CN104532851A - Recycling assembling type double-row pile and supporting method thereof - Google Patents
Recycling assembling type double-row pile and supporting method thereof Download PDFInfo
- Publication number
- CN104532851A CN104532851A CN201410784923.0A CN201410784923A CN104532851A CN 104532851 A CN104532851 A CN 104532851A CN 201410784923 A CN201410784923 A CN 201410784923A CN 104532851 A CN104532851 A CN 104532851A
- Authority
- CN
- China
- Prior art keywords
- campshed
- pile
- row
- stake
- row pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
Abstract
The invention belongs to the field of civil engineering, and relates to a recycling assembling type double-row pile and a supporting method thereof. Pile caps (4) are preset on the tops of front-row pile bodies (1), and the front-row pile bodies (1) are connected through a crown beam (2). The front-row pile bodies (1) and rear-row pile bodies (3) are connected through two pull rods (6), and the rear-row pile bodies (3) are connected through a lock connector (7). The two pull rods (6) are connected through a lock connector (7). The pile caps (4) and the pull rods (6) are connected through pin shafts (10), and pull rod sleeves (5) and the pull rods (6) are connected through pin shafts (10). Lock pins are inserted in lock holes (11) to prevent the pull rod sleeves (5) from longitudinally moving. The integrity of the supporting structure is improved, more cost is saved, economic benefits are increased, the construction time is shortened, and the safety coefficient of surrounding buildings during foundation pit construction is increased.
Description
Technical field
The invention belongs to engineering construction technology field, be mainly used in closing on important building and the larger Deep Foundation Pit Supporting Project of risk.
Background technology
In the Excavation Process of city, because foundation ditch periphery exists many existing buildings, and building foundation is darker, so do not allow to put slope excavation, in order to ensure horizontal movement and the sedimentation of stablizing, limiting the foundation ditch periphery soil body of foundation ditch, must adopt suitable foundation pit support plan, in practice, general conventional foundation pit supporting method comprises: (1) campshed Prestressing anchorage cable method.Namely first a placing of reinforcement concrete pile is laid at foundation ditch periphery, the then step excavation soil body, at projected depth place Shi Hanzhang anchor cable, the horizontal movement of restriction hole Zhou Tuti.(2) campshed adds inner support method.Namely first lay a placing of reinforcement concrete pile at foundation ditch periphery, the then step excavation soil body, apply bracing members at projected depth place, the horizontal movement of restriction hole Zhou Tuti.(3) double-row pile method.Namely successively lay the reinforced concrete pile of the suitable spacing of two rows at foundation ditch periphery, and connected by Guan Liang and coupling beam, form the larger overall soil-baffling structure of rigidity with inter-pile soil, the horizontal movement of restriction hole Zhou Tuti.
Above three kinds of foundation pit support plan, all have respective limitation and deficiency: (1) plants campshed Prestressing anchorage cable method, require that surrounding building basis can not be too dark, otherwise anchor cable cannot be constructed; (2) plants campshed adds inner support method, and it is shaping that campshed needs to carry out cast in situs.Inner support requires sleeve configuration foundation ditch, and the direction applying bracing members can not be too wide, otherwise bracing members amount of deflection is too large, and efficiency of construction is lower; (3) plants double-row pile method, and need cast in situs two row, non-assembling, the engineering time is longer, and material can not reclaim and comparatively waste.
Summary of the invention:
This method, based on double-row pile method, adopts assembling, and be a set of comparatively dark mainly for closing on building foundation, the foundation pit supporting method of periphery geological condition complexity, mainly solves following technical problem: the assembling building technology of (1) double-row pile.By arranging drag link sleeve, pull bar, latching connector, make front campshed and rear campshed assemble in aggregates, and conveniently rear campshed is dismantled.(2) recovery technology of coupling beam and rear campshed is solved.Excavation of foundation pit, to be onstructedly to proceed to ± 0 after rear campshed (steel pipe pile), drag link sleeve, pull bar, latching connector are reclaimed, treat that next time, construction still can use above device.
