CN202969950U - Hybrid power concrete pumping device - Google Patents

Hybrid power concrete pumping device Download PDF

Info

Publication number
CN202969950U
CN202969950U CN2012206141688U CN201220614168U CN202969950U CN 202969950 U CN202969950 U CN 202969950U CN 2012206141688 U CN2012206141688 U CN 2012206141688U CN 201220614168 U CN201220614168 U CN 201220614168U CN 202969950 U CN202969950 U CN 202969950U
Authority
CN
China
Prior art keywords
oil pump
motor
main oil
battery
pump motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012206141688U
Other languages
Chinese (zh)
Inventor
代青龙
沈明星
方艺平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Automobile Manufacturing Co Ltd
Original Assignee
Sany Automobile Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Automobile Manufacturing Co Ltd filed Critical Sany Automobile Manufacturing Co Ltd
Priority to CN2012206141688U priority Critical patent/CN202969950U/en
Application granted granted Critical
Publication of CN202969950U publication Critical patent/CN202969950U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0436Devices for both conveying and distributing with distribution hose on a mobile support, e.g. truck
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0445Devices for both conveying and distributing with distribution hose with booms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The utility model discloses a hybrid power concrete pumping device which comprises a chassis, an engine, a storage battery, a controller, a main oil pump motor and a pumping device, wherein the engine is connected with a transmission shaft of the chassis, the engine drives the chassis to run under a running state, the storage battery is connected with the main oil pump motor, the main oil pump motor is connected with a main oil pump of the pumping device, the controller is connected with the storage battery, the controller controls the storage battery to discharge under a pumping state, so as to drive the main oil pump motor to work according to a demanding power of the pumping device, and the main oil pump motor drives the main oil pump of the pumping device to work. The engine drives the chassis to run under the running state, the storage battery discharges under the pumping state, and the main oil pump motor drives the main oil pump of the pumping device to work, thus the hybrid power concrete pumping device realizes application of hybrid power in the concrete pumping device for realizing running and pumping functions, and has the advantages of energy saving and environment friendliness.

