CN202831595U - Standardized combination type Platform for aerial work - Google Patents
Standardized combination type Platform for aerial work Download PDFInfo
- Publication number
- CN202831595U CN202831595U CN 201220446480 CN201220446480U CN202831595U CN 202831595 U CN202831595 U CN 202831595U CN 201220446480 CN201220446480 CN 201220446480 CN 201220446480 U CN201220446480 U CN 201220446480U CN 202831595 U CN202831595 U CN 202831595U
- Authority
- CN
- China
- Prior art keywords
- platform
- clamping part
- steel platform
- foot
- combination
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a standardized combination type Platform for aerial work. The up-to-standard combination type Platform for aerial work comprises a protective fence, a friction locking mechanism and a combined steel platform. The protective fence is arranged vertically around the combined steel platform. The protective fence includes a net-like support. The net-like support is fixed with the combined steel platform by bolts. Holes which are used to penetrate through the upright are arranged on the combined steel platform. The friction locking mechanism is provided with a first clamping part which is used to fix the combined steel platform and a second clamping part which is used to fix a crossbeam. The first clamping part and the second clamping part are perpendicular to each other and include U-shaped clamps and lock bolts which are arranged on the U-shaped clamp. An anti-skidding hard rubber layer is arranged inside the U-shaped clamp. Due to the fact that the platform is assembled into a whole on the ground and adopts integral hoisting method, the assemble speed of the platform is greatly improved and the traditional method of using steel pipes and spring boards to assemble the components in the air is avoided.
Description
Technical field
The utility model relates to a kind of high-altitude construction reference Combined operation platform mechanism.
Background technology
In the construction of current super high steel structure, proofread and correct in the steel column high-altitude, the welding operation platform mostly is greatly in the interim earrings measure of steel column welding, adopts scaffolding steel pipe to set up and form, and its input amount is large, need that repeated disassembled and assembled drops into that the labour is many, poor stability, expense are high.
The utility model content
The utility model is in order to solve problems of the prior art, and a kind of high-altitude construction reference Combined operation platform mechanism is provided, and it is simple in structure, and assembly and disassembly are quick, save the labour, can reuse without spillage of material and component.
For achieving the above object, the technical solution of the utility model is: a kind of high-altitude construction reference Combined operation platform mechanism, comprise powerful protective fence, silent ratchet, the foot-operated steel platform of combination, described powerful protective fence vertically be arranged on the foot-operated steel platform of combination around, comprise netted support, described support is fixed by bolt and the foot-operated steel platform of combination; The middle part of the foot-operated steel platform of described combination is provided with the hole of column to be run through; Described silent ratchet comprises mutually vertically disposed the first clamping part for the foot-operated steel platform of fixed combination, with the second clamping part that is used for fixed cross beam, described the first clamping part and the second clamping part comprise U-shaped anchor clamps, with the lock bolt that is positioned on the U-shaped anchor clamps, the inboard of described U-shaped anchor clamps is provided with anti-skidding hard rubber layer.
Platform mechanism of the present utility model uses tower crane to carry out integral hoisting when mounted, is fixed on the floor girder steel, then uses silent ratchet locking.Platform mechanism of the present utility model is assembled into integral body owing to having adopted to produce once on ground, and the mode of integral hoisting has improved the installation rate of operating platform greatly, has avoided adopting in the conventional method steel pipe and springboard to carry out assembly in the high-altitude.
Description of drawings
Fig. 1 shows the top view of the utility model platform mechanism.
Fig. 2 shows the structural representation of powerful protective fence among Fig. 1.
Fig. 3, Fig. 4 show the structural representation of the utility model silent ratchet.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described further.
By analyzing the design feature of housing steel pipe column, the steel pipe column operating platform is made into the assembling operating platform, greatly improve operating efficiency, improved operational security, shortened the duration, reduced construction cost, obtained preferably economic benefit.
The assembling operating platform is comprised of 3 parts: main platform, guardrail, banded plate, by analyzing steel pipe column diameter and high-altitude personnel operation requisite space, operating platform is 3m * 3m * 1.5m.Main rod connects by high-strength bolt, and inferior rod member and main rod are welded to connect, and finishes the platform assembling on ground, installs by the tower crane whole lifting, is supported on the floor girder steel.
