CN202830920U - Recoverable foundation pit supporting pipe pile - Google Patents

Recoverable foundation pit supporting pipe pile Download PDF

Info

Publication number
CN202830920U
CN202830920U CN 201220511483 CN201220511483U CN202830920U CN 202830920 U CN202830920 U CN 202830920U CN 201220511483 CN201220511483 CN 201220511483 CN 201220511483 U CN201220511483 U CN 201220511483U CN 202830920 U CN202830920 U CN 202830920U
Authority
CN
China
Prior art keywords
foundation pit
hollow steel
semicircle shape
pit supporting
shape hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220511483
Other languages
Chinese (zh)
Inventor
柴艳飞
王存贵
余流
张云富
陆海英
黄克起
方杰
高璞
朱芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN 201220511483 priority Critical patent/CN202830920U/en
Application granted granted Critical
Publication of CN202830920U publication Critical patent/CN202830920U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a recoverable foundation pit supporting pipe pile. The recoverable foundation pit supporting pipe pile comprises two semi-circle hollow steel pipes, wherein rectangular bulged teeth and rectangular concave teeth are respectively arranged on the axial section of each semi-circle hollow steel pipe in a staggered mode, pin holes are respectively arranged on the rectangular bulged teeth of the two semi-circle hollow steel pipes, centre lines of the pin holes coincide, and the pin holes are used for combining the two semi-circle hollow steel pipes into a steel pipe pile, and penetrate long pins of the rectangular bulged teeth in the axial direction for fixation. The recoverable foundation pit supporting pipe pile has the advantages of making up the defects in the prior art, achieving the recovery and repeated use of the supporting structure of foundation pit, lowering engineering cost, shortening engineering cycle, preventing a foundation from being damaged, and being strong in practical applicability.

