CN107327319B - The Quick steam blowing method and device of steam turbine admission line - Google Patents

The Quick steam blowing method and device of steam turbine admission line Download PDF

Info

Publication number
CN107327319B
CN107327319B CN201710527049.6A CN201710527049A CN107327319B CN 107327319 B CN107327319 B CN 107327319B CN 201710527049 A CN201710527049 A CN 201710527049A CN 107327319 B CN107327319 B CN 107327319B
Authority
CN
China
Prior art keywords
steam
flange
purging process
purging
steam blowing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710527049.6A
Other languages
Chinese (zh)
Other versions
CN107327319A (en
Inventor
冯亮
杨凯波
张瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Heavy Machinery Co Ltd
Original Assignee
Hudong Heavy Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Heavy Machinery Co Ltd filed Critical Hudong Heavy Machinery Co Ltd
Priority to CN201710527049.6A priority Critical patent/CN107327319B/en
Publication of CN107327319A publication Critical patent/CN107327319A/en
Application granted granted Critical
Publication of CN107327319B publication Critical patent/CN107327319B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/32Collecting of condensation water; Drainage ; Removing solid particles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/003Arrangements for testing or measuring

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pipeline Systems (AREA)

Abstract

A kind of Quick steam blowing method of steam turbine admission line, including following specific steps: 1) intercepting close to the restructuring of the final stage steam inlet pipe road of turbine inlet is purging process pipe, 90 ° of curved right-angle elbow pipes of purging process Guan Weicheng, both ends are fixed with flange, one end is abutted flange, with the flanged joint of steam turbine admission line end, the other end is outlet(discharge) flange, is connect with steam turbine;2) position of purging process pipe is rotated by 90 ° upwards, is installed as the state of outlet(discharge) flange vertically upward;3) target plate is used as steam blowing detection plate, be mounted on the outlet(discharge) flange of purging process pipe;4) steam is passed through into admission line to be purged;5) it removes steam blowing detection plate after purged every time to detect purging result, until testing result reaches requirement;6) all after purging, purging process pipe is changed into connection direction, is connect again with steam turbine.The present invention has the advantages that steam blowing is efficient and convenient, work efficiency is high, low in cost.

