CN202831595U - Standardized combination type Platform for aerial work - Google Patents

Standardized combination type Platform for aerial work Download PDF

Info

Publication number
CN202831595U
CN202831595U CN 201220446480 CN201220446480U CN202831595U CN 202831595 U CN202831595 U CN 202831595U CN 201220446480 CN201220446480 CN 201220446480 CN 201220446480 U CN201220446480 U CN 201220446480U CN 202831595 U CN202831595 U CN 202831595U
Authority
CN
China
Prior art keywords
platform
clamping part
steel platform
foot
combination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220446480
Other languages
Chinese (zh)
Inventor
张枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN JINXIN GREEN CONSTRUCTION CO., LTD.
Original Assignee
Shenzhen Prosperous Steel Building Installing Engineering Of Gold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Prosperous Steel Building Installing Engineering Of Gold Co Ltd filed Critical Shenzhen Prosperous Steel Building Installing Engineering Of Gold Co Ltd
Priority to CN 201220446480 priority Critical patent/CN202831595U/en
Application granted granted Critical
Publication of CN202831595U publication Critical patent/CN202831595U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a standardized combination type Platform for aerial work. The up-to-standard combination type Platform for aerial work comprises a protective fence, a friction locking mechanism and a combined steel platform. The protective fence is arranged vertically around the combined steel platform. The protective fence includes a net-like support. The net-like support is fixed with the combined steel platform by bolts. Holes which are used to penetrate through the upright are arranged on the combined steel platform. The friction locking mechanism is provided with a first clamping part which is used to fix the combined steel platform and a second clamping part which is used to fix a crossbeam. The first clamping part and the second clamping part are perpendicular to each other and include U-shaped clamps and lock bolts which are arranged on the U-shaped clamp. An anti-skidding hard rubber layer is arranged inside the U-shaped clamp. Due to the fact that the platform is assembled into a whole on the ground and adopts integral hoisting method, the assemble speed of the platform is greatly improved and the traditional method of using steel pipes and spring boards to assemble the components in the air is avoided.

