CN103001148A - Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor - Google Patents

Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor Download PDF

Info

Publication number
CN103001148A
CN103001148A CN201210512475XA CN201210512475A CN103001148A CN 103001148 A CN103001148 A CN 103001148A CN 201210512475X A CN201210512475X A CN 201210512475XA CN 201210512475 A CN201210512475 A CN 201210512475A CN 103001148 A CN103001148 A CN 103001148A
Authority
CN
China
Prior art keywords
conductor
electrician
ground
clamping device
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210512475XA
Other languages
Chinese (zh)
Inventor
常栋梁
何立柱
孟令增
李燕军
杨超
牛成林
高飞
朱艾军
周玲
孟令文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TONGCHUAN ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Original Assignee
TONGCHUAN ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TONGCHUAN ELECTRIC POWER BUREAU, State Grid Corp of China SGCC filed Critical TONGCHUAN ELECTRIC POWER BUREAU
Priority to CN201210512475XA priority Critical patent/CN103001148A/en
Publication of CN103001148A publication Critical patent/CN103001148A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a simple-root breakage high-altitude connecting method for a 330kVdouble bundled conductor. The high-altitude connecting method is adopted, an operator only needs to use a first electrician carrying pulley and a marline climbing rope ladder to reach an operation position, a conductor clamping device is clamped on a small side breaking head of the conductor, a ground electrician enables the conductor clamping device to be clamped on a big side breaking head of the conductor on the ground, then a conductor card is connected with a twisting mill through a steel wire rope, the twisting mill drags the conductor in a gear to the position parallel to a spacing rod, and the breakage conductor is connected through a first electrician full-tension connecting stripe (FTSMS10008-LGJQ300). Tools and materials are simple and light, convenient to carry, small in working quantity, capable of rapidly repairing and recovering line operation.