Description

A kind of hybrid power concrete pumping equipment
Technical field
The utility model relates to engineering machinery field, and particularly a kind of hybrid power concrete pumping equipment, comprise hybrid concrete pump truck or hybrid vehicle formula concrete pump.
Background technology
In recent years, the successful Application along with Technology of Hybrid Electric Vehicle on automobile, Technology of Hybrid Electric Vehicle reaches its maturity, and the cry that Technology of Hybrid Electric Vehicle is applied in engineering machinery is more and more stronger.Adopt Technology of Hybrid Electric Vehicle in engineering machinery, on the one hand can reach good effects of energy saving and emission reduction, on the other hand, constantly perfect along with electronic control technology, surge in engineering machinery, hydraulic control system can be replaced by electronic, electric-control system, further improves its service behaviour.Therefore, hybrid power engineering machinery has comparatively wide development and application prospect.
In prior art, concrete mixer, Vehicular concrete pump provide power by independent diesel engine or motor when carrying out the concrete pumping operation, but, the oil consumption of diesel engine is large, expense is high, not environmental protection, and motor requires the job site to have supply of electric power, has larger limitation.
The utility model content
In view of this, the utility model proposes a kind of hybrid power concrete pumping equipment, under transport condition by motor driven under the pumping state by Motor Drive, energy-conserving and environment-protective.
The utility model proposes a kind of hybrid power concrete pumping equipment, comprising: chassis, motor, battery, controller, main oil pump motor and pumping installations, wherein,
Motor is connected with the power transmission shaft on chassis, and under transport condition, travel in the motor driven chassis;
Battery is connected with the main oil pump motor, the main oil pump motor is connected with the main oil pump of pumping installations, controller is connected with battery, under the pumping state, controller is controlled battery discharging to drive main oil pump motor operation, the main oil pump work of main oil pump Motor Drive pumping device according to the demand power of pumping installations.
Preferably, also comprise the generator that is connected with motor, generator is connected with battery, the engine driven generators generating, and generator is charge in batteries.
Preferably, be provided with on battery for connecting the external charge interface of external power supply to its charging.
Preferably, battery is super accumulator.
Preferably, super accumulator is removably mounted on the chassis.
Preferably, also comprise radiation electromotor, stir motor, lubricated motor and pump motor, radiation electromotor, stir motor, lubricated motor and be connected with battery with pump motor and be connected.
Preferably, also comprise transfer case, the power input shaft of transfer case is connected with motor, and the first power output shaft of transfer case is connected with the power transmission shaft on chassis, and the second power output shaft of transfer case is connected with the main oil pump of pumping installations.
Preferably, also comprise boom device, boom device is arranged on the chassis.
Preferably, also comprise the jib oil pump motor, battery is connected with the jib oil pump motor, and the jib oil pump motor is connected with the jib oil pump of boom device.
Hybrid power concrete pumping equipment of the present utility model, pass through motor driven chassis walking under transport condition, also pass through the main oil pump work of main oil pump Motor Drive pumping device by battery discharging under the pumping state, realized that hybrid power travels and pump function with realization in the application of concrete pumping equipment, had advantages of energy-conserving and environment-protective.
Description of drawings
The accompanying drawing that consists of a part of the present utility model is used to provide further understanding of the present utility model, and illustrative examples of the present utility model and explanation thereof are used for explaining the utility model, do not consist of improper restriction of the present utility model.
Fig. 1 is the structural representation of a kind of hybrid power concrete pumping equipment in the utility model.
The specific embodiment
Need to prove, in the situation that do not conflict, embodiment and the feature in embodiment in the utility model can make up mutually.Describe below with reference to the accompanying drawings and in conjunction with the embodiments the utility model in detail.
As shown in Figure 1, be the structural representation of a kind of hybrid power concrete pumping equipment in the utility model.
With reference to Fig. 1, a kind of hybrid power concrete pumping equipment that the utility model proposes comprises chassis 8, motor 5, generator 6, battery 2, controller 1, main oil pump motor 3 and pumping installations 4, wherein:
Motor 5 is connected with the power transmission shaft on chassis 8, is used for driving chassis 8 and travels, and under transport condition, drives chassis 8 walkings by motor 5;
Motor 5 is connected with generator 6, and generator 6 is connected with battery 2, and motor 5 driving generators 6 generate electricity and are battery 2 chargings, and, being provided with external charge interface 7 on battery 2, external power supply is battery 2 chargings by external charge interface 7;
Battery 2 is connected with main oil pump motor 3, main oil pump motor 3 is connected with the main oil pump 40 of pumping installations 4, controller 1 is connected with battery 2, under the pumping state, controller 1 can be controlled battery 2 according to the demand power of pumping installations 4 and discharge to drive 3 work of main oil pump motor, main oil pump motor 3 drives main oil pump 40 work of pumping installations 4, thus pumping of concrete.
In the utility model, realized that hybrid power travels and pump function with realization in the application of concrete pumping equipment, drive chassis 8 walkings by motor 5 under transport condition, discharge by battery 2 under the pumping state and pass through main oil pump 40 work that main oil pump motor 3 drives pumping installations 4.When the concrete pumping operation, adopt battery 2 as power resources, and controller 1 is controlled battery 2 according to the demand power of pumping installations 4 and is discharged, with respect to existing Diesel Driven mode, can energy efficient, reduction expense and environmental protection more, with respect to the Motor Drive mode, can be not limited to the supply of electric power situation of job site, its range of application is more extensive, and compliance is stronger.
In this example, battery 2 can have two kinds of charge modes, motor 5 can drive generator 6 generatings and be battery 2 chargings, perhaps, external power source is battery 2 chargings by external charge interface 7, two of battery 2 kinds of charge modes form complementation in actual application, to satisfy the power demands of pumping installations 4 long-time continuous pumpings.
For example, before the concrete pumping operation, external power source is battery 2 chargings by external charge interface 7, and motor 5 driving generators 6 generate electricity and are battery 2 chargings in the process of moving; Under the pumping state, battery 2 discharges to drive 3 work of main oil pump motor, thereby controls pumping installations 4 work; According to the actual conditions of job site, the power supply that can adopt the job site in pumping procedure is the needs that battery 2 charges to satisfy the long-time continuous pumping.
Above-mentioned under transport condition, drive in the process of chassis 8 walkings by motor 5, can pass through the belt transferring power between motor 5 and generator 6, thereby motor 5 drives generator 6 generatings under transport condition.
Above-mentioned battery 2 is super accumulator.Battery 2 is removably mounted on chassis 8, conveniently charges by 7 pairs of batteries 2 of external charge interface.
Above-mentioned motor 5 is Diesel engine 5.
In the utility model, under the pumping state, battery 2 discharges drive 3 work of main oil pump motor, and are corresponding, and battery 2 can also provide electric energy for radiation electromotor, stirring motor, lubricated motor and pump motor.Concrete, battery 2 is connected with pump motor with radiation electromotor, stirring motor, lubricated motor, controller 1 is controlled battery 2 discharges and is driven respectively radiation electromotor, stirring motor, lubricated motor and pump motor work when driving 3 work of main oil pump motor.
In above-mentioned hybrid power concrete pumping equipment, can also comprise transfer case, the power input shaft of transfer case is connected with motor 5, and the first power output shaft of transfer case is connected with the power transmission shaft on chassis 8, and the second power output shaft of transfer case is connected with the main oil pump 40 of pumping installations 4.In this technical scheme, motor 5 and main oil pump motor 3 can drive main oil pump 40 work individually or simultaneously, by clutch is set, two driving branch roads are switched type of drive that can the flexible choice main oil pump when concrete the application.For example, in the situation that battery 2 or controller 1 break down, can select motor 5 to drive separately main oil pump 40 work.
The above-mentioned hybrid power concrete pumping equipment of the utility model can be hybrid concrete pump truck or Vehicular concrete pump.
Hybrid concrete pump truck comprises boom device, and boom device is arranged on chassis 8.In hybrid concrete pump truck, can be the expansion of boom device and the folding power that provides by battery 2, concrete, by the jib oil pump motor is set, battery 2 is connected with the jib oil pump motor, the jib oil pump motor is connected with the jib oil pump of boom device, controller 1 is when driving 3 work of main oil pump motor, control battery 2 and discharge to drive the work of jib oil pump motor, the jib oil pump motor drives the jib operation of oil pump, thereby realizes opening and folding of boom device.
The above is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (9)

