CN106475370A - Facilitate implementation the pipeline configuration of postwelding purging - Google Patents
Facilitate implementation the pipeline configuration of postwelding purging Download PDFInfo
- Publication number
- CN106475370A CN106475370A CN201510545242.3A CN201510545242A CN106475370A CN 106475370 A CN106475370 A CN 106475370A CN 201510545242 A CN201510545242 A CN 201510545242A CN 106475370 A CN106475370 A CN 106475370A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pipeline section
- purging
- compressed gas
- postwelding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B7/00—Cleaning by methods not provided for in a single other subclass or a single group in this subclass
- B08B7/0007—Cleaning by methods not provided for in a single other subclass or a single group in this subclass by explosions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B9/00—Cleaning hollow articles by methods or apparatus specially adapted thereto
- B08B9/02—Cleaning pipes or tubes or systems of pipes or tubes
- B08B9/027—Cleaning the internal surfaces; Removal of blockages
- B08B9/032—Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing
- B08B9/0321—Cleaning the internal surfaces; Removal of blockages by the mechanical action of a moving fluid, e.g. by flushing using pressurised, pulsating or purging fluid
Abstract
The invention discloses a kind of pipeline configuration for facilitating implementation postwelding purging, including pipeline and by connecting pipe compressed gas source connected with pipeline, the pipeline is in series by multistage pipeline section, and be connected by adpting flange flange between pipeline section, air inlet is provided with each pipeline section, one end of connecting pipe is connected with the port of export of compressed gas source, the other end connects the air inlet on any one pipeline section, and blind plate is set between the adpting flange of the pipeline section side, rupture disk is set between the adpting flange of the pipeline section opposite side.The simple structure of this pipeline configuration, is convenient for duct segments purging, at the same low to air machinery traffic requirement during purging, while also having good purging effect.
Description
Technical field
The present invention relates to mechanical engineering pipeline construction technical field, more particularly to a kind of pipeline configuration for facilitating implementation postwelding purging.
Background technology
After equipment or process pipe are installed, before leak test pressure testing, all pipeline should be purged, so as to the iron filings, iron rust, welding slag and other debris that are clearly retained in equipment, pipeline, in order to avoid above debris blocking pipeline, damage valve and instrument with fluid during the use of pipeline, to ensure the safe handling of the equipment such as special installation, instrument, regulating valve, pump, filter, while the also quality beneficial to product.
The means for completing the purging of pipeline in prior art are usually washing, air purging, steam blowing and the cleaning of logical ball, above method is worked well when for small-caliber pipeline, when for big-diameter pipeline,, typically up to less than completing to purge the traffic requirement of required fluid media (medium), the time required to not only extending blowing pipeline in such cases, fluid device power consumption is big purges halfway disadvantage while often also having for conventional fluid device.
Content of the invention
For above-mentioned when for big-diameter pipeline, conventional fluid device is typically up to less than completing to purge the traffic requirement of required fluid media (medium), the time required to not only extending blowing pipeline in such cases, fluid device power consumption big while often there is the problem for purging halfway disadvantage, the invention provides a kind of pipeline configuration for facilitating implementation postwelding purging.
For the problems referred to above, the pipeline configuration for facilitating implementation postwelding purging of present invention offer reaches goal of the invention by following technical essential:Facilitate implementation the pipeline configuration of postwelding purging, including pipeline and by connecting pipe compressed gas source connected with pipeline, the pipeline is in series by multistage pipeline section, and be connected by adpting flange flange between pipeline section, air inlet is provided with each pipeline section, and one end of connecting pipe is connected with the port of export of compressed gas source, and the other end connects the air inlet on any one pipeline section, and blind plate is set between the adpting flange of the pipeline section side, rupture disk is set between the adpting flange of the pipeline section opposite side.
Specifically,In this programme,The compressed gas source of setting is used for being passed through compressed gas into pipeline to be purged,The rupture disk of setting and blind plate are used for sealing each section of pipeline section respectively,So,During compressed gas are passed through the pipeline section for being sealed,Internal pressure in the pipeline section is gradually increased,When the strength degree for meeting or exceeding rupture disk,When being its burst pressure,Rupture disk ruptures,In the pipeline section, gas is accused by its side for being provided with rupture disk and is overflowed at a high speed,Above procedure can cause gas in the pipeline section to spray with high flow velocity,While when rupture disk ruptures and fluid high-speed flowing makes the attached crop that the vibrations of generation are also helped in pipe by coming off on pipeline,Can be more effectively by outside the impurity exhaust conduit in pipeline,While the flow of the above compressed gas for being passed through the pipeline section is unrestricted,Existing more compressed gas source is satisfied by the requirement of this method,As centrifugal air compressor、Piston type air compressor、Root's blower、Gas cylinder etc..Be this structure provide pipeline can in any one section of pipeline section two sections be respectively provided with blind plate and rupture disk, to realize the subsection blowing of pipeline.
Further technical scheme is:
For ease of carrying out subsection blowing to pipeline, the compressed gas source is portable air compressor.