Therefore, adopt this method to carry out pattern foundation pit supporting structure, the globality of supporting and protection structure can be increased, and more cost-saving, increase economic efficiency, effectively shorten the engineering time, increase the safety factor of surrounding building in foundation pit construction process.
The present invention adopts following technological means:
A kind of recovery assembling double-row pile, it comprises front campshed 1, front-seat dowel crown beam 2, rear campshed 3, pile cover 4, drag link sleeve 5, pull bar 6, latching connector 7, reinforcing cage 8, skin of paint 9, bearing pin 10, lockhole 11;
Pile cover 4 is preset on front campshed 1 top, connects between front campshed 1 with hat beam 2.Front campshed 1 is connected with two pull bars 6 and a latching connector 7 respectively with between rear campshed 3, rear campshed 3, is wherein connected by a latching connector 7 between two pull bars 6.Pile cover 4 is all connected with bearing pin 10 with pull bar 6 with pull bar 6, drag link sleeve 5, and lockhole 11 inserts lock pin and prevents drag link sleeve 5 from vertically moving;
Described front campshed 1 is cast-in-place concrete pile; Described rear campshed 3 is steel pipe pile;
One of the present invention reclaims assembling double-row pile, and Specific construction step is as follows: lay double-row pile at the foundation ditch periphery intending excavation, wherein, campshed 1 is cast-in-place concrete pile, rotary drilling rig pore-forming, and stake footpath is 600-1000mm, and pile spacing 2d-3d, d are stake footpath; Rear campshed 3 is steel pipe pile, and stake footpath is 600mm, and pile spacing, stake are long identical with front campshed.Rear campshed 3 adopts rig pore-forming in advance, after penetration concrete, is smeared by pile body in the steel pipe pile patchhole of 3-5mm heat-bodied oil paint 9, campshed after being formed.
Front campshed 1 is 2d-3d with rear campshed 3 array pitch.Front campshed 1 pushes up presets pile cover 4, and connect with hat beam 2 between front campshed 1, concreting is shaping.Lockhole 11 is reserved on rear campshed top, and drag link sleeve 5 is preset on stake top; Front campshed 1 is connected with two pull bars 6 and a latching connector 7 with between rear campshed 3 and rear campshed 3, forms recyclable, assembling, stable Retaining Structure with Double-row Piles.
Excavation of foundation pit, to be onstructedly to proceed to ± 0 after, campshed 3, drag link sleeve 5, pull bar 6, latching connector 7 after reclaiming; After extracting, the stake holes of campshed 3 is tamped after inserting sandstone again.
The present invention, by arranging drag link sleeve, pull bar, latching connector, makes front campshed and rear campshed assemble in aggregates, and conveniently dismantles rear campshed, treats that next time, construction still can use above device.The present invention can increase the globality of supporting and protection structure, and more cost-saving, increases economic efficiency, and effectively shortens the engineering time, increases the safety factor of surrounding building in foundation pit construction process.
Accompanying drawing illustrates:
The top view of Fig. 1 structure of the present invention;
Fig. 2 1-1 sectional drawing;
Fig. 3 2-2 sectional drawing;
Fig. 4 3-3 sectional drawing;
In figure: 1. campshed before, 2. front-seat dowel crown beam, campshed, 4. pile cover, 5. drag link sleeve, 6. pull bar, 7. latching connector, 8. reinforcing cage, 9. skin of paint, 10. bearing pin 3., 11. lockholes.
