CN103196641A - Hot-blast stove leakproofness pressure test method - Google Patents

Hot-blast stove leakproofness pressure test method Download PDF

Info

Publication number
CN103196641A
CN103196641A CN2013101051608A CN201310105160A CN103196641A CN 103196641 A CN103196641 A CN 103196641A CN 2013101051608 A CN2013101051608 A CN 2013101051608A CN 201310105160 A CN201310105160 A CN 201310105160A CN 103196641 A CN103196641 A CN 103196641A
Authority
CN
China
Prior art keywords
blind plate
pressure
warm
pipe
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101051608A
Other languages
Chinese (zh)
Inventor
房政
施光涛
周金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2013101051608A priority Critical patent/CN103196641A/en
Publication of CN103196641A publication Critical patent/CN103196641A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

Provided is a hot-blast stove leakproofness pressure test method. A cold air pipe blind plate and a hot air pipe blind plate are manufactured, and then an air inlet pipe and an air discharge pipe are arranged on the cold air pipe blind plate in a holing mode. A cold air pipe and a hot air pipe which are connected with a shell are installed on the position of a first valve. An air source pipe is connected with the air inlet pipe on the blind plate, an air inlet ball valve is opened, pressure rises to 50 percent of test pressure slowly and maintained, meanwhile, a hot-blast stove is checked, if the hot-blast stove is checked to be error-free, the pressure rises continuously step by step according to 10 percent of the test pressure, pressure stabilization is carried out on each step for 5 minutes, when the pressure reaches the test pressure, the pressure is maintained for 15 minutes, then the pressure is reduced to work pressure and maintained for 30 minutes, meanwhile, the hot-blast stove is checked, and if deformation and air leakage do not occur, the hot-blast stove is qualified. After the hot-blast stove is qualified through pressure tests, a ball valve on the air discharge pipe on the blind plate is opened. The hot-blast stove leakproofness pressure test method is simple to operate, convenient to construct and high in pressure test efficiency, shortens hot-blast stove leakproofness pressure test time greatly, creates conditions for building and constructing of hot-blast stoves, shortens a construction period and lowers cost.