Description

The single fracture of a kind of 330kV double bundle conductor high-altitude connecting method
Technical field
The invention belongs to the transmission line technical field, relate to a kind of high-altitude connecting method, the single fracture of especially a kind of 330kV double bundle conductor high-altitude connecting method.
Background technology
The 330KV circuit is because the discrepancy in elevation is large between some shaft tower, span is larger, and running environment is abominable, and some circuit is positioned near cement plant, the rubble field, often can suffer stone to collapse line, and lime overstocks on wire, even the accident of generation broken string.During processing since landform, landforms and the shaft tower span is large, drop is large etc. that factor is brought difficulty to work repair wire work and be difficult to carry out.
The single method for breaking of processing double bundle conductor of carrying out at present mainly contains following two kinds:
1, unwrapping wire crimping: the method is first the wire of fracture to be put to ground, then adopts aluminium hydraulic pressed connecting pipe hydraulic pressure, detonation pressure or adopts full tension force connecting strip to twine, and crimping (continuing) operation is comparatively convenient, but such method drawback is more.
2, marcottage: the method seems simple possible, but because weight of equipment is heavy, the work high above the ground difficulty, personal security also can not be guaranteed; Simultaneously, this repairing is single can't be finished, and the injustice of sub-conductor is carried out and may be caused in two people docking.
Summary of the invention
The object of the invention is to overcome the shortcoming of above-mentioned prior art, the single fracture of a kind of 330kV double bundle conductor high-altitude connecting method is provided, the mode that continues in the high-altitude that the method adopts, its method of operation is simple, avoid using large-scale implement, and only need the one man operation to carry out, can improve operating efficiency and personnel's personal safety.
The objective of the invention is to solve by the following technical programs:
The single fracture of this 330kV double bundle conductor high-altitude connecting method may further comprise the steps:
1) makes the first electrician carry coaster and marline and climb rope ladder and arrive operation place, the first lead clamping device is snapped on the small size side broken end of wire, and coaster is connected to the end of the first lead clamping device, and steel wire rope is contained on the coaster;
2) the second electrician snaps into the second lead clamping device on the wire large size side broken end on ground, then by the steel wire rope two ends the second wire card is connected with ground strand grinding machine, to the conductor spacer parallel position, the first electrician continues to the fracture wire with full tension force connecting strip with the moving shelves of strand grain inside conductor.
Further, in the step 1), described the first electrician is the first lead clamping device on the small size side broken end of distance 170cm place card.
Further, above-mentioned steps 1) in, described steel wire penetrating coaster, and make the steel wire rope two ends stretch to ground, be convenient to ground the second electrician and connect strand grinding machine and the second wire card.
The present invention has following beneficial effect:
1, method of operation of the present invention is simple, has promoted operating efficiency, avoids using large-scale implement, and the one man operation can carry out, and has improved operating efficiency and personnel's personal safety.
2, practical, be suitable for the transmission line of 330kV and above, it is large particularly to have solved span, and the large large operating environment problem of task difficulty that waits of the discrepancy in elevation has improved the operating efficiency of processing the single fracture of bundle conductor.
Description of drawings
Fig. 1 is the on-the-spot schematic diagram of prospecting of the present invention;
Fig. 2 is wire connection diagram of the present invention;
Fig. 3 is handshaking procedure schematic diagram of the present invention.
Embodiment
The single fracture of 330kV double bundle conductor of the present invention high-altitude connecting method specifically may further comprise the steps:
1) makes the first electrician carry coaster and marline and climb rope ladder and arrive operation place, the first lead clamping device is snapped on the small size side broken end of wire, and coaster is connected to the end of the first lead clamping device, and steel wire rope is contained on the coaster; Described the first electrician is the first lead clamping device on the small size side broken end of distance 170cm place card.Described steel wire penetrating coaster, and make the steel wire rope two ends stretch to ground, be convenient to ground the second electrician and connect strand grinding machine and the second wire card.
2) the second electrician snaps into the second lead clamping device on the wire large size side broken end on ground, then by the steel wire rope two ends the second wire card is connected with ground strand grinding machine;
3) spur the shelves inside conductor to the conductor spacer parallel position with the strand grinding machine, the first electrician continues to the fracture wire with full tension force connecting strip.
Below in conjunction with drawings and Examples the present invention is done and to describe in further detail:
Embodiment
1, at first reconnoitred the scene, found to land by large size side broken end, small size side is suspended in the air.Wire fracture schematic diagram such as Fig. 1.
2, the staff hangs up properly and by the ground electrician rope ladder is pulled to A place (as shown in Figure 1) after rope ladder checks the snap close locking on the tower, the first electrician (carrying marline and coaster) climbs rope ladder arrival work place, the ground electrician transmits the first lead clamping device and (adopts aluminum alloy wire clamp LK30-300, rated load 30KN, maximum open 28mm, deadweight 4kg/m) with coaster (band steel wire rope), the first electrician blocks fixing-line device at distance broken end 170cm place and it is connected reliably by Fig. 2 with coaster (band steel wire rope).The second electrician snaps into the second lead clamping device on the wire large size side broken end on ground, then by the steel wire rope two ends the second wire card is connected with ground strand grinding machine;
3, check whether each tie point is reliable, determine to start the strand grinding machine after reliable, slowly pack up two broken ends by the pulling force of steel wire rope, parallel to each other to sub-conductor.Whether the staff makes mutual balance between sub-conductor along proofreading and correct the broken end position to the broken end place on the rope ladder, makes to twine connecting strip preparation.As shown in Figure 3.
4, adopt full tension force connecting strip to continue.
In sum, method continues in the high-altitude that the present invention adopts, only need the first electrician carries coaster, marline is climbed rope ladder and arrived operation place, lead clamping device is snapped on the small size side broken end of wire, the ground electrician snaps into lead clamping device on the wire large size side broken end on ground, then by steel wire rope the wire card is connected with the strand grinding machine, to the conductor spacer parallel position, the first electrician is with full tension force connecting strip (FTSMS10008-LGJQ300) wire that ruptures is continued with the moving shelves of strand grain inside conductor.Instrument, material are simply light, and be easy to carry, and workload is little, can repair fast, recovers the circuit operation.

Claims (3)

1. the single fracture of a 330kV double bundle conductor high-altitude connecting method is characterized in that, may further comprise the steps:
1) makes the first electrician carry coaster and marline and climb rope ladder and arrive operation place, the first lead clamping device is snapped on the small size side broken end of wire, and coaster is connected to the end of the first lead clamping device, and steel wire rope is contained on the coaster;
2) the second electrician snaps into the second lead clamping device on the wire large size side broken end on ground, then by the steel wire rope two ends the second wire card is connected with ground strand grinding machine;
3) spur the shelves inside conductor to the conductor spacer parallel position with the strand grinding machine, the first electrician continues to the fracture wire with full tension force connecting strip.
2. the single fracture of 330kV double bundle conductor according to claim 1 high-altitude connecting method is characterized in that, in the step 1), described the first electrician is the first lead clamping device on the small size side broken end of distance 170cm place card.
3. the single fracture of 330kV double bundle conductor according to claim 1 high-altitude connecting method, it is characterized in that, in the step 1), described steel wire penetrating coaster, and make the steel wire rope two ends stretch to ground, be convenient to ground the second electrician and connect strand grinding machine and the second wire card.
CN201210512475XA 2012-12-04 2012-12-04 Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor Pending CN103001148A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210512475XA CN103001148A (en) 2012-12-04 2012-12-04 Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210512475XA CN103001148A (en) 2012-12-04 2012-12-04 Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor

Publications (1)

Publication Number Publication Date
CN103001148A true CN103001148A (en) 2013-03-27

Family

ID=47929425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210512475XA Pending CN103001148A (en) 2012-12-04 2012-12-04 Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor

Country Status (1)

Country Link
CN (1) CN103001148A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505772A (en) * 2015-01-27 2015-04-08 国网河北省电力公司衡水供电分公司 Split conductor clamping device and method using split conductor clamping device to replace spacers
CN111824716A (en) * 2019-04-17 2020-10-27 G.P.服务公司 Device for detecting and signalling breakage of rollers in roller conveyor
CN112134212A (en) * 2020-09-28 2020-12-25 国网陕西省电力公司铜川供电公司 Electric repairing mechanism for overhead ground wire

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252264A (en) * 2008-04-02 2008-08-27 云南电网公司大理供电局 Equipotential electrical highfield hot-line working method
CN101834416A (en) * 2010-05-21 2010-09-15 安徽省电力公司滁州供电公司 Device and construction method for live repairing of strand-broken overhead earth wire of transmission line

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252264A (en) * 2008-04-02 2008-08-27 云南电网公司大理供电局 Equipotential electrical highfield hot-line working method
CN101834416A (en) * 2010-05-21 2010-09-15 安徽省电力公司滁州供电公司 Device and construction method for live repairing of strand-broken overhead earth wire of transmission line

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张爱军等: "《带电作业操作方法.第一分册,输电线路》", 31 January 2009 *
龚于庆,向文彬: "《供配电线路工程》", 31 March 2011 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104505772A (en) * 2015-01-27 2015-04-08 国网河北省电力公司衡水供电分公司 Split conductor clamping device and method using split conductor clamping device to replace spacers
CN104505772B (en) * 2015-01-27 2017-03-08 国网河北省电力公司衡水供电分公司 Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device
CN111824716A (en) * 2019-04-17 2020-10-27 G.P.服务公司 Device for detecting and signalling breakage of rollers in roller conveyor
CN111824716B (en) * 2019-04-17 2024-04-05 G.P.服务公司 Device for detecting and signalling breakage of rollers in a roller conveyor
CN112134212A (en) * 2020-09-28 2020-12-25 国网陕西省电力公司铜川供电公司 Electric repairing mechanism for overhead ground wire

Similar Documents

Publication Publication Date Title
CN102290742B (en) Tension stringing construction technology
CN103001148A (en) Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor
CN201404604Y (en) High risk tower urgent repair staff protecting device
CN104158112A (en) Multi-purpose pedaled flying vehicle
CN200987049Y (en) Insulation rope ladder for live-wire process operation of earthing wire and optical fiber composite type aerial extension
CN206118641U (en) Instrument is binded to supplementary rope of portable direction
CN202136710U (en) Anti-falling structure for pole and tower climbing on power transmission line
CN203800449U (en) Overhaul platform of equipment on transformer station pillar
CN202802569U (en) Electric power tower climbing protector
CN102403670B (en) Quick wire picking device applied to 10 KV and below overhead power transmission lines
CN106229881B (en) Into the method and rope ladder head used of 500/220 kilovolt of multiple-loop line transmission line of electricity electric field
CN203867453U (en) Lock head type ladder stand
CN203632113U (en) Portable safety string bag for electric pole
CN204720888U (en) Portable power distribution less important work platform
CN204118374U (en) The earth lead point protection device in succession of earth connection
CN204492313U (en) The interim erection device of a kind of portable inclination of transmission line tower
CN209200516U (en) Unmanned plane hang take flexible ladder arrangement
CN203216951U (en) Junction pole used for lightning arrester
CN203734210U (en) 110kV dry outdoor cable terminal hoisting assistance device
CN201733010U (en) Cable erecting chair-lift
CN207339076U (en) A kind of province's force transfering device being fixed in line bar
CN201307730Y (en) Electric transmission line concrete pole safe device
CN103795004B (en) 110kV Dry-type Outdoor Cable Terminator lifting aid
CN201478737U (en) 110KV line single rod anti-falling device
CN205863782U (en) Rope ladder head used during entering 500/220 kilovolt of multiple-loop line transmission line of electricity electric field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130327