Detailed description of the invention:
Below in conjunction with the drawings and specific embodiments, the present invention is further described:
A kind of recovery assembling double-row pile, it comprises front campshed 1, front-seat dowel crown beam 2, rear campshed 3, pile cover 4, drag link sleeve 5, pull bar 6, interlocking 7, reinforcing cage 8, skin of paint 9, bearing pin 10, lockhole 11;
Pile cover 4 is preset on front campshed 1 top, connects between front campshed 1 with hat beam 2.Front campshed 1 is connected with two pull bars 6 and a latching connector 7 respectively with between rear campshed 3, rear campshed 3, is wherein connected by a latching connector 7 between two pull bars 6.Pile cover 4 is all connected with bearing pin 10 with pull bar 6 with pull bar 6, drag link sleeve 5, and lockhole 11 inserts lock pin and prevents drag link sleeve 5 from vertically moving;
Described front campshed 1 is cast-in-place concrete pile; Described rear campshed 3 is steel pipe pile;
One of the present invention reclaims assembling double-row pile, and Specific construction step is as follows: lay double-row pile at the foundation ditch periphery intending excavation, wherein, campshed 1 is cast-in-place concrete pile, rotary drilling rig pore-forming, and stake footpath is 600-1000mm, and pile spacing 2d-3d, d are stake footpath; Rear campshed 3 is steel pipe pile, and stake footpath is 600mm, and pile spacing, stake are long identical with front campshed.Rear campshed 3 adopts rig pore-forming in advance, after penetration concrete, is smeared by pile body in the steel pipe pile patchhole of 3-5mm heat-bodied oil paint 9, campshed after being formed.
Front campshed 1 is 2d-3d with rear campshed 3 array pitch.Front campshed 1 pushes up presets pile cover 4, and connect with hat beam 2 between front campshed 1, concreting is shaping.Lockhole 11 is reserved on rear campshed top, and drag link sleeve 5 is preset on stake top; Front campshed 1 is connected with two pull bars 6 and a latching connector 7 with between rear campshed 3 and rear campshed 3, forms recyclable, assembling, stable Retaining Structure with Double-row Piles.
Excavation of foundation pit, to be onstructedly to proceed to ± 0 after, reclaim steel pipe pile 3, drag link sleeve 5, pull bar 6, latching connector 7; Tamp again after the stake holes of extracting steel pipe pile 3 inserts sandstone.
Claims (3)
1. reclaim an assembling double-row pile, it is characterized in that: it comprises front campshed (1), front-seat dowel crown beam (2), rear campshed (3), pile cover (4), drag link sleeve (5), pull bar (6), latching connector (7), reinforcing cage (8), skin of paint (9), bearing pin (10), lockhole (11);
Pile cover (4) is preset on front campshed (1) stake top, connects between front campshed (1) with Guan Liang (2).Front campshed (1) is connected with two pull bars (6) and a latching connector (7) respectively with between rear campshed (3), rear campshed (3), is wherein connected by a latching connector (7) between two pull bars (6).Pile cover (4) is all connected with bearing pin (10) with pull bar (6) with pull bar (6), drag link sleeve (5), and lockhole (11) inserts lock pin and prevents drag link sleeve (5) from vertically moving.
2. one according to claim 1 reclaims assembling double-row pile, it is characterized in that: described front campshed (1) is cast-in-place concrete pile; Described rear campshed (3) is steel pipe pile.
