CN202661091U - Built-in purging target plate for gas pipeline - Google Patents
Built-in purging target plate for gas pipeline Download PDFInfo
- Publication number
- CN202661091U CN202661091U CN 201220215938 CN201220215938U CN202661091U CN 202661091 U CN202661091 U CN 202661091U CN 201220215938 CN201220215938 CN 201220215938 CN 201220215938 U CN201220215938 U CN 201220215938U CN 202661091 U CN202661091 U CN 202661091U
- Authority
- CN
- China
- Prior art keywords
- target plate
- sleeve
- purging
- breach
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model relates to purging for a gas pipeline, and particularly relates to a purging target plate for a gas pipeline. A built-in purging target plate is installed on a purging pipe, and comprises two parts, namely, a target plate and a target plate sleeve, wherein one end of the target plate sleeve is closed and the other end thereof is provided with a connection flange; the target plate sleeve is provided with nicks along a length direction, and inserted into the purged pipeline along the radial direction of the purging pipe by means of enabling the nicks to face the position of the coming direction of a purging gas; all the nicks of the target plate sleeve are located in the purging pipe; and the purging target plate is arranged in the target plate sleeve, and arranged by means of enabling the nicks of the target plate sleeve to face the coming direction of the purging gas. The purging target plate disclosed by the utility model is simple in material selection and use, low in production difficulty, strong in practicability, high in safety factor, and suitable for purging test for medium pipelines with high temperature, high pressure and large gas pipe diameter.
Description
Technical field
The utility model relates to gas pipeline and purges, and especially gas pipeline is with purging target plate.
Background technology
Carry out in the purge at the gas medium pipeline of constructing complete, at pipe interior the target plate that check purges effect is set.Traditional external target plate need to be arranged on that to purge interim diffusion mouth outside, and it is fixed, if check temperature, pressure, gas medium pipeline that flow velocity is very high, then external target plate need to be made sufficiently solid support.
Summary of the invention
The utility model is intended to address the aforementioned drawbacks, and provides a kind of gas pipeline with built-in purging target plate.The utility model material selection is simple, and manufacture difficulty is low, and is practical, and safety coefficient is high, be applicable to high temperature, high pressure, medium pipeline that the gas caliber is larger purge test and use.
For addressing the above problem, a kind of gas pipeline is with built-in purging target plate, it is installed on the scavenging duct, it comprises target plate and target plate sleeve, described target plate sleeve one end seals an end and is provided with joint flange, it alongst has breach, and radially insert this jet chimney towards purge gas arriving direction position along described scavenging duct with this breach, described breach all is positioned at scavenging duct, described target plate is arranged in the target plate sleeve, and arranges towards purge gas arriving direction by the breach of target plate sleeve.
Described gas pipeline is with built-in purging target plate, described target plate comprises that an outer internal diameter is less than the sleeve pipe of target plate sleeve diameter, its upper end is provided with the shutoff of blind plate lower end, blind plate is provided with handle, and the flange of being connected with the target plate sleeve connects with bolt, described sleeve pipe and target plate sleeve correspondence have the breach of length direction, and breach is embedded in and is provided with channel-section steel, is provided with the galvanized iron sheet with plank in the channel-section steel.
Described gas pipeline is with built-in purging target plate, described target plate length sleeve is for purging pipe diameter+200mm, and caliber≤1/2 purges pipe diameter, and the breach that dissects along the length sleeve direction is positioned at the sleeve center, length is for being not more than the purging pipe diameter, and width is 1/2 target plate sleeve caliber.
The utility model designs (DN1000>caliber 〉=DN200) during mainly for the higher gas medium blowing pipeline test of temperature, pressure, flow velocity, built-in target plate is mounted in the test target plate of pipe interior, by on-the-spot practical operation, verify that its test effect is up to standard, and workable, safety coefficient is high.Relatively traditional, the material more simple to the blowing pipeline verifying attachment form of elevated pressures of the utility model popularized, and makes things convenient for installation and removal, can be used repeatedly.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described:
Fig. 1 is the utility model synoptic diagram;
Fig. 2 is described target plate equipment synoptic diagram.
Embodiment
The below comes the utility model is described in detail with manufacturing process of the present utility model:
See also Fig. 1 and Fig. 2, the utility model blowing pipeline mainly is comprised of target plate sleeve 1 and built-in target plate 2 two parts with built-in target plate.
The making of target plate sleeve 1: at first select one section steel pipe, length is for purging pipe diameter+200mm, caliber≤1/2 purges pipeline 3 calibers, dissect along the length sleeve direction, be positioned at the sleeve center, the length of dissecing part must not be greater than purging pipe diameter, and width is 1/2 target plate sleeve, 1 pipe diameter, target plate sleeve 1 one ends weld interim flange 4, one ends and use the steel plate shutoff.The sleeve of having made is run through on the temporary pipeline that closes on diffusion mouth that is welded on the purging pipeline 3.Dissect the arriving direction of partly meeting to purge gas.
The making of target plate 2: sleeve pipe 5 materials that target plate is selected are than the little specification of sleeve pipeline, the making form is consistent with target plate sleeve 1, the size of dissecing according to the target plate sleeve pipe is simultaneously carried out opening, one end welding blind plate 9 and handle, the close channel-section steel of specification 6, plank 7 and galvanized iron sheet 8 are selected in other end shutoff, and galvanized iron sheet is fixed on the plank, subsequently plank and galvanized iron sheet are embedded in the channel-section steel, subsequently with above-mentioned three's the Combination Welding indentation, there at the target plate sleeve pipe 5 that completes.
The pattern that target plate 2 is similar to as " drawer " is inserted in the target plate sleeve 1, is inlaid with galvanized iron sheet 8 one sides and meets arriving direction to purge gas, selects suitable pad, uses bolts to fix blind plate 9 and interim flange 4.
Claims (3)
1. a gas pipeline is with built-in purging target plate, it is installed on the scavenging duct, it is characterized in that, it comprises target plate and target plate sleeve, described target plate sleeve one end seals an end and is provided with joint flange, it alongst has breach, and radially insert this jet chimney towards purge gas arriving direction position along described scavenging duct with this breach, described breach all is positioned at scavenging duct, described target plate is arranged in the target plate sleeve, and arranges towards purge gas arriving direction by the breach of target plate sleeve.
2. gas pipeline according to claim 1 is with built-in purging target plate, it is characterized in that, described target plate comprises that an outer internal diameter is less than the sleeve pipe of target plate sleeve diameter, its upper end is provided with the shutoff of blind plate lower end, blind plate is provided with handle, and the flange of being connected with the target plate sleeve connects with bolt, and described sleeve pipe and target plate sleeve correspondence have the breach of length direction, breach is embedded in and is provided with channel-section steel, is provided with the galvanized iron sheet with plank in the channel-section steel.
3. gas pipeline according to claim 1 is with built-in purging target plate, it is characterized in that, described target plate length sleeve is for purging pipe diameter+200mm, caliber≤1/2 purges pipe diameter, the breach that dissects along the length sleeve direction is positioned at the sleeve center, length is for being not more than the purging pipe diameter, and width is 1/2 target plate sleeve caliber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220215938 CN202661091U (en) | 2012-05-15 | 2012-05-15 | Built-in purging target plate for gas pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220215938 CN202661091U (en) | 2012-05-15 | 2012-05-15 | Built-in purging target plate for gas pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202661091U true CN202661091U (en) | 2013-01-09 |
Family
ID=47455994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220215938 Expired - Lifetime CN202661091U (en) | 2012-05-15 | 2012-05-15 | Built-in purging target plate for gas pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202661091U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103344744A (en) * | 2013-07-24 | 2013-10-09 | 中国能源建设集团江苏省电力建设第一工程公司 | Target plate device |
CN104019454A (en) * | 2014-06-23 | 2014-09-03 | 山东电力建设第一工程公司 | Online continuous target test device of blowing pipe of steel furnace |
CN106338076A (en) * | 2016-11-07 | 2017-01-18 | 中国化学工程第四建设有限公司 | The purging and targeting device for high-pressure steam pipeline |
CN107327319A (en) * | 2017-06-30 | 2017-11-07 | 沪东重机有限公司 | The Quick steam blowing method and device of steam turbine admission line |
CN110006061A (en) * | 2019-04-30 | 2019-07-12 | 延安大学 | A kind of Chemical Manufacture jet chimney target practice device |
CN110243654A (en) * | 2019-03-12 | 2019-09-17 | 华电电力科学研究院有限公司 | Sweeping steam pipeline target plate device |
WO2023124176A1 (en) * | 2021-12-31 | 2023-07-06 | 中国电建集团山东电力建设第一工程有限公司 | Method for safely and online replacing target board by single person |
-
2012
- 2012-05-15 CN CN 201220215938 patent/CN202661091U/en not_active Expired - Lifetime
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103344744A (en) * | 2013-07-24 | 2013-10-09 | 中国能源建设集团江苏省电力建设第一工程公司 | Target plate device |
CN103344744B (en) * | 2013-07-24 | 2015-02-18 | 中国能源建设集团江苏省电力建设第一工程公司 | Target plate device |
CN104019454A (en) * | 2014-06-23 | 2014-09-03 | 山东电力建设第一工程公司 | Online continuous target test device of blowing pipe of steel furnace |
CN106338076A (en) * | 2016-11-07 | 2017-01-18 | 中国化学工程第四建设有限公司 | The purging and targeting device for high-pressure steam pipeline |
CN106338076B (en) * | 2016-11-07 | 2018-05-29 | 中国化学工程第四建设有限公司 | High steam pipeline purges target apparatus |
CN107327319A (en) * | 2017-06-30 | 2017-11-07 | 沪东重机有限公司 | The Quick steam blowing method and device of steam turbine admission line |
CN107327319B (en) * | 2017-06-30 | 2019-02-12 | 沪东重机有限公司 | The Quick steam blowing method and device of steam turbine admission line |
CN110243654A (en) * | 2019-03-12 | 2019-09-17 | 华电电力科学研究院有限公司 | Sweeping steam pipeline target plate device |
CN110006061A (en) * | 2019-04-30 | 2019-07-12 | 延安大学 | A kind of Chemical Manufacture jet chimney target practice device |
WO2023124176A1 (en) * | 2021-12-31 | 2023-07-06 | 中国电建集团山东电力建设第一工程有限公司 | Method for safely and online replacing target board by single person |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202661091U (en) | Built-in purging target plate for gas pipeline | |
CN103912758B (en) | A kind of on-line production expansion duct closing type device | |
WO2012021572A3 (en) | Method and apparatus for venting gas from liquid-conveying conduit | |
CN103791157A (en) | Construction technology for natural gas pipeline | |
CN203099209U (en) | Gas pipeline leakage gap isobaric electric hot melting plugging mechanism | |
CN106545417A (en) | Noise reduction panel section and related silencing pipeline | |
CN205938242U (en) | Double -wall pipe inner tube is to removable outer tube of interface welding seam department | |
CN202916152U (en) | Single-bend pressure test device | |
CN204345266U (en) | High-temperature and pressure pipeline system | |
CN201866465U (en) | Online repair device for gas leakage of gas pipeline | |
CA2919252A1 (en) | Protective hose assembly having fire resistance capabilities for fluid delivery systems and applications | |
CN205400907U (en) | Miniature for gas turbine gas mixer of external -burning marsh gas | |
CN205244676U (en) | Dual -seal structure clamp formula flange | |
CN203904373U (en) | Repairing cooler suitable for later maintenance of cooling wall blast furnace | |
CN204547068U (en) | The hot-melting fixture of multiple tube is manufactured for metal tube plastic lining | |
CN107327319A (en) | The Quick steam blowing method and device of steam turbine admission line | |
CN204007221U (en) | A kind of single tube journey movable tube sheets heat exchanger with expansion joint guider | |
CN103196641A (en) | Hot-blast stove leakproofness pressure test method | |
CN107655776B (en) | Test device for simulating erosion condition of flexible riser of oil-gas field | |
CN205781650U (en) | A kind of thermal expansion of pipeline compensation device | |
CN202812385U (en) | Butt-welded anti-blockage gas flue butterfly valve | |
CN202846004U (en) | Boiler stainless steel argon arc welding protector | |
CN210179095U (en) | Prefabricated built on stilts insulating tube of ability high-speed joint | |
CN101476656A (en) | Butt joint method of thin-wall metal pipe | |
CN204122423U (en) | Low-pressure steam pipeline end blow device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130109 |