Description

The Quick steam blowing method and device of steam turbine admission line
Technical field
The present invention relates to the manufacturing process of steam turbine more particularly to a kind of Quick steam purging sides of steam turbine admission line Method and device belong to chain drive manufacturing technology field.
Background technique
Steam turbine must have the steam of high temperature and pressure to input during operating normally, and provide the pot of high temperature and high pressure steam Furnace system must carry out steam conveying with the steam pipework that steam turbine is connect between the two by it.But steam pipework is being made Make, in welding and installation process, not only has foul and enter pipeline, but also inner wall of the pipe can also be attached with metallic particles, metal The impurity such as oxide, welding slag.Although the quick-closing valve of steam turbine is equipped with steam filter screen, after steam turbine puts into operation, size is less than The solid impurity of strainer hole can still enter high speed flow passage component by strainer, hit, feather plucking blade even damages steam turbine leaf The parts such as piece and packing.To eliminate this hidden danger, before the first time starting after steam turbine installation, to guarantee in jet chimney Solid impurity thoroughly removed completely, the admission passage of steam turbine must carry out steam blowing.
When steam turbine admission line carries out steam blowing, it usually needs in addition make one section of dedicated technique of steam blowing Pipe removes one section on former steam inlet pipe road, then connects dedicated purging process pipe.Due to being related to the dismounting in more root canal roads, because This this traditional method is inconvenient;In addition, in order to check and judge whether purging effect is good, in steam blowing technique The exit of pipe needs to install steam blowing detection part.Traditional steam blowing detection part by flanged (FLGD) fixed bracket, The part such as target plate and bracket forms, and structure is complex and cost of manufacture is higher, simultaneously because its specific structure and installation side Formula, in actual use, the dismounting of steam blowing detection part are comparatively laborious.
Summary of the invention
It is an object of the present invention to overcome the shortcomings of above-mentioned prior art technology, a kind of steam turbine admission line is provided Quick steam blowing method and device improve existing steam blowing process duct and purging detection part, reach system Make effect simple, low in cost and convenient for disassembly and assembly in actual use.
It is as follows that the present invention solves the technical solution that its technical problem is taken:
A kind of Quick steam blowing method of steam turbine admission line, it is characterised in that:
The Quick steam blowing method includes following specific steps:
1) intercepting close to the restructuring of the final stage steam inlet pipe road of turbine inlet is purging process pipe, the purging process pipe For in 90 ° of curved right-angle elbow pipes, both ends are fixed with flange, one end is abutted flange, with the steam turbine admission line end The flanged joint at end, the other end are outlet(discharge) flange, are connect with the steam turbine;
2) position of the purging process pipe is rotated by 90 ° upwards, is installed as the state of the outlet(discharge) flange vertically upward;
3) target plate is used as steam blowing detection plate, be mounted on the outlet(discharge) flange of the purging process pipe;
4) steam is passed through into the admission line to be purged;
5) it removes the steam blowing detection plate after purged every time to detect purging result, until testing result reaches To requirement;
6) all after purging, the purging process pipe is changed into connection direction, is connect again with the steam turbine.
Another technical solution of the invention are as follows:
A kind of device for realizing Quick steam purging comprising purging process pipe and steam blowing detection plate, 90 ° of curved right-angle elbow pipes of the purging process Guan Weicheng, one end pass through the method for bolt and steam turbine admission line end Blue detachably connected, the other end is detachably connected by bolt and the steam turbine.
Further, the purging process pipe both ends are fixed with flange.
Further, the steam blowing detection plate is restructured by the target plate of steam blowing detection part, and material is Aluminium sheet, with a thickness of 2~3mm, width 30mm.
Compared with traditional steam blowing method, technical effect of the invention is as follows:
1) the final stage steam inlet pipe road repacking that will be close to turbine inlet is used as steam blowing process duct, there is no need to Dedicated steam blowing process duct is still further made, relative production expense is saved, reduces costs, while greatly reducing and blowing The dismounting workload for sweeping process duct, makes blow job reach conveniently effect.
2) original steam is purged into the target plate in detection part and replaces original steam blowing detection part, there is production letter Easily, the advantages that low in cost and convenient for disassembly and assembly.
3) the method for the invention has the advantages that steam blowing is efficient and convenient, work efficiency is high, low in cost.
Detailed description of the invention
Fig. 1 is method program figure of the invention.
Fig. 2 is the state diagram before steam turbine admission line is purged.
Fig. 3 is that the present invention carries out purged state diagram.
In figure, 1-admission line, 2-abutted flanges, 3-purging process pipes, 4-steam turbines, the detection of 5-steam blowings Plate.
Specific embodiment
The present invention will be described in detail in the following with reference to the drawings and specific embodiments, but the guarantor that the present invention cannot be limited in this way Protect range.
Fig. 1 show Quick steam blowing method of the present invention.Before carrying out steam blowing, admission line 1 is pressed It is attached according to former connection type and the steam turbine 4, referring to fig. 2.
The Quick steam blowing method of the steam turbine admission line includes following specific steps:
1) restructuring of final stage steam inlet pipe road 1 intercepted close to 4 inlet of steam turbine is purging process pipe 3.The purging Process duct 3 is in 90 ° of curved right-angle elbow pipes, and both ends are fixed with flange, and one end is abutted flange 2, by bolt with it is described The flange of 1 end of admission line of steam turbine 4 is detachably connected, and the other end is outlet(discharge) flange, passes through bolt and the steamer Machine 4 is detachably connected.
It regard a part restructuring in steam inlet pipe road 1 as purging process pipe 3, there is no need to still further make special steam to blow Process duct is swept, relative production expense has been reduced;It is greatly reduced the dismounting workload of purging process pipe simultaneously, it is fast to have reached convenience Prompt degree.
2) connection abutted flange 2 is reinstalled, the position of the purging process pipe 3 is rotated by 90 ° upwards, by purging process The direction of the outlet(discharge) flange of pipe 3 is changed to vertically upward.
3) original steam is purged into the target plate in detection part and is changed to steam blowing detection plate 5, be mounted on the purging work On the outlet(discharge) flange of skill pipe 3, referring to Fig. 3.
The material of the steam blowing detection plate 5 is one block of aluminium sheet, is processed into thickness about 2~3mm, wide about 30mm, length It is determined according to the size of 3 outlet(discharge) flange of purging process pipe, while in the longitudinal direction according to 3 outlet(discharge) flange bolt of purging process pipe Hole center circle diameter and diameter of bolt hole process two connecting holes, the side being connected with the outlet(discharge) flange of purging process pipe 3 Formula is fixed.
4) steam is passed through into the admission line 1 carry out purging work;
5) after purged every time, 5 pairs of purging results of the steam blowing detection plate is removed and are detected, up to testing result Reach requirement.
The work of disassembly steam blowing detection plate 5 becomes very convenient, only need to be by outlet(discharge) flange and steam blowing detection plate 5 Two bolts of connection unclamp, so that it may remove steam blowing detection plate 5 and be checked.
6) all after purging, steam blowing detection plate 5 is unloaded in process duct 3 from purging, and by the docking Flange 2 dismantles re-attached, make purging process pipe 3 change connection direction, reply as former state and with described 4 the corresponding interface of steam turbine It reconnects.
Present invention connection quickly, conveniently, and can ensure that all pipe paths have all carried out steam blowing.
It above are only a preferred embodiment of the invention, be not used to limit the present invention, it is all according in the scope of the invention Equivalent changes and modifications made by holding, belong to the scope of protection of present invention.