Description

A kind of high-altitude construction reference Combined operation platform mechanism
Technical field
The utility model relates to a kind of high-altitude construction reference Combined operation platform mechanism.
Background technology
In the construction of current super high steel structure, proofread and correct in the steel column high-altitude, the welding operation platform mostly is greatly in the interim earrings measure of steel column welding, adopts scaffolding steel pipe to set up and form, and its input amount is large, need that repeated disassembled and assembled drops into that the labour is many, poor stability, expense are high.
The utility model content
The utility model is in order to solve problems of the prior art, and a kind of high-altitude construction reference Combined operation platform mechanism is provided, and it is simple in structure, and assembly and disassembly are quick, save the labour, can reuse without spillage of material and component.
For achieving the above object, the technical solution of the utility model is: a kind of high-altitude construction reference Combined operation platform mechanism, comprise powerful protective fence, silent ratchet, the foot-operated steel platform of combination, described powerful protective fence vertically be arranged on the foot-operated steel platform of combination around, comprise netted support, described support is fixed by bolt and the foot-operated steel platform of combination; The middle part of the foot-operated steel platform of described combination is provided with the hole of column to be run through; Described silent ratchet comprises mutually vertically disposed the first clamping part for the foot-operated steel platform of fixed combination, with the second clamping part that is used for fixed cross beam, described the first clamping part and the second clamping part comprise U-shaped anchor clamps, with the lock bolt that is positioned on the U-shaped anchor clamps, the inboard of described U-shaped anchor clamps is provided with anti-skidding hard rubber layer.
Platform mechanism of the present utility model uses tower crane to carry out integral hoisting when mounted, is fixed on the floor girder steel, then uses silent ratchet locking.Platform mechanism of the present utility model is assembled into integral body owing to having adopted to produce once on ground, and the mode of integral hoisting has improved the installation rate of operating platform greatly, has avoided adopting in the conventional method steel pipe and springboard to carry out assembly in the high-altitude.
Description of drawings
Fig. 1 shows the top view of the utility model platform mechanism.
Fig. 2 shows the structural representation of powerful protective fence among Fig. 1.
Fig. 3, Fig. 4 show the structural representation of the utility model silent ratchet.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described further.
By analyzing the design feature of housing steel pipe column, the steel pipe column operating platform is made into the assembling operating platform, greatly improve operating efficiency, improved operational security, shortened the duration, reduced construction cost, obtained preferably economic benefit.
The assembling operating platform is comprised of 3 parts: main platform, guardrail, banded plate, by analyzing steel pipe column diameter and high-altitude personnel operation requisite space, operating platform is 3m * 3m * 1.5m.Main rod connects by high-strength bolt, and inferior rod member and main rod are welded to connect, and finishes the platform assembling on ground, installs by the tower crane whole lifting, is supported on the floor girder steel.
Because of the characteristics of Super High exterior frame column, the Combined operating platform security reliability is high, Reusability capable of circulation; The disassembled one-tenth of whole platform is on chip to be loaded and transported to similar engineering and reuses; Given full play to that it is light and handy, safety, economy, highly versatile and easy characteristics such as installations, for steel columns of steel structures correction, welding operation platform standard melt and have created new approaches.
Shown in Figure 4 with reference to figure 1-, a kind of high-altitude of the present utility model construction reference Combined operation platform mechanism, comprise powerful protective fence 2, silent ratchet 7, the foot-operated steel platform 5 of combination, described powerful protective fence 2 vertically be arranged on the foot-operated steel platform 5 of combination around, comprise netted support 21, for example can be a kind of support body that wire lath is set, mainly play one and go along with sb. to guard him.Described support 21 is fixed together by bolt and the foot-operated steel platform 5 of combination; The middle part of the foot-operated steel platform 5 of described combination is provided with the hole 6 of column to be run through; Described silent ratchet 7 is provided with mutually vertically disposed the first clamping part 71 for the foot-operated steel platform 5 of fixed combination, with the second clamping part 72 that is used for fixed cross beam, described the first clamping part 71 and the second clamping part 72 comprise U-shaped anchor clamps, with the lock bolt 73 that is positioned on the U-shaped anchor clamps, the inboard of described U-shaped anchor clamps is provided with anti-skidding hard rubber layer 75.The below of described support 21 also is provided with steel plate protection baseboard 22.
Platform mechanism of the present utility model is arranged at operating platform on the floor girder steel, in the installation of finishing with the laggard line operate platform of installation of four girder steels of steel column butt joint.According to steel column appearance and size, personnel operation demand and security consideration, the operating platform design size is 3m * 3m * 1.5m.During installation, use tower crane to carry out integral hoisting, be fixed on the floor girder steel, then use silent ratchet locking.Platform mechanism of the present utility model is assembled into integral body owing to having adopted to produce once on ground, and the mode of integral hoisting has improved the installation rate of operating platform greatly, has avoided adopting in the conventional method steel pipe and springboard to carry out assembly in the high-altitude.Its turnover rate is high, because the variation of housing steel column is very little, and repeatedly turnover use after the assembling operating platform can be produced once in the engineering, it adopts the tower crane lifting in transport process, and whole the transhipment avoided the secondary dismounting.And behind the Practical Completion, the removable sheet that is divided into of assembling operating platform is transported to other similar engineerings and reuses.Spillage of material is few: because the assembling operating platform makes, is assembled into integral body on the ground, and integral hoisting in work progress, transhipment, installation, therefore in the loss that splits out, do not exist in handling and the use procedure material that consists of the horizontal channel.Safety improves: because of the good integrity of assembling operating platform, improved operating personnel's safety.Closure is good around the operating platform, greatly reduces the potential safety hazards such as the high-altitude small-sized object falls, welding spark descends slowly and lightly.The assembling operating platform is integral disassembly, assembly, can avoid in by the process of tearing open because the peril that falls and cause of the scattered objects such as fastener, steel pipe or springboard.Therefore, the assembling operating platform that adopts of this engineering has improved safety greatly.
The utility model is by preferred embodiment having carried out detailed explanation.Yet, by to the studying carefully of preamble, to the variation of each embodiment with to increase also be that one of ordinary skill in the art institute is apparent.Being intended that all these variations and increasing of applicant all dropped in the protection domain of the utility model claim.
Similar numbering refers to similar element in the whole text.For the purpose of clear, the situation that some line, layer, element, parts or feature are amplified may be arranged in the accompanying drawings.
Term used herein is only for to be illustrated specific embodiment, and it is not to be intended to the utility model is limited.Unless otherwise defined, all terms used herein (comprising technical term and scientific terminology) are all identical with the utility model one of ordinary skill in the art's understanding.

