CN1837511B - 一种双排围堰及其制作方法 - Google Patents

一种双排围堰及其制作方法 Download PDF

Info

Publication number
CN1837511B
CN1837511B CN2006100255345A CN200610025534A CN1837511B CN 1837511 B CN1837511 B CN 1837511B CN 2006100255345 A CN2006100255345 A CN 2006100255345A CN 200610025534 A CN200610025534 A CN 200610025534A CN 1837511 B CN1837511 B CN 1837511B
Authority
CN
China
Prior art keywords
pile
cofferdam
steel sheet
steel pipe
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2006100255345A
Other languages
English (en)
Other versions
CN1837511A (zh
Inventor
王海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN2006100255345A priority Critical patent/CN1837511B/zh
Publication of CN1837511A publication Critical patent/CN1837511A/zh
Application granted granted Critical
Publication of CN1837511B publication Critical patent/CN1837511B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种双排围堰,其特征在于在钢管桩围堰外侧设置一排钢板桩围堰,并在两排围堰之间进行土方回填,并进行加固,形成止水帷幕。本发明利用钢管桩的刚度比较大、钢板桩止水性良好的特点,两者组合使用克服了各自的不足,可以使围堰与深基坑支护结合起来,施工方便,造价合理,经济适用。

Description

一种双排围堰及其制作方法
技术领域:
本发明涉及水中施工过程中基坑止水围护方面的大型土建材料,特别涉及一种双排围堰及其制作方法。
背景技术:
对于水中基坑开挖,具体应有安全的基坑防护,即在基坑周围修筑围堰,以便排水、挖基和砌筑基础施工。围堰工程主要应考虑稳定和防渗的要求。常用围堰的类型有:土围堰、草袋围堰、木板桩围堰、钢围堰和钢混凝土围堰等。在深水中施工的安全等级较高的基坑工程,对围堰的稳定性和防渗性要求比较严格。钢围堰由于自身刚度较大,防渗性好,适用范围较广等优点,在工程中被广泛使用。钢围堰一般包括钢板桩、钢管桩等形式。钢管桩刚度很大,可作为基坑的支护结构,但其接口处止水效果难以保证;钢板桩则具有材质稳定,质量可靠,在软弱土层中施工速度快等优点,技术也较简单,并具有较好的挡水性,作为临时性结构的钢板桩可拔出重复使用,降低工程造价等优点,但存在着刚度较小,在侧向压力作用下变形很大等缺点。比较重要的基坑工程,一般对围护结构侧向变形有着比较严格的要求,这种情况下钢板桩就缺少适用性。
发明内容:
本发明的一个目的是提供一种能够克服以上缺陷的双排围堰及其制作方法。
为了实现上述目的,本发明的技术方案是:一种双排围堰,它包括一排钢管桩围堰,其特征在于在钢管桩围堰外侧设置一排钢板桩围堰,并在两排围堰之间进行土方回填,并进行加固,形成止水帷幕。钢管桩围堰与钢板桩围堰之间的间距在0.5m~2.5m之间,钢板桩的沉桩深度为钢管桩沉桩深度的40%~80%,钢板桩和钢管桩的沉桩深度均不小于5m。
本发明的另一目的是提供一种能够克服以上缺陷的双排围堰制作方法。
为了实现上述目的,本发明的技术方案是:一种双排围堰制作方法,其特征在于它包括以下步骤:A、搭设工作台,清理水底障碍物,并将河床整平,整平后地面倾斜度不大于0.5%;B、吊装钢管桩,并将相邻钢管桩的企口连接定位,利用打桩设备将其沉入,钢管桩沉桩深度不小于5m,制成钢管桩围堰;C、吊装钢板桩,并将相邻的钢板桩企口连接定位,在钢管桩围堰外侧0.5m~2.5m处沉入钢板桩至钢板桩沉桩深度,制成钢板桩围堰,钢板桩沉桩深度为钢管桩沉桩深度的40%~80%,钢板桩的沉桩深度不小于5m;D、在钢管桩围堰和钢板桩围堰之间进行土方回填,并进行加固,形成止水帷幕。其中加固方式为旋喷或注浆加固。
