CN202925554U - Excavation slope supporting structure for sloping construction - Google Patents

Excavation slope supporting structure for sloping construction Download PDF

Info

Publication number
CN202925554U
CN202925554U CN 201220378418 CN201220378418U CN202925554U CN 202925554 U CN202925554 U CN 202925554U CN 201220378418 CN201220378418 CN 201220378418 CN 201220378418 U CN201220378418 U CN 201220378418U CN 202925554 U CN202925554 U CN 202925554U
Authority
CN
China
Prior art keywords
slope
excavation slope
grid
geo
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220378418
Other languages
Chinese (zh)
Inventor
华文鑫
杨慧峰
李克江
龚小东
宋巍
陈赛菊
刘光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd Tianjin Branch
Original Assignee
Zhongtian Construction Group Co Ltd Tianjin Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd Tianjin Branch filed Critical Zhongtian Construction Group Co Ltd Tianjin Branch
Priority to CN 201220378418 priority Critical patent/CN202925554U/en
Application granted granted Critical
Publication of CN202925554U publication Critical patent/CN202925554U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses an excavation slope supporting structure for sloping construction. The excavation slope supporting structure comprises a fine aggregate concrete base layer and geogrid, wherein the fine aggregate concrete base layer is sprayed on the excavation slope, and the geogrid is laid on the fine aggregate concrete base layer. The geogrid is fixed on the excavation slope. A fine aggregate concrete surface layer is sprayed on the geogrid. A reinforcing function can be achieved by the excavation slope supporting structure on the excavation slope effectively, and effects of soil body stress homogenization, excavation slope deformation restraining and the like are good. The excavation slope supporting structure has the advantages of being good in stability after molded, capable of keeping stability of the excavation slope after rain wash, easy in material obtaining, easy and convenient to construct, small in requirements of manpower and machinery, capable of improving economic benefits, safe in effects and notable in social benefits.

Description

Be used for putting the foundation pit stope support structure of slope construction
Technical field
The utility model relates to a kind of foundation pit stope support structure, particularly relates to a kind of foundation pit stope support structure be used to putting the slope construction.
Background technology
The continuous propelling of urbanization process causes the land resources growing tension, and the swift and violent universal contention that has aggravated city parking position of the various vehicles, and the design of Underground Garage in large area becomes inexorable trend.
Foundation ditch is put slope excavation because of its economy, have a wide range of applications at the realm of building construction, but because of the difference of on-the-spot soil property situation, if do not take corresponding measure, it is very easily accidents caused that non-support is put the slope excavation, causes unnecessary loss.
The utility model content
The utility model provides a kind of foundation pit stope support structure be used to putting the slope construction for solving the technical problem that exists in known technology.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is: a kind of foundation pit stope support structure be used to putting the slope construction, comprise the pea gravel concreten bottom that is injected on described excavation slope and the geo-grid that is laid on described pea gravel concreten bottom, described geo-grid is fixed on described excavation slope, and spraying on described geo-grid has the pea gravel concreten surface layer.
Toe place at described excavation slope is provided with apron slope and coupled annular french drain, and described annular french drain is communicated with collecting well.
Be provided with apron slope and coupled gutter at the Po Dingchu of described excavation slope.
Described geo-grid is fixed on described excavation slope by fixture.
Described fixture is U-shaped that is made by reinforcing bar, and length is not less than 300mm.
Described geo-grid is formed by the synthetic fibers braiding.
Advantage and the good effect that the utlity model has are: can play effective reinforcement effect to side slope, there is good effect the aspects such as homogenizing resistance to shear of soil, constraint slope deforming.The utility model moulding rear stability is good, still can keep stability of slope after rain drop erosion, and material is easy to get, easy construction, and is artificial, the mechanical requirements amount is little, can greatly increase economic efficiency, and safe effect and social benefit are remarkable.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is that the utility model geo-grid and fixture thereof are arranged schematic diagram;
Fig. 3 is the structural representation of the utility model fixture.
In figure: 1, excavation slope, 2, the gutter, 3, apron slope, 4, french drain, 5, geo-grid, 6, the pea gravel concreten bottom, 7, the pea gravel concreten surface layer, 8, fixture.
The specific embodiment
For further understanding summary of the invention of the present utility model, Characteristic, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
See also Fig. 1~Fig. 3, a kind of foundation pit stope support structure be used to putting the slope construction, comprise the pea gravel concreten bottom 6 that is injected on described excavation slope 1 and the geo-grid 5 that is laid on described pea gravel concreten bottom 6, described geo-grid 5 is fixed on described excavation slope 1, and spraying on described geo-grid 5 has pea gravel concreten surface layer 7.Toe place at described excavation slope 1 is provided with apron slope and coupled annular french drain 4, and described annular french drain 4 is communicated with collecting well, by submersible pump, current is discharged foundation ditch.Can prevent the landslide that toe is caused by the rainwater erosion.In order to prevent that rainwater, surface water from pouring into foundation ditch from the top, slope.Be provided with apron slope 3 and coupled gutter 2 at the Po Dingchu of described excavation slope 1.Can make surface water form functional in organized water drainage.
Before doing supporting and protection structure, reply excavation slope 1 is repaired, and requires slope leveling, and sloping coefficient meets designing requirement.Above-mentioned pea gravel concreten bottom 6 can adopt the C20 fine-stone concrete to form.After 1 finishing of described excavation slope is completed, with special tool with the C20 fine-stone concrete from bottom to top vertical foundation pit side slope 1 spray on excavation slope 1, jet thickness requires uniformity, forms pea gravel concreten bottom 6.Described geo-grid 5 is formed by the synthetic fibers braiding, and its size of mesh opening is 25.4mm * 25.4mm.After 6 injections of pea gravel concreten bottom are completed, described geo-grid 5 is laid from bottom to top along side slope 1, at the rotation angle position of side slope 1, geo-grid 5 short lap length are not less than 500mm, and all the other positions are not less than 200mm; 4 of excavation slope 1 and french drains, geo-grid 5 is all laid by slope aspect in 2, side slope 1 and gutter.Described geo-grid 5 is fixed on described excavation slope 1 by fixture 8.The desirable on-the-spot reinforcing bar waste material self-control of described fixture 8 becomes length to be not less than " U " type spare of 300mm the reinforcing bar waste-material-preparing.Geo-grid 5 is being detained grid with described fixture 8 and is being hammered into excavation slope 1 after laying and completing, and fixture 8 is rule to be arranged, can suitably encrypt at geo-grid 5 overlapping parts.Described pea gravel concreten surface layer 7 can adopt the C20 fine-stone concrete to form.Lay in geo-grid 5 and complete, and fixing with fixture 8, and after qualified by inspection, with special tool with the C20 fine-stone concrete from bottom to top vertical geo-grid 5 spray on geo-grid 5, jet thickness requires uniformity, formation pea gravel concreten surface layer 7.After pea gravel concreten surface layer 7 sprays and completes, the operation construction of lower step of must being allowed for access after being no less than maintenance in 24 hours.
Although the above is described preferred embodiment of the present utility model by reference to the accompanying drawings; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not breaking away from the scope situation that the utility model aim and claim protect, can also make a lot of forms, within these all belong to protection domain of the present utility model.

Claims (6)

1. one kind is used for putting the foundation pit stope support structure of constructing in the slope, it is characterized in that, comprise the pea gravel concreten bottom that is injected on described excavation slope and the geo-grid that is laid on described pea gravel concreten bottom, described geo-grid is fixed on described excavation slope, and spraying on described geo-grid has the pea gravel concreten surface layer.
2. the foundation pit stope support structure be used to putting slope construction according to claim 1, is characterized in that, is provided with apron slope and coupled annular french drain at the toe place of described excavation slope, and described annular french drain is communicated with collecting well.
3. the foundation pit stope support structure be used to putting the slope construction according to claim 1 and 2, is characterized in that, is provided with apron slope and coupled gutter at the Po Dingchu of described excavation slope.
4. the foundation pit stope support structure be used to putting the slope construction according to claim 1 and 2, is characterized in that, described geo-grid is fixed on described excavation slope by fixture.
5. the foundation pit stope support structure be used to putting the slope construction according to claim 4, is characterized in that, described fixture is U-shaped that is made by reinforcing bar, and length is not less than 300mm.
6. the foundation pit stope support structure be used to putting the slope construction according to claim 1, is characterized in that, described geo-grid is formed by the synthetic fibers braiding.
CN 201220378418 2012-07-31 2012-07-31 Excavation slope supporting structure for sloping construction Expired - Fee Related CN202925554U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220378418 CN202925554U (en) 2012-07-31 2012-07-31 Excavation slope supporting structure for sloping construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220378418 CN202925554U (en) 2012-07-31 2012-07-31 Excavation slope supporting structure for sloping construction

