CN202850472U - Fixing and movement structure for outer wall scaffold - Google Patents
Fixing and movement structure for outer wall scaffold Download PDFInfo
- Publication number
- CN202850472U CN202850472U CN 201220540374 CN201220540374U CN202850472U CN 202850472 U CN202850472 U CN 202850472U CN 201220540374 CN201220540374 CN 201220540374 CN 201220540374 U CN201220540374 U CN 201220540374U CN 202850472 U CN202850472 U CN 202850472U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- fixing
- connecting piece
- holder
- triangular support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to the field of building equipment, in particular to a fixing and movement structure for an outer wall scaffold. A support beam is connected with a T-shaped connection piece, triangular support platforms which are arranged in the longitudinal direction are symmetrically distributed on two sides of a head end of the T-shaped connection piece, and the T-shaped connection piece is provided with a plurality of pin shaft holes in the longitudinal direction. A plurality of fixing seats which are arranged in the longitudinal direction are arranged on a wall body, and each fixing seat is provided with a T-shaped opening. The T-shaped connection piece is clamped inside the T-shaped openings of the fixing seats, pin shafts penetrate through the pin shaft holes to lock the T-shaped connection piece tightly, and the pin shafts are arranged above the fixing seats. Each fixing seat is provided with two V-shaped rotating seats which are arranged oppositely, the V-shaped rotating seats are connected with the top of each fixing seat in a hinged mode, and one side of each V-shaped rotating seat is clamped on the lower portion of each triangular support platform on the T-shaped connection piece. Through design of the fixing seats and related accessories of the fixing seats, the whole outer wall scaffold is enabled to be firmly fixed with the wall body. Under the matching of the V-shaped rotating seats and the triangular support platforms, the scaffold cannot fall downward, and the outdoor operation safety is improved.
Description
Technical field
The utility model relates to the construction equipment field, specifically relates to the fixing and moving structure of a kind of exterior wall scaffold.
Background technology
In existing building operations, exterior wall scaffold is one of indispensable necessary accessories.All be from the basis at our Chinese great majority, every layer of steel pipe scaffold of bridge joint upwards.The bridge joint mode of its steel pipe frame is the steel pipe of erectting with two rows, is connected with crossbeam.Several roads of colligation steel pipe on crossbeam is at steel pipe upper berth one deck bamboo basketry, to do the operating platform of scaffold.Contacting mutually with steel pipe and the steel pipe of setting in both sides, makes it to become integral body, installs at last safety net.Mainly there is following defective in every layer of steel pipe scaffold of bridge joint upwards in this way:
1, material usage is large, and this scaffold is from basic platform, the every layer of bridge joint that makes progress.Owing to make loaded down with trivial details and complicated from giving up interior emersion building body basic platform in addition.Delamination is made basic platform, only has bridge joint in the above.Cause material usage large.
2, artificial consumption is greatly and dangerous, and exterior wall scaffold is made every layer all will complete platform, installs safety net, because the high-altitude field operation, speed of application can't improve.Allow simultaneously steel pipe frame workman's personal safety also can not get due guarantee.
3, the materials'use cycle long because present floor builds higher and higher, the construction period also prolongs thereupon, and steel pipe frame just can be dismantled for a long time.
4, be not easy to check because the number of plies of steel pipe scaffold is many, have again main body to finish after, seldom use following scaffold so that the careful inspection and maintenance of shortage of staff, a lot of local when construction injury.
5, the danger of collapsing is arranged, stand on outside the house because steel pipe frame is put year in year out, standing wind and weather, make steel pipe and fastener getting rusty and damage in various degree.The steel pipe that has and fastener do not know to have used many years.In the whole scaffold, at main stress point, as long as have the steel pipe or the fastener that get rusty can't bear the heavy load, will allow integral-scaffold bring the danger of collapsing.The event that scaffold collapses happens occasionally.
For defects, the applicant once applied for a patent, and a kind of novel external wall scaffold is provided, and it is 201220346852.2 utility model that concrete technical scheme sees also application number, is used for solving the existing deficiency of above-mentioned prior art.