Description

A kind of heat generator tightness pressure-measuring method
Technical field
The present invention relates to bulk container tightness pressure test technology field, is a kind of heat generator tightness pressure-measuring method specifically, is particularly useful for bulky housings tightness pressure testings such as heat generator.
Background technology
In the existing metallurgical construction, hot blast stove system is the important process system that matches with blast furnace, the work pressure test of carrying out hot blast stove system is to satisfy the design and use requirement, guarantee that heat generator normally moves when putting into production, avoid because of gas leak influence safety in production, cause casualties and necessity work of economic loss.
Summary of the invention
Purpose of the present invention will overcome the above problems exactly, and a kind of heat generator tightness pressure-measuring method is provided, and can guarantee quality, can shorten the pressure testing time again, reduces cost.
Technical scheme of the present invention is achieved like this: a kind of heat generator tightness pressure-measuring method, be characterized in: make its corresponding cool air hose blind plate and warm-air pipe blind plate according to the cool air hose flange that is connected with the heat generator housing and the size of warm-air pipe flange earlier, cool air hose blind plate and warm-air pipe blind plate are made of δ 16mm steel plate, the end face of cool air hose blind plate and warm-air pipe blind plate carries out grid with δ 14mm gusset and reinforces, open two holes at the cool air hose blind plate again DN25 draft tube and DN50 bleeder pipe are set, 0.4Mpa tensimeter and the DN25 ball valve of assay approval are set on the DN25 draft tube, the DN50 ball valve is set on the DN50 blowdown piping; Cool air hose, the warm-air pipe that will be connected with housing 1 is mounted to first valve location then, treat cool air hose flange, warm-air pipe flange respectively with cool air hose, warm-air pipe firm welding after, cold air duct blind plate, its corresponding flange of hot air duct blind plate made are connected with bolt, and cool air hose flange, warm-air pipe flange are used bolted respectively and after adding the graphite packing between cool air hose blind plate, warm-air pipe blind plate; The hot air duct top is established the tensimeter of an assay approval 0.4Mpa in addition; The source of the gas pipe is connected with DN25 draft tube on the blind plate, open air inlet DN25 ball valve, slowly rise to 50% of test pressure, keep-up pressure and check, confirm that errorless back continues to boost step by step by 10% of test pressure, every grade of voltage stabilizing 5 minutes reached the test pressure pressurize 15 minutes, check not have distortion, do not have gas leakage for qualified being down to the working pressure pressurize after 30 minutes; After treating that pressure testing is qualified, open the DN50 ball valve on the blowdown piping on the blind plate, thereby realize the pressure testing of heat generator tightness; Heat generator tightness pressure-measuring method carries out as follows:
The first step, make blind plate, the turnover feed channel is set: make its corresponding blind plate according to the cool air hose that is connected with heat generator housing 1 and the flange size of warm-air pipe earlier, two blind plates are all made of δ 16mm steel plate, the blind plate end face all carries out grid with δ 14mm gusset and reinforces, perforate arranges DN25 draft tube 7 and DN50 bleeder pipe 8 on the cold air duct blind plate again, 0.4Mpa tensimeter 5 and the DN25 ball valve 6 of assay approval are set on the air inlet pipeline, DN50 ball valve 9 is set on the blowdown piping;
Second step, blind plate is installed: cool air hose 2, the warm-air pipe 10 that will be connected with housing 1 are mounted to first valve location, after treating cool air hose flange 3, warm-air pipe flange 11 and cool air hose 2, warm-air pipe 10 firm welding, cool air hose blind plate 4, the warm-air pipe blind plate 12 its corresponding flanges made are connected with bolt, and cool air hose flange 3, warm-air pipe flange 11 add fastening bolt behind the graphite packing with cool air hose blind plate 4,12 of warm-air pipe blind plates respectively.Hot air duct 10 tops are established the tensimeter 13 of an assay approval 0.4Mpa in addition;
The 3rd step, tightness pressure testing: the source of the gas pipe is connected with draft tube 7 on the blind plate, open air intake valve 6, slowly rise to 50% of test pressure, keep-uping pressure checks, confirms that errorless back continues to boost step by step by 10% of test pressure, every grade of voltage stabilizing 5 minutes, reached the test pressure pressurize 15 minutes, and checked after 30 minutes being down to the working pressure pressurize, do not have distortion, do not have gas leakage for qualified; After treating that pressure testing is qualified, open the DN50 ball valve 9 of blowdown piping on the blind plate, thereby realize the pressure testing of heat generator tightness.
