CN102322069B - 一种沉井和钢管桩的水中组合基础及其施工方法 - Google Patents

一种沉井和钢管桩的水中组合基础及其施工方法 Download PDF

Info

Publication number
CN102322069B
CN102322069B CN 201110186004 CN201110186004A CN102322069B CN 102322069 B CN102322069 B CN 102322069B CN 201110186004 CN201110186004 CN 201110186004 CN 201110186004 A CN201110186004 A CN 201110186004A CN 102322069 B CN102322069 B CN 102322069B
Authority
CN
China
Prior art keywords
open caisson
steel pipe
pipe pile
pipe piles
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110186004
Other languages
English (en)
Other versions
CN102322069A (zh
Inventor
陈向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shuzhijiaoyuan Technology Co Ltd
Original Assignee
Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd filed Critical Zhejiang Provincial Institute of Communications Planning Design and Research Co Ltd
Priority to CN 201110186004 priority Critical patent/CN102322069B/zh
Publication of CN102322069A publication Critical patent/CN102322069A/zh
Application granted granted Critical
Publication of CN102322069B publication Critical patent/CN102322069B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明公开了一种沉井和钢管桩的水中组合基础的施工方法,包括:(i)打入钢管桩,利用钢桁架将钢管桩连成整体;在钢桁架上设置千斤顶;(ii)将沉井的底节的钢壳浮运到钢管桩外侧,组装成整体,通过吊杆与千斤顶固定连接;浇筑沉井混凝土;(iii)利用千斤顶控制沉井下沉;下沉到设计标高后拆除钢桁架,利用沉井做工作平台,振动下沉钢管桩至预制高度;(iv)浇筑沉井封底混凝土;架设沉井顶板并对沉井底部土层进行加固。本发明的施工方法,施工方便,不需要大型定位和固定船舶,不发生偏向,施工成本低;由该施工方法制作的沉井和钢管桩的水中组合基础,能有效提高水中桥梁基础的承载力,抗船舶撞击作用强。