For the benefit of the rupture time of the Stress control of this device or anticipation rupture disk, is additionally provided with pressure gauge on the connecting pipe.
As a kind of be easy to draw materials, burst pressure is easy to adjust while beneficial to the explosion sheet form for reducing purging low cost, the rupture disk is highland barley paper or the bakelized paper of single or multiple lift.
The invention has the advantages that:
This apparatus structure is simple,The compressed gas source of setting is used for being passed through compressed gas into pipeline to be purged,The rupture disk of setting and blind plate are used for sealing each section of pipeline section respectively,So,During compressed gas are passed through the pipeline section for being sealed,Internal pressure in the pipeline section is gradually increased,When the strength degree for meeting or exceeding rupture disk,When being its burst pressure,Rupture disk ruptures,In the pipeline section, gas is accused by its side for being provided with rupture disk and is overflowed at a high speed,Above procedure can cause gas in the pipeline section to spray with high flow velocity,While when rupture disk ruptures and fluid high-speed flowing makes the attached crop that the vibrations of generation are also helped in pipe by coming off on pipeline,Can be more effectively by outside the impurity exhaust conduit in pipeline,While the flow of the above compressed gas for being passed through the pipeline section is unrestricted,Existing more compressed gas source is satisfied by the requirement of this method,As centrifugal air compressor、Piston type air compressor、Root's blower、Gas cylinder etc..I.e. above structure is particularly well-suited to be relatively large in diameter the pipeline longer with pipeline.
Description of the drawings
Fig. 1 is the structural representation of one specific embodiment of pipeline configuration for facilitating implementation postwelding purging of the present invention;
Mark in accompanying drawing is respectively:1st, compressed gas source, 2, pressure gauge, 3, connecting pipe, 4, the pipeline section, 5, rupture disk, 6, adpting flange, 7, air inlet.
Specific embodiment
With reference to embodiment, the present invention is described in further detail, but the structure of the present invention is not limited only to following examples.
Embodiment 1:
Facilitate implementation the pipeline configuration of postwelding purging, including pipeline 4 and by connecting pipe 3 and 4 connected compressed gas source 1 of pipeline, the pipeline 4 is in series by multistage pipeline section, and be connected by 6 flange of adpting flange between pipeline section, air inlet 7 is provided with each pipeline section, one end of connecting pipe 3 is connected with the port of export of compressed gas source 1, the other end connects the air inlet 7 on any one pipeline section, and blind plate is set between the adpting flange 6 of the pipeline section side, rupture disk 5 is set between the adpting flange 6 of the pipeline section opposite side.
Specifically,In this programme,The compressed gas source 1 of setting is used for being passed through compressed gas into pipeline 4 to be purged,The rupture disk 5 of setting and blind plate are used for sealing each section of pipeline section respectively,So,During compressed gas are passed through the pipeline section for being sealed,Internal pressure in the pipeline section is gradually increased,When the strength degree for meeting or exceeding rupture disk 5,When being its burst pressure,Rupture disk 5 ruptures,In the pipeline section, gas is accused by its side for being provided with rupture disk 5 and is overflowed at a high speed,Above procedure can cause gas in the pipeline section to spray with high flow velocity,While when rupture disk 5 ruptures and fluid high-speed flowing makes the attached crop that the vibrations of generation are also helped in pipe by coming off on pipeline 4,Can be more effectively by outside the impurity exhaust conduit in pipeline 4,While the flow of the above compressed gas for being passed through the pipeline section is unrestricted,Existing more compressed gas source 1 is satisfied by the requirement of this method,As centrifugal air compressor、Piston type air compressor、Root's blower、Gas cylinder etc..Be this structure provide pipeline 4 can in any one section of pipeline section two sections be respectively provided with blind plate and rupture disk 5, to realize the subsection blowing of pipeline 4.
In the present embodiment, above pipeline section is many tube weldings that is bought by producer and forms, and the length of single pipeline section is 500 meters.
Embodiment 2:
The present embodiment is further qualified on the basis of embodiment 1, and for ease of carrying out subsection blowing to pipeline 4, the compressed gas source 1 is portable air compressor.
For the benefit of the rupture time of the Stress control of this device or anticipation rupture disk 5, is additionally provided with pressure gauge 2 on the connecting pipe 3.
As a kind of be easy to draw materials, burst pressure is easy to adjust while beneficial to 5 form of rupture disk for reducing purging low cost, the rupture disk 5 is highland barley paper or the bakelized paper of single or multiple lift.
Above content is the further description that the present invention is made with reference to specific preferred embodiment, it is impossible to assert that the specific embodiment of the present invention is confined to these explanations.For general technical staff of the technical field of the invention, the other embodiment that draws under without departing from technical scheme, should be included in protection scope of the present invention.
