CN202728545U - Full circle swinging tug leaning-forward type carrying structure - Google Patents

Full circle swinging tug leaning-forward type carrying structure Download PDF

Info

Publication number
CN202728545U
CN202728545U CN 201220327008 CN201220327008U CN202728545U CN 202728545 U CN202728545 U CN 202728545U CN 201220327008 CN201220327008 CN 201220327008 CN 201220327008 U CN201220327008 U CN 201220327008U CN 202728545 U CN202728545 U CN 202728545U
Authority
CN
China
Prior art keywords
shipway
steel
building berth
tug
carrying structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220327008
Other languages
Chinese (zh)
Inventor
于秉权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN XINHE SHIPBUILDING HEAVY INDUSTRY Co Ltd
Original Assignee
TIANJIN XINHE SHIPBUILDING HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN XINHE SHIPBUILDING HEAVY INDUSTRY Co Ltd filed Critical TIANJIN XINHE SHIPBUILDING HEAVY INDUSTRY Co Ltd
Priority to CN 201220327008 priority Critical patent/CN202728545U/en
Application granted granted Critical
Publication of CN202728545U publication Critical patent/CN202728545U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a full circle swinging tug leaning-forward type carrying structure which comprises a plurality of first shipway steel piers which are arranged between a flat keel and a main ship body shipway. The elevations of the plurality of first shipway steel piers are the same. A plurality of second shipway steel piers are respectively arranged in front of a first shipway steel pier which is placed at the forefront end and behind a first shipway steel pier which is placed at the rearmost end on the main ship body shipway. The elevations of the plurality of second shipway steel piers are the same as the elevations of the corresponding positions on the bottom of a ship. According to the full circle swinging tug leaning-forward type carrying structure, a large quantity of materials such as steel pier wood are saved, and meanwhile the range of working aloft is reduced, convenience and rapidness are achieved, the construction cycle of the shipway is shortened, and cost is lowered.

Description

Z-propeller tug FC carrying structure
Technical field
The utility model relates to a kind of carrying structure, especially relates to Z-propeller tug FC carrying structure.
Background technology
Shown in Figure 1, flat of bottom keel and baseline have the angle about 2 degree, the conventional method for loading of tugboat is that normotopia is built, normotopia is built when carrying, the low and high of flat of bottom keel differs about about 1000mm, the minimum laying height of building berth steel pier h1 is 1800mm, the high-order need laying of this ship plate keel height h2 is the steel pier about 2800mm so, ship molded breadth 11000mm laterally need lay 5 steel piers, need to increase a lot of steel piers and timber more than calculating 1800mm like this, also enlarged simultaneously the aloft work scope, the concerned process steps work capacity strengthens.
Summary of the invention
The purpose of this utility model is to overcome the deficiency of prior art, and a kind of a large amount of materials such as steel block material of having saved are provided, and has also reduced simultaneously the scope of aloft work, and is simple and efficient and shortened the Z-propeller tug FC carrying structure of building berth production cycle.
Z-propeller tug FC carrying structure of the present utility model, it comprises a plurality of the first building berth steel piers that are arranged between plate keel and the main body building berth, the absolute altitude of described a plurality of the first building berth steel piers is identical, be separately installed with a plurality of the second building berth steel piers at the main body building berth at rear portion that is positioned at the anterior of described the first building berth steel pier foremost and is positioned at the first building berth steel pier of rearmost end, the absolute altitude of described a plurality of the second building berth steel piers is consistent with the absolute altitude of hull bottom correspondence position.
Adopt this structure to save a large amount of materials such as steel block material, also reduced simultaneously the scope of aloft work, simple and efficient and shortened the building berth production cycle, reduced cost.
Description of drawings
Fig. 1 is conventional Z-propeller tug method for loading scheme drawing;
Fig. 2 is the mounting structure scheme drawing of the utility model Z-propeller tug FC carrying structure.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is done to describe in detail.
Z-propeller tug FC carrying structure of the present utility model as shown in drawings, it comprises a plurality of the first building berth steel piers that are arranged between plate keel 1 and the main body building berth 6, the absolute altitude h1 of described a plurality of the first building berth steel piers is identical, be separately installed with a plurality of the second building berth steel pier 3-2 at the main body building berth at rear portion that is positioned at the anterior of described the first building berth steel pier foremost and is positioned at the first building berth steel pier 3-1 of rearmost end, the absolute altitude of described a plurality of the second building berth steel piers is consistent with the absolute altitude of hull bottom correspondence position.
During practical operation, the building berth steel pier height of putting in the flat of bottom keel scope can be 1800mm, the steel pier height dimension of other position, line style elevation dimension according to the position is put, each segmentation is according to the lift-launch order of technological requirement, handling to building berth is put on the steel pier successively, areal survey, centering, location, the last main body moulding of welding.