3. one according to claim 1 and 2 reclaims assembling double-row pile, it is characterized in that: Specific construction step is as follows: lay double-row pile at the foundation ditch periphery intending excavation, wherein front campshed (1) is cast-in-place concrete pile, rotary drilling rig pore-forming, stake footpath is 600-1000mm, pile spacing 2d-3d, d are stake footpath; Rear campshed (3) is steel pipe pile, and stake footpath is 600mm, and pile spacing, stake are long identical with front campshed; Rear campshed (3) adopts rig pore-forming in advance, after penetration concrete, is smeared by pile body in the steel pipe pile patchhole of 3-5mm heat-bodied oil paint (9), campshed after being formed;
Front campshed (1) and rear campshed (3) array pitch are 2d-3d; Pile cover (4) is preset on front campshed (1) top, and connect with Guan Liang (2) between front campshed (1), concreting is shaping; Lockhole (11) is reserved on rear campshed top, and drag link sleeve (5) is preset on stake top; Front campshed (1) is connected with two pull bars (6) and a latching connector (7) with between rear campshed (3) and rear campshed (3), forms recyclable, assembling, stable Retaining Structure with Double-row Piles;
Excavation of foundation pit, to be onstructedly proceeds to after+0, campshed (3), drag link sleeve (5), pull bar (6), latching connector (7) after reclaiming; Tamp again after after extracting, the stake holes of campshed (3) inserts sandstone.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410784923.0A CN104532851B (en) | 2014-12-17 | 2014-12-17 | Recycling assembling type double-row pile and supporting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410784923.0A CN104532851B (en) | 2014-12-17 | 2014-12-17 | Recycling assembling type double-row pile and supporting method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104532851A true CN104532851A (en) | 2015-04-22 |
CN104532851B CN104532851B (en) | 2017-01-11 |
Family
ID=52848459
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410784923.0A Expired - Fee Related CN104532851B (en) | 2014-12-17 | 2014-12-17 | Recycling assembling type double-row pile and supporting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532851B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223344A (en) * | 2016-07-26 | 2016-12-14 | 北京工业大学 | A kind of ground line piled anchor framework foundation pit supporting method |
CN106284272A (en) * | 2016-10-08 | 2017-01-04 | 江苏省交通工程集团有限公司 | Fore shaft grouting steel tube pile guide wall and construction method |
CN109403344A (en) * | 2018-11-26 | 2019-03-01 | 中建局集团建设发展有限公司 | A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method |
CN110080206A (en) * | 2019-05-07 | 2019-08-02 | 中国核电工程有限公司 | Recoverable spiral double-row pile and its recovery method |
CN111576435A (en) * | 2020-04-17 | 2020-08-25 | 中建五局第三建设有限公司 | Construction method and structure of column control slip surface of inter-pile soil steel structure |
CN111648378A (en) * | 2020-06-16 | 2020-09-11 | 深圳市勘察测绘院(集团)有限公司 | Square-round pile combined foundation pit supporting method |
CN112227382A (en) * | 2020-10-19 | 2021-01-15 | 中建一局集团建设发展有限公司 | Double-row pile structure with water stopping function and construction method thereof |
CN116677203A (en) * | 2023-07-06 | 2023-09-01 | 北京住总第二开发建设有限公司 | Pipe frame structure of shaping pump and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201232180Y (en) * | 2008-07-22 | 2009-05-06 | 大连三川建设集团股份有限公司 | Novel sheet-pile wall |
KR20110029888A (en) * | 2009-09-16 | 2011-03-23 | 박강호 | Retaining wall structure and constructing method thereof |
CN102116028A (en) * | 2011-01-13 | 2011-07-06 | 中建四局第三建筑工程有限公司 | Method and structure for excavating soil in core tube region based on raft pile supporting |
CN102383435A (en) * | 2011-09-28 | 2012-03-21 | 中铁大桥局股份有限公司 | High-fall levee double-row piles |
CN103088831A (en) * | 2013-01-24 | 2013-05-08 | 东南大学 | Overall assembly-type double-row steel pile foundation pit supporting structure |
CN203855970U (en) * | 2014-05-15 | 2014-10-01 | 江苏鼎达建筑新技术有限公司 | Assembly type foundation pit supporting double-row hollow pile structure |
-
2014
- 2014-12-17 CN CN201410784923.0A patent/CN104532851B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201232180Y (en) * | 2008-07-22 | 2009-05-06 | 大连三川建设集团股份有限公司 | Novel sheet-pile wall |
KR20110029888A (en) * | 2009-09-16 | 2011-03-23 | 박강호 | Retaining wall structure and constructing method thereof |
CN102116028A (en) * | 2011-01-13 | 2011-07-06 | 中建四局第三建筑工程有限公司 | Method and structure for excavating soil in core tube region based on raft pile supporting |
CN102383435A (en) * | 2011-09-28 | 2012-03-21 | 中铁大桥局股份有限公司 | High-fall levee double-row piles |
CN103088831A (en) * | 2013-01-24 | 2013-05-08 | 东南大学 | Overall assembly-type double-row steel pile foundation pit supporting structure |
CN203855970U (en) * | 2014-05-15 | 2014-10-01 | 江苏鼎达建筑新技术有限公司 | Assembly type foundation pit supporting double-row hollow pile structure |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223344A (en) * | 2016-07-26 | 2016-12-14 | 北京工业大学 | A kind of ground line piled anchor framework foundation pit supporting method |
CN106223344B (en) * | 2016-07-26 | 2018-07-13 | 北京工业大学 | A kind of ground line piled anchor frame foundation pit supporting method |
CN106284272A (en) * | 2016-10-08 | 2017-01-04 | 江苏省交通工程集团有限公司 | Fore shaft grouting steel tube pile guide wall and construction method |
CN109403344A (en) * | 2018-11-26 | 2019-03-01 | 中建局集团建设发展有限公司 | A kind of truss-like double-row pile cement soil wall foundation pit enclosure structure and its construction method |
CN110080206A (en) * | 2019-05-07 | 2019-08-02 | 中国核电工程有限公司 | Recoverable spiral double-row pile and its recovery method |
CN111576435A (en) * | 2020-04-17 | 2020-08-25 | 中建五局第三建设有限公司 | Construction method and structure of column control slip surface of inter-pile soil steel structure |
CN111648378A (en) * | 2020-06-16 | 2020-09-11 | 深圳市勘察测绘院(集团)有限公司 | Square-round pile combined foundation pit supporting method |
CN112227382A (en) * | 2020-10-19 | 2021-01-15 | 中建一局集团建设发展有限公司 | Double-row pile structure with water stopping function and construction method thereof |
CN116677203A (en) * | 2023-07-06 | 2023-09-01 | 北京住总第二开发建设有限公司 | Pipe frame structure of shaping pump and construction method thereof |
CN116677203B (en) * | 2023-07-06 | 2024-04-16 | 北京住总第二开发建设有限公司 | Pipe frame structure of shaping pump and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN104532851B (en) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104532851B (en) | Recycling assembling type double-row pile and supporting method thereof | |
CN110374633B (en) | Tunnel opening section construction method for tunnel to pass through loose body | |
CN105781571A (en) | Construction method for soft rock deformation tunnel lining support dismantling-replacing arch | |
CN103306289B (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN205134331U (en) | Foundation ditch excavation bearing structure | |
CN101509261B (en) | Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation | |
CN106522242A (en) | Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system | |
CN104594361B (en) | A kind of I shape fender post and building enclosure also serve as the construction method of agent structure | |
CN105756091B (en) | A kind of Metro station excavation construction method of control adjacent building composition deformation | |
CN105442605B (en) | Extract PHC and be reused in deep foundation pit supporting construction method | |
CN106498950A (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body | |
CN102660955B (en) | Quick construction method for foundation pit slope support | |
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
CN102864781A (en) | Foundation pit supporting method utilizing inclined piles | |
CN111395358A (en) | Novel support system for double-row pile vertical-blocking cross anchor and construction method thereof | |
CN106522236A (en) | Structure for shoring of foundation trench and construction method | |
CN108130910A (en) | A kind of support system and its design method of the displacement of active control foundation pit | |
CN104131566B (en) | A kind of basement is without the construction method of horizontal support foundation ditch | |
CN206554091U (en) | The foundation ditch temporary support structures of anti-Nearby Structure foundation deformation | |
CN112411610A (en) | Pile foundation underpinning construction method | |
CN203729309U (en) | Support system with combined double-row piles combined with vertical prestressed anchor bolts | |
CN105735383A (en) | Partial underground obstacle removing construction method capable of reserving structural system | |
CN207862945U (en) | Mixing pile inner sleeve beats the foundation pit enclosure structure of quincunx bored concrete pile | |
CN203891047U (en) | Equipment equipped with steel platform for foundation construction of land bridge | |
CN105350547A (en) | Method applicable to inter-pile soil support of slope protection pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20211217 |