本发明利用钢管桩的刚度比较大、钢板桩止水性良好的特点,两者组合使用克服了各自的不足,可以使围堰与深基坑支护结合起来,施工方便,造价合理,经济适用。
附图说明:
图1为本发明结构平面示意图
图2为本发明结构剖面示意图
具体实施方式:
下面结合附图和实施例对本发明进一步的描述。
图中1为钢管桩围堰,2为钢板桩围堰,3为止水帷幕,4为河床,5为基坑。
一种双排围堰,它包括一排钢管桩围堰1,其特征在于在钢管桩围堰1外侧设置一排钢板桩围堰2,并在两排围堰之间进行土方回填,并进行加固,形成止水帷幕3。加固形式可以是旋喷或注浆加固,形成止水帷幕。钢管桩围堰1与钢板桩围堰2之间的间距在0.5m~2.5m之间。其中,钢管桩围堰按照基坑围护结构设计计算其沉桩深度,具体方法见规范《地基基础设计规范》(DGJ08-11-1999)、《基坑工程设计规程》(DGJ08-61-97)。钢板桩的沉桩深度为钢管桩沉桩深度的40%~80%。
本发明与现有技术的区别之处在于在基坑内侧形成钢管桩围堰1,既作为围护结构、又作为第一道挡水结构;在钢管桩围堰1外侧形成钢板桩围堰2作为第二道挡水结构;在二者之间采用旋喷或注浆加固,形成第三道止水帷幕3。这样,既增加了围堰结构整体的刚度,又能良好的止水防漏。
一种双排围堰制作方法,其特征在于它包括以下步骤:A、搭设工作台,清理水底障碍物,并将河床4整平,整平后地面倾斜度不大于0.5%;B、吊装钢管桩,并将相邻钢管桩的企口连接定位,利用打桩设备将其沉入,钢管桩沉桩深度不小于5m,制成钢管桩围堰1,陆上部分围堰采用陆上打桩机打入的方法沉桩,水上部分的围堰桩则采用由驳船上吊机挂振动锤打入的方法沉桩,锤重不宜大于4.5t(柴油锤),锤击过程中桩架前应有横向约束装置防止横向失稳,钢管桩的桩顶标高一致,桩顶标高允许偏差为-50~100mm,沉桩平面位置允许偏差为150mm,沉桩倾斜度不大于1%;C、吊装钢板桩,并将相邻的钢板桩企口连接定位,在钢管桩围堰外侧0.5m~2.5m处沉入钢板桩至钢板桩沉桩深度,制成钢板桩围堰2,钢板桩沉桩深度为钢管桩沉桩深度的40%~80%,钢板桩沉桩深度也不小于5m,陆上部分围堰采用陆上打桩机打入的方法沉桩,水上部分的围堰桩则采用由驳船上吊机挂振动锤打入的方法沉桩,锤重不宜大于4.5t(柴油锤),锤击过程中桩架前应有横向约束装置防止横向失稳。钢板桩的桩顶标高一致,桩顶标高允许偏差为-50~100mm。沉桩平面位置允许偏差为150mm,沉桩倾斜度不大于1%;D、在钢管桩与钢板桩之间进行土方回填,要求回填粘土,分层夯实后密实度>0.8,并采用旋喷或注浆等方式进行土体加固,形成止水帷幕3,土体加固可采用纯水泥浆或水泥砂浆,水泥标号为C15~C40,水泥掺量在8%~20%之间。
根据本发明的一个实施例,钢管桩的长度为10~50m,沉桩深度为5~40m,钢板桩的长度为10~42m,钢管桩和钢板桩的桩顶标高一致。
其中,钢管桩围堰1、钢板桩围堰2的施工技术以及旋喷或注浆土体加固技术均为现有成熟技术。
工程实例:某江中开挖工程,河水深5m,河床下基坑开挖深度10m,基坑总周长500m。采用本发明作为挡水围堰兼作开挖支护结构。内侧钢管桩围堰的钢管桩长35m,沉桩深度25m,采用Φ800企口钢管桩;外侧钢板桩围堰的钢板桩采用III号钢板桩(400×150×13.1),长度为20m,沉桩深度为10m;两排围堰之间间距0.5m,回填粘土后,采用旋喷进行土体加固,水泥标号C20,水泥掺量20%。
若采用传统设计方法,围堰选用普通Φ800钢管桩形式挡水,则需钢管桩长30m,沉桩深度20m。但是其内侧还要加建围护结构,基坑深10m,采用Φ800地连墙的围护形式,围护结构宽1m,入土深度为25m,采用防渗混凝土C30,抗渗标号S8,配筋率0.15t/m3
两种围堰方案进行工程量比较,本发明中合计用钢量1940.3t,水泥量(C20)10000m3;传统设计围堰方案合计用钢量2327t,C30混凝土12500m3。本发明用钢量仅为传统设计围堰方案的83.3%,水泥用量也节省了2500m3,本发明对水泥的标号和防渗要求比传统设计围堰方案要低,并且传统设计方案围护墙施工时要进行水下混凝土灌注,价格比普通混凝土灌注价格还要高很多。可见,本发明可以大大降低工程造价。
本实施例中采用本发明作为挡水围堰兼作开挖支护结构,只需要施工一次即可完成,而传统设计方案要施工两次才能完成,在施工工序上本发明更为节省,工期更短。

