CN202706588U - Pole straightening device - Google Patents
Pole straightening device Download PDFInfo
- Publication number
- CN202706588U CN202706588U CN 201220200863 CN201220200863U CN202706588U CN 202706588 U CN202706588 U CN 202706588U CN 201220200863 CN201220200863 CN 201220200863 CN 201220200863 U CN201220200863 U CN 201220200863U CN 202706588 U CN202706588 U CN 202706588U
- Authority
- CN
- China
- Prior art keywords
- pole
- straightening
- base
- rod
- working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 239000004568 cement Substances 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 2
- 101100334009 Caenorhabditis elegans rib-2 gene Proteins 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a pole straightening device which comprises a base with a slant plane, a hydraulic lifting device which is provided with a contractive rod and fixed on the slant plane of the base, a fulcrum rod connected with the contractive rod and a fixation clamp connected with the other end of the fulcrum rod in hinge mode. The pole straightening device breaks through a traditional existing working manner of straightening a pole, finishes straightening a pole once, saves the power source, reduces labor strength of the working staff, and guarantees personal safety of the working staff and is suitable for rapid rush-repair of electrical equipment and not constrained by a landform. A maintainer can finish straightening more conveniently and rapidly. Working time is shortened, black out is avoided, operation is easy, safety performance is strong and maintaining cost is reduced.
Description
Technical field
The utility model relates to a kind of instrument of the maintenance inclination electric pole for power engineering vertical rod correction and power system, specifically refers to a kind of pole centralizing device of righting oblique electric pole.
Background technology
The cement pole of power system 10kV distribution line, because the factors such as the variation in season, geological condition, running time often cause cement pole crooked situation to occur, the normal operation of serious threat distribution line so just need to be to crooked cement pole righting.The operating type of traditional electric pole alignment is under the prerequisite that has a power failure, and first at bar tip fixed pulling rope, comes the righting electric pole with manpower traction's stay cord again; At present normal crane or the on-the-spot mode such as earth anchor of beating of adopting be to the cement pole righting, but often can because landform limits, affect righting work.Particularly adopt the crane righting, also will have a power failure to relevant distribution line and just can finish righting work.
Summary of the invention
The purpose of this utility model is the deficiency that exists in order to overcome above-mentioned prior art, and provide a kind of can be at circuit not under the power-off condition, simple, convenient, quick, safe pole centralizing device.
For achieving the above object, the technical solution of the utility model is as follows:
A kind of pole centralizing device includes one with the base on inclined plane, the hydraulic lift with expansion link that is fixed on the base inclined plane, a pole that is connected on the expansion link, a geometrical clamp that links with the pole other end.
Described pole is made of fixed bar and loose joint pole, fixed bar one end and geometrical clamp hinge joint, and its other end is socketed in an end of loose joint pole, and the other end of loose joint pole is socketed on the expansion link of hydraulic lift.
Described geometrical clamp is made of two semicircular intermediate plates, and each intermediate plate both ends horizontal is stretched out a sheet, is welded with reinforcing rib between seat sheet and the intermediate plate, corresponding a pair of seat sheet and the hinge joint of fixed bar one end, and corresponding another is to the loose joint of seat sheet.
The utility model breaks traditions and the operating type of existing electric pole alignment, can once finish the positive bar task, and the conservation of power resource reduces operating personnel's labour intensity, has guaranteed operating personnel's personal safety, adapts to rapid rush-repair power equipment needs.Simultaneously not limited by landform, the maintainer can finish electric pole righting work convenient, efficiently, and can shorten working hours, and circuit does not have a power failure, and is simple to operate, and security performance is high, reduces maintenance cost.The utility model moves brisk, and is easy to use, and suitable field and vehicle enter the operation field operation of inconvenience, meet the specialized requirement of power equipment.
The present invention is further described below in conjunction with accompanying drawing.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is use view of the present utility model.
The specific embodiment
A kind of pole centralizing device includes 10, one of a base with inclined plane 9 and is fixed on 8, one poles that are connected on the expansion link 6 of hydraulic lift with expansion link 6 on base 10 inclined planes 9, the geometrical clamp with the hinge joint of the pole other end.The inclined plane 9 of base 10 is to tilt the plane that forms certain acute angle with horizontal plane, hydraulic lift 8 can adopt prior art, as " jack " that be similar to the automobile use installs, for ease of construction, described pole can be adopted two sections designs, is made of fixed bar 4 one ends and geometrical clamp hinge joint fixed bar 4 and loose joint pole 5, its other end thread bush is connected on an end of loose joint pole 5, and the other end thread bush of loose joint pole 5 is connected on the expansion link 6 of hydraulic lift 8.Described geometrical clamp can adopt by two semicircular intermediate plates 3 and consist of, each intermediate plate 3 both ends horizontal is stretched out a sheet 1, be welded with reinforcing rib 2 between seat sheet 1 and the intermediate plate 3, corresponding a pair of seat sheet and the hinge joint of fixed bar one end, corresponding another connects by bolt and nut the seat sheet.