But, through finding after the long-term use in building site that in this technical scheme, the fixed structure between scaffold and the body of wall exists some such as fixing the technological deficiencies such as not firm.
The utility model content
For the technical problem that exists in the prior art, the utility model has been intended to overcome the deficiency that exists in the above-mentioned patent document, and a kind of fixing and moving structure of exterior wall scaffold of reasonable in design is provided.
To achieve these goals, the technical scheme of employing is as follows:
Fixing and the moving structure of exterior wall scaffold comprises the scaffold that places outside the exterior wall, and scaffold is provided with the brace summer of several parallel arrangements parallel with body of wall, it is characterized in that,
Described brace summer is connected with T-connecting piece, and the head end bilateral symmetry of T-connecting piece is distributed with and is the triangular support platform of vertically arranging, and vertically is placed with several pin shaft holes on the T-connecting piece;
Be several holders of vertically arranging, be located on the body of wall, holder is provided with T shape opening, and T-connecting piece is stuck in the holder T shape opening, and passes pin shaft hole locking by bearing pin, and bearing pin places the top of holder;
Holder is provided with two V-arrangement rotating seats of relatively arranging, V-arrangement rotating seat and holder top are hinged, T-connecting piece rises with respect to holder after the distance, one side of V-arrangement rotating seat is stuck in the bottom of the triangular support platform on the T-connecting piece, when T-connecting piece continues to rise, the triangular support platform drives the V-arrangement rotating seat and rotates along pin joint, until a side of V-arrangement rotating seat is stuck in the bottom of next triangular support platform.
Further, the opening angle of described V-arrangement rotating seat is the 90-120 degree.
Further, described scaffold is provided with the discharging platform.
Further, described scaffold is provided with several stair, and stair are provided with guardrail.
Fixing and the moving structure of the utility model exterior wall scaffold by the design of holder and related accessory thereof, makes exterior wall scaffold whole fixing more firm with body of wall.Simultaneously, under the cooperation of V-arrangement rotating seat and triangular support platform, exterior wall scaffold can't fall, and field operation is improved safely.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 be among Fig. 1 B-B to view.
Fig. 3 is the syndeton schematic diagram of brace summer, T-connecting piece and holder.
Fig. 4 be among Fig. 3 A-A to view.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing design of the present utility model is further elaborated; need to prove; under those skilled in the art following specific embodiment is made various modifications or replenish or adopt similar mode to substitute; only otherwise depart from structure, the design of utility model or do not surmount this scope as defined in the claims, all should belong to protection domain of the present utility model.
See also Fig. 1-4, fixing and the moving structure of exterior wall scaffold, comprise the scaffold 1 that places outside the exterior wall 3, scaffold 1 is provided with the brace summer 2 of several parallel arrangements parallel with body of wall 3, brace summer 2 is connected with T-connecting piece 12, the head end bilateral symmetry of T-connecting piece 12 is distributed with and is the triangular support platform 5 of vertically arranging, and vertically is placed with several pin shaft holes 13 on the T-connecting piece 12.
Be several holders 4 of vertically arranging, be located on the body of wall 3 and (both can realized installing by the installing hole 11 of being located on the holder 4, can adopt again other mounting meanss that it is fixed on the body of wall 3), holder 4 is provided with T shape opening, T-connecting piece 12 is stuck in the T shape opening of holder 4, and pass pin shaft hole 13 by bearing pin 6 and lock, bearing pin 6 places the top of holder 4.
V-arrangement rotating seat 7 is hinged with holder 4 tops, and T-connecting piece 12 rises with respect to holder 4 after the distance, and a side of V-arrangement rotating seat 7 is stuck in the bottom of the triangular support platform 5 on the T-connecting piece 12.
When T-connecting piece 12 continues to rise, triangular support platform 5 drives V-arrangement rotating seat 7 and rotates along pin joint, after arriving critical point, V-arrangement rotating seat 7 snaps in the bottom of next triangular support platform 5 again under its Action of Gravity Field, thereby finishes the lifting of " unit ".
After promoting an operating platform, the holder of least significant end is pulled down, and be installed in one position, top of top holder, repeatedly promote with this.
