CN203099209U - Gas pipeline leakage gap isobaric electric hot melting plugging mechanism - Google Patents

Gas pipeline leakage gap isobaric electric hot melting plugging mechanism Download PDF

Info

Publication number
CN203099209U
CN203099209U CN 201320047492 CN201320047492U CN203099209U CN 203099209 U CN203099209 U CN 203099209U CN 201320047492 CN201320047492 CN 201320047492 CN 201320047492 U CN201320047492 U CN 201320047492U CN 203099209 U CN203099209 U CN 203099209U
Authority
CN
China
Prior art keywords
isobaric
gas pipeline
aluminum alloy
anchor ear
electric heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320047492
Other languages
Chinese (zh)
Inventor
江禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320047492 priority Critical patent/CN203099209U/en
Application granted granted Critical
Publication of CN203099209U publication Critical patent/CN203099209U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a gas pipeline leakage gap isobaric electric hot melting plugging mechanism. The gas pipeline leakage gap isobaric electric hot melting plugging mechanism comprises isobaric chamber walls, aluminum alloy hoops, polyethylene pipes and heating wires. The isobaric chamber walls surround the outside of a gas pipeline, are divided into at least two parts, and are buckled in the circumferential direction in a complementary mode. The inner sides of the buckled and closed isobaric chamber walls and the outer wall of the gas pipeline surround to form a gas-tight isobaric chamber. A pressure relief opening and a pressure inflating opening are formed in each isobaric chamber wall and a pressure gage is further arranged on each isobaric chamber wall. The aluminum alloy hoops are divided into at least two parts, buckled in the circumferential direction in a complementary mode and located on gas pipeline leakage gaps in the isobaric chamber. The polyethylene pipes are embedded between the aluminum alloy hoops and the outer wall of the gas pipeline. The heating wires are arranged in the isobaric chamber and make contact with the polyethylene pipes. The gas pipeline leakage gap isobaric electric hot melting plugging mechanism is suitable for repairing a sub-high pressure gas pipeline, and has the advantages that dropping pressure is not needed, and repairing is rapid.