During use, the geometrical clamp setting is clipped in electric pole 11 tapers of inclination, base 10 fixes on the ground by straight nail 7, and by hydraulic lift 8 is executed external force, the expansion link 6 of hydraulic lift 8 stretches out, make pole constantly impose support external force to electric pole 11, finally reach the vertical purpose of electric pole, then the securing electric lines bar is removed geometrical clamp, hydraulic lift sets back, and takes off straight nail and makes base break away from ground.
Claims (3)
1. a pole centralizing device is characterized in that including one with the base on inclined plane, the hydraulic lift with expansion link that is fixed on the base inclined plane, a pole that is connected on the expansion link, a geometrical clamp that links with the pole other end.
2. a kind of pole centralizing device according to claim 1, it is characterized in that described pole is made of fixed bar and loose joint pole, fixed bar one end and geometrical clamp hinge joint, its other end is socketed in an end of loose joint pole, and the other end of loose joint pole is socketed on the expansion link of hydraulic lift.
3. a kind of pole centralizing device according to claim 1, it is characterized in that described geometrical clamp is made of two semicircular intermediate plates, each intermediate plate both ends horizontal is stretched out a sheet, be welded with reinforcing rib between seat sheet and the intermediate plate, corresponding a pair of seat sheet and the hinge joint of fixed bar one end, corresponding another is to the loose joint of seat sheet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220200863 CN202706588U (en) | 2012-05-08 | 2012-05-08 | Pole straightening device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220200863 CN202706588U (en) | 2012-05-08 | 2012-05-08 | Pole straightening device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202706588U true CN202706588U (en) | 2013-01-30 |
Family
ID=47586905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220200863 Expired - Lifetime CN202706588U (en) | 2012-05-08 | 2012-05-08 | Pole straightening device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202706588U (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291117A (en) * | 2013-05-31 | 2013-09-11 | 国家电网公司 | Full-automatic utility pole centralizer |
CN103669977A (en) * | 2013-12-03 | 2014-03-26 | 国家电网公司 | Tool for calibrating pole positions during live pole working |
CN103867021A (en) * | 2014-03-15 | 2014-06-18 | 国网山东省电力公司潍坊供电公司 | Electric pole centralizer |
CN103982051A (en) * | 2014-05-28 | 2014-08-13 | 扬州大学 | Historic building slanting timber frame tensioning jacking resetting device |
CN104018725A (en) * | 2014-05-12 | 2014-09-03 | 国家电网公司 | Terminal pole electric pole and top pole connecting structure |
CN104389319A (en) * | 2014-12-02 | 2015-03-04 | 国家电网公司 | High-voltage wire tower base fixing device |
CN104929420A (en) * | 2015-06-29 | 2015-09-23 | 国网山东招远市供电公司 | Electric pole standing transposition device |
CN105442926A (en) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | Multifunctional electric pole reset device used for all-weather overhaul |
CN105442923A (en) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | Multifunctional telegraph-pole centering device for electric power repairing |
CN105442918A (en) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | Telegraph-pole centering repairing device |
CN105464451A (en) * | 2015-10-28 | 2016-04-06 | 国网山东省电力公司潍坊供电公司 | Electric pole correcting and rush-repairing tool enabling quick construction |
CN106285179A (en) * | 2016-09-30 | 2017-01-04 | 国网山东省电力公司章丘市供电公司 | Line linear cement pole pole centralizing device |
CN110984674A (en) * | 2019-11-27 | 2020-04-10 | 国网山东省电力公司经济技术研究院 | Electric power engineering construction power consumption pole correcting device |
CN113404371A (en) * | 2021-07-16 | 2021-09-17 | 吉林众德建筑工程有限公司 | Self-adaptive telegraph pole installation auxiliary stabilizing system |
CN113860216A (en) * | 2021-09-02 | 2021-12-31 | 黎图(晋江)科技有限公司 | Distribution lines broken pole salvagees hoisting accessory based on image recognition |
CN113860167A (en) * | 2021-09-02 | 2021-12-31 | 黎图(晋江)科技有限公司 | Camera-based stable lifting method for broken rod of distribution line |
CN114150920A (en) * | 2021-11-30 | 2022-03-08 | 广西电网有限责任公司崇左供电局 | Hydraulic device for correcting cement rod |
-
2012
- 2012-05-08 CN CN 201220200863 patent/CN202706588U/en not_active Expired - Lifetime
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291117A (en) * | 2013-05-31 | 2013-09-11 | 国家电网公司 | Full-automatic utility pole centralizer |
CN103669977A (en) * | 2013-12-03 | 2014-03-26 | 国家电网公司 | Tool for calibrating pole positions during live pole working |
CN103669977B (en) * | 2013-12-03 | 2015-09-30 | 国家电网公司 | Adjustable stem position instrument in a kind of charged pole operation |
CN103867021A (en) * | 2014-03-15 | 2014-06-18 | 国网山东省电力公司潍坊供电公司 | Electric pole centralizer |
CN104018725A (en) * | 2014-05-12 | 2014-09-03 | 国家电网公司 | Terminal pole electric pole and top pole connecting structure |
CN104018725B (en) * | 2014-05-12 | 2016-07-27 | 国家电网公司 | A kind of terminal pole electric pole and push rod attachment structure |
CN103982051A (en) * | 2014-05-28 | 2014-08-13 | 扬州大学 | Historic building slanting timber frame tensioning jacking resetting device |
CN103982051B (en) * | 2014-05-28 | 2016-01-20 | 扬州大学 | Resetting means is shored in the stretch-draw of ancient building askew sudden strain of a muscle timber frame |
CN104389319A (en) * | 2014-12-02 | 2015-03-04 | 国家电网公司 | High-voltage wire tower base fixing device |
CN104929420A (en) * | 2015-06-29 | 2015-09-23 | 国网山东招远市供电公司 | Electric pole standing transposition device |
CN105442923A (en) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | Multifunctional telegraph-pole centering device for electric power repairing |
CN105442918A (en) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | Telegraph-pole centering repairing device |
CN105464451A (en) * | 2015-10-28 | 2016-04-06 | 国网山东省电力公司潍坊供电公司 | Electric pole correcting and rush-repairing tool enabling quick construction |
CN105442926A (en) * | 2015-10-28 | 2016-03-30 | 国网山东省电力公司潍坊供电公司 | Multifunctional electric pole reset device used for all-weather overhaul |
CN106285179A (en) * | 2016-09-30 | 2017-01-04 | 国网山东省电力公司章丘市供电公司 | Line linear cement pole pole centralizing device |
CN110984674A (en) * | 2019-11-27 | 2020-04-10 | 国网山东省电力公司经济技术研究院 | Electric power engineering construction power consumption pole correcting device |
CN113404371A (en) * | 2021-07-16 | 2021-09-17 | 吉林众德建筑工程有限公司 | Self-adaptive telegraph pole installation auxiliary stabilizing system |
CN113860216A (en) * | 2021-09-02 | 2021-12-31 | 黎图(晋江)科技有限公司 | Distribution lines broken pole salvagees hoisting accessory based on image recognition |
CN113860167A (en) * | 2021-09-02 | 2021-12-31 | 黎图(晋江)科技有限公司 | Camera-based stable lifting method for broken rod of distribution line |
CN113860216B (en) * | 2021-09-02 | 2023-05-23 | 黎图(晋江)科技有限公司 | Distribution line broken pole rush repair hoisting accessory based on image recognition |
CN113860167B (en) * | 2021-09-02 | 2023-05-23 | 黎图(晋江)科技有限公司 | Distribution line broken rod stable hoisting method based on camera shooting |
CN114150920A (en) * | 2021-11-30 | 2022-03-08 | 广西电网有限责任公司崇左供电局 | Hydraulic device for correcting cement rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202706588U (en) | Pole straightening device | |
CN204370830U (en) | A kind of electric pole centralizer | |
CN105442934B (en) | Bi-directional torque cement pole pole centralizing device | |
CN204876779U (en) | Slope shaft tower orthotic devices | |
CN205445098U (en) | A righting device for sloping wire pole | |
CN204982667U (en) | Prestressing force rubber tube poling machine | |
CN102733615B (en) | Unsymmetrical integral lifting construction method | |
CN102856838A (en) | Tubular bus support insulator changing tool and method | |
CN201240787Y (en) | Flat-top tower crane | |
CN203296451U (en) | Pole straightening device | |
CN205445099U (en) | Pole orthotic devices | |
CN103269036A (en) | Tensioning resistant cross arm lifting machine | |
CN103953200B (en) | Wallboard mounting machine | |
CN102486051A (en) | Manual demolishing method of large-area spherical net rack | |
CN110690589A (en) | Grounding pile capable of being pulled up and pulled out quickly | |
CN204609436U (en) | A kind of pole centralizing device | |
CN210825317U (en) | Auxiliary pulling device for angle iron pile | |
CN202513517U (en) | Bracket arm hoop | |
CN204756170U (en) | Pre -buried formula mechanical connection pipeline support | |
CN204024443U (en) | Adopt the bamboo ladder stand of connector overlapping | |
CN208226447U (en) | A kind of portable temporary guy of distribution line | |
CN203333224U (en) | Steel structural beam upward lifting tool | |
CN205275069U (en) | Tower crane attaches wall connection structure | |
CN205531288U (en) | A hanging flower basket guide rail bearing structure for karst area | |
CN220201193U (en) | Novel supporting rod for mounting and dismounting landing leg of gantry crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130130 |
|
CX01 | Expiry of patent term |