CN104505772B - Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device - Google Patents

Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device Download PDF

Info

Publication number
CN104505772B
CN104505772B CN201510038973.9A CN201510038973A CN104505772B CN 104505772 B CN104505772 B CN 104505772B CN 201510038973 A CN201510038973 A CN 201510038973A CN 104505772 B CN104505772 B CN 104505772B
Authority
CN
China
Prior art keywords
inserted link
sleeve pipe
fixing
fixation hook
fixed mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510038973.9A
Other languages
Chinese (zh)
Other versions
CN104505772A (en
Inventor
程旭
张玉
何义良
张�杰
赵建辉
张留岗
席晓丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN201510038973.9A priority Critical patent/CN104505772B/en
Publication of CN104505772A publication Critical patent/CN104505772A/en
Application granted granted Critical
Publication of CN104505772B publication Critical patent/CN104505772B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention belongs to electric construction tool technical field, disclose a kind of split conductor fixing-line device and the method changing conductor spacer with this fixing-line device.It is mainly characterized in that:Including sleeve pipe and inserted link, described inserted link inserts from one end of described sleeve pipe, and the other end of described sleeve pipe is provided with the first fixed mount, is provided with the first cable fixation hook that medial surface is arc-shaped on described first fixed mount;The outer end of described inserted link is provided with the second fixed mount, described second fixed mount is located at the same side of described sleeve pipe radial direction with described first fixed mount, the second cable fixation hook that medial surface is arc-shaped is provided with described second fixed mount;Described sleeve pipe side is provided with limit sliding chutes, described inserted link and this limit sliding chutes correspondence position are provided with gag lever post;Being provided between described sleeve pipe and described inserted link can be with the blocking mechanism of folding.Operation is more convenient, shortens replacing construction, and conductor spacer installation quality is good.

