CN204163416U - Steel work docks assembled moulding bed - Google Patents

Steel work docks assembled moulding bed Download PDF

Info

Publication number
CN204163416U
CN204163416U CN201420638751.1U CN201420638751U CN204163416U CN 204163416 U CN204163416 U CN 204163416U CN 201420638751 U CN201420638751 U CN 201420638751U CN 204163416 U CN204163416 U CN 204163416U
Authority
CN
China
Prior art keywords
frame
moulding bed
support frame
adjustment jack
assembled moulding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420638751.1U
Other languages
Chinese (zh)
Inventor
王磊
刘昌岑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22mcc Group Equipment Manufacturing Co ltd
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201420638751.1U priority Critical patent/CN204163416U/en
Application granted granted Critical
Publication of CN204163416U publication Critical patent/CN204163416U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of steel work and docks assembled moulding bed, docks assembled moulding bed and comprises base for supporting, and base for supporting upper surface is provided with left and right bracing frame and Height Adjustment jack; The upper surface of left and right bracing frame is respectively arranged with left and right side locating rack; Bracing frame and support plate upper surface are provided with truss member; Truss member and be provided with left side horizontal adjustment jack and right side horizontal adjustment jack between left positioner frame and right positioner frame.The utility model steel work docks assembled moulding bed, without the need to using crane during assembling construction, only component need be put to put in place and namely can carry out counterpart operation by setting up jack on moulding bed, accurately can control the quality of counterpart.Avoid simultaneously and weld auxiliary part on component, the manpower of the outward appearance that ensure that component and the auxiliary part saving process welding and material, ensure construction speed, improve efficiency of construction and construction quality.

Description

Steel work docks assembled moulding bed
Technical field
The utility model relates to a kind of welding for steel structure aid, specifically, relates to a kind of steel work and docks assembled moulding bed.
Background technology
Steel work docks in assembled process, and the method usually adopted has: 1, utilize crane to carry out assembled, adjustment mating interface; 2, on structural member, weld auxiliary part and carry out adjustment mating interface.It is slow that the first directly utilizes crane to adjust mating interface speed, and accuracy cannot ensure.The second also needs to cut off at component surface welding auxiliary part, and grinding process affects component outward appearance, lost labor and material.
Utility model content
For above-mentioned deficiency of the prior art, the utility model provides a kind of structure simple, and the steel work improving efficiency of construction and construction quality docks assembled moulding bed.
Technical solution adopted in the utility model is:
A kind of steel work docks assembled moulding bed, and comprise front end and dock assembled moulding bed and rear end bracing frame, the assembled moulding bed of described docking comprises base for supporting, and base for supporting upper surface is provided with left support frame, right support frame and Height Adjustment jack; Height Adjustment jack is arranged between left support frame and right support frame; Be provided with gripper shoe above Height Adjustment jack, be provided with through hole in the middle part of gripper shoe, gripper shoe both sides are arranged on the upper surface of left support frame and right support frame; The upper surface of gripper shoe left outer bracing frame and right support frame is respectively arranged with left positioner frame and right positioner frame; Left positioner frame is fixedly connected with right support frame with left support frame respectively with right positioner frame; Bracing frame and support plate upper surface are provided with truss member; Truss member and be provided with left side horizontal adjustment jack and right side horizontal adjustment jack between left positioner frame and right positioner frame.
Described support plate upper surface distance ground level is less than rear end bracing frame upper surface distance ground level.
The beneficial effect of the utility model hinge structure:
The utility model steel work docks assembled moulding bed, and structure is simple, without the need to using crane during assembling construction, only component need be put to put in place and namely can carry out counterpart operation by setting up jack on moulding bed, accurately can control the quality of counterpart.Avoid simultaneously and weld auxiliary part on component, the manpower of the outward appearance that ensure that component and the auxiliary part saving process welding and material, ensure construction speed, improve efficiency of construction and construction quality.
Accompanying drawing explanation
Fig. 1 is the side-looking structural representation that the utility model steel work docks the welded condition of assembled moulding bed;
Fig. 2 is the plan structure schematic diagram that the utility model steel work docks the welded condition of assembled moulding bed;
Fig. 3 is the main TV structure schematic diagram that the utility model steel work docks the welded condition of assembled moulding bed.
Critical piece symbol description in accompanying drawing:
In figure:
1, assembled moulding bed 2, bracing frame is docked
3, base for supporting 4, left support frame
5, right support frame 6, Height Adjustment jack
7, gripper shoe 8, through hole
9, left positioner frame 10, right positioner frame
11, truss member 12, left side horizontal adjustment jack
13, right side horizontal adjustment jack 14, mating interface.
Detailed description of the invention
Referring to drawings and Examples, the utility model is described in detail:
Accompanying drawing 1-3 is known, a kind of steel work docks assembled moulding bed, comprise front end and dock assembled moulding bed 1 and rear end bracing frame 2, the assembled moulding bed of described docking comprises base for supporting 3, and base for supporting 3 upper surface is provided with left support frame 4, right support frame 5 and Height Adjustment jack 6; Height Adjustment jack 6 is arranged between left support frame 4 and right support frame 5; Be provided with gripper shoe 7 above Height Adjustment jack 6, be provided with through hole 8 in the middle part of gripper shoe, gripper shoe 7 both sides are arranged on the upper surface of left support frame 4 and right support frame 5; The upper surface of gripper shoe 7 left outer bracing frame 4 and right support frame 5 is respectively arranged with left positioner frame 9 and right positioner frame 10; Left positioner frame 9 is fixedly connected with right support frame 5 with left support frame 4 respectively with right positioner frame 10; Bracing frame 2 and gripper shoe 7 upper surface are provided with truss member 11; Truss member 11 and be provided with left side horizontal adjustment jack 12 and right side horizontal adjustment jack 13 between left positioner frame 9 and right positioner frame 10.
Described support plate upper surface distance ground level is less than rear end bracing frame upper surface distance ground level.
The utility model steel work docks assembled moulding bed, and structure is simple, without the need to using crane during assembling construction, only component need be put to put in place and namely can carry out counterpart operation by setting up jack on moulding bed, accurately can control the quality of counterpart.Avoid simultaneously and weld auxiliary part on component, the manpower of the outward appearance that ensure that component and the auxiliary part saving process welding and material, ensure construction speed, improve efficiency of construction and construction quality.
The assembled moulding bed used in constructing operation process, by improveing traditional moulding bed, mainly arranges the position of jack can placing adjustment steel beam column absolute altitude, left and right skew on moulding bed, and provides fulcrum for jack.Ensure, in the assembled process of steel beam column, jack pair steel beam column to be placed as required and carry out across-the-board regulation.
The utility model steel work docks assembled moulding bed main operational steps:
1, crane is used to be placed on assembled moulding bed by the assembled component of needs.Interface position is a little less than the two ends of component.
2, left side horizontal adjustment jack and the horizontal direction of horizontal adjustment jack pair component interface position, right side is used to carry out adjusting until component is straight or meet the requirements of springing quantum.Left side horizontal adjustment jack and right side horizontal adjustment jack and dismountable after adjustment.
3, Height Adjustment jack pair component interface position absolute altitude is used to adjust, until component is up to the standard or the springing quantum of designing requirement.
Whether occur mobile, finely tune if there is mobile left side horizontal adjustment jack and the right side horizontal adjustment jack of using if after Pass line adjustment, 4, checking modular level position.Left side horizontal adjustment jack and right side horizontal adjustment jack and dismountable after adjustment.
5, weld after adjustment.

Claims (2)

1. steel work docks an assembled moulding bed, and comprise front end and dock assembled moulding bed and rear end bracing frame, it is characterized in that: the assembled moulding bed of described docking comprises base for supporting, base for supporting upper surface is provided with left support frame, right support frame and Height Adjustment jack; Height Adjustment jack is arranged between left support frame and right support frame; Be provided with gripper shoe above Height Adjustment jack, be provided with through hole in the middle part of gripper shoe, gripper shoe both sides are arranged on the upper surface of left support frame and right support frame; The upper surface of gripper shoe left outer bracing frame and right support frame is respectively arranged with left positioner frame and right positioner frame; Left positioner frame is fixedly connected with right support frame with left support frame respectively with right positioner frame; Bracing frame and support plate upper surface are provided with truss member; Truss member and be provided with left side horizontal adjustment jack and right side horizontal adjustment jack between left positioner frame and right positioner frame.
2. steel work docks assembled moulding bed according to claim 1, it is characterized in that: described support plate upper surface distance ground level is less than rear end bracing frame upper surface distance ground level.
CN201420638751.1U 2014-10-31 2014-10-31 Steel work docks assembled moulding bed Expired - Fee Related CN204163416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420638751.1U CN204163416U (en) 2014-10-31 2014-10-31 Steel work docks assembled moulding bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420638751.1U CN204163416U (en) 2014-10-31 2014-10-31 Steel work docks assembled moulding bed

Publications (1)

Publication Number Publication Date
CN204163416U true CN204163416U (en) 2015-02-18

Family

ID=52537118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420638751.1U Expired - Fee Related CN204163416U (en) 2014-10-31 2014-10-31 Steel work docks assembled moulding bed

Country Status (1)

Country Link
CN (1) CN204163416U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086694A (en) * 2017-11-02 2018-05-29 广东精工钢结构有限公司 A kind of building iron knot abnormity component makes moulding bed
CN109178244A (en) * 2018-10-29 2019-01-11 上海外高桥造船有限公司 Moulding bed
CN109610883A (en) * 2018-10-31 2019-04-12 上海闵轩钢结构工程有限公司 Temporary support is used in assembling type steel structure installation
CN113605719A (en) * 2021-08-11 2021-11-05 中建八局第四建设有限公司 Steel member butt joint installation method, steel member auxiliary alignment base and manufacturing method thereof
CN115070326A (en) * 2022-08-03 2022-09-20 江苏百崮钢结构工程有限公司 Jig frame convenient for folding miter gate
CN115676621A (en) * 2022-09-07 2023-02-03 浙江长兴金诺预制构件有限公司 High-efficient installation device of prefab for capital construction

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086694A (en) * 2017-11-02 2018-05-29 广东精工钢结构有限公司 A kind of building iron knot abnormity component makes moulding bed
CN109178244A (en) * 2018-10-29 2019-01-11 上海外高桥造船有限公司 Moulding bed
CN109610883A (en) * 2018-10-31 2019-04-12 上海闵轩钢结构工程有限公司 Temporary support is used in assembling type steel structure installation
CN113605719A (en) * 2021-08-11 2021-11-05 中建八局第四建设有限公司 Steel member butt joint installation method, steel member auxiliary alignment base and manufacturing method thereof
CN115070326A (en) * 2022-08-03 2022-09-20 江苏百崮钢结构工程有限公司 Jig frame convenient for folding miter gate
CN115676621A (en) * 2022-09-07 2023-02-03 浙江长兴金诺预制构件有限公司 High-efficient installation device of prefab for capital construction
CN115676621B (en) * 2022-09-07 2024-05-07 山西宏图清明建设工程有限公司 Prefabricated member efficient installation device for foundation construction

Similar Documents

Publication Publication Date Title
CN204163416U (en) Steel work docks assembled moulding bed
CN204524692U (en) Precision controlling frock
CN203726032U (en) Truck frame combined type assembling mould
CN207858161U (en) Confine position, welding, turnable integrated tooling in case tank end
CN101985196B (en) Device for welding walking frame main body of excavator
CN203738292U (en) Tool jig for welding elevator underbeams
CN203924704U (en) Aluminum alloy pattern plate system
CN204895763U (en) Auxiliary fixtures is corrected to boats and ships upper deck T roof beam
CN204081464U (en) Ruggedized construction bottom a kind of aluminum alloy mould plate
CN204148782U (en) A kind of container plate jig
CN206912516U (en) A kind of device that stainless steel welded deformation is adjusted using jack
CN206998165U (en) A kind of both sides plate hole coaxial welding positioning tool
CN202522310U (en) Novel cement split scale
CN203442269U (en) Angle bracket for connecting valve body and actuator
CN209935595U (en) Quick forming device of shaft bracket
CN208329151U (en) A kind of assemble welding formula steel construction
CN201970052U (en) Fixture for variable cross section manufacturing of small-section H-shaped steel
CN105149839A (en) Draft sill fish web pressing device for railway freight car
CN201752823U (en) Angle welding machine for double guide wheel
CN204843375U (en) Joint welding frock of dipper
CN214818355U (en) Supporting component for folding platform
CN205629806U (en) Semitrailer welds special frock with mechanical lift kits positioning group
CN202367387U (en) Calandria support positioner
CN204913172U (en) Membrane work piece welding set
CN206351361U (en) A kind of mobile jib automatic butt auxiliary body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180323

Address after: 063000 happy road, Tangshan City, Hebei Province, No. 16

Co-patentee after: CHINA 22MCC GROUP EQUIPMENT MANUFACTURING CO.,LTD.

Patentee after: China MCC22 Group Corp.,Ltd.

Address before: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee before: China MCC22 Group Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218