Description

一种沉井和钢管桩的水中组合基础及其施工方法
技术领域
本发明属于土建工程建造技术领域,具体涉及一种跨海(河)桥梁的基础,特别涉及一种适用于具有深厚覆盖层的沉井和钢管桩的水中组合基础及其施工方法。
背景技术
根据施工和地质条件不同,桥梁深水基础有沉井、沉箱、钢管桩和钻孔灌注桩等形式,一般分开使用。沉井是一种将上部荷载传至地基的深基础,是一个无底无盖的井筒,一般由刃脚、井壁、隔墙等部分组成。水中沉井一般采用在岸边陆地先制造底节,然后浮运就位,再接筑上部,浇筑一节,下沉一节,达到设计标高后,进行混凝土封底、填心、修建顶盖,构成沉井基础。钢管桩广泛地应用于跨海桥梁,一般采用大型打桩船施工。
跨海桥梁的防船舶撞击要求高,因此需要其基础具有较大的抗弯能力。斜拉桥的辅助墩、过渡墩和大跨径连续梁桥的过渡墩由于上部传递的竖向荷载特别小,抗船舶撞击能量特别弱,需要数量较多的钢管桩和钻孔灌注桩,造价高,因此采用一种新型的基础有重要意义。沉井基础刚度大,抗船舶撞击能量强,但在深水软土地质条件上,施工困难,成本高,风险大。常规做法是先在场地预制底部沉井,利用拖船运输到桥址,利用定位船舶定位,并不断接高下沉。在整个施工过程,需要大量船舶用于定位和固定沉井位置,因而造价高,风险大。下沉过程中,由于地质条件差,容易下沉过快,并因此容易失控偏向,而沉井纠偏是很困难的。
发明内容
本发明提供了一种沉井和钢管桩的水中组合基础的施工方法,该方法施工方便,不需要大型定位和固定船舶,不会发生偏向。本发明提供了由上述施工方法制作的沉井和钢管桩的水中组合基础,该基础能有效提高水中桥梁基础的承载力,抗船舶撞击作用强。
一种沉井和钢管桩的水中组合基础的施工方法,包括:
(i)在预定施工位置,打入若干钢管桩,并利用钢桁架将钢管桩连成整体,形成沉井内侧的定位支撑;同时在钢桁架上均匀设置两个以上的千斤顶,通过电脑同步系统控制该千斤顶的运行;
(ii)将沉井的底节的钢壳浮运到钢管桩(1)外侧,然后组装成整体,并通过吊杆与钢桁架上的千斤顶固定连接,同时将沉井导向圈套设在外围钢管桩上;浇筑沉井混凝土;
(iii)浇筑完设计高度的沉井后,利用千斤顶控制沉井稳步匀速下沉;下沉到设计标高后,拆除钢管桩的连接钢桁架,利用沉井做工作平台,振动下沉钢管桩至预制高度,此时钢管桩顶端高于沉井底端高度;
(iv)利用水下混凝土浇筑沉井封底混凝土,使钢管桩和沉井共同作用,形成整体;架设沉井顶板,并对沉井底部土层进行注水泥浆加固。
为保证沉井混凝土浇筑过程中,沉井的稳定性,优选的技术方案中,可选择在所述的浇筑沉井过程中,在沉井周围设置空气箱,控制沉井下沉深度和钢桁架受力大小;在沉井浇筑完成后,释放空气箱使沉井下沉。
所述的沉井下沉过程中受阻时,可采用吸泥或冲高压水等方法辅助沉井下沉。保证沉井下沉的顺利完成。具体采用何种方式进行辅助作业,可根据实际施工条件决定。
所述的钢管桩的数量为3~9个,且均匀分布。钢管桩的数量根据实际沉井的大小也可进行调整。所述的千斤顶的数量为2~8个,且沿沉井四周均匀设置。
所述的沉井导向圈平行设置2~4排,保证沉井能竖向下沉而不发生偏向。
所述的沉井下沉速度可利用千斤顶控制。
一种由上述施工方法加工得到的沉井和钢管桩的水中组合基础,包括沉井,所述的沉井内腔下方设有若干顶端高于沉井底端的钢管桩,两者通过沉井封底混凝土相互固定。
上述组合基础中,所述的钢管桩的数量为3~9个,且均匀分布在沉井结构内腔水平投影空间内。本发明的沉井和钢管桩的水中组合基础的施工方法,施工方便,不需要大型定位和固定船舶,不会发生偏向,施工成本低;同时由该施工方法制作的沉井和钢管桩的水中组合基础,能有效提高水中桥梁基础的承载力,抗船舶撞击作用强。
附图说明
图1为本发明的施工方法的设备设置结构示意图;
图2为本发明的沉井和钢管桩的水中组合基础的结构示意图;
图3为图2内部的俯视结构示意图。
具体实施方式
如图1所示,一种沉井和钢管桩的水中组合基础的施工方法,包括
(i)在预定施工位置,打入五个钢管桩1,并利用钢桁架2将五个钢管桩1连成整体,形成沉井内侧的定位支撑;同时在钢桁架2上对称设置两个千斤顶4,通过电脑同步系统控制该千斤顶4的运行,有效保证沉井3的同步下沉;
(ii)将沉井3的底节的钢壳分段浮运到钢管桩(1)外侧,然后组装成整体,并通过吊杆5与钢桁架2上的千斤顶4固定连接,同时将上下两排沉井导向圈6套设在外围钢管桩上;浇筑沉井底节混凝土;然后逐节浇筑沉井混凝土;下沉利用钢桁架2的千斤顶4控制沉井3下沉,根据需要,沉井3周围设置空气箱以控制沉井下沉深度和钢桁架受力;
(iii)浇筑完设计高度的沉井3后,释放空气箱使沉井3下沉,利用千斤顶4控制沉井稳步匀速下沉;下沉受阻后,可以采用吸泥、冲高压水等措施辅助下沉,但仍利用钢桁架控制沉井稳步、均匀下沉;下沉到设计标高后,拆除钢管桩1的连接钢桁架2,利用沉井3做工作平台,振动下沉钢管桩1至高于沉井底端合适连接的高度,此时钢管桩1顶端高于沉井3底端高度,便于利用水下混凝土对两者进行固定;
(iv)利用水下混凝土浇筑沉井封底混凝土7,使钢管桩1和沉井3共同作用,形成整体;架设沉井顶板8,并对沉井底部土层进行注水泥浆加固。
沉井的下沉施工应安排在平潮期,在大潮期和恶劣天气时可以在上下游采用地锚加强沉井的横向稳定。
钢管桩1的数量可根据实际需要确定,一般为3~9个,且均匀分布。
千斤顶3的数量也可根据实际需要确定,一般为2~8个,且沿沉井四周均匀设置。
沉井导向圈6的数量也可根据实际需要确定,一般平行设置2~4排。
沉井下沉速度可利用千斤顶进行控制。
如图2和图3所示,由上述方法制备得到的沉井和钢管桩的水中组合基础,包括沉井3,沉井3内腔下方设有五个顶端高于沉井3底端的钢管桩1,两者通过沉井封底混凝土7相互固定。
上述组合基础中,钢管桩1的数量也可根据实际需要调整,一般为3~9个,且均匀分布在沉井结构3内腔在水平面投影空间内。
上述的沉井3结构中还包括刃脚9、井壁11、沉静顶板8和凹槽10等,凹槽10设置在刃脚9上方井壁11内侧,其作用时使封底混凝土7和底板与井壁间有更好的联结,以传递基底反力。