The present invention is simple to operate, easy construction, and pressure testing efficient height has shortened the heat generator tightness pressure testing time greatly, has created condition for the heat generator building construction, has shortened the duration, has reduced cost.
Description of drawings
Fig. 1 is heat generator pressure testing elevation drawing.
Among the figure: 1, heat generator housing 2, cool air hose 3, cool air hose flange 4, cool air hose blind plate 5, tensimeter 6, DN25 ball valve 7, DN25 draft tube 8, DN50 bleeder pipe 9, DN50 ball valve 10, warm-air pipe 11, warm-air pipe flange 12, warm-air pipe blind plate 13, tensimeter.
Embodiment
As shown in Figure 1, the present invention makes its corresponding cool air hose blind plate 4 and warm-air pipe blind plate 12 according to the cool air hose flange 3 that is connected with heat generator housing 1 and the size of warm-air pipe flange 11 earlier, cool air hose blind plate 4 and warm-air pipe blind plate 12 usefulness δ 16mm steel plates are made, the end face of cool air hose blind plate 4 and warm-air pipe blind plate 12 carries out grid with δ 14mm gusset and reinforces, open two holes at cool air hose blind plate 4 again DN25 draft tube 7 and DN50 bleeder pipe 8 are set, 0.4Mpa tensimeter 5 and the DN25 ball valve 6 of assay approval are set on the DN25 draft tube 7, DN50 ball valve 9 is set on the DN50 blowdown piping 8.Cool air hose 2, the warm-air pipe 10 that will be connected with housing 1 is mounted to first valve location then, treat cool air hose flange 3, warm-air pipe flange 11 respectively with cool air hose 2, warm-air pipe 10 firm welding after, cold air duct blind plate 4, the hot air duct blind plate 12 its corresponding flanges made are connected with bolt, cool air hose flange 3, warm-air pipe flange 11 respectively and cool air hose blind plate 4,12 of warm-air pipe blind plates use bolted after adding the graphite packing.Hot air duct 10 tops are established the tensimeter 13 of an assay approval 0.4Mpa in addition.The source of the gas pipe is connected with DN25 draft tube 7 on the blind plate, open air inlet DN25 ball valve 6, slowly rise to 50% of test pressure, keep-up pressure and check, confirm that errorless back continues to boost step by step by 10% of test pressure, every grade of voltage stabilizing 5 minutes reached the test pressure pressurize 15 minutes, check not have distortion, do not have gas leakage for qualified being down to the working pressure pressurize after 30 minutes; After treating that pressure testing is qualified, open the DN50 ball valve 9 on the blowdown piping on the blind plate, thereby realize the pressure testing of heat generator tightness.
Heat generator tightness pressure-measuring method carries out as follows:
The first step is made blind plate, the turnover feed channel is set.Make its corresponding blind plate according to the cool air hose that is connected with heat generator housing 1 and the flange size of warm-air pipe earlier, two blind plates are all made of δ 16mm steel plate, the blind plate end face all carries out grid with δ 14mm gusset and reinforces, perforate arranges DN25 draft tube 7 and DN50 bleeder pipe 8 on the cold air duct blind plate again, 0.4Mpa tensimeter 5 and the DN25 ball valve 6 of assay approval are set on the air inlet pipeline, DN50 ball valve 9 is set on the blowdown piping.
In second step, blind plate is installed.Cool air hose 2, the warm-air pipe 10 that will be connected with housing 1 are mounted to first valve location, after treating cool air hose flange 3, warm-air pipe flange 11 and cool air hose 2, warm-air pipe 10 firm welding, cool air hose blind plate 4, the warm-air pipe blind plate 12 its corresponding flanges made are connected with bolt, and cool air hose flange 3, warm-air pipe flange 11 add fastening bolt behind the graphite packing with cool air hose blind plate 4,12 of warm-air pipe blind plates respectively.Hot air duct 10 tops are established the tensimeter 13 of an assay approval 0.4Mpa in addition.
The 3rd step, the tightness pressure testing.The source of the gas pipe is connected with draft tube 7 on the blind plate, open air intake valve 6, slowly rise to 50% of test pressure, keep-up pressure and check, confirm that errorless back continues to boost step by step by 10% of test pressure, every grade of voltage stabilizing 5 minutes reached the test pressure pressurize 15 minutes, check not have distortion, do not have gas leakage for qualified being down to the working pressure pressurize after 30 minutes; After treating that pressure testing is qualified, open the DN50 ball valve 9 of blowdown piping on the blind plate, thereby realize the pressure testing of heat generator tightness.

