CN202896820U - Double cargo hold based on integrated ballast tanks - Google Patents

Double cargo hold based on integrated ballast tanks Download PDF

Info

Publication number
CN202896820U
CN202896820U CN 201220584528 CN201220584528U CN202896820U CN 202896820 U CN202896820 U CN 202896820U CN 201220584528 CN201220584528 CN 201220584528 CN 201220584528 U CN201220584528 U CN 201220584528U CN 202896820 U CN202896820 U CN 202896820U
Authority
CN
China
Prior art keywords
ballast tanks
cargo hold
ballast tank
double
holds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220584528
Other languages
Chinese (zh)
Inventor
包岩
马延德
姜世跃
李嘉换
衣岩
李峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shipbuilding Industry Co Ltd filed Critical Dalian Shipbuilding Industry Co Ltd
Priority to CN 201220584528 priority Critical patent/CN202896820U/en
Application granted granted Critical
Publication of CN202896820U publication Critical patent/CN202896820U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Cooling, Air Intake And Gas Exhaust, And Fuel Tank Arrangements In Propulsion Units (AREA)

Abstract

The utility model discloses a double cargo hold based on integrated ballast tanks. The double cargo hold comprises two adjacent holds (1) and ballast tanks on two sides of the holds (1). The double cargo hold is characterized in that the ballast tanks on two sides of the two adjacent holds are independent of each other. A transverse watertight bulkhead of a double hull part is omitted, the combined ballast tanks are obtained, and difficulty in pipeline system layout is lowered while stability is satisfied, for example, layout of parts such as sounding pipes, overflow pipes and air nozzles corresponding to the pair of ballast tanks and related pipelines is omitted. Therefore, construction difficulty is lowered and the cost is reduced.

Description

Two cargo holds based on the integral type ballast tank
Technical field
The present invention relates to the marine technology field, more particularly, relate to cargo hold and build.
Background technology
Prior art, ballast tank designed as shown in Figure 2 when cargo vessel was built, and each bivalve, independent cargo hold 1 corresponding left and right sides part also correspondingly becomes a pair of independently ballast tank (left ballast tank 3 and right ballast tank 2).That is to say, have what (to) how many cargo holds just has corresponding with it to ballast tank.But in most cases, the ballast tank of all cargo compartment section or complete empty, otherwise full up.Problem is that cabin quantity is more, and piping arrangement is comparatively loaded down with trivial details.
Summary of the invention
The present invention can reduce the quantity of ballast tank and relevant fitting-out piping configuration by the part ballast tank two cabins unification of boats and ships, reduces the man-hour of constructing.
In order to achieve the above object, the invention provides a kind of two cargo holds based on the integral type ballast tank, comprise two adjacent cargo holds, and the ballast tank of described cargo hold both sides.The present invention improves and is that the ballast tank of described adjacent two cargo hold both sides is respectively separately independently cabin body.
The present invention cancels bivalve parts transversely watertight bulkhead, ballast tank after can obtaining merging, satisfying under the prerequisite of stability, reduce the difficulty of piping arrangement, for example reduce the layout of the corresponding sounding pipe of a pair of ballast tank, overflow pipe, the first-class parts of air and relevant piping, reached the effect that reduces difficulty of construction and cost.
Description of drawings
Fig. 1 is that ballast tank is arranged scheme drawing (overlooking) in the prior art.
Fig. 2 is that the ballast tank after the present invention merges is arranged scheme drawing (overlooking).
The specific embodiment
The present invention cancels bivalve parts transversely watertight bulkhead, the ballast tank after obtaining merging, as shown in Figure 2.Specific practice is: in the Preliminary Ship Design stage, carry out simply first the subdivision of ballast tank according to the every section corresponding bivalve of cargo hold part, as shown in Figure 1 the mode of prior art.Again by on the basis of damaged stability calculation, optionally to pick out and several ballast tank is merged, the ballast tank after the merging is as shown in Figure 2.On this basis, again carry out stability calculation, as satisfying, both illustrated that this merging method was feasible, next can carry out structure design.The present invention has reduced the layout of the corresponding sounding pipe of a pair of ballast tank, overflow pipe, the first-class parts of air and relevant piping.
The present invention is based on as shown in Figure 2 two cargo holds of integral type ballast tank, comprise two adjacent cargo holds 1.Ballast tank with adjacent two cargo hold 1 both sides is respectively separately independently cabin body, the left ballast tank 3 among the figure and right ballast tank 2.
The above; only be the better specific embodiment of the present invention; but protection scope of the present invention is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to replacement or change according to technical scheme of the present invention and inventive concept thereof, all should be encompassed within protection scope of the present invention.

Claims (1)

1. the two cargo holds based on the integral type ballast tank comprise adjacent two cargo holds (1), and the ballast tank of described cargo hold (1) both sides; It is characterized in that,
The ballast tank of described adjacent two cargo holds (1) both sides is respectively separately independently cabin body.
CN 201220584528 2012-11-08 2012-11-08 Double cargo hold based on integrated ballast tanks Expired - Lifetime CN202896820U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220584528 CN202896820U (en) 2012-11-08 2012-11-08 Double cargo hold based on integrated ballast tanks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220584528 CN202896820U (en) 2012-11-08 2012-11-08 Double cargo hold based on integrated ballast tanks

Publications (1)

Publication Number Publication Date
CN202896820U true CN202896820U (en) 2013-04-24

Family

ID=48117520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220584528 Expired - Lifetime CN202896820U (en) 2012-11-08 2012-11-08 Double cargo hold based on integrated ballast tanks

Country Status (1)

Country Link
CN (1) CN202896820U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104122A (en) * 2019-05-24 2019-08-09 江南造船(集团)有限责任公司 A kind of ballast cabin structure and its application

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104122A (en) * 2019-05-24 2019-08-09 江南造船(集团)有限责任公司 A kind of ballast cabin structure and its application

Similar Documents

Publication Publication Date Title
CN203975160U (en) A kind of Liquefied Natural Gas fuel filling ship
US20190135379A1 (en) Method for conversion of a vessel for use as floating liquefied natural gas facility
NZ715324A (en) Cargo transfer vessel
CN105059522A (en) Ballast tank ventilation pipeline
CN202896820U (en) Double cargo hold based on integrated ballast tanks
CN205770093U (en) A kind of ballast-free merchant ship
CN204452795U (en) Based on the container ship of interval type fuel oil tank cargo hold design
CN104875855B (en) A kind of large-sized launching barge Ballast Management method
CN204250304U (en) A kind of bulge carrier engine room arrangement structure
CN104410016A (en) Deck cable transition box
CN105836090A (en) Merchant ship without ballast water
WO2010007554A3 (en) Multi -hull work boat
CN105667709A (en) Hull manufacturing method
CN205837138U (en) A kind of marine oil and gas stimulation work ship
CN107745781A (en) A kind of fertile large transport ship of rise of floor or deadrise
WO2014013584A1 (en) Ship
CN104554626B (en) Container ship with top-inclined fuel oil tanks between cargo compartments
KR20130000742A (en) Upper deck plate with knuckle of membrane lng carrier and membrane lng storage unit
KR101778809B1 (en) A floating facility for processing gas
CN206171712U (en) Binary freighter lamellar body connection structure
CN105416505A (en) Low-resistance wave-piercing ship bow with arrow-shaped waterlines
KR101815313B1 (en) Ballast tank arrangement structure of ship
KR20160031747A (en) Lng fpso and reconstructing method using lng carrier
CN104627317A (en) Offshore ship bow thrust with noise reduction function
CN204726617U (en) A kind of river sea through transport ship

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130424

CX01 Expiry of patent term