Claims (5)

1.一种沉井和钢管桩的水中组合基础的施工方法,包括:
(i)在预定施工位置,打入若干钢管桩(1),并利用钢桁架(2)将钢管桩(1)连成整体,形成沉井内侧的定位支撑;同时在钢桁架(2)上均匀设置两个以上的千斤顶(4),通过电脑同步系统控制该千斤顶(4)的运行;
(ii)将沉井(3)的底节的钢壳浮运到钢管桩(1)外侧,然后组装成整体,并通过吊杆(5)与钢桁架上的千斤顶(4)固定连接,同时将沉井导向圈(6)套设在外围钢管桩上;浇筑沉井混凝土;
(iii)浇筑完设计高度的沉井(3)后,利用千斤顶(4)控制沉井稳步匀速下沉;所述的浇筑沉井过程中,在沉井周围设置空气箱,控制沉井下沉深度和钢桁架受力;在沉井浇筑完成后,释放空气箱使沉井下沉;下沉到设计标高后,拆除钢管桩(1)的链接钢桁架(2),利用沉井(3)做工作平台,振动下沉钢管桩(1)至预制高度,此时钢管桩(1)顶端高于沉井(3)底端高度;
(iv)利用水下混凝土浇筑沉井封底混凝土(7),使钢管桩(1)和沉井(3)共同作用,形成整体;架设沉井顶板(8),并对沉井底部土层进行注水泥浆加固。
2.根据权利要求1所述的沉井和钢管桩的水中组合基础的施工方法其特征在于,所述的沉井下沉过程中受阻时,采用吸泥或冲高压水方法辅助沉井下沉。
3.根据权利要求1所述的沉井和钢管桩的水中组合基础的施工方法其特征在于,所述的钢管桩(1)的数量为3~9个,且均匀分布。
4.根据权利要求1所述的沉井和钢管桩的水中组合基础的施工方法其特征在于,所述的千斤顶(3)的数量为2~8个,且沿沉井四周均匀设置。
5.根据权利要求1所述的沉井和钢管桩的水中组合基础的施工方法其特征在于,所述的沉井导向圈(6)平行设置2~4排。
CN 201110186004 2011-07-04 2011-07-04 一种沉井和钢管桩的水中组合基础及其施工方法 Active CN102322069B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110186004 CN102322069B (zh) 2011-07-04 2011-07-04 一种沉井和钢管桩的水中组合基础及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110186004 CN102322069B (zh) 2011-07-04 2011-07-04 一种沉井和钢管桩的水中组合基础及其施工方法

Publications (2)

Publication Number Publication Date
CN102322069A CN102322069A (zh) 2012-01-18
CN102322069B true CN102322069B (zh) 2013-09-04

Family

ID=45449895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110186004 Active CN102322069B (zh) 2011-07-04 2011-07-04 一种沉井和钢管桩的水中组合基础及其施工方法

Country Status (1)

Country Link
CN (1) CN102322069B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388339A (zh) * 2012-05-07 2013-11-13 中铁十局集团第五工程有限公司 一种顶升套箱下放装置
CN103967031B (zh) * 2013-01-24 2015-09-16 中交公路规划设计院有限公司 一种加固地基的沉箱与桩组合基础及其施工方法
CN103255776A (zh) * 2013-04-23 2013-08-21 李尚喜 桥点式、组合、移动、吸盘式桥梁基础建设与施工
CN103982187B (zh) * 2014-05-26 2016-04-27 马莎 竖井施工用沉筒加固装置
CN104005427B (zh) * 2014-06-10 2016-01-13 东南大学 一种用于深水组合基础的可协调变形的连接装置
CN104480865B (zh) * 2014-12-24 2016-06-29 中铁大桥局集团有限公司 一种大型钢沉井精确定位方法
CN105020110A (zh) * 2015-07-24 2015-11-04 浙江中控太阳能技术有限公司 一种定日镜立柱及安装基础
CN106498951B (zh) * 2016-11-30 2019-02-05 上海市机械施工集团有限公司 一种竖井开挖施工方法
CN108316328A (zh) * 2018-03-02 2018-07-24 中铁上海工程局集团有限公司 一种用于沉井施工的加压下沉装置及其施工方法
CN114352288B (zh) * 2021-12-30 2024-04-16 南京工大交通科学研究院(滁州)有限公司 一种盾构近距离上穿既有盾构隧道施工结构及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004137685A (ja) * 2002-10-15 2004-05-13 East Japan Railway Co 本設基礎杭を利用したケーソン沈設方法および支持方法
CN101003974A (zh) * 2006-12-22 2007-07-25 中铁大桥局股份有限公司 大型深水沉井基础施工方法
CN101270581A (zh) * 2008-05-09 2008-09-24 天津市市政工程设计研究院 锚桩式沉井基础及其施工工艺
CN101962958A (zh) * 2009-07-22 2011-02-02 中交公路规划设计院有限公司 一种沉井与桩组成的桥梁复合基础及施工方法
CN201826320U (zh) * 2010-10-15 2011-05-11 中铁三局集团有限公司 一种用于双壁钢围堰拼装和下沉的装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004137685A (ja) * 2002-10-15 2004-05-13 East Japan Railway Co 本設基礎杭を利用したケーソン沈設方法および支持方法
CN101003974A (zh) * 2006-12-22 2007-07-25 中铁大桥局股份有限公司 大型深水沉井基础施工方法
CN101270581A (zh) * 2008-05-09 2008-09-24 天津市市政工程设计研究院 锚桩式沉井基础及其施工工艺
CN101962958A (zh) * 2009-07-22 2011-02-02 中交公路规划设计院有限公司 一种沉井与桩组成的桥梁复合基础及施工方法
CN201826320U (zh) * 2010-10-15 2011-05-11 中铁三局集团有限公司 一种用于双壁钢围堰拼装和下沉的装置

Also Published As

Publication number Publication date
CN102322069A (zh) 2012-01-18

Similar Documents

Publication Publication Date Title
CN102322069B (zh) 一种沉井和钢管桩的水中组合基础及其施工方法
EP2837554A1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN101368389B (zh) 单双壁结合钢围堰施工方法及其单双壁结合钢围堰
CN101962958B (zh) 一种沉井与桩组成的桥梁复合基础及施工方法
CN105926628B (zh) 一种浮动、固定可转换的水中桩基施工平台装置
CN102561371B (zh) 岛遂结合部钢沉箱围护结构及其施工方法
CN109113086B (zh) 一种深水基岩裸露河床区的钢混组合围堰施工方法
CN102953341A (zh) 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构
CN102720140A (zh) 大跨度预应力砼连续梁深水桥墩施工工艺
US20090324341A1 (en) Method of erecting a building structure in a water basin
CN102644293A (zh) 桩基桶形基础及其施工方法
CN104912045A (zh) 水上平台结构水底固定用空心筒墩及其安装施工方法
CN109797749A (zh) 一种水下基坑施工装置及施工方法
CN102979039A (zh) 一种在深水急流无覆盖层陡峭裸岩上的高位栈桥施工方法
CN106088120B (zh) 一种围堰下放施工方法
CN102021901B (zh) 陡坡裸岩钢管桩平台搭设方法
CN202170512U (zh) 一种沉井和钢管桩的水中组合基础
CN105133558A (zh) 深水裸岩平台及其施工方法
CN203049443U (zh) 一种设置于深水急流无覆盖层陡峭裸岩上的高位栈桥结构
CN107620316B (zh) 一种岩石河床大体积深水基础施工方法
CN109707002B (zh) 大型取水头精确定位沉放安装装置及方法
CN104975612A (zh) 水上沉井施工新工艺
CN101392521A (zh) 嵌岩钢架码头结构及其施工方法
CN202969333U (zh) 钢桁架嵌岩码头结构
CN210684426U (zh) 一种深水裸岩钢栈桥

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 89 round City West Road, Xihu District, Hangzhou, Zhejiang

Patentee after: Zhejiang transportation planning and Design Research Institute Co., Ltd.

Address before: No. 89 round City West Road, Xihu District, Hangzhou, Zhejiang

Patentee before: Zhejiang Provincial Plan Design&Research Institute of Communications

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: No. 928, yuhangtang Road, Xihu District, Hangzhou City, Zhejiang Province 310011

Patentee after: Zhejiang shuzhijiaoyuan Technology Co.,Ltd.

Address before: 310006 No. 89 West Ring Road, Hangzhou, Zhejiang, Xihu District

Patentee before: ZHEJIANG PROVINCIAL INSTITUTE OF COMMUNICATIONS PLANNING DESIGN & RESEARCH Co.,Ltd.

CP03 Change of name, title or address