Publications (1)

Publication Number Publication Date
CN202925554U true CN202925554U (en) 2013-05-08

Family

ID=48215530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220378418 Expired - Fee Related CN202925554U (en) 2012-07-31 2012-07-31 Excavation slope supporting structure for sloping construction

Country Status (1)

Country Link
CN (1) CN202925554U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213564A (en) * 2014-09-04 2014-12-17 中建四局第六建筑工程有限公司 Excavation slope supporting structure and construction method thereof
CN104234061A (en) * 2014-08-08 2014-12-24 青岛润国生态科技发展有限公司 Reinforced ecological concrete revetment and construction method thereof
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN109610481A (en) * 2018-11-28 2019-04-12 湘潭大学 A kind of supporting improvement construction method for tunnel portal concordant strong-weathered rock matter high gradient slope
CN109914444A (en) * 2019-04-03 2019-06-21 河南中科建筑规划设计有限公司 A kind of slope retaining mechanism and its construction method
CN110284505A (en) * 2019-04-29 2019-09-27 中国建筑第二工程局有限公司 Construction method of mountain foundation pit
CN110725323A (en) * 2019-10-19 2020-01-24 湖北广元岩土工程有限公司 Foundation pit supporting structure and construction method
CN111074909A (en) * 2018-10-22 2020-04-28 黄种玉 Gabion fixing construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234061A (en) * 2014-08-08 2014-12-24 青岛润国生态科技发展有限公司 Reinforced ecological concrete revetment and construction method thereof
CN104314090A (en) * 2014-08-29 2015-01-28 中铁八局集团建筑工程有限公司 Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN104213564A (en) * 2014-09-04 2014-12-17 中建四局第六建筑工程有限公司 Excavation slope supporting structure and construction method thereof
CN111074909A (en) * 2018-10-22 2020-04-28 黄种玉 Gabion fixing construction method
CN109610481A (en) * 2018-11-28 2019-04-12 湘潭大学 A kind of supporting improvement construction method for tunnel portal concordant strong-weathered rock matter high gradient slope
CN109914444A (en) * 2019-04-03 2019-06-21 河南中科建筑规划设计有限公司 A kind of slope retaining mechanism and its construction method
CN109914444B (en) * 2019-04-03 2020-09-11 中科瑞城设计有限公司 Slope supporting mechanism and construction method thereof
CN110284505A (en) * 2019-04-29 2019-09-27 中国建筑第二工程局有限公司 Construction method of mountain foundation pit
CN110725323A (en) * 2019-10-19 2020-01-24 湖北广元岩土工程有限公司 Foundation pit supporting structure and construction method

Similar Documents

Publication Publication Date Title
CN202925554U (en) Excavation slope supporting structure for sloping construction
CN103669398B (en) A kind of monoblock type cutting retaining wall
CN103233446A (en) Composite panel earth and rockfill dam and anti-seepage body construction method
CN206599798U (en) Advanced water-stop post-pouring belt of foundation slab structure
CN204418349U (en) The prefabricated gutter of narrow dark formula
CN103866774A (en) Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN207567892U (en) A kind of large size karst depression flood drainage system
CN102561281A (en) Irrigation and drainage canal in coastal reclamation area
CN109826065A (en) A kind of high-fill roadbed guard system and its construction method
CN204875929U (en) System of recycling is retrieved to rainwater
CN202466544U (en) Irrigation and drainage ditch in coastal reclamation area
CN204825969U (en) Inspection shaft subsides prevents and treats structure
CN207484214U (en) A kind of water permeability and water storage ability terrace
CN207904939U (en) A kind of ecological revetment grass planting plane
CN203403434U (en) Basement
CN208899257U (en) A kind of low drain structure between setting structure location line of magnetic levitation track traffic
CN203960759U (en) A kind of off-load formula rigidity culvert structure
CN103374920B (en) First shaft lining structure and construction method thereof
CN106277687A (en) The installation method of stem pressing glass reinforced plastics anaerobic tank
CN201649261U (en) Drainage ditch with cover plate
CN204661409U (en) For the pool wall in vertical multistage AO ecological sewage treatment pond
CN107245982B (en) A kind of construction method of mud-flat soil pond protecting slope
CN104452506A (en) Method for constructing consolid road
CN202969478U (en) Draining device for resisting water accumulation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20130731