CN202744965U - 钢管混凝土拱桥拱肋合龙机构 - Google Patents

钢管混凝土拱桥拱肋合龙机构 Download PDF

Info

Publication number
CN202744965U
CN202744965U CN 201220307702 CN201220307702U CN202744965U CN 202744965 U CN202744965 U CN 202744965U CN 201220307702 CN201220307702 CN 201220307702 CN 201220307702 U CN201220307702 U CN 201220307702U CN 202744965 U CN202744965 U CN 202744965U
Authority
CN
China
Prior art keywords
steel pipe
closure
steel tube
bases
principal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220307702
Other languages
English (en)
Inventor
高学文
沙权贤
王成双
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN 201220307702 priority Critical patent/CN202744965U/zh
Application granted granted Critical
Publication of CN202744965U publication Critical patent/CN202744965U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开一种钢管混凝土拱桥拱肋合龙机构,包括两段需要合龙的主弦钢管,其特征在于:所述的两段主弦钢管之间夹有合龙段钢管,在合龙段钢管与其两端的主弦钢管通过多个加劲板连接为一体结构,并且加劲板设置在主弦钢管和合龙段钢管的内壁上,在两段主弦钢管的端部分别连接有基座,基座上设置有千斤顶托槽,在两个基座之间设置有千斤顶;所述的基座和主弦钢管之间还设置有至少两个斜向加强杆。一种结构简单,设计巧妙,布局合理,可以实现快速、瞬时合龙,并保证合龙后的结构安全、可靠的钢管混凝土拱桥拱肋合龙机构。

Description

钢管混凝土拱桥拱肋合龙机构
技术领域
本实用新型涉及一种桥梁施工用合龙阶段用辅助装置,特别是一种钢管混凝土拱桥拱肋合龙机构。
背景技术
在桥梁施工的过程中,特别是各类钢管混凝土拱桥拱肋的合龙过程中,多采用静态合龙技术。但是这种技术方法对于大跨度悬拼施工的钢管混凝土拱桥来说不适用,这种大跨度悬拼桥梁要求能够快速、甚至瞬时合龙,才能让整体结构的安全性得到保证。因此现在需要一种能够适用于大跨度悬拼桥梁施工的合龙装置或结构。
发明内容
本实用新型是为了解决现有技术所存在的上述不足,提出一种结构简单,设计巧妙,布局合理,可以实现快速、瞬时合龙,并保证合龙后的结构安全、可靠的钢管混凝土拱桥拱肋合龙机构。
本实用新型的技术解决方案是:一种钢管混凝土拱桥拱肋合龙机构,包括两段需要合龙的主弦钢管1,其特征在于:所述的两段主弦钢管1之间夹有合龙段钢管2,在合龙段钢管2与其两端的主弦钢管1通过多个加劲板3连接为一体结构,并且加劲板3设置在主弦钢管1和合龙段钢管2的内壁上,在两段主弦钢管1的端部分别连接有基座4,基座4上设置有千斤顶托槽5,在两个基座4之间设置有千斤顶6。
所述的基座4和主弦钢管1之间还设置有至少两个斜向加强杆7。
本实用新型同现有技术相比,具有如下优点:
本种结构形式的钢管混凝土拱桥拱肋合龙机构,其结构简单,设计巧妙,它针对传统的静态合龙方式无法应用在大跨度桥梁施工过程中,因而设计出这种特殊结构,它可以应用在悬拼式桥梁施工中,特别是可以应用在钢管混凝土拱桥拱肋的合龙过程中。它可以实现两段主弦钢管之间的快速、瞬时合龙,并且可以保证合龙后桥梁整体结构的安全性。并且这种合龙机构的制作工艺简单,制造成本低廉,可以说它具备了多种优点,特别适合于在桥梁施工领域之中推广应用,其市场前景十分广阔。
附图说明
图1是本实用新型实施例的结构示意图。
具体实施方式
下面将结合附图说明本实用新型的具体实施方式。如图1所示:一种钢管混凝土拱桥拱肋合龙机构,它的作用是将两段需要合龙的主弦钢管1连接为一体结构;在两段主弦钢管1之间夹设有合龙段钢管2,这个合龙段钢管2与位于其两端的主弦钢管1通过多个加劲板3连接为一体结构,并且这些加劲板3都设置在主弦钢管1和合龙段钢管2的内壁上,在两段主弦钢管1的端部附近还分别设置有基座4,在基座4上设置有千斤顶托槽5,在两个基座4之间则设置有千斤顶6,并且在基座4和主弦钢管1之间还设置有至少两个斜向加强杆7,以增强整个系统的强度。
本实用新型实施例的钢管混凝土拱桥拱肋合龙机构的工作过程如下:首先在两段主弦钢管1上安装基座4和斜向加强杆7,在基座4上的千斤顶托槽5内安装千斤顶6,全部准备工作完成后,在适合的温度条件下同步进行施力(即千斤顶5顶出),为两段主弦钢管1提供模拟合龙最佳受力状态,其具体施力值根据环境温度进行计算测定;然后在两段主弦钢管1之间的内壁上焊接多个加劲板3,加劲板3连接完成后,按照合龙口尺寸制作分为两块的合龙段钢管2,将这两块合龙段钢管2安装就位后,进行纵缝和环缝的焊接,焊接工作全部完成。最后将基座4、千斤顶6和斜向加强杆7拆除即可。

