CN204163416U - Steel work docks assembled moulding bed - Google Patents
Steel work docks assembled moulding bed Download PDFInfo
- Publication number
- CN204163416U CN204163416U CN201420638751.1U CN201420638751U CN204163416U CN 204163416 U CN204163416 U CN 204163416U CN 201420638751 U CN201420638751 U CN 201420638751U CN 204163416 U CN204163416 U CN 204163416U
- Authority
- CN
- China
- Prior art keywords
- frame
- moulding bed
- support frame
- adjustment jack
- assembled moulding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000465 moulding Methods 0.000 title claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 21
- 239000010959 steel Substances 0.000 title claims abstract description 21
- 238000003032 molecular docking Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 14
- 238000000034 method Methods 0.000 abstract description 8
- 238000003466 welding Methods 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 4
- 230000013011 mating Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a kind of steel work and docks assembled moulding bed, docks assembled moulding bed and comprises base for supporting, and base for supporting upper surface is provided with left and right bracing frame and Height Adjustment jack; The upper surface of left and right bracing frame is respectively arranged with left and right side locating rack; Bracing frame and support plate upper surface are provided with truss member; Truss member and be provided with left side horizontal adjustment jack and right side horizontal adjustment jack between left positioner frame and right positioner frame.The utility model steel work docks assembled moulding bed, without the need to using crane during assembling construction, only component need be put to put in place and namely can carry out counterpart operation by setting up jack on moulding bed, accurately can control the quality of counterpart.Avoid simultaneously and weld auxiliary part on component, the manpower of the outward appearance that ensure that component and the auxiliary part saving process welding and material, ensure construction speed, improve efficiency of construction and construction quality.
Description
Technical field
The utility model relates to a kind of welding for steel structure aid, specifically, relates to a kind of steel work and docks assembled moulding bed.
Background technology
Steel work docks in assembled process, and the method usually adopted has: 1, utilize crane to carry out assembled, adjustment mating interface; 2, on structural member, weld auxiliary part and carry out adjustment mating interface.It is slow that the first directly utilizes crane to adjust mating interface speed, and accuracy cannot ensure.The second also needs to cut off at component surface welding auxiliary part, and grinding process affects component outward appearance, lost labor and material.
Utility model content
For above-mentioned deficiency of the prior art, the utility model provides a kind of structure simple, and the steel work improving efficiency of construction and construction quality docks assembled moulding bed.
Technical solution adopted in the utility model is:
A kind of steel work docks assembled moulding bed, and comprise front end and dock assembled moulding bed and rear end bracing frame, the assembled moulding bed of described docking comprises base for supporting, and base for supporting upper surface is provided with left support frame, right support frame and Height Adjustment jack; Height Adjustment jack is arranged between left support frame and right support frame; Be provided with gripper shoe above Height Adjustment jack, be provided with through hole in the middle part of gripper shoe, gripper shoe both sides are arranged on the upper surface of left support frame and right support frame; The upper surface of gripper shoe left outer bracing frame and right support frame is respectively arranged with left positioner frame and right positioner frame; Left positioner frame is fixedly connected with right support frame with left support frame respectively with right positioner frame; Bracing frame and support plate upper surface are provided with truss member; Truss member and be provided with left side horizontal adjustment jack and right side horizontal adjustment jack between left positioner frame and right positioner frame.
Described support plate upper surface distance ground level is less than rear end bracing frame upper surface distance ground level.
The beneficial effect of the utility model hinge structure:
The utility model steel work docks assembled moulding bed, and structure is simple, without the need to using crane during assembling construction, only component need be put to put in place and namely can carry out counterpart operation by setting up jack on moulding bed, accurately can control the quality of counterpart.Avoid simultaneously and weld auxiliary part on component, the manpower of the outward appearance that ensure that component and the auxiliary part saving process welding and material, ensure construction speed, improve efficiency of construction and construction quality.
Accompanying drawing explanation
Fig. 1 is the side-looking structural representation that the utility model steel work docks the welded condition of assembled moulding bed;
Fig. 2 is the plan structure schematic diagram that the utility model steel work docks the welded condition of assembled moulding bed;
Fig. 3 is the main TV structure schematic diagram that the utility model steel work docks the welded condition of assembled moulding bed.
Critical piece symbol description in accompanying drawing:
In figure:
1, assembled moulding bed 2, bracing frame is docked
3, base for supporting 4, left support frame
5, right support frame 6, Height Adjustment jack
7, gripper shoe 8, through hole
9, left positioner frame 10, right positioner frame
11, truss member 12, left side horizontal adjustment jack
13, right side horizontal adjustment jack 14, mating interface.