Claims (4)
1. the pipeline configuration of postwelding purging is facilitated implementation, including pipeline(4)And pass through connecting pipe(3)With pipeline(4)Connected compressed gas source(1), it is characterised in that the pipeline(4)It is in series by multistage pipeline section, and between pipeline section, passes through adpting flange(6)Flange is connected, and is provided with air inlet on each pipeline section(7), connecting pipe(3)One end and compressed gas source(1)The port of export be connected, the other end connects the air inlet on any one pipeline section(7), and the adpting flange of the pipeline section side(6)Between arrange blind plate, the adpting flange of the pipeline section opposite side(6)Between arrange rupture disk(5).
2. according to claim 1 facilitate implementation postwelding purging pipeline configuration, it is characterised in that the compressed gas source(1)For portable air compressor.
3. according to claim 1 facilitate implementation postwelding purging pipeline configuration, it is characterised in that the connecting pipe(3)On be additionally provided with pressure gauge(2).
4. according to claim 1 facilitate implementation postwelding purging pipeline configuration, it is characterised in that the rupture disk(5)Highland barley paper or bakelized paper for single or multiple lift.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510545242.3A CN106475370A (en) | 2015-08-31 | 2015-08-31 | Facilitate implementation the pipeline configuration of postwelding purging |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510545242.3A CN106475370A (en) | 2015-08-31 | 2015-08-31 | Facilitate implementation the pipeline configuration of postwelding purging |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106475370A true CN106475370A (en) | 2017-03-08 |
Family
ID=58235136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510545242.3A Pending CN106475370A (en) | 2015-08-31 | 2015-08-31 | Facilitate implementation the pipeline configuration of postwelding purging |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106475370A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109550749A (en) * | 2018-10-12 | 2019-04-02 | 庄河市液压件厂 | A kind of hydraulic pipeline wash cycles technique |
CN111014196A (en) * | 2019-12-25 | 2020-04-17 | 中国海洋石油集团有限公司 | Continuous blasting and purging device for pipeline and blasting and purging method thereof |
WO2020225984A1 (en) * | 2019-05-07 | 2020-11-12 | 株式会社タクマ | Extraneous-matter removal device |
-
2015
- 2015-08-31 CN CN201510545242.3A patent/CN106475370A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109550749A (en) * | 2018-10-12 | 2019-04-02 | 庄河市液压件厂 | A kind of hydraulic pipeline wash cycles technique |
WO2020225984A1 (en) * | 2019-05-07 | 2020-11-12 | 株式会社タクマ | Extraneous-matter removal device |
JPWO2020225984A1 (en) * | 2019-05-07 | 2021-05-20 | 株式会社タクマ | Deposit remover |
JP2021113674A (en) * | 2019-05-07 | 2021-08-05 | 株式会社タクマ | Adhesion matter removing device and adhesion matter removing method |
JP7157844B2 (en) | 2019-05-07 | 2022-10-20 | 株式会社タクマ | Deposit removing device and deposit removing method |
CN111014196A (en) * | 2019-12-25 | 2020-04-17 | 中国海洋石油集团有限公司 | Continuous blasting and purging device for pipeline and blasting and purging method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6845635B2 (en) | How to detect leaks in the fuel circuit of a gas turbine fuel supply system | |
CN106475370A (en) | Facilitate implementation the pipeline configuration of postwelding purging | |
CN207204785U (en) | A kind of gas circuit purging system | |
CN207095802U (en) | The instrument that a kind of valve blowdown leak detection lengthens | |
CN106475367A (en) | Purge the pipeline configuration of effect beneficial to postwelding | |
CN106475368A (en) | Device for blowing pipeline | |
CN106475372A (en) | Blowing method of pipeline | |
CN203820812U (en) | Device for repairing copper cooling stave of blast furnace | |
CN206300758U (en) | One kind tube bank pressure test leak-detecting device | |
CN206132329U (en) | Gasbag solenoid valve detection device | |
CN106475366A (en) | Method beneficial to impurity cleaning effect in pipe after the completion of Pipe installing | |
CN205191037U (en) | Inhale oil pipe way for testing platform | |
CN106475369A (en) | The blowing method of pipeline to source of the gas requirement can be reduced | |
CN207087491U (en) | A kind of osculum path length straight tube endoporus overlap sanding apparatus | |
CN107327319B (en) | The Quick steam blowing method and device of steam turbine admission line | |
CN106475371A (en) | Can reduce to for blowing pipeline supplemental equipment requirement method | |
CN202065609U (en) | Leakage-stopping device for pressurized pipeline | |
CN205719551U (en) | A kind of big flux gas sources system | |
CN205593697U (en) | Novel gaseous phase differential pressure measurement device | |
Zhang et al. | Analysis of aircraft hydraulic system failures | |
CN207064816U (en) | A kind of natural gas valve blowdown air releasing silencer | |
CN107096771A (en) | A kind of ship pipeline compressed air is purged automatically, inspection method | |
CN207598456U (en) | A kind of duct type active flow pulsation damping device for large reciprocating compressor | |
CN207486276U (en) | A kind of vacuum sealing flange | |
CN205423107U (en) | Gas column resonance disease -prevention institutions of compressor pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |