CN101812853B - 游泳池基础主动抗浮施工方法 - Google Patents

游泳池基础主动抗浮施工方法 Download PDF

Info

Publication number
CN101812853B
CN101812853B CN2010101692548A CN201010169254A CN101812853B CN 101812853 B CN101812853 B CN 101812853B CN 2010101692548 A CN2010101692548 A CN 2010101692548A CN 201010169254 A CN201010169254 A CN 201010169254A CN 101812853 B CN101812853 B CN 101812853B
Authority
CN
China
Prior art keywords
swimming pool
gutter
filter membrane
base
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101692548A
Other languages
English (en)
Other versions
CN101812853A (zh
Inventor
梅国雄
梅岭
宋林辉
王宏
徐美娟
谢洪阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
Nanchang Hangkong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Hangkong University filed Critical Nanchang Hangkong University
Priority to CN2010101692548A priority Critical patent/CN101812853B/zh
Publication of CN101812853A publication Critical patent/CN101812853A/zh
Application granted granted Critical
Publication of CN101812853B publication Critical patent/CN101812853B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

一种游泳池基础主动抗浮施工方法,(1)在游泳池基底开挖排水沟;(2)填碎石垫层,铺滤膜;(3)在滤膜上摆放排水管;(4)滤膜包裹排水管;(5)排水沟回填;(6)做游泳池基础;(7)砌筑游泳池。本发明的优点是:本发明在地下水的渗流通道上设有排水沟,让地下水主动地排出,从而降低了游泳池的浮力,保证了游泳池的安全,尤其是空载时游泳池的安全,而且减小了基础筏板的厚度,从而减小了混凝土的用量;游泳池基础板上一系列贯通洞口的布置,一定程度上减小了地下水浮力对基础板产生的弯矩,减少了基础板内钢筋的用量,与排水沟联合使用,达到了双重保证的效果。