Description

Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device
Technical field
The invention belongs to electric construction tool technical field, more particularly, to a kind of split conductor fixing-line device and use this fixing-line device The method changing conductor spacer.
Background technology
Ultra-high-tension power transmission line is chronically at wild environment, and with society's constantly progress, running environment becomes increasingly complex, Building a house around protection zone, construction site, cross over thing and get more and more, cause shaft tower to build higher and higher, in the winter time spring strong wind season, Conductor spacer on wire can cause to disconnect, shifts, damages with vibrations, and serious meeting causes wire whiplash, leads to wire impaired, Cause 220KV line outage, have a strong impact on electrical network reliability service, the hotline maintenance therefore on 220kv wire works increasingly Many.220kv wire is double bundle conductor, in different shaft tower spans, due to sag deviation, from the distance between wire simultaneously It is not fixing 400mm, when on-line treatment conductor spacer damages defect, sub-conductor spacing often occurs excessive or too small, especially When isoelectric level staff works on wire, sub-conductor spacing can be changed further, lead to new conductor spacer to be difficult to correct installation, Changing conductor spacer, operator are difficult to two wires are brought in two mounting grooves of conductor spacer, due to being work high above the ground, Operation easier is big, and working strength is big, and the set-up time is long, so can bring a lot of inconvenience to staff, very in service work To the process that can not complete some defects.
Content of the invention
The invention solves the problems that first technical problem be exactly provide a kind of easy to use, change that conductor spacer is rapid, interval The good split conductor fixing-line device of excellent installation quality.
For solving above-mentioned technical problem, the technical solution used in the present invention is:Including sleeve pipe and inserted link, described inserted link is from institute State one end insertion of sleeve pipe, the other end of described sleeve pipe is provided with the first fixed mount, described first fixed mount is provided with Medial surface is the first cable fixation hook of arc-shaped;The outer end of described inserted link is provided with the second fixed mount, described second is solid Determine frame and described first fixed mount is located at the same side of described sleeve pipe radial direction, being provided with medial surface on described second fixed mount is Second cable fixation hook of arc-shaped;Described sleeve pipe side is provided with limit sliding chutes, in described inserted link and this limit sliding chutes pair Position is answered to be provided with gag lever post;Being provided between described sleeve pipe and described inserted link can be with the blocking mechanism of folding.
Its additional technical feature is:
Described blocking mechanism includes fixing pole outside described sleeve pipe and the ripping bar being connected with this pole axle, described Ripping bar leading section is provided with fixture block, in described sleeve pipe, described fixture block correspondence position is provided with fixture block hole, with fixture block hole pair Answer draw-in groove on the inserted link of side, the rearward end of described ripping bar is provided with the ripping bar top spring being connected with described sleeve pipe;
In described draw-in groove, fixture block sliding tray, the bottom of described fixture block sliding tray are carried on the inserted link of the first fixed mount side Face is inclined-plane;
Described sleeve pipe internal face is provided with inner baffle ring, described inserted link outer wall is provided with outer baffle ring, in described interior gear Inserted link top spring is cased with the inserted link between ring and outer baffle ring;
The end of the sleeve pipe one end with the first fixed mount is inclined-plane, and described sleeve pipe end chamfer is solid with described first cable The arc surface determining hook medial surface is tangent, and the described plunger end carrying the second fixed mount side is inclined-plane, and described plunger end is oblique Face is tangent with the arc surface of described second cable fixation hook medial surface;
Plunger end positioned at the first fixed mount side is provided with the spacing mandril that top is arcuation.
Second technical problem that the present invention solves is exactly to provide one kind to enter between-line spacing using above-mentioned split conductor fixing-line device The method that rod is changed.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
The method comprises the following steps:
The first step, inserted link is stretched out from sleeve pipe
Press down on the rear end of ripping bar, open blocking mechanism, outwards stretch by top by inserted link for inserted link top spring, the gag lever post on inserted link Move along limit sliding chutes;
Second step, the first cable fixation hook and the second cable fixation hook are stuck on wire
First cable fixation hook and the second cable fixation hook are hung in above two wires;
3rd step, inserted link is pushed back in sleeve pipe
Hold the first cable fixation hook and the second cable fixation hook and corresponding wire with two handss respectively, firmly by One cable fixation hook and the second cable fixation hook extrude to inner side together with corresponding wire, until locking mechanism automatic blocking, this When two wires between just the interval and two draw-in grooves of conductor spacer between is equal at interval;
4th step, installs fixed interval rod
Two cable clamping interfaces of conductor spacer are respectively clamped on corresponding wire, then will fix with wire on conductor spacer;
5th step, unloads split conductor fixing-line device