The lifting of scaffold 1 can be adopted any lift structure in the prior art, and to this, the utility model there is no particular restriction.
Simultaneously, be provided with discharging platform 8 at scaffold 1, be used for the objects such as template that transportation is removed.Scaffold 1 is provided with several stair 9, and stair 9 have been provided with the guardrail 10 of safety protection function.
Claims (4)
1. the fixing and moving structure of exterior wall scaffold comprises the scaffold that places outside the exterior wall, and scaffold is provided with the brace summer of several parallel arrangements parallel with body of wall, it is characterized in that,
Described brace summer is connected with T-connecting piece, and the head end bilateral symmetry of T-connecting piece is distributed with and is the triangular support platform of vertically arranging, and vertically is placed with several pin shaft holes on the T-connecting piece;
Be several holders of vertically arranging, be located on the body of wall, holder is provided with T shape opening, and T-connecting piece is stuck in the holder T shape opening, and passes pin shaft hole locking by bearing pin, and bearing pin places the top of holder;
Holder is provided with two V-arrangement rotating seats of relatively arranging, V-arrangement rotating seat and holder top are hinged, T-connecting piece rises with respect to holder after the distance, one side of V-arrangement rotating seat is stuck in the bottom of the triangular support platform on the T-connecting piece, when T-connecting piece continues to rise, the triangular support platform drives the V-arrangement rotating seat and rotates along pin joint, until a side of V-arrangement rotating seat is stuck in the bottom of next triangular support platform.
2. the fixing and moving structure of exterior wall scaffold according to claim 1 is characterized in that the opening angle of described V-arrangement rotating seat is the 90-120 degree.
3. the fixing and moving structure of exterior wall scaffold according to claim 1 is characterized in that described scaffold is provided with the discharging platform.
4. the fixing and moving structure of exterior wall scaffold according to claim 1 is characterized in that described scaffold is provided with several stair, and stair are provided with guardrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220540374 CN202850472U (en) | 2012-10-19 | 2012-10-19 | Fixing and movement structure for outer wall scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220540374 CN202850472U (en) | 2012-10-19 | 2012-10-19 | Fixing and movement structure for outer wall scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202850472U true CN202850472U (en) | 2013-04-03 |
Family
ID=47981684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220540374 Expired - Fee Related CN202850472U (en) | 2012-10-19 | 2012-10-19 | Fixing and movement structure for outer wall scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202850472U (en) |
-
2012
- 2012-10-19 CN CN 201220540374 patent/CN202850472U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201268937Y (en) | Double-layer hanging cradle for working aloft | |
CN202706498U (en) | Novel exterior-wall scaffold | |
CN107902545B (en) | Horse way air pipe hoisting construction device and construction method | |
CN203113658U (en) | High-rise emergency escape ladder balcony guardrail | |
CN105350759A (en) | Suspended scaffold | |
US20120241255A1 (en) | Maintenance platform | |
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN204738226U (en) | Arched bridge main arch bottom plate rail formula tool car | |
CN207048345U (en) | Construction discharge platform device | |
CN205476387U (en) | Scaffold | |
CN202483154U (en) | High bearing capacity suspending scaffold | |
CN202265369U (en) | Upright post type 360-degree rotary oil tank maintenance platform | |
CN202850472U (en) | Fixing and movement structure for outer wall scaffold | |
CN201531111U (en) | Movable hanging basket for installing and decorating curtain walls | |
CN205532502U (en) | Operating platform | |
CN201620593U (en) | Spring-board frame for building construction | |
CN102989091B (en) | A kind of rescue net | |
CN203441120U (en) | Safety protection support for building construction | |
CN2853976Y (en) | Jacket auto-lifting radial expansion structural hanging-up for hollow-shaped building construction | |
CN202899589U (en) | Foldable lifting scaffold | |
CN206158146U (en) | Novel building section of thick bamboo well construction operation platform | |
CN205617771U (en) | Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN204775838U (en) | A device of passing a bridge for it is current between container ship ladder | |
CN204081433U (en) | Steel structural roof liner profiled sheet construction Special-purpose hanger basket support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 Termination date: 20151019 |
|