Claims (2)

1.一种钢管混凝土拱桥拱肋合龙机构,包括两段需要合龙的主弦钢管(1),其特征在于:所述的两段主弦钢管(1)之间夹有合龙段钢管(2),在合龙段钢管(2)与其两端的主弦钢管(1)通过多个加劲板(3)连接为一体结构,并且加劲板(3)设置在主弦钢管(1)和合龙段钢管(2)的内壁上,在两段主弦钢管(1)的端部分别连接有基座(4),基座(4)上设置有千斤顶托槽(5),在两个基座(4)之间设置有千斤顶(6)。
2.根据权利要求1所述的钢管混凝土拱桥拱肋合龙机构,其特征在于:所述的基座(4)和主弦钢管(1)之间还设置有至少两个斜向加强杆(7)。
CN 201220307702 2012-06-28 2012-06-28 钢管混凝土拱桥拱肋合龙机构 Expired - Fee Related CN202744965U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220307702 CN202744965U (zh) 2012-06-28 2012-06-28 钢管混凝土拱桥拱肋合龙机构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220307702 CN202744965U (zh) 2012-06-28 2012-06-28 钢管混凝土拱桥拱肋合龙机构

Publications (1)

Publication Number Publication Date
CN202744965U true CN202744965U (zh) 2013-02-20

Family

ID=47704388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220307702 Expired - Fee Related CN202744965U (zh) 2012-06-28 2012-06-28 钢管混凝土拱桥拱肋合龙机构

Country Status (1)

Country Link
CN (1) CN202744965U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704410A (zh) * 2012-06-28 2012-10-03 中铁十三局集团第一工程有限公司 钢管混凝土拱桥拱肋合龙机构
CN112323631A (zh) * 2020-10-20 2021-02-05 高军 一种大跨钢桁拱桥斜桥快速合龙方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704410A (zh) * 2012-06-28 2012-10-03 中铁十三局集团第一工程有限公司 钢管混凝土拱桥拱肋合龙机构
CN112323631A (zh) * 2020-10-20 2021-02-05 高军 一种大跨钢桁拱桥斜桥快速合龙方法

Similar Documents

Publication Publication Date Title
CN108240069A (zh) 一种大跨度多截面组合式桁架屋面结构体系及其施工方法
CN104847020A (zh) 一种树丫型圆管节点转换结构及其加工制作方法
CN102966185B (zh) 新型钢管混凝土连接节点及其施工方法
CN104047378A (zh) 一种钢管束组合结构剪力墙现场拼接节点
CN202744965U (zh) 钢管混凝土拱桥拱肋合龙机构
CN202644741U (zh) 一种管桁架的现场连接节点
CN202611223U (zh) 可循环使用的螺栓式脚手架连墙件
CN105088971A (zh) 一种波形钢腹板pc箱梁斜拉桥中跨合龙施工方法
CN203145481U (zh) 一种变角度钢管柱拼接耳板制作定位装置
CN204753819U (zh) 一种带预应力的二次分叉树形支承网格结构
CN204212058U (zh) 用于钢砼组合桁架梁施工中的钢桁梁拼装支架
CN102704410A (zh) 钢管混凝土拱桥拱肋合龙机构
CN203891256U (zh) 钢管束组合结构剪力墙现场拼接节点
CN107893480A (zh) 一种格构式梁与柱的装配式连接节点
CN205295915U (zh) 一种波形钢腹板导梁
CN204753839U (zh) 一种钢柱间支撑用连接装置
CN204504600U (zh) 用于自升平台桩腿焊接的辅助平台及其支撑装置
CN201136550Y (zh) 中段桁架式客车车架
CN104234189B (zh) 一种预制装配式房屋的四管状桁架结构
CN202540273U (zh) 斜撑杆用支架
CN102733494A (zh) 一种管桁架的现场连接节点
CN210597877U (zh) 一种部分填充组合柱装配式安装工装
CN113802769A (zh) 一种套管式缀条连接的钢管夹层混凝土格构柱及施工方法
CN104047379A (zh) 钢管束组合结构剪力墙现场拼接节点
CN202790959U (zh) 基于高空横向支撑的钢管桁架结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BURE

Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP 1ST ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 116000 the Yellow River Road, Xigang District, Liaoning, No. 219, No.

Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP 1ST ENGINEERING CO., LTD.

Address before: 116000 the Yellow River Road, Xigang District, Liaoning, No. 219, No.

Patentee before: China Railway 13th Bureau Group 1st Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20210628