Because of the characteristics of Super High exterior frame column, the Combined operating platform security reliability is high, Reusability capable of circulation; The disassembled one-tenth of whole platform is on chip to be loaded and transported to similar engineering and reuses; Given full play to that it is light and handy, safety, economy, highly versatile and easy characteristics such as installations, for steel columns of steel structures correction, welding operation platform standard melt and have created new approaches.
Shown in Figure 4 with reference to figure 1-, a kind of high-altitude of the present utility model construction reference Combined operation platform mechanism, comprise powerful protective fence 2, silent ratchet 7, the foot-operated steel platform 5 of combination, described powerful protective fence 2 vertically be arranged on the foot-operated steel platform 5 of combination around, comprise netted support 21, for example can be a kind of support body that wire lath is set, mainly play one and go along with sb. to guard him.Described support 21 is fixed together by bolt and the foot-operated steel platform 5 of combination; The middle part of the foot-operated steel platform 5 of described combination is provided with the hole 6 of column to be run through; Described silent ratchet 7 is provided with mutually vertically disposed the first clamping part 71 for the foot-operated steel platform 5 of fixed combination, with the second clamping part 72 that is used for fixed cross beam, described the first clamping part 71 and the second clamping part 72 comprise U-shaped anchor clamps, with the lock bolt 73 that is positioned on the U-shaped anchor clamps, the inboard of described U-shaped anchor clamps is provided with anti-skidding hard rubber layer 75.The below of described support 21 also is provided with steel plate protection baseboard 22.
Platform mechanism of the present utility model is arranged at operating platform on the floor girder steel, in the installation of finishing with the laggard line operate platform of installation of four girder steels of steel column butt joint.According to steel column appearance and size, personnel operation demand and security consideration, the operating platform design size is 3m * 3m * 1.5m.During installation, use tower crane to carry out integral hoisting, be fixed on the floor girder steel, then use silent ratchet locking.Platform mechanism of the present utility model is assembled into integral body owing to having adopted to produce once on ground, and the mode of integral hoisting has improved the installation rate of operating platform greatly, has avoided adopting in the conventional method steel pipe and springboard to carry out assembly in the high-altitude.Its turnover rate is high, because the variation of housing steel column is very little, and repeatedly turnover use after the assembling operating platform can be produced once in the engineering, it adopts the tower crane lifting in transport process, and whole the transhipment avoided the secondary dismounting.And behind the Practical Completion, the removable sheet that is divided into of assembling operating platform is transported to other similar engineerings and reuses.Spillage of material is few: because the assembling operating platform makes, is assembled into integral body on the ground, and integral hoisting in work progress, transhipment, installation, therefore in the loss that splits out, do not exist in handling and the use procedure material that consists of the horizontal channel.Safety improves: because of the good integrity of assembling operating platform, improved operating personnel's safety.Closure is good around the operating platform, greatly reduces the potential safety hazards such as the high-altitude small-sized object falls, welding spark descends slowly and lightly.The assembling operating platform is integral disassembly, assembly, can avoid in by the process of tearing open because the peril that falls and cause of the scattered objects such as fastener, steel pipe or springboard.Therefore, the assembling operating platform that adopts of this engineering has improved safety greatly.
The utility model is by preferred embodiment having carried out detailed explanation.Yet, by to the studying carefully of preamble, to the variation of each embodiment with to increase also be that one of ordinary skill in the art institute is apparent.Being intended that all these variations and increasing of applicant all dropped in the protection domain of the utility model claim.
Similar numbering refers to similar element in the whole text.For the purpose of clear, the situation that some line, layer, element, parts or feature are amplified may be arranged in the accompanying drawings.
Term used herein is only for to be illustrated specific embodiment, and it is not to be intended to the utility model is limited.Unless otherwise defined, all terms used herein (comprising technical term and scientific terminology) are all identical with the utility model one of ordinary skill in the art's understanding.