1. a hybrid power concrete pumping equipment, is characterized in that, comprising: chassis, motor, battery, controller, main oil pump motor and pumping installations, wherein,
Motor is connected with the power transmission shaft on chassis, and under transport condition, travel in the motor driven chassis;
Battery is connected with the main oil pump motor, the main oil pump motor is connected with the main oil pump of pumping installations, controller is connected with battery, under the pumping state, controller is controlled battery discharging to drive main oil pump motor operation, the main oil pump work of main oil pump Motor Drive pumping device according to the demand power of pumping installations.
2. hybrid power concrete pumping equipment according to claim 1, is characterized in that, also comprises the generator that is connected with motor, and generator is connected with battery, the engine driven generators generating, and generator is charge in batteries.
3. hybrid power concrete pumping equipment according to claim 1, is characterized in that, is provided with on battery for connecting the external charge interface of external power supply to its charging.
4. hybrid power concrete pumping equipment according to claim 1, is characterized in that, battery is super accumulator.
5. hybrid power concrete pumping equipment according to claim 4, is characterized in that, super accumulator is removably mounted on the chassis.
6. hybrid power concrete pumping equipment according to claim 1, it is characterized in that, also comprise radiation electromotor, stir motor, lubricated motor and pump motor, radiation electromotor, stir motor, lubricated motor and be connected with battery with pump motor and be connected.
7. hybrid power concrete pumping equipment according to claim 1, it is characterized in that, also comprise transfer case, the power input shaft of transfer case is connected with motor, the first power output shaft of transfer case is connected with the power transmission shaft on chassis, and the second power output shaft of transfer case is connected with the main oil pump of pumping installations.
8. the described hybrid power concrete pumping equipment of according to claim 1 to 7 any one, is characterized in that, also comprise boom device, boom device is arranged on the chassis.
9. hybrid power concrete pumping equipment according to claim 8, is characterized in that, also comprises the jib oil pump motor, and battery is connected with the jib oil pump motor, and the jib oil pump motor is connected with the jib oil pump of boom device.
CN2012206141688U 2012-11-20 2012-11-20 Hybrid power concrete pumping device Expired - Lifetime CN202969950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206141688U CN202969950U (en) 2012-11-20 2012-11-20 Hybrid power concrete pumping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206141688U CN202969950U (en) 2012-11-20 2012-11-20 Hybrid power concrete pumping device

Publications (1)

Publication Number Publication Date
CN202969950U true CN202969950U (en) 2013-06-05

Family

ID=48511044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206141688U Expired - Lifetime CN202969950U (en) 2012-11-20 2012-11-20 Hybrid power concrete pumping device

Country Status (1)

Country Link
CN (1) CN202969950U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3023212A1 (en) 2014-11-24 2016-05-25 Cifa S.P.A. Vehicle to project concrete
CN105774570A (en) * 2014-12-25 2016-07-20 包头市北工机械有限公司 Electrically driven concrete delivery pump truck
CN107696876A (en) * 2017-03-17 2018-02-16 蔡绮睿 Charging equipment and pure electric or hybrid vehicle with same
CN108357354A (en) * 2018-03-27 2018-08-03 西安法士特汽车传动有限公司 A kind of hybrid power power takeoff assembly
CN108437775A (en) * 2018-04-19 2018-08-24 贵州大学 A kind of parallel connection type oil electric mixed dynamic towed concrete pump
CN108583268A (en) * 2018-04-19 2018-09-28 贵州大学 A kind of parallel connection type oil electric mixed dynamic jib concrete pump truck
CN109057346A (en) * 2018-10-17 2018-12-21 三汽车制造有限公司 Pump truck
CN110670882A (en) * 2018-07-02 2020-01-10 西法股份公司 Drive device for a mobile manipulator and mobile manipulator comprising a drive device
WO2020048745A1 (en) * 2018-09-04 2020-03-12 Putzmeister Engineering Gmbh Vehicle-mounted concrete pump