Description

A kind of recyclable pattern foundation pit supporting structure pile tube
Technical field
The utility model relates to a kind of supporting pile tube, and in particular, the utility model relates to a kind of recyclable pattern foundation pit supporting structure pile tube that is applicable to building construction foundation ditch and Metro station excavation engineering.
Background technology
Because foundation ditch belongs to temporary works, basically be the bottom foundation construction complete after, the soldier pile of foundation pit walls side has just lost effect.And present base pit engineering mainly adopts two kinds of job practicess of bored pile and concrete pile anchor structure.There is respectively following defective in these two kinds of job practicess:
(1) for bored pile, its stake is not recyclable, and construction all needs drill-pouring each time, has increased construction period, inevitably brings huge financial cost waste;
(2) for the concrete pile anchor structure, not only its very difficult recovery, and the steel sheet pile in the piled anchor structure also is with the soil body of loose stake bottom easily in the pile pulling process, thereby the foundation of the complete top-out of constructing is destroyed;
(3) if the concrete pile anchor structure is used in the harder soil layer of soil property, then its pile pulling process just is not only the soil body of band pine stake bottom, and more serious problem is to make on every side that soil layer suffers damage effect.
The utility model content
Problem to be solved in the utility model overcomes the defective of aforementioned prior art exactly, and a kind of recyclable pattern foundation pit supporting structure pile tube is provided for this reason.
The technical solution of the utility model is as follows:
A kind of recyclable pattern foundation pit supporting structure pile tube, comprise two semicircle shape hollow steel pipes, rectangle double wedge and the recessed tooth of rectangle are crisscross arranged respectively on the axial section of two described semicircle shape hollow steel pipes, the pin-and-hole of central lines is set respectively on the rectangle double wedge of two described semicircle shape hollow steel pipes, and described pin-and-hole is used for two semicircle shape hollow steel pipes are fixed axially to run through having strong market potential of described rectangle double wedge when being combined into steel pipe pile.
The diameter of described semicircle shape hollow steel pipe is 600-800mm.
The wall thickness of described semicircle shape hollow steel pipe is 28-36mm.
The spacing of two adjacent rectangle double wedges is 200-300mm on the axial section of described semicircle shape hollow steel pipe.
The described steel making of having strong market potential to be not less than the secondary steel, its diameter is 24-32mm.
Described pin-and-hole can be screwed hole, and described screwed hole is used for two semicircle shape hollow steel pipes are fixed with the stay bolt that axially runs through rectangle double wedge on two described semicircle shape hollow steel pipes when being combined into steel pipe pile.
Described stay bolt is made with the steel that are not less than the secondary steel, and its specification is M24-M32.
The beneficial effects of the utility model are:
(1) remedied the defective of bored pile and concrete pile anchor structure, to guarantee the safety of pattern foundation pit supporting structure.
(2) realized recovery and the recycling of foundation pit supporting construction, thereby reduce project cost shortens construction period, avoids the foundation of top-out to be destroyed, and has good practicality.
Description of drawings
Fig. 1 is the end face structure schematic diagram of steel pipe pile in the utility model.
Fig. 2 is A-A section (a) part-structure schematic diagram among Fig. 1.
Fig. 3 is A-A section (b) part-structure schematic diagram among Fig. 1.
Fig. 4 is pile pulling step schematic diagram among the embodiment of the present utility model.
The specific embodiment
The utility model is easier to be understood in order to make, and below in conjunction with drawings and Examples the technical solution of the utility model is described in detail.
With reference to Fig. 1, Fig. 2, Fig. 3, recyclable pattern foundation pit supporting structure pile tube in the technical solutions of the utility model, comprise two semicircle shape hollow steel pipes 1, alternate rectangle double wedge 2 and the recessed tooth 2 ' of rectangle of arranging respectively on the axial section of two described semicircle shape hollow steel pipes 1, when two 1 pair of described semicircle shape hollow steel pipes were combined into steel sheet pile, staggered rectangle double wedge 2 and the recessed tooth 2 ' of rectangle in position can agree with mutually on its axial section;
Be respectively arranged with pin-and-hole 4 on the described rectangle double wedge 2, the center line counterpoise of pin-and-hole 4 is combined into one on two described semicircle shape hollow steel pipe 1 all rectangle double wedges 2, the pin-and-hole 4 of this central lines 3 is fixed axially to run through having strong market potential of rectangle double wedge 2 on it when being used for that 1 pair of two semicircle shape hollow steel pipe are combined into steel pipe pile.
The diameter of described semicircle shape hollow steel pipe 1 is 600-800mm, and the wall thickness of described semicircle shape hollow steel pipe 1 is 28-36mm, and the spacing of two adjacent rectangle double wedges 2 is 200-300mm on the described semicircle shape hollow steel pipe 1 axial section.
Described having strong market potential 3 made with the steel that are not less than the secondary steel, and it is 24-32mm that the utility model arranges its diameter.
The pin-and-hole 4 that arranges respectively on the rectangle double wedge 2 of two described semicircle shape hollow steel pipes 1 also can be screwed hole, is fixed with the stay bolt that axially runs through rectangle double wedge 2 on two described semicircle shape hollow steel pipes 1 when described screwed hole is used for that 1 pair of two semicircle shape hollow steel pipe are combined into steel pipe pile.
Described stay bolt is made with the steel that are not less than the secondary steel, and its specification is M24-M32.
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, use and the recovery method of the recyclable pattern foundation pit supporting structure pile tube of the utility model may further comprise the steps;
(1) before excavation of foundation pit, accurately locates the setting position of each steel pipe pile in foundation ditch with transit;
(2) use auger in the position of fixed each steel pipe pile, according to the diameter boring of projected depth and described steel pipe pile;
(3) utilize mutually the agreeing with it being combined into steel pipe pile of rectangle double wedge 2 on two semicircle shape hollow steel pipes, the 1 axial section and the recessed tooth 2 ' of rectangle, and run through having strong market potential of described rectangle double wedge 2 with two respectively and 3 fixed;
(4) will finish and be combined fixing steel pipe pile and be placed in the boring that (2) step finishes, and around described steel pipe pile, tamp the construction on beginning foundation ditch basis with soil;
(5) finish the construction on foundation ditch basis after, reclaim steel pipe pile with following method:
(a) first with two 3 one by one dismountings of having strong market potential that axially run through described rectangle double wedge;
(b) exert pressure from the top of described steel pipe pile with block stamp again and strut by this pressure and to remove 3 two the semicircle shape hollow steel pipes 1 of having strong market potential, make two semicircle shape hollow steel pipes 1 that strutted to the foundation soil mineralization pressure effect around it;
(c) from being extracted described block stamp by the steel pipe pile that struts;
(d) foundation soil around the described steel pipe pile the pressure-acting of described steel pipe pile contract next time and described steel pipe pile between form a gap after, again two described semicircle shape hollow steel pipes 1 are extracted one by one, reclaimed.
(6) extract described semicircle shape hollow steel pipe 1 after, layered backfill in left cavity, require whenever to fill out 1-2m just compacting once, until till described cavity filled up and tamping.
Recyclable pattern foundation pit supporting structure pile tube of the present utility model has two innovative points:
The pile tube of first supporting and protection structure is by to have strong market potential or the semicircle shape hollow steel pipe of stay bolt was fastenedly connected two axial section band rectangle double wedges and the recessed tooth of rectangle consists of, the Main Function of two described semicircle shape hollow steel pipes is the soil pressures of bearing foundation pit side-wall, thereby guarantees the resistance to overturning of foundation pit side-wall;
It two is in reclaiming the process of steel pipe pile; drift with described block stamp struts two semicircle shape hollow steel pipes; so that formed a space under the effect of soil pressure around between two described semicircle shape hollow steel pipes that strut; thereby easy tube drawing; and can not make surrounding soil loosening, the protection foundation is not destroyed.
Abovely with reference to drawings and Examples the utility model is schematically described, this description does not have restricted.Those of ordinary skill in the art will be understood that in actual applications some change might occur set-up mode of the present utility model, and other staff also may make similar Design under its enlightenment.Therefore, every institute that does not break away from the utility model design aim changes and similar Design, all is included within the protection domain of the present utility model.