Description

游泳池基础主动抗浮施工方法
技术领域
本发明涉及一种游泳池基础施工方法,尤其涉及一种游泳池基础主动抗浮施工方法。
背景技术
目前,游泳池的供水方式大多是循环供水方式,即游泳池的全部循环水量经设在池子端壁和侧壁水面以下的给水口送入池内,再由设在池底的回水口取回使用过的相应体积的水,进行净化后再送回池内继续使用的水流方式,这一情况只需游泳池装满水时其地基的抗压承载力满足要求即可。而在实际中,也有排空游泳池中水的情况,这就涉及到空载游泳池的抗浮问题。目前,在游泳池的设计中,其基础形式一般为整体片筏基础,地下水位一般较高,其对整个基础的浮力很大,若用整个基础的混凝土自重来抵抗地下水对其产生的浮力,基础厚度将会很大,一般都在2m以上,需要混凝土百万吨左右,这就会造成大量的CO2排放,不符合我国节能减排的战略目标。而且,一旦游泳池上浮,会拉裂或拉断地下水管,造成水资源浪费,严重时,还会危及周边场地的安全。另外,游泳池上浮后,施救所需的费用、游泳池重新建造的投资都构成了一笔不小的直接经济损失。
从上述现状可以看出,游泳池基础的抗浮问题迫在眉睫。通过增大基础筏板厚度来抵抗地下水浮力不仅会造成环境污染,而且还有可能使得地基承载力不满足要求。所以,发展一种既简单又经济的游泳池基础抗浮施工工艺显得尤为迫切。
发明内容
本发明的目的在于提供一种游泳池基础主动抗浮施工方法,该方法有效解决了游泳池基础的抗浮问题,减少施工材料,保证游泳池的安全。
本发明是这样来实现的,其特征是施工方法为:
(1)在游泳池基底开挖排水沟:排水沟有自流输水的坡度,纵横坡坡度不小于0.5%,即从基底中心沿纵、横向向两边开挖坡度不小于0.5%的排水沟,断面呈梯形;并在基底四周设置积水沟,并在积水沟布置水泵,以便将从排水沟排到积水沟内的水抽出;
(2)填碎石垫层,铺滤膜:在开挖完毕的排水沟底面填一层碎石垫层,压实使其平整,在其上铺设无纺土工布作为滤膜,纵、横向排水沟交界处,无纺土工布要断开,并留有搭接长度;
(3)在滤膜上摆放排水管:在滤膜上摆设周壁开孔的排水管,纵向排水管在纵、横向排水沟交界处开洞,使横向排水管穿入其中,与纵向排水管连成一整体,并保证接口处的密封性;
(4)滤膜包裹排水管:把铺设在排水沟底面上的滤膜从两边将排水管包裹住,并注意纵、横向排水管交界处滤膜的搭接;
(5)排水沟回填:排水沟铺设完毕后,验收合格后回填含泥量较小的中粗砂,将排水沟回填至整平高度;
(6)做游泳池基础:在游泳池基础浇筑之前,沿厚度方向上均匀布置直径较小的塑料管,使得浇筑完成后的游泳池基础均匀地布有贯穿其厚度方向的孔洞,即把游泳池底面与上述排水沟通过该塑料管连接起来,注意孔洞布置的位置尽量不要影响基础的配筋;
(7)砌筑游泳池:塑料管顶面处即游泳池底面的孔洞处设有阀门,其做法同游泳池回水阀门做法,游泳池正常使用时,即池内有水时,塑料管阀门处于闭合状态;当游泳池内水被排干时,塑料管阀门开启,地下水从游泳池基础底部向上对游泳池产生浮力,地下水向上渗流。
本发明的优点是:本发明在其渗流的通道上设有排水沟,让地下水主动地排出,从而降低了游泳池的浮力,保证了游泳池的安全,而且减小了基础筏板的厚度,减小了混凝土的用量;游泳池基础板上一系列贯通洞口的布置,一定程度上减小了地下水浮力对基础板产生的弯矩,减少了基础板内钢筋的用量,与排水沟联合使用,达到了双重保证的效果。
附图说明
图1是本发明横向排水沟剖面示意图。
图2是本发明排水沟平面布置图示意图。
图3是本发明排水沟断面图示意图。
在图中:1.纵向排水管;2.横向排水管;3.积水沟;4.滤膜;5.中粗砂;6.游泳池;7.塑料管;8.塑料管阀门;9.游泳池基础;10.孔洞。
具体实施方式
本发明是这样实现的,如图1、图2、图3所示,
(1)从基底中心沿纵、横向向两边开挖坡度为0.5%的排水沟,排水沟起点深度约为150mm,底宽150mm,顶宽450mm,断面呈梯形,并在基底四周设置积水沟3,并在积水沟3合适位置布置水泵,以便将从排水沟排到积水沟3内的水抽出;
(2)在开挖完毕的排水沟底面填一层碎石垫层,碎石的含泥量不超过5%,压实使其平整,在其上铺设无纺土工布作为滤膜4,纵、横向排水沟交界处,无纺土工布要断开,并留有一定的搭接长度;
(3)在滤膜4上摆设周壁开有孔洞10的排水管,排水管有横向排水管2和纵向排水管1,排水管管径为Φ110×6的塑料管,塑料管的管壁上开有Φ8的孔洞10,开孔率2~3%。纵向排水管1在纵、横向排水沟交界处开洞,使横向排水管2穿入其中,与纵向排水管1连成一整体,并保证接口处的密封性;
(4)把铺设在排水沟底面上的滤膜4从两边将排水管包裹住,纵、横向排水管交界处滤膜4的搭接长度100mm左右;
(5)排水沟铺设完毕后,验收合格后回填含泥量不超过5%的中粗砂5,将排水沟回填至整平高度;
(6)做游泳池基础:在游泳池基础9浇筑之前,沿厚度方向上均匀布置Φ110×6的塑料管7,使得浇筑完成后的游泳池基础9均匀地布有贯穿其厚度方向的孔洞,即把游泳池6底面与上述排水沟通过该塑料管7连接起来,注意孔洞布置的位置尽量不要影响基础的配筋。
(7)砌筑游泳池:塑料管顶面处即游泳池底面的孔洞处设有塑料管阀门8,其做法同游泳池回水阀门做法,游泳池正常使用时,即池内有水时,塑料管阀门处于闭合状态;当游泳池内水被排干时,塑料管阀门开启,地下水从游泳池基础底部向上对游泳池产生浮力,地下水向上渗流。

Claims (1)

1.一种游泳池基础主动抗浮施工方法,其特征是施工方法为:
(1)在游泳池基底开挖排水沟:排水沟有自流输水的坡度,纵横坡坡度不小于0.5%,即从基底中心沿纵、横向向两边开挖坡度不小于0.5%的排水沟,断面呈梯形;并在基底四周设置积水沟,并在积水沟布置水泵,以便将从排水沟排到积水沟内的水抽出;
(2)填碎石垫层,铺滤膜:在开挖完毕的排水沟底面填一层碎石垫层,压实使其平整,在其上铺设无纺土工布作为滤膜,纵、横向排水沟交界处,无纺土工布要断开,并留有搭接长度;
(3)在滤膜上摆放排水管:在滤膜上摆设周壁开孔的排水管,纵向排水管在纵、横向排水沟交界处开洞,使横向排水管穿入其中,与纵向排水管连成一整体,并保证接口处的密封性;
(4)滤膜包裹排水管:把铺设在排水沟底面上的滤膜从两边将排水管包裹住,并注意纵、横向排水管交界处滤膜的搭接;
(5)排水沟回填:排水沟铺设完毕后,验收合格后回填含泥量较小的中粗砂,将排水沟回填至整平高度;
(6)做游泳池基础:在游泳池基础浇筑之前,沿厚度方向上均匀布置直径较小的塑料管,使得浇筑完成后的游泳池基础均匀地布有贯穿其厚度方向的孔洞,即把游泳池底面与上述排水沟通过该塑料管连接起来,注意孔洞布置的位置尽量不要影响基础的配筋;
(7)砌筑游泳池:塑料管顶面处即游泳池底面的孔洞处设有塑料管阀门,其做法同游泳池回水阀门做法,游泳池正常使用时,即池内有水时,塑料管阀门处于闭合状态;当游泳池内水被排干时,塑料管阀门开启,地下水从游泳池基础底部向上对游泳池产生浮力,地下水向上渗流。
CN2010101692548A 2010-05-12 2010-05-12 游泳池基础主动抗浮施工方法 Expired - Fee Related CN101812853B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101692548A CN101812853B (zh) 2010-05-12 2010-05-12 游泳池基础主动抗浮施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101692548A CN101812853B (zh) 2010-05-12 2010-05-12 游泳池基础主动抗浮施工方法