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9850671B2 (en) 2014-11-24 2017-12-26 Cifa Spa Vehicle to project concrete
EP3023212A1 (en) 2014-11-24 2016-05-25 Cifa S.P.A. Vehicle to project concrete
CN105774570A (en) * 2014-12-25 2016-07-20 包头市北工机械有限公司 Electrically driven concrete delivery pump truck
CN107696876A (en) * 2017-03-17 2018-02-16 蔡绮睿 Charging equipment and pure electric or hybrid vehicle with same
CN108357354A (en) * 2018-03-27 2018-08-03 西安法士特汽车传动有限公司 A kind of hybrid power power takeoff assembly
CN108437775B (en) * 2018-04-19 2023-04-25 贵州大学 Parallel type oil-electricity hybrid power towed concrete pump
CN108437775A (en) * 2018-04-19 2018-08-24 贵州大学 A kind of parallel connection type oil electric mixed dynamic towed concrete pump
CN108583268A (en) * 2018-04-19 2018-09-28 贵州大学 A kind of parallel connection type oil electric mixed dynamic jib concrete pump truck
CN108583268B (en) * 2018-04-19 2024-04-30 贵州大学 Parallel type oil-electricity hybrid power arm frame type concrete pump truck
CN110670882A (en) * 2018-07-02 2020-01-10 西法股份公司 Drive device for a mobile manipulator and mobile manipulator comprising a drive device
CN112912577A (en) * 2018-09-04 2021-06-04 普茨迈斯特工程有限公司 Vehicle-mounted concrete pump
WO2020048745A1 (en) * 2018-09-04 2020-03-12 Putzmeister Engineering Gmbh Vehicle-mounted concrete pump
EP3847321B1 (en) 2018-09-04 2023-05-31 Putzmeister Engineering GmbH Vehicle-mounted concrete pump
EP4234845A2 (en) 2018-09-04 2023-08-30 Putzmeister Engineering GmbH Vehicle-mounted concrete pump
EP4234846A2 (en) 2018-09-04 2023-08-30 Putzmeister Engineering GmbH Vehicle-mounted concrete pump
EP4234846A3 (en) * 2018-09-04 2023-10-04 Putzmeister Engineering GmbH Vehicle-mounted concrete pump
EP4234845A3 (en) * 2018-09-04 2023-10-04 Putzmeister Engineering GmbH Vehicle-mounted concrete pump
JP7381587B2 (en) 2018-09-04 2023-11-15 プツマイスター エンジニアリング ゲーエムベーハー Vehicle-mounted concrete pump
CN109057346A (en) * 2018-10-17 2018-12-21 三汽车制造有限公司 Pump truck

Similar Documents

Publication Publication Date Title
CN202969950U (en) Hybrid power concrete pumping device
CN102826000B (en) Vehicle hybrid system and container stacking machine
CN214786070U (en) Pump truck
CN103825359A (en) A working machine
CN201423907Y (en) Pure electric automobile power assembly system
CN211543272U (en) Range-extending multifunctional electric service vehicle with alternating current provided by inverter
CN109774496A (en) A kind of transmission system and quarry tipper of quarry tipper
CN204870528U (en) Electric liquid hybrid power system of vehicle oil
CN209873925U (en) Mobile power supply electric hydraulic excavator
CN201627216U (en) Hybrid backhoe loader
CN101920660A (en) Power supply method and system for mobile type engineering machine
CN103114978A (en) Engineering machine and piezoelectric energy-absorbing power generation system for same
CN108437775B (en) Parallel type oil-electricity hybrid power towed concrete pump
CN104393355A (en) Electric balance control method and device of power battery
CN103538482A (en) Automobile start-stop system capable of providing assisting power and recycling braking energy
CN217944933U (en) Vehicle-mounted concrete pump and cooperative operation system
CN102080675B (en) Wheeled crane and hydraulic control system and pump/motor control circuit thereof
US20100122860A1 (en) Electric off-road vehicle drive
CN204738260U (en) A driving system , motor sweeper and mixed driving system for clean
CN203246326U (en) Auxiliary power system and agitating lorry
CN204875924U (en) Hydraulic shovel's electric driving system
CN215793204U (en) Range-extending running and parallel operation power system suitable for engineering machinery
CN104060949A (en) Energy-storage type hybrid workover rig
CN206647360U (en) A kind of dual power supply type engineering machinery
CN103507627B (en) A kind of sanitation cart and power control system thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130605