Press down on the rear end of ripping bar, open blocking mechanism, outwards stretch by top by inserted link for inserted link top spring, the gag lever post on inserted link Move along limit sliding chutes, now, bounce back in sleeve pipe positioned at the spacing mandril of plunger end, fixing with the first cable fixation hook Wire moves along the inclined-plane of cannula tip, the wire fixing with the second cable fixation hook along plunger end inclined-plane mobile so that Split conductor fixing-line device rides over above two wires, and split conductor fixing-line device is taken off.
Split conductor fixing-line device provided by the present invention compared with prior art, has advantages below:First, due to including Sleeve pipe and inserted link, described inserted link inserts from one end of described sleeve pipe, and the other end of described sleeve pipe is provided with the first fixed mount, The first cable fixation hook that medial surface is arc-shaped is provided with described first fixed mount;It is provided with the outer end of described inserted link Second fixed mount, described second fixed mount is located at the same side of described sleeve pipe radial direction with described first fixed mount, described second The second cable fixation hook that medial surface is arc-shaped is provided with fixed mount;Described sleeve pipe side is provided with limit sliding chutes, Described inserted link and this limit sliding chutes correspondence position are provided with gag lever post;It is provided between described sleeve pipe and described inserted link and can open Inserted link is stretched out from sleeve pipe and rides on wire, then holds first respectively with two handss by blocking mechanism first that close Cable fixation hook and the second cable fixation hook and corresponding wire, firmly by the first cable fixation hook and the second cable fixation hook Extrude to inner side together with corresponding wire, until locking mechanism automatic blocking, now the interval between two wires just and Interval between rod is equal, then installs fixed interval rod, finally takes off this split conductor fixing-line device, split conductor fixing-line device Dismounting is convenient, during installation interval rod, the distance between two wires just with two cable clamping interfaces of conductor spacer apart from equal, behaviour It is more convenient to make, and shortens replacing construction, and conductor spacer installation quality is good;Second, because described blocking mechanism is included in described sleeve pipe The fixing pole in outside and the ripping bar being connected with this pole axle, are provided with fixture block in described ripping bar leading section, in described sleeve pipe Described fixture block correspondence position is provided with fixture block hole, draw-in groove on the inserted link of side corresponding with fixture block hole, after described ripping bar End is provided with the ripping bar top spring being connected with described sleeve pipe, and locking mechanism folding is convenient, advantageously in work high above the ground;Its Three, due to fixture block sliding tray, the bottom of described fixture block sliding tray being carried on the inserted link of the first fixed mount side in described draw-in groove Face is inclined-plane, and when in fixture block insertion draw-in groove, the distance between the first cable fixation hook and the second cable fixation hook are just 400mm, i.e. the distance between two cable clamping interfaces of conductor spacer, when fixture block leaves draw-in groove and moves along fixture block sliding tray, fixture block slides The end block face of groove serves position-limiting action, it is to avoid inserted link is deviate from from sleeve pipe;Fourth, being provided with described sleeve pipe internal face Inner baffle ring, is provided with outer baffle ring on described inserted link outer wall, is cased with inserted link on the inserted link between described inner baffle ring and outer baffle ring Top spring, when pressing ripping bar rear end, inserted link automatic spring, using convenient;Fifth, due to the sleeve pipe with the first fixed mount The end of one end is inclined-plane, and described sleeve pipe end chamfer is tangent with the arc surface of described first cable fixation hook medial surface, described Plunger end with the second fixed mount side is inclined-plane, described plunger end inclined-plane and described second cable fixation hook medial surface Arc surface tangent, after opening blocking mechanism, the first cable fixation hook and the second cable fixation hook are easy to lead from corresponding Deviate from line, sixth, due to being provided with, in the plunger end positioned at the first fixed mount side, the spacing mandril that top is arcuation, After wire is fixed, spacing mandril and the first cable fixation hook surround cylinder, tightly embrace wire, it is to avoid because leading Line such as rocks at the generation causing split conductor fixing-line device from wire dropping, the accident such as fall.
Brief description
Fig. 1 is the structural representation after split conductor fixing-line device inserted link of the present invention is retracted;
Fig. 2 is the profile of the split conductor fixing-line device shown in Fig. 1;
Fig. 3 stretch out for split conductor fixing-line device inserted link of the present invention after structural representation;
Fig. 4 is the profile of the split conductor fixing-line device shown in Fig. 3.
Specific embodiment
With reference to the accompanying drawings and detailed description the structure to split conductor fixing-line device of the present invention and use principle do into One step describes in detail.