Claims (8)

1.一种双排围堰,它包括一排钢管桩围堰,其特征在于在钢管桩围堰外侧设置一排钢板桩围堰,并在两排围堰之间进行土方回填,并进行加固,形成止水帷幕。
2.如权利要求1所述的双排围堰,其特征在于钢管桩围堰与钢板桩围堰之间的间距在0.5m~2.5m之间,钢板桩的沉桩深度为钢管桩沉桩深度的40%~80%,钢板桩和钢管桩的沉桩深度均不小于5m。
3.如权利要求2所述的双排围堰,其特征在于钢管桩的长度为10~50m,沉桩深度为5~40m,钢板桩的长度为10~42m,钢管桩和钢板桩的桩顶标高一致。
4.如权利要求3所述的双排围堰,其特征在于对回填土体采用旋喷或注浆的方法进行加固,加固采用纯水泥浆或水泥砂浆,水泥标号为C15~C40,水泥掺量在8%~20%之间。
5.一种双排围堰制作方法,其特征在于它包括以下步骤:A、搭设工作台,清理水底障碍物,并将河床整平,整平后地面倾斜度不大于0.5%;B、吊装钢管桩,并将相邻钢管桩企口连接定位,利用打桩设备将其沉入钢管桩沉桩深度,制成钢管桩围堰,钢管桩沉桩深度不小于5m;C、吊装钢板桩,并将相邻的钢板桩企口连接定位,在钢管桩围堰外侧0.5m~2.5m处沉入钢板桩至钢板桩沉桩深度,制成钢板桩围堰,钢板桩沉桩深度为钢管桩沉桩深度的40%~80%,钢板桩的沉桩深度不小于5m;D、在钢管桩围堰和钢板桩围堰之间进行土方回填,并进行加固,形成止水帷幕。
6.如权利要求5所述的双排围堰制作方法,其特征在于钢管桩围堰与钢板桩围堰之间的间距在0.5m~2.5m之间,钢板桩的沉桩深度为钢管桩沉桩深度的40%~80%。
7.如权利要求6所述的双排围堰制作方法,其特征在于钢管桩的长度为10~50m,沉桩深度为5~40m,钢板桩的长度为10~42m,钢管桩和钢板桩的桩顶标高一致。
8.如权利要求7所述的双排围堰制作方法,其特征在于对回填土体采用旋喷或注浆的方法进行加固,加固采用纯水泥浆或水泥砂浆,水泥标号为C15~C40,水泥掺量在8%~20%之间。
CN2006100255345A 2006-04-07 2006-04-07 一种双排围堰及其制作方法 Active CN1837511B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2006100255345A CN1837511B (zh) 2006-04-07 2006-04-07 一种双排围堰及其制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2006100255345A CN1837511B (zh) 2006-04-07 2006-04-07 一种双排围堰及其制作方法

Publications (2)

Publication Number Publication Date
CN1837511A CN1837511A (zh) 2006-09-27
CN1837511B true CN1837511B (zh) 2010-06-02

