CN202672168U - 结合土工膜袋和钢板桩的围堰 - Google Patents
结合土工膜袋和钢板桩的围堰 Download PDFInfo
- Publication number
- CN202672168U CN202672168U CN 201220277524 CN201220277524U CN202672168U CN 202672168 U CN202672168 U CN 202672168U CN 201220277524 CN201220277524 CN 201220277524 CN 201220277524 U CN201220277524 U CN 201220277524U CN 202672168 U CN202672168 U CN 202672168U
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- steel sheet
- pile
- sheet pile
- geomembrane bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本实用新型公开一种结合土工膜袋和钢板桩的围堰,包括由围堰内至围堰外依次设置的内侧管桩、钢板桩、土工膜袋和外侧防护桩,该内侧管桩、钢板桩、土工膜袋和外侧防护桩与边坡一起形成防水结构,该内侧管桩为间隔设置的多根,该外侧防护桩亦为间隔设置的多根,该土工膜袋设置在钢板桩与外侧防护桩之间,该土工膜袋填充有粉砂土。与现有技术相比,本实用新型拓宽了围堰种类,为各类地理环境的施工提供了更多选择。
Description
技术领域
本实用新型涉及桥梁施工领域,更具体的说涉及一种结合土工膜袋和钢板桩的围堰。
背景技术
围堰是指在水利工程建设中,为建造永久性水利设施而修建的临时性围护结构,该围堰的作用是防止水和土进入建筑物的修建位置,以便在围堰内排水、开挖基坑和修筑建筑物。
目前在水较深且流速较大的河流中,一般是采用木板桩或钢板桩形成的单层或双层围堰,其多使用双层薄壁钢围堰,从而达到防水、围水,并同时支撑基坑坑壁的作用。
但是,在实际的桥梁施工中,其会涉及到各式情形,比如施工周期短、水文及地质条件恶劣等问题,如此十分迫切需要更多的围堰结构来应对不同的施工需求。
有鉴于此,本发明人针对现有技术在桥梁施工时的上述缺陷深入研究,遂有本案产生。
实用新型内容
本实用新型的目的在于提供一种结合土工膜袋和钢板桩的围堰,其可以应用在流速较高的深水、岩面倾斜度大的基础施工中,从而大大丰富现有技术中的围堰结构,并为施工提供了更多选择。
为了达成上述目的,本实用新型的解决方案是:
一种结合土工膜袋和钢板桩的围堰,其中,包括由围堰内至围堰外依次设置的内侧管桩、钢板桩、土工膜袋和外侧防护桩,该内侧管桩、钢板桩、土工膜袋和外侧防护桩与边坡一起形成防水结构,该内侧管桩为间隔设置的多根,该外侧防护桩亦为间隔设置的多根,该土工膜袋设置在钢板桩与外侧防护桩之间,该土工膜袋填充有粉砂土。
进一步,该围堰还包括栈桥,该栈桥具有立柱螺旋管和连接槽钢,该内侧管桩均通过连接槽钢而与立柱螺旋管固定相连。
采用上述结构后,本实用新型涉及的结合土工膜袋和钢板桩的围堰,其克服了传统钢板桩围堰和土工膜袋围堰分别的缺点,并将两者的优点结合在一起,从而大大降低施工周期,并可以应用流速较高深水、岩面倾斜度大等地理条件。如此,与现有技术相比,本实用新型拓宽了围堰种类,为各类地理环境的施工提供了更多选择。
附图说明
图1为本实用新型涉及一种结合土工膜袋和钢板桩的围堰的俯视图;
图2为本实用新型显示内侧管桩、钢板桩、土工膜袋和外侧防护桩内外排布关系的示意图。
图中:
围堰 100
内侧管桩 1 钢板桩 2
土工膜袋 3 粉砂土 31
外侧防护桩 4 栈桥 5
立柱螺旋管 51 连接槽钢 6
边坡 200。
具体实施方式
为了进一步解释本实用新型的技术方案,下面通过具体实施例来对本实用新型进行详细阐述。
如图1和图2所示,本实用新型涉及的一种结合土工膜袋3和钢板桩2的围堰100,包括内侧管桩1、钢板桩2、土工膜袋3和外侧防护桩4,该内侧管桩1为间隔设置的多根,该外侧防护桩4亦为间隔设置的多根,其均可插入至地面内,从而起到基础定位作用。
该内侧管桩1、钢板桩2、土工膜袋3和外侧防护桩4由围堰100内至围堰100外依次设置,该内侧管桩1、钢板桩2、土工膜袋3和外侧防护桩4与边坡200一起形成防水结构,从而为围堰100内的桥梁主体结构施工提供条件,该土工膜袋3设置在钢板桩2与外侧防护桩4之间,该土工膜袋3填充有粉砂土31。
另外,该围堰100还包括栈桥5,该栈桥5具有立柱螺旋管51和连接槽钢6,如图1和图2所示,该内侧管桩1均通过连接槽钢6而与立柱螺旋管5固定相连。
如此,本实用新型涉及的结合土工膜袋3和钢板桩2的围堰100,其克服了传统钢板桩2围堰100和土工膜袋3围堰100分别的缺点,并将两者的优点结合在一起,从而大大降低施工周期,并可以应用于流速较高的深水、岩面倾斜度大等地理条件。
综上所述,与现有技术相比,本实用新型拓宽了围堰100种类,为各类地理环境的施工提供了更多选择。
上述实施例和图式并非限定本实用新型的产品形态和式样,任何所属技术领域的普通技术人员对其所做的适当变化或修饰,皆应视为不脱离本实用新型的专利范畴。
Claims (2)
1.一种结合土工膜袋和钢板桩的围堰,其特征在于,包括由围堰内至围堰外依次设置的内侧管桩、钢板桩、土工膜袋和外侧防护桩,该内侧管桩、钢板桩、土工膜袋和外侧防护桩与边坡一起形成防水结构,该内侧管桩为间隔设置的多根,该外侧防护桩亦为间隔设置的多根,该土工膜袋设置在钢板桩与外侧防护桩之间,该土工膜袋填充有粉砂土。
2.如权利要求1所述的结合土工膜袋和钢板桩的围堰,其特征在于,该围堰还包括栈桥,该栈桥具有立柱螺旋管和连接槽钢,该内侧管桩均通过连接槽钢而与立柱螺旋管固定相连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220277524 CN202672168U (zh) | 2012-06-13 | 2012-06-13 | 结合土工膜袋和钢板桩的围堰 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220277524 CN202672168U (zh) | 2012-06-13 | 2012-06-13 | 结合土工膜袋和钢板桩的围堰 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202672168U true CN202672168U (zh) | 2013-01-16 |
Family
ID=47493077
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220277524 Expired - Fee Related CN202672168U (zh) | 2012-06-13 | 2012-06-13 | 结合土工膜袋和钢板桩的围堰 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202672168U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669375A (zh) * | 2013-12-27 | 2014-03-26 | 张安政 | 一种无内撑双层钢板桩土芯组合围堰结构及其应用 |
CN116201151A (zh) * | 2023-05-06 | 2023-06-02 | 中交第一航务工程局有限公司 | 综合围堰系统及安装与拆除方法 |
-
2012
- 2012-06-13 CN CN 201220277524 patent/CN202672168U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669375A (zh) * | 2013-12-27 | 2014-03-26 | 张安政 | 一种无内撑双层钢板桩土芯组合围堰结构及其应用 |
CN116201151A (zh) * | 2023-05-06 | 2023-06-02 | 中交第一航务工程局有限公司 | 综合围堰系统及安装与拆除方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1837511B (zh) | 一种双排围堰及其制作方法 | |
CN1837512B (zh) | 一种钢板桩和钢管桩组合围堰及其制作方法 | |
CN202559361U (zh) | 一种预制高强混凝土薄壁钢管桩基坑支护结构 | |
CN202644551U (zh) | 钢管桩围堰结构 | |
CN102926328B (zh) | 桥梁临水基坑开挖支护方法及支护墙结构 | |
CN204326082U (zh) | 一种适用于软土地基上的基坑围护结构 | |
CN100510283C (zh) | 自压重式抗浮方法及其装置 | |
CN102051876A (zh) | 一种新型树根形结构桩及其施工工艺 | |
CN208650073U (zh) | 明挖法水底隧道钢板桩围堰构造 | |
CN203514303U (zh) | 后注浆扩底抗拔微型桩 | |
CN202787274U (zh) | 丰水超厚砂层深基坑围护结构 | |
CN202689009U (zh) | 一种钢板桩与管桩组合基坑支护结构 | |
CN202672168U (zh) | 结合土工膜袋和钢板桩的围堰 | |
CN203188224U (zh) | 土工膜袋吹砂围堰 | |
CN103898915B (zh) | 建筑物小面积深基坑抗浮止水施工方法 | |
CN203977409U (zh) | 一种预制装配式混凝土桩基 | |
CN105297773A (zh) | 一种可减少盖挖土方量的逆作法土方开挖方法 | |
CN204000856U (zh) | 内撑灌浆式水平抗侧变刚度桩基 | |
CN205604273U (zh) | 一种砂质粉土上的围堰 | |
CN203808101U (zh) | 混凝土面板加筋挡土墙 | |
CN202850062U (zh) | 建筑物或构筑物的水浮力控制装置 | |
CN206015511U (zh) | 一种植桩钢管柱 | |
CN201031398Y (zh) | 自压重式抗浮装置 | |
CN106759252A (zh) | 一种适用于深厚软土地基的双排板桩墙驳岸结构 | |
CN203113358U (zh) | 一种粘土砂岩围堰结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130116 Termination date: 20140613 |
|
EXPY | Termination of patent right or utility model |