CN100510283C - 自压重式抗浮方法及其装置 - Google Patents

自压重式抗浮方法及其装置 Download PDF

Info

Publication number
CN100510283C
CN100510283C CNB2007100229631A CN200710022963A CN100510283C CN 100510283 C CN100510283 C CN 100510283C CN B2007100229631 A CNB2007100229631 A CN B2007100229631A CN 200710022963 A CN200710022963 A CN 200710022963A CN 100510283 C CN100510283 C CN 100510283C
Authority
CN
China
Prior art keywords
floating
water proof
basal layer
self
ballast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007100229631A
Other languages
English (en)
Other versions
CN101063310A (zh
Inventor
梅国雄
宋林辉
周峰
梅岭
周国凇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANCHANG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CNB2007100229631A priority Critical patent/CN100510283C/zh
Publication of CN101063310A publication Critical patent/CN101063310A/zh
Application granted granted Critical
Publication of CN100510283C publication Critical patent/CN100510283C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明公开了一种自压重式抗浮方法及其装置,该方法包括以下步骤:计算压重土体的厚度和进行隔水处理,本发明通过隔水体的设置,能够隔断水力传递,完全利用基底土层自重进行抗浮,起到了很好的抗浮效果,因此本发明不仅不会使得底板结构截面加大或配筋量增加等现象出现,而且省去了抗浮桩或抗浮锚杆,大大降低了工程造价,还能缩短施工工期。