Claims (1)

1. high-altitude construction reference Combined operation platform mechanism, it is characterized in that: comprise powerful protective fence, silent ratchet, the foot-operated steel platform of combination, described powerful protective fence vertically be arranged on the foot-operated steel platform of combination around, comprise netted support, described support is fixed by bolt and the foot-operated steel platform of combination; The middle part of the foot-operated steel platform of described combination is provided with the hole of column to be run through; Described silent ratchet comprises mutually vertically disposed the first clamping part for the foot-operated steel platform of fixed combination, with the second clamping part that is used for fixed cross beam, described the first clamping part and the second clamping part comprise U-shaped anchor clamps, with the lock bolt that is positioned on the U-shaped anchor clamps, the inboard of described U-shaped anchor clamps is provided with anti-skidding hard rubber layer.
CN 201220446480 2012-09-04 2012-09-04 Standardized combination type Platform for aerial work Expired - Fee Related CN202831595U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220446480 CN202831595U (en) 2012-09-04 2012-09-04 Standardized combination type Platform for aerial work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220446480 CN202831595U (en) 2012-09-04 2012-09-04 Standardized combination type Platform for aerial work

Publications (1)

Publication Number Publication Date
CN202831595U true CN202831595U (en) 2013-03-27

Family

ID=47943338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220446480 Expired - Fee Related CN202831595U (en) 2012-09-04 2012-09-04 Standardized combination type Platform for aerial work

Country Status (1)

Country Link
CN (1) CN202831595U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352573A (en) * 2013-07-08 2013-10-16 陕西煤业化工建设(集团)有限公司 Construction method for lifting butt joint of single cylindrical pier steel bar
CN106840239A (en) * 2017-03-10 2017-06-13 无锡市政设计研究院有限公司 A kind of aquatic measurement instrument workbench
CN110778093A (en) * 2019-10-17 2020-02-11 五冶集团上海有限公司 Platform for installing instrument of coke oven diffusing pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352573A (en) * 2013-07-08 2013-10-16 陕西煤业化工建设(集团)有限公司 Construction method for lifting butt joint of single cylindrical pier steel bar
CN106840239A (en) * 2017-03-10 2017-06-13 无锡市政设计研究院有限公司 A kind of aquatic measurement instrument workbench
CN110778093A (en) * 2019-10-17 2020-02-11 五冶集团上海有限公司 Platform for installing instrument of coke oven diffusing pipe

Similar Documents

Publication Publication Date Title
JP2005083186A (en) Demolition and removal method for arch bridge
CN202831595U (en) Standardized combination type Platform for aerial work
CN205527400U (en) Lifting mechanism
CN204552054U (en) A kind of telescopic work high above the ground hanger bracket
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN102127987A (en) Guide rail system for assembling flange connection tower sections of power transmission line iron tower through helicopter
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN204590598U (en) A kind of readily removable inner corner trim unit for aluminum alloy mould plate system
CN201778479U (en) Detachable high-altitude working platform
CN101967902B (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN206329024U (en) Hanging large-span steel-reinforced concrete structure construction steel platform
CN205444961U (en) Tool room safety protection canopy with double -deck shed roof structure
CN101967903A (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN103321438B (en) A kind of modular protection marguise of large cantilever being applicable to high-building construction
CN204059904U (en) A kind of hoistway operation platform being applied to multi-platform operation
CN201908429U (en) Assembly integral building overhanging discharging platform
CN204510815U (en) A kind of pull-up strut-framed is encorbelmented flange beam formwork frame
CN206091308U (en) Be used for reinforced (rfd) supporting platform device of big steel form of outer wall
CN203022328U (en) Climbing operation platform
CN205000659U (en) Discharging platform
CN205669326U (en) A kind of architectural engineering modular guard canopy
CN204703542U (en) The assembled passage of a kind of Construction of Steel Structure regularization
KR101707037B1 (en) A structure for assembled system scaffold and erecting method thereof
CN203699828U (en) Simple tool-type lifting frame for mounting of steel reinforcement cages

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Two road in Longgang District of Shenzhen City, Guangdong province 518000 Ping Street No. 9 Xinfeng Nianfeng community

Patentee after: SHENZHEN JINXIN GREEN CONSTRUCTION CO., LTD.

Address before: Nine road 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Tairan No. 1 Tang East Building 1104

Patentee before: The Shenzhen prosperous steel building installing engineering of gold Co., Ltd

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20200904

CF01 Termination of patent right due to non-payment of annual fee