Family

ID=37015008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006100255345A Active CN1837511B (zh) 2006-04-07 2006-04-07 一种双排围堰及其制作方法

Country Status (1)

Country Link
CN (1) CN1837511B (zh)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101245886B (zh) * 2008-03-13 2010-12-08 武汉京冶地基基础工程有限责任公司 深基坑管涌的处理方法
KR100866162B1 (ko) * 2008-08-14 2008-10-30 이재호 의자형 자립식 흙막이벽의 시공방법
CN101838995A (zh) * 2010-05-20 2010-09-22 中铁六局集团有限公司 受潮汐水位影响浅滩钢板桩围堰简易止水方法
CN102226401A (zh) * 2011-04-15 2011-10-26 上海建工集团股份有限公司 非垂向帷幕结构及其施工方法
CN102444132A (zh) * 2011-09-15 2012-05-09 中国建筑第六工程局有限公司 接力式双排钢板桩水中深基坑支护结构和施工工法
CN102912809B (zh) * 2012-11-06 2014-12-10 中铁大桥局股份有限公司 底面位于坚硬不透水层的承台施工方法
CN103243725A (zh) * 2013-04-26 2013-08-14 中铁隧道集团有限公司 一种海上基坑围堰施工工艺
CN104047289B (zh) * 2014-06-25 2017-05-24 中交第三航务工程局有限公司 一种格型钢板桩大圆筒副格桩位散拼、单锤散打工艺
CN104088280A (zh) * 2014-06-25 2014-10-08 中交第三航务工程局有限公司 一种格型钢板桩大圆筒副格预拼整打、接桩散打组合施工工艺
CN104088279B (zh) * 2014-06-25 2017-05-03 中交第三航务工程局有限公司 一种格型钢板桩大圆筒副格现场预拼、整体吊打的施工工艺
CN104047282B (zh) * 2014-06-25 2017-04-05 中交第三航务工程局有限公司 一种格型钢板桩大圆筒副格陆域预拼、水上散打的施工工艺
CN104895095B (zh) * 2015-03-26 2017-01-18 中国建筑第六工程局有限公司 一种加固深水基坑钢板桩围堰的方法
CN104947697A (zh) * 2015-06-25 2015-09-30 中国水利水电第十二工程局有限公司 一种利用拉森钢板桩快速围堰的施工方法
CN104947698B (zh) * 2015-07-09 2017-03-01 中国水利水电第七工程局有限公司 一种在水下裸露基岩上进行钢板桩围堰施工的方法
CN105040595B (zh) * 2015-07-28 2016-09-21 中国十九冶集团有限公司 缓坡河床基岩上的桥梁主墩承台基坑支护结构及其施工方法
CN107355225A (zh) * 2017-08-11 2017-11-17 中铁第勘察设计院集团有限公司 水中超深盾构始发/吊出井结构及其施工方法
CN108570996B (zh) * 2018-05-18 2019-09-13 中交路桥北方工程有限公司 浅水淤泥条件下筑坝围堰方法
CN109137944B (zh) * 2018-10-26 2021-01-05 四川公路桥梁建设集团有限公司 一种深水无封底钢围堰内止水墙的施工方法
CN109898403A (zh) * 2019-04-02 2019-06-18 广州市恒盛建设工程有限公司 城区河道水下渠箱钢便桥与双排钢板桩围堰嵌套施工方法
CN110258600B (zh) * 2019-06-18 2020-10-02 广东省第二建筑工程有限公司 一种适用于深水水域的立式围堰施工工法
CN110485444B (zh) * 2019-07-19 2020-12-01 中电建十一局工程有限公司 一种进行深水围堰防渗和加固的施工方法
CN110685290A (zh) * 2019-10-12 2020-01-14 上海市政工程设计研究总院(集团)有限公司 一种永久结构桩基与临时钢板桩相结合的围堰及其施工方法
CN111139847A (zh) * 2020-01-17 2020-05-12 上海公路桥梁(集团)有限公司 海涂围垦区止水结构及利用其的止水方法
CN111364447B (zh) * 2020-03-27 2021-06-08 哈尔滨工业大学 一种永久性多功能型地下连续墙及其施工方法
CN114232647A (zh) * 2021-11-30 2022-03-25 中交路桥建设有限公司 基桩加固结构、围堰及基坑施工结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5595459A (en) * 1995-10-02 1997-01-21 Lomonaco; Stenis Cofferdam for 4', 8' and 12' diameter tanks
CN1245236A (zh) * 1998-08-15 2000-02-23 刘天球 活动挡水蓄水墙
US6652187B2 (en) * 2001-02-15 2003-11-25 State Of North Carolina Portable cofferdam and method for stabilizing the structural integrity of box culvert bridges
CN1635223A (zh) * 2003-12-26 2005-07-06 上海市基础工程公司 桥梁围堰止水施工工艺
CN2730944Y (zh) * 2004-10-13 2005-10-05 郑在洲 水下混凝土工程无水检修围堰

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5595459A (en) * 1995-10-02 1997-01-21 Lomonaco; Stenis Cofferdam for 4', 8' and 12' diameter tanks
CN1245236A (zh) * 1998-08-15 2000-02-23 刘天球 活动挡水蓄水墙
US6652187B2 (en) * 2001-02-15 2003-11-25 State Of North Carolina Portable cofferdam and method for stabilizing the structural integrity of box culvert bridges
CN1635223A (zh) * 2003-12-26 2005-07-06 上海市基础工程公司 桥梁围堰止水施工工艺
CN2730944Y (zh) * 2004-10-13 2005-10-05 郑在洲 水下混凝土工程无水检修围堰

Also Published As

Publication number Publication date
CN1837511A (zh) 2006-09-27

Similar Documents

Publication Publication Date Title
CN1837511B (zh) 一种双排围堰及其制作方法
CN1837512B (zh) 一种钢板桩和钢管桩组合围堰及其制作方法
CN103967031B (zh) 一种加固地基的沉箱与桩组合基础及其施工方法
CN103774675B (zh) 组合双排桩联合竖向预应力锚杆支护体系的施工方法
CN103321241B (zh) 深水开敞式组合基础码头及其施工方法
CN107419630A (zh) 一种有效控制工后沉降的软土地基高填方路堤及施工方法
CN102888834B (zh) 一种大直径碎石桩的施工方法
CN204199335U (zh) 一种减小phc管桩施工挤土效应的泄压井
CN102286955B (zh) 钢筋混凝土桩式堤及其施工方法
CN106368219A (zh) 一种深基坑的支护加固结构与施工方法
CN207003421U (zh) 一种坐落于硬岩顶面的钢板桩结构
CN210658383U (zh) 一种淤泥深水大水流基坑组合支护
CN208105281U (zh) 一种含富水砂卵石地层的地铁车站基坑止水及降水系统
CN202170498U (zh) 钢筋混凝土桩式堤
CN203939036U (zh) 一种适用于河道的钢板桩围堰结构
CN203729309U (zh) 组合双排桩联合竖向预应力锚杆支护体系
CN101481913A (zh) 嵌岩地下连续墙冲孔槽段施工方法
CN213390185U (zh) 一种土石围堰与混凝土围堰相结合的围堰结构
CN213897154U (zh) 一种软土基坑坑底固化结构
CN201738286U (zh) 一种四脚架墩式结构
CN212801549U (zh) h形双排钢板桩支护结构
CN111305050B (zh) 一种隧道施工中对两侧既有桥墩的防护工艺
CN103981858A (zh) 一种网格状水泥土连续墙防护的抗倾斜管桩及其工法
CN114109394A (zh) 隧道浅埋软弱围岩高压旋喷桩法地表加固的桩长确定方法
CN208309626U (zh) 一种浮式管桩及其堤坝挡土结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI MUNICIPAL ENGINEERING DESIGN INSTITUTE (G

Free format text: FORMER NAME: SHANGHAI MUNICIPAL ENGINEERING DESIGN INSTITUTE

CP03 Change of name, title or address

Address after: 200092 Shanghai, Zhongshan, North Road, No. two, No. 901, No.

Patentee after: Shanghai Municipal Engineering Design Institute (Group) Co., Ltd.

Address before: 200092 No. two, 901 North Road, Shanghai, Zhongshan

Patentee before: Shanghai Municipal Engineering Design Institute