Claims (1)

1. Z-propeller tug FC carrying structure, it is characterized in that: it comprises a plurality of the first building berth steel piers that are arranged between plate keel and the main body building berth, the absolute altitude of described a plurality of the first building berth steel piers is identical, be separately installed with a plurality of the second building berth steel piers at the main body building berth at rear portion that is positioned at the anterior of described the first building berth steel pier foremost and is positioned at the first building berth steel pier of rearmost end, the absolute altitude of described a plurality of the second building berth steel piers is consistent with the absolute altitude of hull bottom correspondence position.
CN 201220327008 2012-07-06 2012-07-06 Full circle swinging tug leaning-forward type carrying structure Expired - Fee Related CN202728545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220327008 CN202728545U (en) 2012-07-06 2012-07-06 Full circle swinging tug leaning-forward type carrying structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220327008 CN202728545U (en) 2012-07-06 2012-07-06 Full circle swinging tug leaning-forward type carrying structure

Publications (1)

Publication Number Publication Date
CN202728545U true CN202728545U (en) 2013-02-13

Family

ID=47654272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220327008 Expired - Fee Related CN202728545U (en) 2012-07-06 2012-07-06 Full circle swinging tug leaning-forward type carrying structure

Country Status (1)

Country Link
CN (1) CN202728545U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113697029A (en) * 2021-09-29 2021-11-26 广船国际有限公司 Underwater line type of ship

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113697029A (en) * 2021-09-29 2021-11-26 广船国际有限公司 Underwater line type of ship

Similar Documents

Publication Publication Date Title
CN205049978U (en) Photovoltaic array cleaning head position appearance control system
CN204771269U (en) A special bed -jig for making boats and ships forecastle bulwark
CN202728545U (en) Full circle swinging tug leaning-forward type carrying structure
CN204163416U (en) Steel work docks assembled moulding bed
CN204076081U (en) Flat-bulb steel butt assembling structure
CN104071301A (en) Preassembling method for anchor mouth of bulk frighter in segmentation stage
CN204749011U (en) Cylindricality mistake proofing skeleton charging means
CN105667709A (en) Hull manufacturing method
CN204818573U (en) Multi -functional high altitude construction car rear axle welding frock
CN204979184U (en) Be used for boats and ships superstructure always to organize location bed -jig frock
CN204913151U (en) Multi -functional high altitude construction plantago axle welding frock
CN204528737U (en) Fixed dock ramp
CN204953837U (en) Reliable lost pattern casting processing platform that disappears
CN202023574U (en) Big-drop transition bracket
CN205441623U (en) Multi -purpose transportation frame
CN205330008U (en) Reinforcing steel bar support
CN203617261U (en) Charging carriage
CN204250303U (en) A kind of adjustable flower pier
CN204606646U (en) A kind of hold-down mechanism of plate glass barrow
CN204195130U (en) A kind of catch on wheel welding coaxial die
CN203511407U (en) Connecting structure for carriage side board and upright column of dumper
CN204473660U (en) A kind of erecting frame of glass transportation in heaps
CN203401239U (en) Universal platform combined type installing and welding clamping fixture of heading machine body
CN203941927U (en) A kind of novel photovoltaic module workshop tote cart
CN203359768U (en) Lifting tool for case plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20180706

CF01 Termination of patent right due to non-payment of annual fee