As shown in Figure 1, Figure 2 shown in Fig. 3 and Fig. 4, the structural representation of split conductor fixing-line device of the present invention, split conductor of the present invention Fixing-line device includes sleeve pipe 1 and inserted link 2, and inserted link 2 inserts from one end of sleeve pipe 1, and the other end of sleeve pipe 1 is provided with the first fixed mount 3, the first cable fixation hook 4 is provided with the first fixed mount 3, the medial surface 41 of the first cable fixation hook 4 is arc-shaped.Inserting The outer end of bar 2 is provided with the second fixed mount 5, and the second fixed mount 5 and the first fixed mount 3 are located at the same side of sleeve pipe 1 radial direction, Second cable fixation hook 6 is provided with the second fixed mount 5, the medial surface 61 of the second cable fixation hook 6 is arc-shaped;In sleeve pipe 1 Side be provided with limit sliding chutes 7, inserted link 2 and this limit sliding chutes 7 correspondence position are provided with gag lever post 8;In sleeve pipe 1 and inserted link Being provided between 2 can be with the blocking mechanism 9 of folding.First inserted link 2 is stretched out from sleeve pipe 1 and ride on wire, then Hold the first cable fixation hook 4 and the second cable fixation hook 6 and corresponding wire with two handss respectively, firmly by the first cable Fixation hook 4 and the second cable fixation hook 6 extrude to inner side together with corresponding wire, until locking mechanism 9 automatic blocking, now two Just the interval between conductor spacer is equal at interval between root wire, then installs fixed interval rod, finally by this split conductor Fixing-line device takes off, split conductor fixing-line device dismounting convenient, installation interval rod when, the distance between two wires just and Every two cable clamping interfaces of rod apart from equal, operation is more convenient, shortens replacing construction, and conductor spacer installation quality is good.
Blocking mechanism 9 includes the ripping bar 92 be connected in the fixing pole 91 in sleeve pipe 1 outside and with this pole 91 axle, in ripping bar 92 leading section is provided with fixture block 93, on sleeve pipe 1, fixture block 93 correspondence position is provided with fixture block hole 94, right with fixture block hole 94 Answer draw-in groove 95 on the inserted link 2 of side, the rearward end of ripping bar 92 is provided with the ripping bar top spring 96 being connected with sleeve pipe 1, locking mechanism Folding is convenient, advantageously in work high above the ground.
In draw-in groove 95, fixture block sliding tray 98, the bottom surface of fixture block sliding tray 98 are carried on the inserted link of the first fixed mount side For inclined-plane, when in fixture block insertion draw-in groove, the distance between the first cable fixation hook and the second cable fixation hook are just 400mm, i.e. the distance between two cable clamping interfaces of conductor spacer, when fixture block leaves draw-in groove and moves along fixture block sliding tray, fixture block slides The end block face 97 of groove 98 serves position-limiting action, it is to avoid inserted link is deviate from from sleeve pipe.
Sleeve pipe 1 internal face is provided with inner baffle ring 10, outer baffle ring 11 is provided with the outer wall of inserted link 2, in inner baffle ring 10 Inserted link top spring 12 is cased with the inserted link and outer baffle ring 11 between, when pressing ripping bar 92 rear end, inserted link 2 automatic spring, using more Plus it is convenient.
The end of the sleeve pipe one end with the first fixed mount 3 is inclined-plane, cannula tip inclined-plane 13 and the first cable fixation hook The arc surface of medial surface 41 is tangent, and the plunger end with the second fixed mount 5 side is inclined-plane, plunger end inclined-plane 14 and second The arc surface of cable fixation hook medial surface 61 is tangent, and after opening blocking mechanism 9, the first cable fixation hook 4 and the second cable are solid Determine hook 6 and be easy to abjection from corresponding wire.
The end of the inserted link 2 positioned at the first fixed mount 3 side is provided with the spacing mandril 15 that top is arcuation, will lead After line fixes, spacing mandril 15 and the first cable fixation hook 4 surround cylinder, tightly embrace wire, it is to avoid because leading Line such as rocks at the generation causing split conductor fixing-line device from wire dropping, the accident such as fall.
The method carrying out conductor spacer replacing using above-mentioned split conductor fixing-line device, the method comprises the following steps:
The first step, inserted link 2 is stretched out from sleeve pipe 1
Press down on the rear end of ripping bar 92, open blocking mechanism 9, inserted link 2 is outwards pushed up by inserted link top spring 12 to be stretched, on inserted link 2 Gag lever post 8 mobile along limit sliding chutes 7;
Second step, the first cable fixation hook 4 and the second cable fixation hook 6 are stuck on wire
First cable fixation hook 4 and the second cable fixation hook 6 are hung in above two wires;
3rd step, inserted link is pushed back in sleeve pipe
Hold the first cable fixation hook 4 and the second cable fixation hook 6 and corresponding wire respectively with two handss, firmly will First cable fixation hook 4 and the second cable fixation hook 6 extrude to inner side together with corresponding wire, until locking mechanism 9 is locked automatically Close, now just the interval and two draw-in grooves of conductor spacer between is equal the interval between two wires;
4th step, installs fixed interval rod
Two cable clamping interfaces of conductor spacer are respectively clamped on corresponding wire, then will fix with wire on conductor spacer;
5th step, unloads split conductor fixing-line device
Press down on the rear end of ripping bar 92, open blocking mechanism 9, inserted link 2 is outwards pushed up by inserted link top spring 12 to be stretched, on inserted link 2 Gag lever post along limit sliding chutes move, now, bounce back in sleeve pipe positioned at the spacing mandril of plunger end, fix with the first cable The fixing wire of hook moves along the inclined-plane of cannula tip, and fixing wire moves along the inclined-plane of plunger end with the second cable fixation hook Move so that split conductor fixing-line device rides over above two wires, split conductor fixing-line device is taken off.
Protection scope of the present invention is not limited solely to above-described embodiment, as long as structure and split conductor fixing-line device of the present invention Structure is identical, just falls in the scope of protection of the invention.