Claims (1)
1. high-altitude construction reference Combined operation platform mechanism, it is characterized in that: comprise powerful protective fence, silent ratchet, the foot-operated steel platform of combination, described powerful protective fence vertically be arranged on the foot-operated steel platform of combination around, comprise netted support, described support is fixed by bolt and the foot-operated steel platform of combination; The middle part of the foot-operated steel platform of described combination is provided with the hole of column to be run through; Described silent ratchet comprises mutually vertically disposed the first clamping part for the foot-operated steel platform of fixed combination, with the second clamping part that is used for fixed cross beam, described the first clamping part and the second clamping part comprise U-shaped anchor clamps, with the lock bolt that is positioned on the U-shaped anchor clamps, the inboard of described U-shaped anchor clamps is provided with anti-skidding hard rubber layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220446480 CN202831595U (en) | 2012-09-04 | 2012-09-04 | Standardized combination type Platform for aerial work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220446480 CN202831595U (en) | 2012-09-04 | 2012-09-04 | Standardized combination type Platform for aerial work |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202831595U true CN202831595U (en) | 2013-03-27 |
Family
ID=47943338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220446480 Expired - Fee Related CN202831595U (en) | 2012-09-04 | 2012-09-04 | Standardized combination type Platform for aerial work |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202831595U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103352573A (en) * | 2013-07-08 | 2013-10-16 | 陕西煤业化工建设(集团)有限公司 | Construction method for lifting butt joint of single cylindrical pier steel bar |
CN106840239A (en) * | 2017-03-10 | 2017-06-13 | 无锡市政设计研究院有限公司 | A kind of aquatic measurement instrument workbench |
CN110778093A (en) * | 2019-10-17 | 2020-02-11 | 五冶集团上海有限公司 | Platform for installing instrument of coke oven diffusing pipe |
-
2012
- 2012-09-04 CN CN 201220446480 patent/CN202831595U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103352573A (en) * | 2013-07-08 | 2013-10-16 | 陕西煤业化工建设(集团)有限公司 | Construction method for lifting butt joint of single cylindrical pier steel bar |
CN106840239A (en) * | 2017-03-10 | 2017-06-13 | 无锡市政设计研究院有限公司 | A kind of aquatic measurement instrument workbench |
CN110778093A (en) * | 2019-10-17 | 2020-02-11 | 五冶集团上海有限公司 | Platform for installing instrument of coke oven diffusing pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2005083186A (en) | Demolition and removal method for arch bridge | |
CN202831595U (en) | Standardized combination type Platform for aerial work | |
CN205527400U (en) | Lifting mechanism | |
CN204552054U (en) | A kind of telescopic work high above the ground hanger bracket | |
CN203475806U (en) | Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites | |
CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
CN102127987A (en) | Guide rail system for assembling flange connection tower sections of power transmission line iron tower through helicopter | |
CN103774838A (en) | Assembly type safe operation platform for elevator shaft construction and use method thereof | |
CN204590598U (en) | A kind of readily removable inner corner trim unit for aluminum alloy mould plate system | |
CN201778479U (en) | Detachable high-altitude working platform | |
CN101967902B (en) | Basic guide rail for helicopter assembly transmission line iron tower leg section | |
CN206329024U (en) | Hanging large-span steel-reinforced concrete structure construction steel platform | |
CN205444961U (en) | Tool room safety protection canopy with double -deck shed roof structure | |
CN101967903A (en) | Basic guide rail for helicopter assembly transmission line iron tower leg section | |
CN103321438B (en) | A kind of modular protection marguise of large cantilever being applicable to high-building construction | |
CN204059904U (en) | A kind of hoistway operation platform being applied to multi-platform operation | |
CN201908429U (en) | Assembly integral building overhanging discharging platform | |
CN204510815U (en) | A kind of pull-up strut-framed is encorbelmented flange beam formwork frame | |
CN206091308U (en) | Be used for reinforced (rfd) supporting platform device of big steel form of outer wall | |
CN203022328U (en) | Climbing operation platform | |
CN205000659U (en) | Discharging platform | |
CN205669326U (en) | A kind of architectural engineering modular guard canopy | |
CN204703542U (en) | The assembled passage of a kind of Construction of Steel Structure regularization | |
KR101707037B1 (en) | A structure for assembled system scaffold and erecting method thereof | |
CN203699828U (en) | Simple tool-type lifting frame for mounting of steel reinforcement cages |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: Two road in Longgang District of Shenzhen City, Guangdong province 518000 Ping Street No. 9 Xinfeng Nianfeng community Patentee after: SHENZHEN JINXIN GREEN CONSTRUCTION CO., LTD. Address before: Nine road 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Tairan No. 1 Tang East Building 1104 Patentee before: The Shenzhen prosperous steel building installing engineering of gold Co., Ltd |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130327 Termination date: 20200904 |
|
CF01 | Termination of patent right due to non-payment of annual fee |