Description

自压重式抗浮方法及其装置
技术领域
本发明涉及一种基础抗浮方法及其装置,尤其涉及一种自压重式抗浮方法及其装置。
背景技术
随着城市地下空间的开发利用,地下结构物的浮力问题已逐渐凸显出来,基础完工后,地下水位随时间的推移逐渐恢复到正常水位,对基础产生水浮力,导致结构变形损坏。
目前,地下结构物抗浮(或防浮)方法很多,其类型有:增加自重法(包括顶板压载、基板加载及边墙加载)、下拉法(抗拔桩和锚杆)、排水减压法、以及利用土层与地下结构之间的摩擦力、利用废弃的临时挡土设施和延伸基板法等。现在实际工程的抗浮设计主要采用抗浮桩和抗浮锚杆两种方法。每种抗浮方案各有利弊优劣,需要根据工程特点、地质情况、场地条件和环境等具体因素加以选择。目前实际工程中常用的抗浮桩和抗浮锚杆,均是通过和基础底板固定,当基础底板受到水浮力时,提供抗拔力阻止建筑物上浮,但同时对基础底板施加了一个作用力,造成底板结构截面加大或配筋量增加,提高了工程的造价。
发明内容
本发明提供一种抗浮效果好且工程造价低的自压重式抗浮方法及其装置。
本发明采用如下技术方案:
一种自压重式抗浮方法,其特征在于该方法包括以下步骤:
a、计算压重土体的厚度:根据基础层上部所受载荷的大小以及基础层所受的浮力大小,计算出保证基础层和建筑物安全所需提供的抗浮力大小,在此基础上再根据基底土层的物理力学参数确定所需的压重土层的厚度,
b、隔水处理:沿基础层周边以及压重土体底部设置隔水体,且隔水体的深度等于基础层的深度和压重土体的厚度之和。
一种自压重式抗浮装置,包括压重土体和基础层,且压重土体位于基础层的下面,沿基础层周边在压重土体四周及底部设有隔水体。
与现有技术相比,本发明具有以下优点:
本发明能够降低工程造价并缩短施工工期。本发明通过设置隔水体,将压重土体中的水力传递与外部隔断,利用土重大于水重的特性,完全利用基底土层的自重进行抗浮,不需要设置抗浮桩,不仅起到了很好的抗浮效果,而且节省工程造价;另外,隔断水力传递,还可以消除作用在基础底板上的水压力,从而降低底板中的弯矩,达到减小底板结构截面和钢筋的使用量,大大降低了工程造价,并缩短施工工期。
附图说明
图1是本发明实施例1的结构剖视图。
图2是本发明实施例2的结构剖视图。
图3是本发明的平面示意图。
以上的图中有:1、建筑物的柱墙 2、基础层 3、压重土体 4、隔水体 5、现有地面
具体实施方式
实施例1一种自压重式抗浮方法,该方法包括以下步骤:
a、计算  压重土体的厚度:根据基础层上部所受载荷的大小以及基础层所受的浮力大小,计算出保证基础层和建筑物安全所需提供的抗浮力大小,在此基础上再根据基底土层的物理力学参数确定所需的压重土层的厚度,
b、隔水处理:沿基础层周边以及压重土体底部设置隔水体,且隔水体的深度等于基础层的深度和压重土体的厚度之和,步骤b隔水处理中隔水体由注浆方式设置,具体的设置方法为:沿基础层周边和计算出的隔水体所需深度处注浆,使注浆层相互连接形成封闭的隔水体。
在本实施例中,具体施工时,根据建筑物的柱墙1传递至基础层2的荷载以及地下水浮力大小计算出所需压重土体3的厚度,比如:(参照图1)建筑面积为A的建筑物,上部荷载为F1,地下水水位为h0,基础埋深为h1,隔水处理的土层厚度为h2,基底土层的浮重度为γ′,水的重度为γw,抗浮安全系数取2.0,则此时:
(1)建筑物的自重为:F1
(2)建筑物所受的浮力为:(h1-h0wA
(3)压重土体提供的压重为:(h2-h1)γ′A
要保证建筑物不上浮,并满足使用功能,根据力的平衡关系可得:
(h2-h1)γ′A+F1=2.0(h1-h0wA       (1)
由式(1)移项可得压重土层厚度h2为:
h 2 = 2.0 ( h 1 - h 0 ) γ w A - F 1 γ ′ A - h 1 - - - ( 2 )
式(2)中,当h2>0,则需要抗浮;当h2<0,则不需要抗浮。
例如:取A=300m2,上部荷载为F1=3000kN,地下水水位为h0=1.0m,基础埋深为h1=6.0m,基底土层重度为γ′=8.5kN/m3,水的重度为γw=10.0kN/m,抗浮安全系数取2.0,则基底下提供的压重的土层厚度h2为:
h 2 = 2.0 &times; ( 6.0 - 1.0 ) &times; 10.0 &times; 300 - 3000 8.5 &times; 300 - 6.0 = 4.6 m
则需要设置的隔水体深度为:4.6+6.0=10.6m(从自然地面算起)。
实施例2 一种自压重式抗浮方法,该方法包括以下步骤:
a、计算压重土体的厚度:根据基础层上部所受载荷的大小以及基础层所受的浮力大小,计算出保证基础层和建筑物安全所需提供的抗浮力大小,在此基础上再根据基底土层的物理力学参数确定所需的压重土层的厚度,
b、隔水处理:沿基础层周边以及压重土体底部设置隔水体,且隔水体的深度等于基础层的深度和压重土体的厚度之和,步骤b隔水处理中隔水体通过设置隔水膜形成,具体的设置方法为为先将基础层下的地基采用换填方法处理,在计算出的隔水体所需深度处设置隔水膜,然后再回填压重土体。
在本实施例中,具体施工时,根据建筑物的柱墙1传递至基础层2的荷载以及地下水浮力大小计算出所需压重土体3的厚度,比如:(参照图2)建筑面积为A的建筑物,上部荷载为F1,地下水水位为h0,基础埋深为h1,隔水处理的土层厚度为h2,基底土层的浮重度为γ′,水的重度为γw,抗浮安全系数取2.0,则此时:
(1)建筑物的自重为:F1
(2)建筑物所受的浮力为:(h1-h0wA
(3)压重土体提供的压重为:(h2-h1)γ′A
要保证建筑物不上浮,并满足使用功能,根据力的平衡关系可得:
(h2-h1)γ′A+F1=2.0(h1-h0wA     (1)
由式(1)移项可得压重土层厚度h2为:
h 2 = 2.0 ( h 1 - h 0 ) &gamma; w A - F 1 &gamma; &prime; A - h 1 - - - ( 2 )
式(2)中,当h2>0,则需要抗浮;当h2<0,则不需要抗浮。
例如:取A=300m2,上部荷载为F1=3000kN,地下水水位为h0=1.0m,基础埋深为h1=5.0m,基底土层重度为γ′=8.5kN/m3,水的重度为γw=10.0kN/m,抗浮安全系数取2.0,则基底下提供的压重的土层厚度h2为:
h 2 = 2.0 &times; ( 5 . 0 - 1.0 ) &times; 10.0 &times; 300 - 3000 8.5 &times; 300 - 5.0 = 3.3 m
则需要设置的隔水膜深度为:3.3+5.0=8.3m(从自然地面算起)。
实施例3
一种自压重式抗浮装置,包括压重土体3和基础层2,且压重土体3位于基础层2的下面,沿基础层2周边在压重土体3四周及底部设有隔水体4。

Claims (4)

1、一种自压重式抗浮方法,其特征在于该方法包括以下步骤:
a、计算压重土体的厚度:根据基础层上部所受载荷的大小以及基础层所受的浮力大小,计算出保证基础层和建筑物安全所需提供的抗浮力大小,在此基础上再根据基底土层的物理力学参数确定所需的压重土层的厚度,
b、隔水处理:沿基础层周边以及压重土体底部设置隔水体,且隔水体的深度等于基础层的深度和压重土体的厚度之和。
2、根据权利要求1所述的自压重式抗浮方法,其特征在于所述步骤b隔水处理中隔水体由注浆方式设置。
3、根据权利要求1所述的自压重式抗浮方法,其特征在于所述步骤b隔水处理中隔水体通过设置隔水膜形成。
4、一种实施权利要求1所述的自压重式抗浮方法的自压重式抗浮装置,包括压重土体(3)和基础层(2),且压重土体(3)位于基础层(2)的下面,其特征在于沿基础层(2)周边在压重土体(3)四周及底部设有隔水体(4)。
CNB2007100229631A 2007-05-25 2007-05-25 自压重式抗浮方法及其装置 Expired - Fee Related CN100510283C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100229631A CN100510283C (zh) 2007-05-25 2007-05-25 自压重式抗浮方法及其装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100229631A CN100510283C (zh) 2007-05-25 2007-05-25 自压重式抗浮方法及其装置