Description

The fuel gas pipeline leakage slit stifled mechanism of isobaric electric heating sealing by fusing
Technical fieldThe utility model relates to the gas pipeline blocking technology, relates in particular to a kind of fuel gas pipeline leakage slit stifled mechanism of isobaric electric heating sealing by fusing.
Background techniqueGas pipeline provides natural gas supply for the civic daily life, it is the indispensable constituent element of modern city life, the fuel gas pipeline leakage that any reason causes all is serious accident, be easy to cause great economic asset loss if deal with improperly, and even threaten the civic personal safety.Therefore leak in case generation must be rushed to repair fast and effectively.Existing gas pipeline emergency repair method all needs to carry out step-down to be handled, and spends a large amount of time and reduced pressure operation and can cause gas leakage, threatens the safety of construction area periphery yet at present.Therefore, the industry present situation with regard to present relatively is short of the effective means of carrying out shutoff under the situation of not step-down.
Summary of the inventionThe utility model provides a kind of suitable sub-high pressure gas pipeline to repair, and possesses the step-down of need not, and repairs the fuel gas pipeline leakage slit stifled mechanism of isobaric electric heating sealing by fusing of quick characteristics.
For achieving the above object, the utility model fuel gas pipeline leakage slit stifled mechanism of isobaric electric heating sealing by fusing comprises isobaric locular wall, aluminum alloy anchor ear, polyvinyl piping materials and electric heating wire, described isobaric locular wall is encircled in the gas pipeline outside, isobaric locular wall is divided into two and complementary in a circumferential direction the fastening at least, fastening between the isobaric locular wall of described complementation is a heat fusion, surround gas-tight isobaric chamber between isobaric locular wall inboard after the fastening sealing and the gas pipeline outer wall, isobaric locular wall is provided with pressure relief opening, pressurising mouth and pressure gauge; Described aluminum alloy anchor ear is divided into two and complementary in a circumferential direction the fastening at least, fastening between the described complementary aluminum alloy anchor ear is a bolt, the aluminum alloy anchor ear is positioned at isobaric building gas pipe, service pipe, indoor pipe gap leakage place, is nested with polyvinyl piping materials between aluminum alloy anchor ear and the gas pipeline outer wall; Described electric heating wire is arranged at isobaric indoorly contact with polyvinyl piping materials.
The utility model fuel gas pipeline leakage slit stifled mechanism of isobaric electric heating sealing by fusing also comprises two runners and bull stick, is symmetricly set in the both sides of isobaric chamber, and runner is encircled gas pipeline and can be rotated around gas pipeline; Bull stick series connection is inserted on the runner of aluminum alloy anchor ear and both sides the runner of aluminum alloy anchor ear and both sides is rotated synchronously around gas pipeline.
As a kind of mode of execution of the present utility model, described isobaric locular wall by on circumference complementary two constitute.Described aluminum alloy anchor ear by on circumference complementary two constitute.
Adopt above design, its job step is: the two ends that, runner are fixed on place, fuel gas pipeline leakage slit; Two, two semi-circular and complementary aluminum alloy anchor ear one ends are connected with bolt or latch; Three, be arranged between aluminum alloy anchor ear and the gas pipeline two semi-circular polyvinyl piping materials and compacting; Four, two bull sticks are passed by aluminum alloy anchor ear two ends, connect the runner at two ends, place, fuel gas pipeline leakage slit respectively; Five, rotating wheel puts the aluminum alloy anchor ear in place, and the bolt of the fastening aluminum alloy anchor ear the other end makes the aluminum alloy anchor ear compress polyvinyl piping materials, makes polyvinyl piping materials tightly embrace place, fuel gas pipeline leakage slit, realizes preliminary shutoff, reduces the pressure of leak; Six, the isobaric locular wall of two halves carries out the electric heating fusion welding under normal pressure up and down, in ' the isobaric chamber ' of the outer construction sealing of aluminum alloy anchor ear; Seven, pressurizeed in ' isobaric chamber ' by the pressurising mouth, discharge ' isobaric chamber ' interior combustion gas by pressure relief opening, observe pressure gauge, pressure in ' isobaric chamber ' and the pressure in the gas pipeline maintain an equal level; Eight, connect the electrothermal wire power, melting polyethylene tubing, the shutoff gap leakage is realized ' isobaric electric heating is molten ' soldering.
Compared with prior art, the stifled mechanism of the isobaric electric heating sealing by fusing in the utility model fuel gas pipeline leakage slit is fit to the sub-high pressure gas pipeline repairs, and possesses the step-down of need not, and repairs characteristics fast.
Description of drawingsBelow in conjunction with the drawings and specific embodiments the utility model is described in further detail:
Fig. 1 is a structural representation of the present utility model.
EmbodimentAs shown in Figure 1, the utility model fuel gas pipeline leakage slit stifled mechanism of isobaric electric heating sealing by fusing comprises isobaric locular wall 1, aluminum alloy anchor ear 2, polyvinyl piping materials 3 and electric heating wire 4, described isobaric locular wall 1 is encircled in gas pipeline 5 outsides, isobaric locular wall 1 is divided into two and complementary in a circumferential direction the fastening at least, fastening between the isobaric locular wall 1 of described complementation is a heat fusion, surround gas-tight isobaric chamber 6 between isobaric locular wall 1 inboard after the fastening sealing and gas pipeline 5 outer walls, isobaric chamber 6 walls are provided with pressure relief opening 61, pressurising mouth 62 and pressure gauge 63; Described aluminum alloy anchor ear 2 is divided into two and complementary in a circumferential direction the fastening at least, fastening between the described complementary aluminum alloy anchor ear 2 is a bolt, aluminum alloy anchor ear 2 is positioned at 6 gas pipeline gap leakage places, isobaric chamber, is nested with polyvinyl piping materials 3 between aluminum alloy anchor ear 2 and gas pipeline 5 outer walls; Described electric heating wire 4 is arranged in the isobaric chamber 6 and contacts with polyvinyl piping materials 3.
The utility model fuel gas pipeline leakage slit stifled mechanism of isobaric electric heating sealing by fusing also comprises two runners 7 and bull stick 8, is symmetricly set in the both sides of isobaric chamber 6, and runner 7 is encircled gas pipeline 5 and can be rotated around gas pipeline 5; Bull stick 8 series connection is inserted on the runner 7 of aluminum alloy anchor ear 2 and both sides the runner 7 of aluminum alloy anchor ear 2 and both sides is rotated synchronously around gas pipeline 5.
As a kind of mode of execution of the present utility model, described isobaric locular wall 1 by on circumference complementary two constitute.Described aluminum alloy anchor ear 2 by on circumference complementary two constitute.
Adopt above design, its job step is: the two ends that, runner 7 are fixed on gas pipeline 5 gap leakage places; Two, two semi-circular and complementary aluminum alloy anchor ear 2 one ends are connected with bolt or latch; Three, be arranged between aluminum alloy anchor ear 2 and the gas pipeline 5 two semi-circular polyvinyl piping materials 3 and compacting; Four, two bull sticks 8 are passed by aluminum alloy anchor ear 2 two ends, connect the runner 7 at two ends, gas pipeline 5 gap leakage place respectively; Five, rotating wheel 7 puts aluminum alloy anchor ear 2 in place, the bolt of fastening aluminum alloy anchor ear 2 the other ends makes aluminum alloy anchor ear 2 compress polyvinyl piping materials 3, makes polyvinyl piping materials 3 tightly embrace gas pipeline 5 gap leakage places, realize preliminary shutoff, reduce the pressure of leak; Six, the isobaric locular wall 1 of two halves carries out the electric heating fusion welding under normal pressure up and down, in ' ' 6, isobaric chamber of aluminum alloy anchor ear 2 outer construction sealings; Seven, by pressurising mouth 62 toward ' pressurization in ' 6, isobaric chamber is discharged by pressure relief opening 61 that ' pressure gauge 63 is observed in combustion gas in ' 6, isobaric chamber, until ' pressure ' 6, isobaric chamber in and the pressure in the gas pipeline are fair; Eight, connect electric heating wire 4 power supplys, melting polyethylene tubing 3, the shutoff gap leakage is realized ' isobaric electric heating is molten ' soldering.

Claims (6)

1. the isobaric electric heating sealing by fusing in fuel gas pipeline leakage slit blocks up mechanism, it is characterized in that: it comprises isobaric locular wall, aluminum alloy anchor ear, polyvinyl piping materials and electric heating wire, described isobaric locular wall is encircled in the gas pipeline outside, isobaric locular wall is divided into two and complementary in a circumferential direction the fastening at least, surround gas-tight isobaric chamber between isobaric locular wall inboard after the fastening sealing and the gas pipeline outer wall, isobaric locular wall is provided with pressure relief opening, pressurising mouth and pressure gauge; Described aluminum alloy anchor ear is divided into two and complementary in a circumferential direction the fastening at least, and the aluminum alloy anchor ear is positioned at isobaric building gas pipe, service pipe, indoor pipe gap leakage place, is nested with polyvinyl piping materials between aluminum alloy anchor ear and the gas pipeline outer wall; Described electric heating wire is arranged at isobaric indoorly contact with polyvinyl piping materials.
2. the fuel gas pipeline leakage according to claim 1 slit stifled mechanism of isobaric electric heating sealing by fusing, it is characterized in that: it also comprises two runners and bull stick, is symmetricly set in the both sides of isobaric chamber, runner is encircled gas pipeline and can be rotated around gas pipeline; Bull stick series connection is inserted on the runner of aluminum alloy anchor ear and both sides the runner of aluminum alloy anchor ear and both sides is rotated synchronously around gas pipeline.
3. the fuel gas pipeline leakage according to claim 1 and 2 slit stifled mechanism of isobaric electric heating sealing by fusing is characterized in that: described isobaric locular wall by on circumference complementary two constitute.
4. the fuel gas pipeline leakage according to claim 1 and 2 slit stifled mechanism of isobaric electric heating sealing by fusing, it is characterized in that: the fastening between the described isobaric locular wall is a heat fusion.
5. the fuel gas pipeline leakage according to claim 1 and 2 slit stifled mechanism of isobaric electric heating sealing by fusing is characterized in that: described aluminum alloy anchor ear by on circumference complementary two constitute.
6. the fuel gas pipeline leakage according to claim 1 and 2 slit stifled mechanism of isobaric electric heating sealing by fusing, it is characterized in that: the fastening between the described aluminum alloy anchor ear is a bolt.
CN 201320047492 2013-01-28 2013-01-28 Gas pipeline leakage gap isobaric electric hot melting plugging mechanism Expired - Fee Related CN203099209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320047492 CN203099209U (en) 2013-01-28 2013-01-28 Gas pipeline leakage gap isobaric electric hot melting plugging mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320047492 CN203099209U (en) 2013-01-28 2013-01-28 Gas pipeline leakage gap isobaric electric hot melting plugging mechanism

Publications (1)

Publication Number Publication Date
CN203099209U true CN203099209U (en) 2013-07-31

Family

ID=48850612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320047492 Expired - Fee Related CN203099209U (en) 2013-01-28 2013-01-28 Gas pipeline leakage gap isobaric electric hot melting plugging mechanism

Country Status (1)

Country Link
CN (1) CN203099209U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103752990A (en) * 2013-12-31 2014-04-30 中国庆华能源集团有限公司 Leak repairing method of combustible gas pipe under pressure
CN104500920A (en) * 2014-12-17 2015-04-08 四川金发科技发展有限公司 Joint coating implement and construction method
CN104633391A (en) * 2014-12-17 2015-05-20 四川金发科技发展有限公司 Joint coating method
CN104633392A (en) * 2014-12-17 2015-05-20 四川金发科技发展有限公司 Joint coating method
WO2016095766A1 (en) * 2014-12-17 2016-06-23 四川金发科技发展有限公司 Pipeline-joint coating machine, construction method and novel pipeline-joint coating structure
CN106523848A (en) * 2016-11-16 2017-03-22 深圳市燃气集团股份有限公司 City gas polyethylene pipe safe operation maintenance realization method and system
CN111928055A (en) * 2020-08-17 2020-11-13 南通世睿电力科技有限公司 Hoop type pipeline reconstruction sealing and plugging process

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103752990A (en) * 2013-12-31 2014-04-30 中国庆华能源集团有限公司 Leak repairing method of combustible gas pipe under pressure
CN103752990B (en) * 2013-12-31 2016-06-15 中国庆华能源集团有限公司 The method of a kind of combustible gas pipe racks pressure mending-leakage
CN104500920A (en) * 2014-12-17 2015-04-08 四川金发科技发展有限公司 Joint coating implement and construction method
CN104633391A (en) * 2014-12-17 2015-05-20 四川金发科技发展有限公司 Joint coating method
CN104633392A (en) * 2014-12-17 2015-05-20 四川金发科技发展有限公司 Joint coating method
WO2016095766A1 (en) * 2014-12-17 2016-06-23 四川金发科技发展有限公司 Pipeline-joint coating machine, construction method and novel pipeline-joint coating structure
CN106523848A (en) * 2016-11-16 2017-03-22 深圳市燃气集团股份有限公司 City gas polyethylene pipe safe operation maintenance realization method and system
CN111928055A (en) * 2020-08-17 2020-11-13 南通世睿电力科技有限公司 Hoop type pipeline reconstruction sealing and plugging process

Similar Documents

Publication Publication Date Title
CN203099209U (en) Gas pipeline leakage gap isobaric electric hot melting plugging mechanism
CN104633377A (en) High-pressure glass fiber pipe installation and pipe breaking maintaining device and process method
CN203656416U (en) Buckling type hydraulic rubber hose joint with high pulse performance
CN103698206B (en) Sealing clamp and using method thereof for the test of plastic pipe internal pressure-resistant
CN202852326U (en) Isolated seal fixture with pressure
CN201096679Y (en) Sealing device for small-diameter pipe pressure test
CN203730957U (en) Insulated joint
CN202852421U (en) Welded type rupture disk device
CN104019324B (en) The quick maintenance device of Underwater Two-layer oil transport pipeline
CN102878383A (en) Isolating belt pressure sealing clamp
CN203797184U (en) Pipe connecting component structure
CN202895701U (en) Resin lined hose upender for non-excavation recovery of underground pipeline
CN203628139U (en) High-pressure fiberglass pipeline installing and damage maintenance device
CN112145864B (en) Under-pressure ladle repairing technology for nodular cast iron pipe
CN103604021A (en) Coupled pipe leakage rush repair clamp and design method thereof
CN201621400U (en) Large-calibre and high-pressure integral insulated joint of pipeline
CN209166121U (en) A kind of electric furnace electrode sand seal device
CN204785307U (en) Anticorrosive plastic tubing pipeline of inside lining
CN211840680U (en) Pipeline welding protection device
CN204083291U (en) A kind of lightweight plates gate valve
CN203533078U (en) Coupling type pipeline leakage first-aid repair clamp
CN208546660U (en) A kind of natural gas line press and open holes fitting device
CN202188262U (en) On-line instant repair device for broken pipeline
CN207179041U (en) A kind of corrosion-resistant high-temperature and the extinguishing pipe of convenient installation
CN201954189U (en) Sealing device of steel plastic composite pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130731

Termination date: 20150128

EXPY Termination of patent right or utility model