Claims (1)

1. heat generator tightness pressure-measuring method, it is characterized in that: make its corresponding cool air hose blind plate and warm-air pipe blind plate according to the cool air hose flange that is connected with the heat generator housing and the size of warm-air pipe flange earlier, cool air hose blind plate and warm-air pipe blind plate are made of δ 16mm steel plate, the end face of cool air hose blind plate and warm-air pipe blind plate carries out grid with δ 14mm gusset and reinforces, open two holes at the cool air hose blind plate again DN25 draft tube and DN50 bleeder pipe are set, 0.4Mpa tensimeter 5 and the DN25 ball valve of assay approval are set on the DN25 draft tube, the DN50 ball valve is set on the DN50 blowdown piping; Cool air hose, the warm-air pipe that will be connected with housing is mounted to first valve location then, treat cool air hose flange, warm-air pipe flange respectively with cool air hose, warm-air pipe firm welding after, cold air duct blind plate, its corresponding flange of hot air duct blind plate made are connected with bolt, and cool air hose flange, warm-air pipe flange are used bolted respectively and after adding the graphite packing between cool air hose blind plate, warm-air pipe blind plate; The hot air duct top is established the tensimeter of an assay approval 0.4Mpa in addition; The source of the gas pipe is connected with DN25 draft tube on the blind plate, open air inlet DN25 ball valve, slowly rise to 50% of test pressure, keep-up pressure and check, confirm that errorless back continues to boost step by step by 10% of test pressure, every grade of voltage stabilizing 5 minutes reached the test pressure pressurize 15 minutes, check not have distortion, do not have gas leakage for qualified being down to the working pressure pressurize after 30 minutes; After treating that pressure testing is qualified, open the DN50 ball valve 9 on the blowdown piping on the blind plate, thereby realize the pressure testing of heat generator tightness; Heat generator tightness pressure-measuring method carries out as follows:
The first step, make blind plate, the turnover feed channel is set: make its corresponding blind plate according to the cool air hose that is connected with the heat generator housing and the flange size of warm-air pipe earlier, two blind plates are all made of δ 16mm steel plate, the blind plate end face all carries out grid with δ 14mm gusset and reinforces, perforate arranges DN25 draft tube and DN50 bleeder pipe on the cold air duct blind plate again, 0.4Mpa tensimeter and the DN25 ball valve of assay approval are set on the air inlet pipeline, the DN50 ball valve is set on the blowdown piping;
Second step, blind plate is installed: cool air hose, the warm-air pipe that will be connected with housing are mounted to first valve location, after treating cool air hose flange, warm-air pipe flange and cool air hose, warm-air pipe firm welding, cool air hose blind plate, its corresponding flange of warm-air pipe blind plate made are connected with bolt, cool air hose flange, warm-air pipe flange respectively and add fastening bolt behind the graphite packing between cool air hose blind plate, warm-air pipe blind plate, the hot air duct top is established the tensimeter of an assay approval 0.4Mpa in addition;
The 3rd step, tightness pressure testing: the source of the gas pipe is connected with draft tube on the blind plate, open air intake valve, slowly rise to 50% of test pressure, keep-uping pressure checks, confirms that errorless back continues to boost step by step by 10% of test pressure, every grade of voltage stabilizing 5 minutes, reached the test pressure pressurize 15 minutes, and checked after 30 minutes being down to the working pressure pressurize, do not have distortion, do not have gas leakage for qualified; After treating that pressure testing is qualified, open the DN50 ball valve of blowdown piping on the blind plate, thereby realize the pressure testing of heat generator tightness.
CN2013101051608A 2013-03-29 2013-03-29 Hot-blast stove leakproofness pressure test method Pending CN103196641A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101051608A CN103196641A (en) 2013-03-29 2013-03-29 Hot-blast stove leakproofness pressure test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101051608A CN103196641A (en) 2013-03-29 2013-03-29 Hot-blast stove leakproofness pressure test method

Publications (1)

Publication Number Publication Date
CN103196641A true CN103196641A (en) 2013-07-10

Family

ID=48719335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101051608A Pending CN103196641A (en) 2013-03-29 2013-03-29 Hot-blast stove leakproofness pressure test method

Country Status (1)

Country Link
CN (1) CN103196641A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110231150A (en) * 2018-03-06 2019-09-13 兰州兰石重型装备股份有限公司 A kind of pressure-measuring method of pressure container flange and companion flange
CN110887613A (en) * 2019-12-06 2020-03-17 华能山东石岛湾核电有限公司 Sealing detection method for air pressure test of large pressure container
CN112484930A (en) * 2020-12-21 2021-03-12 山东钢铁集团日照有限公司 Method for testing air tightness before blow-in of blast furnace

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0634479A (en) * 1992-07-16 1994-02-08 Toshiba Ceramics Co Ltd Method and device for detecting gas leak from heat-treatment furnace for semiconductor
CN1916188A (en) * 2005-08-17 2007-02-21 山东省冶金设计院 Hot blast furnace with mixed burner at top part
CN101403657A (en) * 2008-11-07 2009-04-08 南京市锅炉压力容器检验研究院 Calibration apparatus and method for ultra-high pressure safety valve
CN102384827A (en) * 2011-11-23 2012-03-21 安徽淮化股份有限公司 Leak detection device for U-shaped waste heat boiler pipe column
CN102445313A (en) * 2010-10-11 2012-05-09 五冶集团上海有限公司 Pressure testing device and method for coke oven heating gas pipeline
CN202614488U (en) * 2012-06-01 2012-12-19 中国十七冶集团有限公司 Pressure testing device for valve of blast-furnace hot blast stove system
CN102954862A (en) * 2011-08-29 2013-03-06 宝山钢铁股份有限公司 Detection device and detection method for furnace body leakage of continuous hydrogen protection annealing furnace