Claims (6)

1. split conductor fixing-line device it is characterised in that:Including sleeve pipe and inserted link, described inserted link inserts from one end of described sleeve pipe, The other end of described sleeve pipe is provided with the first fixed mount, be provided with described first fixed mount that medial surface is arc-shaped the One cable fixation hook;The outer end of described inserted link is provided with the second fixed mount, described second fixed mount is fixing with described first Frame is located at the same side of described sleeve pipe radial direction, is provided with the second cable that medial surface is arc-shaped solid on described second fixed mount Determine hook;Described sleeve pipe side is provided with limit sliding chutes, described inserted link and this limit sliding chutes correspondence position are provided with gag lever post; Being provided between described sleeve pipe and described inserted link can be with the blocking mechanism of folding;Described blocking mechanism is included outside described sleeve pipe The fixing pole in side and the ripping bar being connected with this pole axle, are provided with fixture block in described ripping bar leading section, in described sleeve pipe and Described fixture block correspondence position is provided with fixture block hole, is provided with draw-in groove, in described ripping bar on the inserted link of side corresponding with fixture block hole Rearward end be provided with the ripping bar top spring being connected with described sleeve pipe.
2. split conductor fixing-line device according to claim 1 it is characterised in that:In described draw-in groove near the first fixed mount one Fixture block sliding tray is carried on the inserted link of side, the bottom surface of described fixture block sliding tray is inclined-plane.
3. split conductor fixing-line device according to claim 2 it is characterised in that:Described sleeve pipe internal face is provided with interior gear Ring, is provided with outer baffle ring on described inserted link outer wall, is cased with inserted link top spring on the inserted link between described inner baffle ring and outer baffle ring.
4. split conductor fixing-line device according to claim 1 it is characterised in that:In the sleeve pipe with the first fixed mount side End is inclined-plane, and cannula tip inclined-plane is tangent with the arc surface of described first cable fixation hook medial surface, fixing with second The plunger end of frame side is inclined-plane, and plunger end inclined-plane is tangent with the arc surface of described second cable fixation hook medial surface.
5. split conductor fixing-line device according to claim 1 it is characterised in that:In the inserted link positioned at the first fixed mount side End is provided with the spacing mandril that top is arcuation.
6. usage right requires the split conductor fixing-line device described in 1,2,3,4 or 5 to carry out the method changing conductor spacer, the method bag Include the following step:
The first step, inserted link is stretched out from sleeve pipe
Press down on the rear end of ripping bar, open blocking mechanism, outwards stretch by top by inserted link for inserted link top spring, and the gag lever post on inserted link is along limit Position chute moves;
Second step, the first cable fixation hook and the second cable fixation hook are stuck on wire
First cable fixation hook and the second cable fixation hook are hung in above two wires;
3rd step, inserted link is pushed back in sleeve pipe
Hold the first cable fixation hook and the second cable fixation hook and corresponding wire with two handss respectively, firmly by First Line Cable fixation hook and the second cable fixation hook extrude to inner side together with corresponding wire, until locking mechanism automatic blocking, now two Just the interval and two draw-in grooves of conductor spacer between is equal at interval between root wire;
4th step, installs fixed interval rod
Two cable clamping interfaces of conductor spacer are respectively clamped on corresponding wire, then will fix with wire on conductor spacer;
5th step, unloads split conductor fixing-line device
Press down on the rear end of ripping bar, open blocking mechanism, outwards stretch by top by inserted link for inserted link top spring, and the gag lever post on inserted link is along limit Position chute moves, and now, bounces back in sleeve pipe positioned at the spacing mandril of plunger end, the fixing wire with the first cable fixation hook Inclined-plane along cannula tip moves, and fixing wire moves so that dividing along the inclined-plane of plunger end with the second cable fixation hook Lead clamping device rides over above two wires, and split conductor fixing-line device is taken off.
CN201510038973.9A 2015-01-27 2015-01-27 Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device Active CN104505772B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510038973.9A CN104505772B (en) 2015-01-27 2015-01-27 Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510038973.9A CN104505772B (en) 2015-01-27 2015-01-27 Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device

Publications (2)

Publication Number Publication Date
CN104505772A CN104505772A (en) 2015-04-08
CN104505772B true CN104505772B (en) 2017-03-08

Family

ID=52947502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510038973.9A Active CN104505772B (en) 2015-01-27 2015-01-27 Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device

Country Status (1)

Country Link
CN (1) CN104505772B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110783096B (en) * 2019-11-13 2021-06-01 湖北巨泰电气有限公司 Bending pliers for transformer lead
CN111210980B (en) * 2020-03-19 2020-12-15 吉安市协创电子科技有限公司 Transformer lead mounting structure
CN114039304B (en) * 2021-09-16 2023-11-14 国网浙江省电力有限公司绍兴供电公司 500 KV transmission line four-split conductor mixed wire corrector