Claims (4)

1. a kind of Quick steam blowing method of steam turbine admission line, it is characterised in that:
The Quick steam blowing method includes following specific steps:
1) intercepting close to the restructuring of the final stage steam inlet pipe road of turbine inlet is purging process pipe, purging process Guan Weicheng 90 ° of curved right-angle elbow pipes, both ends are fixed with flange, and one end is abutted flange, with steam turbine admission line end Flanged joint, the other end are outlet(discharge) flange, are connect with the steam turbine;
2) position of the purging process pipe is rotated by 90 ° upwards, is installed as the state of the outlet(discharge) flange vertically upward;
3) target plate of steam blowing detection part is used as steam blowing detection plate, is mounted on the outlet of the purging process pipe On flange;
4) steam is passed through into the admission line to be purged;
5) it removes the steam blowing detection plate after purged every time to detect purging result, until testing result reaches and wants It asks;
6) all after purging, the purging process pipe is changed into connection direction, is connect again with the steam turbine.
2. a kind of steam blowing equipment for realizing claim 1 the method, it is characterised in that: the steam blowing equipment Including purging process pipe and steam blowing detection plate, 90 ° of curved right-angle elbow pipes of the purging process Guan Weicheng, one end passes through spiral shell Bolt and the flange of steam turbine admission line end are detachably connected, and the other end is detachable by bolt and the steam turbine Ground connection.
3. steam blowing equipment according to claim 2, it is characterised in that: the purging process pipe both ends are fixed with Flange.
4. steam blowing equipment according to claim 2, it is characterised in that: the steam blowing detection plate is blown by steam The target plate for sweeping detection part is restructured, and material is aluminium sheet, with a thickness of 2~3mm, width 30mm.
CN201710527049.6A 2017-06-30 2017-06-30 The Quick steam blowing method and device of steam turbine admission line Active CN107327319B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710527049.6A CN107327319B (en) 2017-06-30 2017-06-30 The Quick steam blowing method and device of steam turbine admission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710527049.6A CN107327319B (en) 2017-06-30 2017-06-30 The Quick steam blowing method and device of steam turbine admission line

Publications (2)