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0634479A (en) * 1992-07-16 1994-02-08 Toshiba Ceramics Co Ltd Method and device for detecting gas leak from heat-treatment furnace for semiconductor
CN1916188A (en) * 2005-08-17 2007-02-21 山东省冶金设计院 Hot blast furnace with mixed burner at top part
CN101403657A (en) * 2008-11-07 2009-04-08 南京市锅炉压力容器检验研究院 Calibration apparatus and method for ultra-high pressure safety valve
CN102445313A (en) * 2010-10-11 2012-05-09 五冶集团上海有限公司 Pressure testing device and method for coke oven heating gas pipeline
CN102954862A (en) * 2011-08-29 2013-03-06 宝山钢铁股份有限公司 Detection device and detection method for furnace body leakage of continuous hydrogen protection annealing furnace
CN102384827A (en) * 2011-11-23 2012-03-21 安徽淮化股份有限公司 Leak detection device for U-shaped waste heat boiler pipe column
CN202614488U (en) * 2012-06-01 2012-12-19 中国十七冶集团有限公司 Pressure testing device for valve of blast-furnace hot blast stove system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡广魁等: "《冷轧连续退火炉密闭性的检测与分析》", 《宝钢技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110231150A (en) * 2018-03-06 2019-09-13 兰州兰石重型装备股份有限公司 A kind of pressure-measuring method of pressure container flange and companion flange
CN110887613A (en) * 2019-12-06 2020-03-17 华能山东石岛湾核电有限公司 Sealing detection method for air pressure test of large pressure container
CN112484930A (en) * 2020-12-21 2021-03-12 山东钢铁集团日照有限公司 Method for testing air tightness before blow-in of blast furnace

Similar Documents

Publication Publication Date Title
CN103196641A (en) Hot-blast stove leakproofness pressure test method
CN105736945A (en) Method for dual-coke-oven grid-connected steam blowing of single main steam pipe and targeting inspection
CN204933585U (en) Block-resistant type low speed coal mill ball adding device
CN103512711A (en) Normalizing annealing furnace airtightness test method
CN109000856A (en) A kind of air seal test method being segmented leak detection, whole pressure testing
CN103257019A (en) Air tightness detecting method for sinter boiler type cooling waste heat recovery system
CN106898393B (en) A kind of main pump hydraulic component static pressure test two, three-level seal simulator
CN204628880U (en) A kind of magnetic control for low-pressure gas pipeline is explosion-proof to be flexible coupling
CN207608569U (en) A kind of online plugging device for replacing blast furnace bucket pressure equalizing blow off valve
CN205745852U (en) temporary pipeline plugging device
CN101463401B (en) Method for detecting hermeticity of blast furnace bucket rubber ring
CN202092319U (en) Spring type explosion preventing door of heating furnace
CN101818220A (en) Blast-furnace gas heating-up system
CN101880026B (en) Ammonia decomposition device
CN202204654U (en) Water-cooled direct-connected gas-tight motor offline seal detection device
CN208594307U (en) A kind of dedicated connecting flange of blast furnace air supply system
CN206396267U (en) A kind of blast furnace gas pipeline leakage repairing device
CN203333692U (en) Inner leakage check device for valve body
CN102313470B (en) Cast plate fin air preheater
CN105586461A (en) Purging device and purging method for gas pipeline of hot blast stove
CN201746315U (en) Ammonia decomposition device
CN202229634U (en) Cast-plate-fin air preheater
CN205398664U (en) Hot -blast furnace gas pipeline sweeps device
CN102974177A (en) Heat compensation device for high-temperature bag dust remover pulse spraying system
CN204502419U (en) A kind of reboiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130710