1 and ring beam 3; Level connection joint reinforcing bar 7 is arranged at hat beam 1 and meets hole side, and one end anchors in hat beam 1, and the other end bends and is positioned over hat beam 1 and meets in the side concrete cover of hole; Diameter, spacing and the anchorage depth of vertical connecting reinforcement 6 and level connection joint reinforcing bar 7 should be by calculative determinations.
As shown in Figure 5, in basement structure top board and ring beam construction stage, the bending segment of reserved horizontal connecting reinforcement 7 is stripped out to stretching (as shown in phantom in Figure 5) and anchor in the vertical limb of ring beam 3; And at hat beam 1 top and ring beam 3 interfaces, rubber fastening band 9 is set, to guarantee the stagnant water effect between constuction joint.
As shown in Figure 6,3 absolute altitudes of ring beam are with the face absolute altitude of basement structure top board 4, ring beam 3 depth of sections are not less than the Vierendeel girder depth of section of basement structure top board 4, ring beam 3 is inverted L-shaped, L shaped interior breach tips upside down on hat beam 1, the vertical limb frame of described ring beam in pilaster 5, and with pilaster 5 uniform thickness.
In the present embodiment, it is only a kind of signal that the reinforcing bar between ring beam, Guan Liang and basement structure top board connects, and in available prior art, either type connects.
The scheme above the utility model example being provided is introduced in detail, for one of ordinary skill in the art, according to the thought of the utility model embodiment, all will change in specific embodiments and applications.In sum, this description should not be construed as restriction of the present utility model, and all any changes of making according to the utility model design philosophy are all within protection domain of the present utility model.

Claims (2)

1. the connected node of a diaphragm wall Guan Liang and basement structure top board structure, Guan Liang (1) is positioned at the top of diaphragm wall (2), pilaster (5) is affixed on the inner side of described diaphragm wall (2), described diaphragm wall (2) is " two wall unifications " body of wall, it is characterized in that: reinforced concrete structure ring beam (3) is arranged between described Guan Liang (1) and steel concrete basement structure top board (4) and is fixed together, described ring beam (3) is inverted L-shaped, interior breach tips upside down on described Guan Liang (1), the vertical limb frame of described ring beam (3) is in described pilaster (5), and with described pilaster (5) uniform thickness, the face absolute altitude of described ring beam (3) is with the face absolute altitude of described basement structure top board (4), the vertical limb depth of section of described ring beam (3) is not less than the Vierendeel girder depth of section of described basement structure top board (4).
2. the connected node of a kind of diaphragm wall Guan Liang according to claim 1 and basement structure top board structure, is characterized in that: between described Guan Liang (1) top and described ring beam (3), rubber fastening band (9) is set.
CN201320806398.9U 2013-12-10 2013-12-10 Connection node structure of underground diaphragm wall top beam and basement structure top plate Expired - Lifetime CN203741869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320806398.9U CN203741869U (en) 2013-12-10 2013-12-10 Connection node structure of underground diaphragm wall top beam and basement structure top plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320806398.9U CN203741869U (en) 2013-12-10 2013-12-10 Connection node structure of underground diaphragm wall top beam and basement structure top plate

Publications (1)

Publication Number Publication Date
CN203741869U true CN203741869U (en) 2014-07-30

Family

ID=51341690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320806398.9U Expired - Lifetime CN203741869U (en) 2013-12-10 2013-12-10 Connection node structure of underground diaphragm wall top beam and basement structure top plate

Country Status (1)

Country Link
CN (1) CN203741869U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615017A (en) * 2013-12-10 2014-03-05 华东建筑设计研究院有限公司 Connecting part of underground continuous wall top beam and basement structure top plate
CN104878776A (en) * 2015-05-27 2015-09-02 中建地下空间有限公司 Full-automatic parking garage body structure at shallow underground layer
CN105040730A (en) * 2015-06-29 2015-11-11 上海市基础工程集团有限公司 Connection processing method for enclosure bored concrete pile and cellar structure floor slab in reversed foundation pit
CN105970976A (en) * 2016-07-26 2016-09-28 华东建筑设计研究院有限公司 Vertical connection structure for supporting row piles and main underground structure
CN108824483A (en) * 2018-07-23 2018-11-16 中国建筑第八工程局有限公司 The external wall structure and its construction method of multi-storey basement

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615017A (en) * 2013-12-10 2014-03-05 华东建筑设计研究院有限公司 Connecting part of underground continuous wall top beam and basement structure top plate
CN104878776A (en) * 2015-05-27 2015-09-02 中建地下空间有限公司 Full-automatic parking garage body structure at shallow underground layer
CN105040730A (en) * 2015-06-29 2015-11-11 上海市基础工程集团有限公司 Connection processing method for enclosure bored concrete pile and cellar structure floor slab in reversed foundation pit
CN105040730B (en) * 2015-06-29 2017-04-19 上海市基础工程集团有限公司 Connection processing method for enclosure bored concrete pile and cellar structure floor slab in reversed foundation pit
CN105970976A (en) * 2016-07-26 2016-09-28 华东建筑设计研究院有限公司 Vertical connection structure for supporting row piles and main underground structure
CN108824483A (en) * 2018-07-23 2018-11-16 中国建筑第八工程局有限公司 The external wall structure and its construction method of multi-storey basement

Similar Documents

Publication Publication Date Title
CN203741869U (en) Connection node structure of underground diaphragm wall top beam and basement structure top plate
CN207160039U (en) A kind of Tenon prefabricated PC open caisson
CN103711238B (en) Assembled ring muscle fastens and is anchored concrete shear wall structure system
CN101914925A (en) Basement by using optimized composite prefabricated arch wall as external wall
CN203080550U (en) V-shaped precast concrete retaining wall
KR101286278B1 (en) Korean traditional roof structure
CN103615017A (en) Connecting part of underground continuous wall top beam and basement structure top plate
CN201567584U (en) Prefabricated construction reinforced concrete cushion cap foundation
CN101418569A (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN106545110A (en) A kind of anti-buckling steel plate shear wall structure being easily assembled
CN108265875A (en) Self waterproofing energy consumption precast shear wall structure and construction method
CN208396179U (en) A kind of prefabricated cantilever stair
CN102852255B (en) A kind of co-layer draining washroom composite floor and construction method
CN204825920U (en) Underground structure outer wall with go along with sb. to guard him vertical load -bearing of campshed integration structure
CN107975043B (en) Foundation pit supporting construction and underground structure, basic integrated structure
CN207812457U (en) Foundation pit supporting construction and underground structure, basic integrated structure
CN206205166U (en) It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure
CN206769023U (en) A kind of outer wall of basement waterproof construction
CN104947687A (en) Integrated vertical load-bearing structure of underground structure external wall and enclosure row piles
CN204703191U (en) A kind of double preformed pile and top board node connecting structure doing structure outer
CN205000360U (en) Basement structure with waterproof structure
CN203924420U (en) Assembling ring muscle fastens and is anchored concrete shear wall structure system
CN209523311U (en) Low multi-story structure
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house
CN208650098U (en) The external wall structure of more absolute altitude complexity basements

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181022

Address after: 211800 No. 12, Xing Long Road, Pukou District, Nanjing, Jiangsu.

Patentee after: Nanjing Jiangbei new area Underground Space Research Institute Co.,Ltd.

Address before: 200002 No. 151, Hankou Road, Shanghai, Huangpu District

Patentee before: EAST CHINA ARCHITECTURAL DESIGN & RESEARCH INSTITUTE Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20140730

CX01 Expiry of patent term