Claims (6)

1. recyclable pattern foundation pit supporting structure pile tube, comprise two semicircle shape hollow steel pipes, it is characterized in that, rectangle double wedge and the recessed tooth of rectangle are crisscross arranged respectively on the axial section of two described semicircle shape hollow steel pipes, pin-and-hole or the screwed hole of central lines are set respectively on the rectangle double wedge of two described semicircle shape hollow steel pipes, described pin-and-hole or screwed hole be used for two semicircle shape hollow steel pipes when being combined into steel pipe pile with axially run through described rectangle double wedge have strong market potential or stay bolt is fixed.
2. recyclable pattern foundation pit supporting structure pile tube according to claim 1 is characterized in that, the diameter of described semicircle shape hollow steel pipe is 600-800mm.
3. recyclable pattern foundation pit supporting structure pile tube according to claim 1 is characterized in that, the wall thickness of described semicircle shape hollow steel pipe is 28-36mm.
4. recyclable pattern foundation pit supporting structure pile tube according to claim 1 is characterized in that, the spacing of two adjacent rectangle double wedges is 200-300mm on the axial section of described semicircle shape hollow steel pipe.
5. recyclable pattern foundation pit supporting structure pile tube according to claim 1 is characterized in that, the described steel making of having strong market potential to be not less than the secondary steel, and its diameter is 24-32mm.
6. recyclable pattern foundation pit supporting structure pile tube according to claim 1 is characterized in that, described stay bolt is made with the steel that are not less than the secondary steel, and its specification is M24-M32.
CN 201220511483 2012-09-28 2012-09-28 Recoverable foundation pit supporting pipe pile Expired - Fee Related CN202830920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220511483 CN202830920U (en) 2012-09-28 2012-09-28 Recoverable foundation pit supporting pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220511483 CN202830920U (en) 2012-09-28 2012-09-28 Recoverable foundation pit supporting pipe pile

Publications (1)

Publication Number Publication Date
CN202830920U true CN202830920U (en) 2013-03-27

Family

ID=47942666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220511483 Expired - Fee Related CN202830920U (en) 2012-09-28 2012-09-28 Recoverable foundation pit supporting pipe pile

Country Status (1)

Country Link
CN (1) CN202830920U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877463A (en) * 2012-09-28 2013-01-16 中国建筑第六工程局有限公司 Recyclable foundation pit support pipe pile and application and recovery method thereof
CN108468337A (en) * 2018-05-02 2018-08-31 南昌大学 A kind of recoverable foundation pit supporting pile and attaching/detaching apparatus and application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877463A (en) * 2012-09-28 2013-01-16 中国建筑第六工程局有限公司 Recyclable foundation pit support pipe pile and application and recovery method thereof
CN102877463B (en) * 2012-09-28 2015-01-07 中国建筑第六工程局有限公司 Recyclable foundation pit support pipe pile and application and recovery method thereof
CN108468337A (en) * 2018-05-02 2018-08-31 南昌大学 A kind of recoverable foundation pit supporting pile and attaching/detaching apparatus and application method

Similar Documents

Publication Publication Date Title
CN102877463B (en) Recyclable foundation pit support pipe pile and application and recovery method thereof
CN105220654B (en) The ruggedized construction and its construction method of a kind of earth and rockfill dam
CN103882869A (en) Inclined supporting pile structure for foundation pit support and construction method thereof
CN108035376B (en) Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof
CN102650212B (en) Construction method for protecting partition wall in double-arch tunnel through temporary support of middle pilot tunnel
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN109667262B (en) Karst water falling hole plugging structure and construction method thereof
CN104532851A (en) Recycling assembling type double-row pile and supporting method thereof
CN202830920U (en) Recoverable foundation pit supporting pipe pile
CN104878786A (en) Inclined-straight alternating group piles-soil-structure interaction experiment model
CN203768914U (en) Foundation pit bracing diagonal support pile structure
CN106013834A (en) Device and method for storey addition of basement
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN204080821U (en) A kind of steel work foundation ditch support replacement device
CN102409670B (en) Method for constructing foundation pile
CN205557535U (en) Compound retaining wall of arch campshed formula
CN205604289U (en) Can resist single storehouse underground pipe gallery of large deformation
CN213390202U (en) Combined type polygonal tubular structure fan foundation
CN204080820U (en) A kind of concrete structure foundation ditch support replacement device
CN204326061U (en) A kind of pile tube be drawn out easily
CN102535429A (en) Combined-rammer construction technology for foundation treatment
CN107476287B (en) Deformed steel for SMW construction method and construction method using same
CN204570675U (en) A kind of novel artificial hole digging pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20150928

EXPY Termination of patent right or utility model