Publication Number Publication Date
CN107327319A CN107327319A (en) 2017-11-07
CN107327319B true CN107327319B (en) 2019-02-12

Family

ID=60198100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710527049.6A Active CN107327319B (en) 2017-06-30 2017-06-30 The Quick steam blowing method and device of steam turbine admission line

Country Status (1)

Country Link
CN (1) CN107327319B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110227674A (en) * 2018-03-06 2019-09-13 兰州兰石重型装备股份有限公司 Flange sealing surface leaks blow device and its application method
CN111744901A (en) * 2020-07-17 2020-10-09 三门核电有限公司 Method for jointly purging auxiliary steam of nuclear power station and steam pipeline of steam turbine shaft seal

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202661091U (en) * 2012-05-15 2013-01-09 中国二十冶集团有限公司 Built-in purging target plate for gas pipeline
CN203376145U (en) * 2013-04-23 2014-01-01 中国联合工程公司 Target plate installation structure in steam pipeline purging system
CN105157047A (en) * 2015-09-07 2015-12-16 广东电网有限责任公司电力科学研究院 Method and system for debugging boiler of 1045MW ultra-supercritical coal-fired unit through pipe purging
CN205591969U (en) * 2016-04-21 2016-09-21 中国化学工程第三建设有限公司 Integration of steam pipe tape steam turbine sweeps device fast

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202661091U (en) * 2012-05-15 2013-01-09 中国二十冶集团有限公司 Built-in purging target plate for gas pipeline
CN203376145U (en) * 2013-04-23 2014-01-01 中国联合工程公司 Target plate installation structure in steam pipeline purging system
CN105157047A (en) * 2015-09-07 2015-12-16 广东电网有限责任公司电力科学研究院 Method and system for debugging boiler of 1045MW ultra-supercritical coal-fired unit through pipe purging
CN205591969U (en) * 2016-04-21 2016-09-21 中国化学工程第三建设有限公司 Integration of steam pipe tape steam turbine sweeps device fast

Also Published As

Publication number Publication date
CN107327319A (en) 2017-11-07

Similar Documents

Publication Publication Date Title
US9933327B2 (en) Method for detecting leaks in a fuel circuit of a gas turbine fuel supply system
CN107327319B (en) The Quick steam blowing method and device of steam turbine admission line
CN107283213A (en) With the air discharging manifold flange processing unit (plant) for removing iron filings function
CN104713369A (en) Distributing device applied to cooling water of industrial furnace
CN104533840A (en) Axial air incoming enclosure of axial-flow compressor
CN209706020U (en) A kind of snakelike tube module
CN106475370A (en) Facilitate implementation the pipeline configuration of postwelding purging
CN102853976B (en) Online leakage detection method and device thereof for heat treatment furnace radiant tube
CN214235413U (en) Tail pipe arranging way
CN112404051B (en) Steam pipe network integrated purging system and method
CN104595612A (en) Corrugated pipe expansion joint assembly capable of testing simultaneously
CN115372008A (en) Gas flow measuring device
CN217686701U (en) Cooling tower for treating high-temperature flue gas
CN204175344U (en) A kind of inlet cone of flue gas turbine expander and flue gas turbine expander
CN105318347B (en) Online maintenance device for fire detection probe of organic heat carrier furnace
CN205424248U (en) Removable bellows safety cover
CN106475367A (en) Purge the pipeline configuration of effect beneficial to postwelding
CN210045708U (en) Steam pipeline sweeps device of shooing
CN110242821B (en) Reinforcing method for gas pipeline plugging construction
CN204122423U (en) Low-pressure steam pipeline end blow device
CN113418205B (en) Blockage dredging device and method for coal conveying pipeline of boiler hearth feeding section
CN203642703U (en) Novel calcining kiln fume extractor
CN213452375U (en) Flange for oil and gas pipeline connection
CN209443236U (en) A kind of fume extractor of combustion gas ironing roller
CN110006061A (en) A kind of Chemical Manufacture jet chimney target practice device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant