CN103422680A - Electrified pole and tower righting device and operation method thereof - Google Patents

Electrified pole and tower righting device and operation method thereof Download PDF

Info

Publication number
CN103422680A
CN103422680A CN2012101515260A CN201210151526A CN103422680A CN 103422680 A CN103422680 A CN 103422680A CN 2012101515260 A CN2012101515260 A CN 2012101515260A CN 201210151526 A CN201210151526 A CN 201210151526A CN 103422680 A CN103422680 A CN 103422680A
Authority
CN
China
Prior art keywords
spiral
wire rope
pricker
shaft tower
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101515260A
Other languages
Chinese (zh)
Other versions
CN103422680B (en
Inventor
孟凡辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210151526.0A priority Critical patent/CN103422680B/en
Publication of CN103422680A publication Critical patent/CN103422680A/en
Application granted granted Critical
Publication of CN103422680B publication Critical patent/CN103422680B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an electrified pole and tower righting device and an operation method thereof. The device is characterized in that a clamp ring is fixed at the end of an adjustable steel wire rope connected with a hand-operated traction machine, 2-4 spiral drill rods are connected to the end of a fixed steel wire rope, and every two adjacent spiral drill rods are fixed with each other through a pull rod. The operation method includes: digging a reserved pit, rotating the spiral drill rods, fixing the pull rods, fixedly sleeving the clamp ring, traction and righting, and filling the reserved hole and tamping. The fixed steel wire rope of the hand-operated traction machine can be fixed effectively by the aid of the acting force of the spiral drill rods and the pull rods, and the pole and tower can be righted by the hand-operated traction machine's traction of the adjustable steel wire rope. A primary concrete pole can be righted in 30 minutes. The device has the advantages that the device is low in one-time investment, free of damages to the pole and tower and wires, unlimited by construction environments, short in operation time, simple in structure, convenient to use, capable of electrified operation, loss reducing, economical and practical, flexible to operate, easy to carry, highly adaptable, suitable for popularization, and the like.

Description

Charged shaft tower erection device and method of operating thereof
Technical fieldThe present invention relates to a kind of shaft tower erection device, especially relate to a kind of shaft tower erection device to the charged righting of being rectified a deviation of inclination transmission tower, the invention still further relates to the operation using method of this device.
Background technologyIn China, power industry is being moved the high-low pressure transmission line of electricity of millions of kilometers.Because the many reasons such as geology, construction technology often can cause the inclination of some shaft towers, as processed and will bring great potential safety hazard to the safe operation of circuit not in time.Processed this kind of correction righting work standard practice is all to carry out righting with crane, index car etc. after having a power failure in the past, and this conventional way equipment gait of march is slow, and the power off time caused is long.Aspect electricity sales amount, bring loss to electric power enterprise, bring the not convenient of the economic loss that can't estimate and life to power consumer again.Moreover, expend fund large, the expense of every grade of shaft tower of a righting all surpasses thousand yuan, even and for extreme terrain find out the high price, crane equipment also can't near the construction.
Summary of the inventionThe object of the present invention is to provide a kind of charged shaft tower erection device and method of operating thereof, mainly in order to solve the necessary power failure operation of existing shaft tower righting, the main equipment gait of march is slow, activity duration is long, expense is high, is subject to the construction environment restriction and brings economic loss and the inconvenient problem of life to electric power enterprise and user.
Charged shaft tower erection device of the present invention, comprise that hand pulls tractor, adjustable steel wire rope, fixing wire rope, it is that end by pull the adjustable steel wire rope that tractor connects at hand is fixed with snap ring, it fixedly is connected and fixed the spiral pricker in the end of wire rope, described spiral pricker is 2-4, between every adjacent two spiral prickers, by pull bar, is fixedly connected with.
Method of operating of the present invention by digging reserved hole, revolve the spiral pricker, steady brace, admittedly overlap snap ring, traction righting, the processing steps in sequence of filling out the hole compacting forms.
The present invention is due to the device of having taked the above structure and method of operating,, fixedly wire rope is effectively fixing can to utilize the active force of spiral pricker and pull bar that hand is pulled to tractor, and pulls by hand the adjustable steel wire rope that tractor affects shaft tower is drawn to righting.This operation only needs three people, 30 minutes just can be complete to the righting of one-level cement pole, the common laborer just can operate, device one-time investment cost is low, operation produces expense hardly, and operation, to shaft tower and wire not damaged, is not limited by construction environment, activity duration is short, has the very big advantage of execute-in-place.Especially livewire work of the present invention, can avoid the direct and inconvenience of indirectly losing and the user is in life brought because having a power failure.Also there is simple in structure, easy to use, economical and practical, flexible operation, be easy to carry about with one, the advantage such as strong adaptability, suitable popularization.
The accompanying drawing explanationFig. 1 is charged shaft tower erection device mounting structure schematic diagram;
Fig. 2 is charged shaft tower erection device spiral pricker front view;
Fig. 3 is charged shaft tower erection device spiral pricker top view.
The specific embodimentBy the charged shaft tower erection device shown in Fig. 1-Fig. 3, to utilize hand to pull tractor 1, the end of pulling the adjustable steel wire rope 2 of tractor 1 connection at hand is fixed with snap ring 4, it fixedly is connected and fixed spiral pricker 5 in the end of wire rope 3, described spiral pricker 5 has 3, between every two adjacent spiral prickers 5, by pull bar 7, is fixedly connected with.Spiral pricker 5 middle parts and top are respectively equipped with the spanner of cross handle bar 7 formations of symmetrical expression, and the middle part spanner is following is gradually thin helical structure.Described pull bar 6 is, on bar, adjustable member 8 is set, and two ends are respectively equipped with the connecting rod with handle bar 7 corresponding buckles on spiral pricker 5.
Method of operating of the present invention by digging reserved hole, revolve the spiral pricker, steady brace, admittedly overlap snap ring, traction righting, the processing steps in sequence of filling out the hole compacting forms.At first digging reserved hole, is that to dig an inclination angle in the 30cm circumference of ground around shaft tower be 40-45 ° of similar conical pits.Contrary with the shaft tower incline direction and screw in first, second, and third spiral pricker 5 with highly suitable apart from the in-line order, the angle formed between each spiral pricker 5 and ground is 70-80 °, spiral pricker 5 spiral parts screw in underground, middle part handle bar 7 is placed in ground, and the spacing between two spiral prickers 5 is at least 1/2 of spiral pricker 5 length.After the spiral pricker screws in, be between two adjacent spiral prickers 5 steady brace 6.Pull bar 6 takes oblique pull to fix with spiral pricker 5, described pull bar 6 by two ends respectively the set buckle corresponding with the handle bar 7 on spiral pricker 5 connected.Pull bar 6 also can be regulated length by adjustable member 8, to facilitate use.By hand pull tractor 1 its fixedly the end of wire rope 3 and the origin of force that the first spiral pricker 5 middle part handle bars 7 form are connected and fixed, and hand pulls tractor 1 other end snap ring 4 fixing by the end of adjustable steel wire rope 2 and be fastened on 2/3 height and position of shaft tower overall length, complete solid cover snap ring.All preparation is ready.The traction righting is to move with hand the joystick that hand is pulled tractor 1, slowly pulls and tightens up adjustable steel wire rope 2, makes shaft tower move and strain righting to the inclination rightabout.Finally compacting being filled out in reserved hole gets final product.

Claims (8)

1. a charged shaft tower erection device, comprise that hand pulls tractor (1), adjustable steel wire rope (2), fixing wire rope (3), it is characterized in that: the end of pulling the adjustable steel wire rope (2) of tractor (1) connection at hand is fixed with snap ring (4), it fixedly is connected and fixed spiral pricker (5) in the end of wire rope (3), described spiral pricker (5) is 2-4, between every adjacent two spiral prickers (5), by pull bar (6), is fixedly connected with.
2. charged shaft tower erection device according to claim 1 is characterized in that: described spiral pricker (5) middle part and top are respectively equipped with the spanner that the cross handle bar (7) of symmetrical expression forms, and the middle part spanner is following is gradually thin helical structure.
3. charged shaft tower erection device according to claim 1 is characterized in that: described pull bar (6) is, on a bar, adjustable member (8) is set, and two ends are respectively equipped with the connecting rod with the corresponding buckle of handle bar (7) on spiral pricker (5).
4. charged shaft tower erection device according to claim 1 is characterized in that: the method for operating of described device by digging reserved hole, revolve the spiral pricker, steady brace, admittedly overlap snap ring, traction righting, the processing steps in sequence of filling out the hole compacting forms.
5. the method for operating of device according to claim 4 is characterized in that: describedly digging reserved hole, is that to dig an inclination angle in the 30cm circumference of ground around shaft tower be 40-45 ° of similar conical pits.
6. the method for operating of installing according to claim 4, it is characterized in that: the described spiral pricker that revolves, be by spiral pricker (5) contrary with the shaft tower incline direction and with highly suitable screwing in apart from the in-line order, the angle formed between each spiral pricker (5) and ground is 70-80 °, spiral pricker (5) spiral part screws in underground, middle part handle bar (7) is placed in ground, and the spacing between two spiral prickers (5) is at least 1/2 of spiral pricker (5) length.
7. the method for operating of installing according to claim 4 is characterized in that: described steady brace is to take oblique pull to fix in pull bar (6) and spiral pricker (5).
8. the method for operating of installing according to claim 4, it is characterized in that: the described snap ring that admittedly overlaps, be hand to be pulled to its origin of force that fixedly end of wire rope (3) and the first spiral pricker (5) middle part handle bar (7) form of tractor (1) be connected and fixed, and hand is pulled tractor (1) other end snap ring (4) fixing by the end of adjustable steel wire rope (2) and is fastened on 2/3 height and position of shaft tower overall length.
CN201210151526.0A 2012-05-16 2012-05-16 Charged shaft tower erection device is used charged shaft tower to be carried out to the method for righting Expired - Fee Related CN103422680B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210151526.0A CN103422680B (en) 2012-05-16 2012-05-16 Charged shaft tower erection device is used charged shaft tower to be carried out to the method for righting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210151526.0A CN103422680B (en) 2012-05-16 2012-05-16 Charged shaft tower erection device is used charged shaft tower to be carried out to the method for righting

Publications (2)

Publication Number Publication Date
CN103422680A true CN103422680A (en) 2013-12-04
CN103422680B CN103422680B (en) 2015-12-02

Family

ID=49648022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210151526.0A Expired - Fee Related CN103422680B (en) 2012-05-16 2012-05-16 Charged shaft tower erection device is used charged shaft tower to be carried out to the method for righting

Country Status (1)

Country Link
CN (1) CN103422680B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938914A (en) * 2014-04-02 2014-07-23 国家电网公司 Portable pole centralizing device and method for centralizing telegraph pole
CN105822133A (en) * 2016-04-01 2016-08-03 国家电网公司 Erecting device for electric pole
CN107327204A (en) * 2017-08-14 2017-11-07 国家电网公司 Portable laborsaving leading screw electric pole erection device
CN107676747A (en) * 2017-09-29 2018-02-09 王世松 A kind of LED lever apparatus
CN108518118A (en) * 2018-05-10 2018-09-11 合肥海银杆塔有限公司 A kind of reversed dip formula terminal shaft tower
CN110583303A (en) * 2019-09-17 2019-12-20 广西农业职业技术学院 Dragon fruit is planted and is supported linear drag chain pole composite set
CN110663446A (en) * 2019-09-17 2020-01-10 广西农业职业技术学院 Three-dimensional planting suspension support frame with passion fruit net structure and building method thereof
CN113062339A (en) * 2021-03-09 2021-07-02 应急管理部国家自然灾害防治研究院 Structure for preventing seabed liquefaction from inducing overturn of extra-large-diameter steel cylinder of artificial island
CN116084757A (en) * 2023-04-07 2023-05-09 兰州有色冶金设计研究院有限公司 Emergency rescue centralizing method for inclined drainage well tower in tailing pond

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3715852A (en) * 1970-12-08 1973-02-13 Mitsubishi Heavy Ind Ltd Method of erecting tower-like structure
CN2749989Y (en) * 2004-08-18 2006-01-04 徐惠君 Line pole correcting device
CN201883699U (en) * 2010-07-07 2011-06-29 新泰市供电公司 Distribution line pole baseband electricity tuning device
CN202611264U (en) * 2012-05-16 2012-12-19 孟凡辉 Device for straightening electrified tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3715852A (en) * 1970-12-08 1973-02-13 Mitsubishi Heavy Ind Ltd Method of erecting tower-like structure
CN2749989Y (en) * 2004-08-18 2006-01-04 徐惠君 Line pole correcting device
CN201883699U (en) * 2010-07-07 2011-06-29 新泰市供电公司 Distribution line pole baseband electricity tuning device
CN202611264U (en) * 2012-05-16 2012-12-19 孟凡辉 Device for straightening electrified tower

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938914A (en) * 2014-04-02 2014-07-23 国家电网公司 Portable pole centralizing device and method for centralizing telegraph pole
CN103938914B (en) * 2014-04-02 2016-09-14 国家电网公司 A kind of portable pole centralizing device for righting electric pole and method thereof
CN105822133A (en) * 2016-04-01 2016-08-03 国家电网公司 Erecting device for electric pole
CN107327204A (en) * 2017-08-14 2017-11-07 国家电网公司 Portable laborsaving leading screw electric pole erection device
CN107676747A (en) * 2017-09-29 2018-02-09 王世松 A kind of LED lever apparatus
CN107676747B (en) * 2017-09-29 2018-12-18 扬州市盛宇机电有限公司 A kind of LED light lever apparatus
CN108518118A (en) * 2018-05-10 2018-09-11 合肥海银杆塔有限公司 A kind of reversed dip formula terminal shaft tower
CN110583303A (en) * 2019-09-17 2019-12-20 广西农业职业技术学院 Dragon fruit is planted and is supported linear drag chain pole composite set
CN110663446A (en) * 2019-09-17 2020-01-10 广西农业职业技术学院 Three-dimensional planting suspension support frame with passion fruit net structure and building method thereof
CN113062339A (en) * 2021-03-09 2021-07-02 应急管理部国家自然灾害防治研究院 Structure for preventing seabed liquefaction from inducing overturn of extra-large-diameter steel cylinder of artificial island
CN113062339B (en) * 2021-03-09 2023-02-03 应急管理部国家自然灾害防治研究院 Structure for preventing seabed liquefaction from inducing overturn of extra-large-diameter steel cylinder of artificial island
CN116084757A (en) * 2023-04-07 2023-05-09 兰州有色冶金设计研究院有限公司 Emergency rescue centralizing method for inclined drainage well tower in tailing pond

Also Published As

Publication number Publication date
CN103422680B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103422680B (en) Charged shaft tower erection device is used charged shaft tower to be carried out to the method for righting
CN204424811U (en) Cable drawing head
CN206591905U (en) A kind of electric pole correcting device
CN105317262A (en) Convenience emergency utility pole
CN107237925A (en) A kind of cable support frame and application method
CN205777821U (en) Pull out under novel guy
CN103938914A (en) Portable pole centralizing device and method for centralizing telegraph pole
CN104242149A (en) Strain-resistant tower drainage plate bolt tightener
CN201865117U (en) Line terminal tower foundation with cable protecting pipe
CN202611264U (en) Device for straightening electrified tower
CN204441498U (en) A kind of ground connection pricker easy to plug and special plug-pull tool thereof
CN202467623U (en) Novel detachable climbing ladder
CN203977421U (en) Line of power dish
CN201812946U (en) Portable grounding wire for power line maintenance
CN105239571B (en) Tree root shape electric pole lateral conductor fixator
CN202888418U (en) Portable self-tapping grounding pin
CN102706492A (en) Anchor rod dynamometer and dynamometry method for underground engineering model experiment
CN202492845U (en) Ground anchor capable of serially anchoring
CN202917650U (en) Cylinder screw type earthing device
CN201413967Y (en) Roller device capable of preventing abrasion of conducting wires in stringing of power transmission and distribution project
CN201326287Y (en) Device for preventing electric pole from tilting
CN201778525U (en) Novel pole
CN103001148A (en) Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor
CN203174605U (en) Gravity type anchor body applied in special geology
CN101915005A (en) Novel electric pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202