Detailed description of the invention
Referring to drawings and Examples, the utility model is described in detail:
Accompanying drawing 1-3 is known, a kind of steel work docks assembled moulding bed, comprise front end and dock assembled moulding bed 1 and rear end bracing frame 2, the assembled moulding bed of described docking comprises base for supporting 3, and base for supporting 3 upper surface is provided with left support frame 4, right support frame 5 and Height Adjustment jack 6; Height Adjustment jack 6 is arranged between left support frame 4 and right support frame 5; Be provided with gripper shoe 7 above Height Adjustment jack 6, be provided with through hole 8 in the middle part of gripper shoe, gripper shoe 7 both sides are arranged on the upper surface of left support frame 4 and right support frame 5; The upper surface of gripper shoe 7 left outer bracing frame 4 and right support frame 5 is respectively arranged with left positioner frame 9 and right positioner frame 10; Left positioner frame 9 is fixedly connected with right support frame 5 with left support frame 4 respectively with right positioner frame 10; Bracing frame 2 and gripper shoe 7 upper surface are provided with truss member 11; Truss member 11 and be provided with left side horizontal adjustment jack 12 and right side horizontal adjustment jack 13 between left positioner frame 9 and right positioner frame 10.
Described support plate upper surface distance ground level is less than rear end bracing frame upper surface distance ground level.
The utility model steel work docks assembled moulding bed, and structure is simple, without the need to using crane during assembling construction, only component need be put to put in place and namely can carry out counterpart operation by setting up jack on moulding bed, accurately can control the quality of counterpart.Avoid simultaneously and weld auxiliary part on component, the manpower of the outward appearance that ensure that component and the auxiliary part saving process welding and material, ensure construction speed, improve efficiency of construction and construction quality.
The assembled moulding bed used in constructing operation process, by improveing traditional moulding bed, mainly arranges the position of jack can placing adjustment steel beam column absolute altitude, left and right skew on moulding bed, and provides fulcrum for jack.Ensure, in the assembled process of steel beam column, jack pair steel beam column to be placed as required and carry out across-the-board regulation.
The utility model steel work docks assembled moulding bed main operational steps:
1, crane is used to be placed on assembled moulding bed by the assembled component of needs.Interface position is a little less than the two ends of component.
2, left side horizontal adjustment jack and the horizontal direction of horizontal adjustment jack pair component interface position, right side is used to carry out adjusting until component is straight or meet the requirements of springing quantum.Left side horizontal adjustment jack and right side horizontal adjustment jack and dismountable after adjustment.
3, Height Adjustment jack pair component interface position absolute altitude is used to adjust, until component is up to the standard or the springing quantum of designing requirement.
Whether occur mobile, finely tune if there is mobile left side horizontal adjustment jack and the right side horizontal adjustment jack of using if after Pass line adjustment, 4, checking modular level position.Left side horizontal adjustment jack and right side horizontal adjustment jack and dismountable after adjustment.
5, weld after adjustment.
Claims (2)
1. steel work docks an assembled moulding bed, and comprise front end and dock assembled moulding bed and rear end bracing frame, it is characterized in that: the assembled moulding bed of described docking comprises base for supporting, base for supporting upper surface is provided with left support frame, right support frame and Height Adjustment jack; Height Adjustment jack is arranged between left support frame and right support frame; Be provided with gripper shoe above Height Adjustment jack, be provided with through hole in the middle part of gripper shoe, gripper shoe both sides are arranged on the upper surface of left support frame and right support frame; The upper surface of gripper shoe left outer bracing frame and right support frame is respectively arranged with left positioner frame and right positioner frame; Left positioner frame is fixedly connected with right support frame with left support frame respectively with right positioner frame; Bracing frame and support plate upper surface are provided with truss member; Truss member and be provided with left side horizontal adjustment jack and right side horizontal adjustment jack between left positioner frame and right positioner frame.
2. steel work docks assembled moulding bed according to claim 1, it is characterized in that: described support plate upper surface distance ground level is less than rear end bracing frame upper surface distance ground level.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420638751.1U CN204163416U (en) | 2014-10-31 | 2014-10-31 | Steel work docks assembled moulding bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420638751.1U CN204163416U (en) | 2014-10-31 | 2014-10-31 | Steel work docks assembled moulding bed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204163416U true CN204163416U (en) | 2015-02-18 |
Family
ID=52537118
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420638751.1U Expired - Fee Related CN204163416U (en) | 2014-10-31 | 2014-10-31 | Steel work docks assembled moulding bed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204163416U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086694A (en) * | 2017-11-02 | 2018-05-29 | 广东精工钢结构有限公司 | A kind of building iron knot abnormity component makes moulding bed |
CN109178244A (en) * | 2018-10-29 | 2019-01-11 | 上海外高桥造船有限公司 | Moulding bed |
CN109610883A (en) * | 2018-10-31 | 2019-04-12 | 上海闵轩钢结构工程有限公司 | Temporary support is used in assembling type steel structure installation |
CN113605719A (en) * | 2021-08-11 | 2021-11-05 | 中建八局第四建设有限公司 | Steel member butt joint installation method, steel member auxiliary alignment base and manufacturing method thereof |
CN115070326A (en) * | 2022-08-03 | 2022-09-20 | 江苏百崮钢结构工程有限公司 | Jig frame convenient for folding miter gate |
CN115676621A (en) * | 2022-09-07 | 2023-02-03 | 浙江长兴金诺预制构件有限公司 | High-efficient installation device of prefab for capital construction |
-
2014
- 2014-10-31 CN CN201420638751.1U patent/CN204163416U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108086694A (en) * | 2017-11-02 | 2018-05-29 | 广东精工钢结构有限公司 | A kind of building iron knot abnormity component makes moulding bed |
CN109178244A (en) * | 2018-10-29 | 2019-01-11 | 上海外高桥造船有限公司 | Moulding bed |
CN109610883A (en) * | 2018-10-31 | 2019-04-12 | 上海闵轩钢结构工程有限公司 | Temporary support is used in assembling type steel structure installation |
CN113605719A (en) * | 2021-08-11 | 2021-11-05 | 中建八局第四建设有限公司 | Steel member butt joint installation method, steel member auxiliary alignment base and manufacturing method thereof |
CN115070326A (en) * | 2022-08-03 | 2022-09-20 | 江苏百崮钢结构工程有限公司 | Jig frame convenient for folding miter gate |
CN115676621A (en) * | 2022-09-07 | 2023-02-03 | 浙江长兴金诺预制构件有限公司 | High-efficient installation device of prefab for capital construction |
CN115676621B (en) * | 2022-09-07 | 2024-05-07 | 山西宏图清明建设工程有限公司 | Prefabricated member efficient installation device for foundation construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204163416U (en) | Steel work docks assembled moulding bed | |
CN204524692U (en) | Precision controlling frock | |
CN203726032U (en) | Truck frame combined type assembling mould | |
CN207858161U (en) | Confine position, welding, turnable integrated tooling in case tank end | |
CN101985196B (en) | Device for welding walking frame main body of excavator | |
CN203738292U (en) | Tool jig for welding elevator underbeams | |
CN203924704U (en) | Aluminum alloy pattern plate system | |
CN204895763U (en) | Auxiliary fixtures is corrected to boats and ships upper deck T roof beam | |
CN204081464U (en) | Ruggedized construction bottom a kind of aluminum alloy mould plate | |
CN204148782U (en) | A kind of container plate jig | |
CN206912516U (en) | A kind of device that stainless steel welded deformation is adjusted using jack | |
CN206998165U (en) | A kind of both sides plate hole coaxial welding positioning tool | |
CN202522310U (en) | Novel cement split scale | |
CN203442269U (en) | Angle bracket for connecting valve body and actuator | |
CN209935595U (en) | Quick forming device of shaft bracket | |
CN208329151U (en) | A kind of assemble welding formula steel construction | |
CN201970052U (en) | Fixture for variable cross section manufacturing of small-section H-shaped steel | |
CN105149839A (en) | Draft sill fish web pressing device for railway freight car | |
CN201752823U (en) | Angle welding machine for double guide wheel | |
CN204843375U (en) | Joint welding frock of dipper | |
CN214818355U (en) | Supporting component for folding platform | |
CN205629806U (en) | Semitrailer welds special frock with mechanical lift kits positioning group | |
CN202367387U (en) | Calandria support positioner | |
CN204913172U (en) | Membrane work piece welding set | |
CN206351361U (en) | A kind of mobile jib automatic butt auxiliary body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180323 Address after: 063000 happy road, Tangshan City, Hebei Province, No. 16 Co-patentee after: CHINA 22MCC GROUP EQUIPMENT MANUFACTURING CO.,LTD. Patentee after: China MCC22 Group Corp.,Ltd. Address before: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness Patentee before: China MCC22 Group Corp.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150218 |