CN202611264U - Device for straightening electrified tower - Google Patents

Device for straightening electrified tower Download PDF

Info

Publication number
CN202611264U
CN202611264U CN 201220219678 CN201220219678U CN202611264U CN 202611264 U CN202611264 U CN 202611264U CN 201220219678 CN201220219678 CN 201220219678 CN 201220219678 U CN201220219678 U CN 201220219678U CN 202611264 U CN202611264 U CN 202611264U
Authority
CN
China
Prior art keywords
wire rope
tower
fixed
hand
spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220219678
Other languages
Chinese (zh)
Inventor
孟凡辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220219678 priority Critical patent/CN202611264U/en
Application granted granted Critical
Publication of CN202611264U publication Critical patent/CN202611264U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a device for straightening an electrified tower, in particular to a device for correcting and straightening an inclined power transmission tower with charges in a power system. According to the device, a clamping ring is fixed at the end of an adjustable steel wire rope connected with a hand-operated dragging machine; the end fixed with the steel wire rope is fixed with 2 to 4 helical drill rods; and every two adjacent helical drill rods are fixedly connected through a pull rod. Under the working force of the helical drill rods and the pull rods, the end, which is fixed with the steel wire rope, of the hand-operated dragging machine is effectively fixed; and the tower can be dragged and straightened by the adjustable steel wire rope dragged by the hand-operated dragging machine. The work can be finished by only three workers, and a first-stage cement pole can be straightened by 30 minutes; the device cannot be limited by a construction environment; the tower and wires cannot be damaged; and the device has the advantages of simple structure, convenience in use and carrying, electrified construction, economy, practicability, suitability for popularization and the like.

Description

Charged shaft tower erection device
Technical fieldThis is practical to relate to a kind of erection device, especially relates to a kind of erection device that the electric pole that tilts is rectified a deviation and set upright.
Background technologyMoving millions of kilometers high-low pressure transmission line of electricity in China's power industry.Owing to multiple reasons such as geology, construction technology through the inclination that regular meeting causes some shaft towers, will bring great potential safety hazard to the safe operation of circuit like untimely processing.Handled this kind correction to set upright the work standard practice all be that the back that has a power failure is set upright with crane, index car etc. in the past, and this conventional way drawback is that expense is excessive, and the equipment gait of march is slow, and the power off time that causes is long.Aspect electricity sales amount, bring loss promptly for electric power enterprise, bring the not convenient of the economic loss that to estimate and life to power consumer again.
Summary of the inventionThe purpose of the utility model is to provide a kind of charged shaft tower erection device; Mainly be to set upright necessary power failure operation in order to solve existing shaft tower; The main equipment gait of march is slow, and long expense of activity duration is high and bring the problem of economic loss and inconvenience for electric power enterprise and user.
The scheme of the utility model is described below: this utility model comprises that hand pulls tractor, adjustable wire rope, fixing wire rope; It is the fixing snap ring in end through pulling the adjustable wire rope that tractor connects at hand; It fixedly connects fixedly spiral pricker in the end of wire rope; Said spiral pricker is 2-4, is fixedly connected realization by pull bar between every adjacent two spiral prickers.
Described spiral pricker middle part is respectively equipped with the spanner that symmetrical expression handle bar constitutes with the top, is gradually thin helical structure below the spanner of middle part.
Described pull bar is on the bar adjustable member to be set, two ends be respectively equipped with the spiral pricker on the connecting rod of the corresponding buckle of handle bar.
This utility model is owing to taked said structure, and the active force of spiral pricker capable of using and pull bar is pulled tractor with hand, and fixedly wire rope is effectively fixing, and pulls adjustable wire rope that tractor affects through hand and shaft tower is drawn set upright, and reliably realizes goal of the invention.This operation only needs three people; Just can set upright the one-level cement pole in 30 minutes and finish, the common laborer just can operate, and device one-time investment cost is lower; Operate and almost do not have the expense generation; To shaft tower and lead not damaged, and standard practice is set upright every grade of shaft tower and all must be surpassed thousand yuan, and this directly loss with indirect that is also not very brought because of having a power failure is also quite big.Even and for extreme terrain find out the high price, equipment also can't be near construction, this device is not limited by construction environment, has the very big advantage of execute-in-place aspect.Also have simple in structure, easy to use, livewire work, economical and practical, easy to carry, be fit to advantage such as popularization.
Description of drawingsFig. 1 is charged shaft tower erection device mounting structure sketch map;
Fig. 2 is charged shaft tower erection device spiral pricker front view;
Fig. 3 is charged shaft tower erection device spiral pricker vertical view.
The specific embodimentBy Fig. 1-charged shaft tower erection device shown in Figure 3 is a kind of new product of developing in the work progress at the scene.It utilizes hand to pull tractor 1; One end connects adjustable wire rope 2; The other end connects fixedly wire rope 3, and at adjustable steel wire end fixed card ring 4, and fixedly steel cord ends and spiral pricker 5 are fixed; Said spiral pricker 5 middle parts and top are respectively equipped with the spanner that symmetrical expression cross handle bar 7 constitutes, and are gradually thin helical structure below the spanner of middle part.Said spiral pricker 5 is two-four, is fixedly connected through pull bar 6 between every adjacent two spiral prickers 5.Described pull bar 6 is on the bar adjustable member 8 to be set, two ends be respectively equipped with spiral pricker 5 on the connecting rod of handle bar 7 corresponding buckles.
When using this device that the inclination shaft tower is set upright operation; At first a conical pit is dug at 30cm place, ground around shaft tower; The first pricker spiral pricker 5 that will be connected with fixing wire rope 3 tilts to screw in underground through spanner; Two other is second, third spiral pricker 5 to draw back the certain distance screw-in by same angle of inclination again, and the set handle bar 7 corresponding buckles with on the spiral pricker 5 tiltedly draw two adjacent spiral prickers 5 fixing through pull bar 6 two ends then.And at three spiral pricker 5 middle parts formation origin of force.The fixing snap ring 4 of adjustable steel wire end of hand being pulled the connection of tractor 1 one ends is fastened on the shaft tower, moves hand with hand and pulls tractor 1, slowly spurs adjustable wire rope 2, can set upright the shaft tower tension.Filling out compacting to the hole at last gets final product.

Claims (3)

1. charged shaft tower erection device; Comprise that hand pulls tractor (1), adjustable wire rope (2), fixing wire rope (3); It is characterized in that: adjustable wire rope (2) end of pulling tractor (1) connection at hand is fixed with snap ring (4); It fixedly connects fixedly spiral pricker (5) in wire rope (3) end, and said spiral pricker (5) is two to four, and is fixing by pull bar (6) between every adjacent two spiral prickers (5).
2. charged shaft tower erection device according to claim 1 is characterized in that: described spiral pricker (5) middle part is respectively equipped with the spanner that symmetrical expression handle bar (7) constitutes with the top, is gradually thin helical structure below the spanner of middle part.
3. charged shaft tower erection device according to claim 1 is characterized in that: described pull bar (6) is on the bar adjustable member (8) to be set, two ends be respectively equipped with spiral pricker (5) on the connecting rod of the corresponding buckle of handle bar (7).
CN 201220219678 2012-05-16 2012-05-16 Device for straightening electrified tower Expired - Fee Related CN202611264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220219678 CN202611264U (en) 2012-05-16 2012-05-16 Device for straightening electrified tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220219678 CN202611264U (en) 2012-05-16 2012-05-16 Device for straightening electrified tower

Publications (1)

Publication Number Publication Date
CN202611264U true CN202611264U (en) 2012-12-19

Family

ID=47344974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220219678 Expired - Fee Related CN202611264U (en) 2012-05-16 2012-05-16 Device for straightening electrified tower

Country Status (1)

Country Link
CN (1) CN202611264U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422680A (en) * 2012-05-16 2013-12-04 孟凡辉 Electrified pole and tower righting device and operation method thereof
CN103437385A (en) * 2013-08-21 2013-12-11 国家电网公司 Transmission iron tower tilt rectification method
CN111561215A (en) * 2020-05-29 2020-08-21 国网河南省电力公司桐柏县供电公司 Telegraph pole support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103422680A (en) * 2012-05-16 2013-12-04 孟凡辉 Electrified pole and tower righting device and operation method thereof
CN103422680B (en) * 2012-05-16 2015-12-02 孟凡辉 Charged shaft tower erection device is used charged shaft tower to be carried out to the method for righting
CN103437385A (en) * 2013-08-21 2013-12-11 国家电网公司 Transmission iron tower tilt rectification method
CN103437385B (en) * 2013-08-21 2016-03-30 国家电网公司 A kind of transmission iron tower tilt rectification
CN111561215A (en) * 2020-05-29 2020-08-21 国网河南省电力公司桐柏县供电公司 Telegraph pole support

Similar Documents

Publication Publication Date Title
CN103422680B (en) Charged shaft tower erection device is used charged shaft tower to be carried out to the method for righting
CN202611264U (en) Device for straightening electrified tower
CN103663301B (en) Inclined nacelle device in a kind of
CN201933828U (en) Stay wire making tool
CN202495706U (en) Electrified installation tool for double split conductor spacer
CN204886018U (en) Intraductal area silk device of wearing of building electrical engineering
CN205124571U (en) A directional auxiliary protection instrument for cutting tree
CN105234916A (en) Mobile type comprehensive storage device for safety tools and instruments
CN201413967Y (en) Roller device capable of preventing abrasion of conducting wires in stringing of power transmission and distribution project
CN204001927U (en) The power transmission steel pipe tower cross-arm handle that strides
CN204435374U (en) A kind of simple and easy earth anchor
CN202888771U (en) Simple and easy cable wire barrow
CN102522718A (en) Method for cable to penetrate into protection tube by using Dyneema rope
CN203922566U (en) Multi-functional high-rise working suspension rope
CN209571765U (en) A kind of auxiliary on-hook of Multifunctional cable
CN103001148A (en) Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor
CN203813326U (en) Wire bending machine
CN103683132B (en) The damaged insulating barrier restorative procedure of transmission pressure
CN202534991U (en) Universal balance board for cable laying
CN207293834U (en) A kind of low-voltage cable take-up and pay-off device
CN205151553U (en) Current collection dolly
CN201778525U (en) Novel pole
CN204089035U (en) A kind of transmission line pole tower ascent aid
CN101915005A (en) Novel electric pole
CN207459581U (en) The pre-buried cable trolley of earth's surface

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121219

Termination date: 20130516