Publications (2)

Publication Number Publication Date
CN101812853A CN101812853A (zh) 2010-08-25
CN101812853B true CN101812853B (zh) 2011-05-11

Family

ID=42620209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101692548A Expired - Fee Related CN101812853B (zh) 2010-05-12 2010-05-12 游泳池基础主动抗浮施工方法

Country Status (1)

Country Link
CN (1) CN101812853B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733414B (zh) * 2011-04-15 2014-10-22 中国石油化工股份有限公司 方锥型锚墩联合水平撑杆的水池抗浮方法
CN111576468A (zh) * 2019-02-15 2020-08-25 闫红民 一种防止地下埋管不均匀沉降的筏板基础及施工方法
CN111705846B (zh) * 2020-06-08 2022-04-15 金建工程设计有限公司 一种蓄水池及其设计计算方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050096353A (ko) * 2004-03-30 2005-10-06 박정진 콘크리트구체 방수성이 향상된 대형거푸집 구조 및 이를이용한 콘크리트 구조물 시공방법
CN100510283C (zh) * 2007-05-25 2009-07-08 南京工业大学 自压重式抗浮方法及其装置
CN101096852B (zh) * 2007-06-11 2010-11-10 袁奕 一种地下建筑物抗浮的方法
CN101565952A (zh) * 2008-04-22 2009-10-28 贵阳铝镁设计研究院 一种防止地坑式建筑基础上浮的方法及结构

Also Published As

Publication number Publication date
CN101812853A (zh) 2010-08-25

Similar Documents

Publication Publication Date Title
CN103526770B (zh) 一种高防渗抗浮桩筏结构的施工方法
CN103046565B (zh) 超深岩基深基坑降排水方法
CN102535488B (zh) 一种高水位地下室底板防水施工方法
CN203213095U (zh) 一种地下给排水构筑物抗浮结构
CN102433876A (zh) 多隔室套管复合桩及其施工方法
CN102995599A (zh) 湿陷性黄土输水渠道的抗冻防渗导水治理方法
CN104452829A (zh) 一种桩筏基础抗浮结构及施工方法
CN106049379B (zh) 溢洪道下游施工滞后时的临时发电方法及堆石自溃坝
CN211228591U (zh) 一种钢纤维混凝土重力式挡土墙防护结构
CN101812853B (zh) 游泳池基础主动抗浮施工方法
CN203594041U (zh) 一种高防渗抗浮桩筏结构
CN111851512A (zh) 深基坑挡墙结构和地下空间结构的施工方法
CN207727514U (zh) 一种库盆防渗抗抬动结构
CN103114605B (zh) 防渗疏水层结构及施工方法
CN202899144U (zh) 一种挡水围堰结构
CN204370378U (zh) 一种柔性拦渣坝结构
CN104631425B (zh) 一种加快粉煤灰排渗固结的方法
JP2003320335A (ja) 海面廃棄物処分場およびその管理方法
CN113174904A (zh) 一种海绵城市下渗滞蓄生态景观明渠施工工法
CN206477347U (zh) 地下室的蓄水结构
CN111379251A (zh) 一种可控刚性桩与挤密砂石桩组合型复合地基及其施工方法
CN205421157U (zh) 一种基于滩涂软基的加筋土岸墙结构
CN204661409U (zh) 用于竖向多级ao生态污水处理池的池壁
CN104532798A (zh) 一种柔性拦渣坝结构及其施工方法
CN204024174U (zh) 一种抗浮托力水池

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: NANCHANG UNIV. OF AVIATION

Effective date: 20130205

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 330000 NANCHANG, JIANGXI PROVINCE TO: 330001 NANCHANG, JIANGXI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130205

Address after: 330001, 15 floor, city foreign trade building, No. 1370, Jinggangshan Avenue, Jiangxi, Nanchang

Patentee after: Jiangxi Zhonglian Construction Group Co.,Ltd.

Address before: 696 No. 330000 Jiangxi province Nanchang Honggutan Feng and South Avenue

Patentee before: Nanchang Univ. of Aviation

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110511

Termination date: 20150512

EXPY Termination of patent right or utility model