Publications (2)

Publication Number Publication Date
CN101063310A CN101063310A (zh) 2007-10-31
CN100510283C true CN100510283C (zh) 2009-07-08

Family

ID=38964563

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100229631A Expired - Fee Related CN100510283C (zh) 2007-05-25 2007-05-25 自压重式抗浮方法及其装置

Country Status (1)

Country Link
CN (1) CN100510283C (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100595397C (zh) * 2007-12-10 2010-03-24 山西建筑工程(集团)总公司 植筋和锚杆相结合的抗浮施工方法
CN101333816B (zh) * 2008-08-06 2012-08-15 青岛海川建设集团有限公司 富含地下水地质条件下抗浮锚杆灌浆施工配合比确定方法
CN101812853B (zh) * 2010-05-12 2011-05-11 南昌航空大学 游泳池基础主动抗浮施工方法
CN101812852B (zh) * 2010-05-12 2011-05-18 南昌航空大学 油罐基础主动抗浮施工方法
CN102535525B (zh) * 2011-11-29 2014-10-15 中国建筑第八工程局有限公司 一种利用抗浮锚杆支撑地下筏板上排筏板钢筋架的方法
CN104153390B (zh) * 2014-08-28 2017-01-11 刘卡丁 超大地下钢筋混凝土框架结构的建造方法
CN104863188A (zh) * 2015-04-23 2015-08-26 侨健新能源科技(苏州)有限公司 自压重式抗浮施工方法
CN107893429B (zh) * 2017-09-25 2023-07-28 中铁二院工程集团有限责任公司 一种地下槽形体抗浮构造的抗浮验算方法
CN107794952A (zh) * 2017-11-08 2018-03-13 中国恩菲工程技术有限公司 垃圾池及其建造方法
CN112726650A (zh) * 2019-10-14 2021-04-30 柳红滨 一种地下室抗浮结构及其施工方法

Also Published As

Publication number Publication date
CN101063310A (zh) 2007-10-31

Similar Documents

Publication Publication Date Title
CN100510283C (zh) 自压重式抗浮方法及其装置
Han Recent research and development of ground column technologies
CN1837511B (zh) 一种双排围堰及其制作方法
US20160376762A1 (en) Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon
CN209243794U (zh) 一种桩基建筑物纠倾截桩托换限位结构
CN106869138A (zh) 一种衡重式双排桩支护结构及其基坑开挖方法
CN103195060A (zh) 软土地基预应力锚杆加固结构及其用途
CN201031398Y (zh) 自压重式抗浮装置
CN204000856U (zh) 内撑灌浆式水平抗侧变刚度桩基
CN201212151Y (zh) 挡土墙基础结构
Bakr The Impact of the unsupported excavation on the boundary of the active zone in medium, stiff and very stiff clay
CN203174586U (zh) 加固铁路软土地基的混凝土管桩
CN208486286U (zh) 一种沉井基础
Wan et al. Post-grouting of drilled shaft tips in coral-reef limestone formations: a case study
CN209144858U (zh) 严重液化场地风机基础承台周围地基土加固结构
CN203188198U (zh) 软土地基预应力锚杆加固结构
Neves et al. The use of CSM technology in permanent or temporary retaining structures with a cofferdam effect
RU2513067C1 (ru) Свайно-плитный фундамент резервуара
Momenzadeh et al. Seismic retrofit of 92/280 I/C foundations by micropile groups in San Francisco Bay area, California
CN101696577B (zh) 深厚饱和软土地基上新建建筑物抗沉陷结构和方法
CN201214761Y (zh) 带钢筋混凝土盖板的u型桥台
CN106013238B (zh) 一种软弱地层大覆土明挖隧道沉降控制方法
CN206052754U (zh) 适合高水位沙土地基采用的水下空心深基础
AL-Amrani et al. Prefabricated and Prestressed Bio-Concrete Piles: Case Study in North Jakarta
CN106522385A (zh) 一种地下室防水结构施工方法及地下室防水结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

Free format text: FORMER OWNER: NANJING UNIVERSITY OF TECHNOLOGY

Effective date: 20110519

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210009 NO. 200, ZHONGSHAN NORTH ROAD, NANJING CITY, JIANGSU PROVINCE TO: 330000 NO. 1318, FENGHE AVENUE, HONGGUTAN NEW DISTRICT, NANCHANG CITY

TR01 Transfer of patent right

Effective date of registration: 20110519

Address after: 1318 No. 330000 Nanchang Honggutan and Fung Avenue

Patentee after: NANCHANG CONSTRUCTION ENGINEERING GROUP CO., LTD.

Address before: 210009 Zhongshan North Road, Jiangsu, No. 200,

Patentee before: Nanjing University of Technology

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090708

Termination date: 20210525

CF01 Termination of patent right due to non-payment of annual fee