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2532123A1 (en) * 1982-08-23 1984-02-24 Stalskog Ab Ing Firma R Temporary connector for overhead power line repair
CN1325555A (en) * 1998-11-02 2001-12-05 泰科电子后勤有限公司 Line spacer for power transmission lines
CN201523201U (en) * 2009-09-28 2010-07-07 湖北省电力公司孝感供电公司 Double split conductor spacing card
CN202159930U (en) * 2011-08-04 2012-03-07 辽宁省电力有限公司辽阳供电公司 Adjuster for compound conductor spacing of power transmission line
CN102457034A (en) * 2010-10-21 2012-05-16 张景春 Multifunctional wire fixer
CN102820628A (en) * 2012-08-28 2012-12-12 邯郸供电公司 Special tool for replacing split conductor spacer rod
CN202651683U (en) * 2011-11-24 2013-01-02 山东电力集团公司超高压公司 General type wire fastening device
CN103001148A (en) * 2012-12-04 2013-03-27 铜川供电局 Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor
CN203103881U (en) * 2012-09-17 2013-07-31 华北电力大学 Connecting rod type self-locking damping spacing rod
CN203911358U (en) * 2014-06-20 2014-10-29 国家电网公司 Special-purpose tool for replacing double-cleavage line spacer
CN204333780U (en) * 2015-01-27 2015-05-13 国网河北省电力公司衡水供电分公司 Bundle conductor fixing-line device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2532123A1 (en) * 1982-08-23 1984-02-24 Stalskog Ab Ing Firma R Temporary connector for overhead power line repair
CN1325555A (en) * 1998-11-02 2001-12-05 泰科电子后勤有限公司 Line spacer for power transmission lines
CN201523201U (en) * 2009-09-28 2010-07-07 湖北省电力公司孝感供电公司 Double split conductor spacing card
CN102457034A (en) * 2010-10-21 2012-05-16 张景春 Multifunctional wire fixer
CN202159930U (en) * 2011-08-04 2012-03-07 辽宁省电力有限公司辽阳供电公司 Adjuster for compound conductor spacing of power transmission line
CN202651683U (en) * 2011-11-24 2013-01-02 山东电力集团公司超高压公司 General type wire fastening device
CN102820628A (en) * 2012-08-28 2012-12-12 邯郸供电公司 Special tool for replacing split conductor spacer rod
CN203103881U (en) * 2012-09-17 2013-07-31 华北电力大学 Connecting rod type self-locking damping spacing rod
CN103001148A (en) * 2012-12-04 2013-03-27 铜川供电局 Simple-root breakage high-altitude connecting method for 330kVdouble-bundled conductor
CN203911358U (en) * 2014-06-20 2014-10-29 国家电网公司 Special-purpose tool for replacing double-cleavage line spacer
CN204333780U (en) * 2015-01-27 2015-05-13 国网河北省电力公司衡水供电分公司 Bundle conductor fixing-line device

Also Published As

Publication number Publication date
CN104505772A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN104505772B (en) Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device
CN110593635A (en) Lifting cross arm for live-wire work and use method thereof
CN106451233A (en) Detachable clamping apparatus for replacement of monolithic insulator and method for replacement of monolithic insulator
CN204333780U (en) Bundle conductor fixing-line device
CN202678823U (en) Jacking tool for tower ground wire clamp
CN204349352U (en) The on-the-spot predilation device of outdoor terminal stress cone
CN215498074U (en) Electrical pipeline fixing structure of electromechanical equipment
CN103762519B (en) A kind of dual-purpose wing type clamp apparatus of self-mountable & dismountuble
CN212008771U (en) Multifunctional monitoring instrument device
CN213959147U (en) Distribution network line overhauls uses ground connection discharge device
CN204858482U (en) Simple and easy high -voltage line cable clamp with adjustable
CN210777283U (en) Distribution network cable true line simulation partial discharge defect rapid setting device
CN210297064U (en) Live-line work tool integrating insulating bottle supporting frame and potential transferring function
CN111864619B (en) 10kv drainage wire replacement supporting tool with load switch
CN208986563U (en) A kind of power line protection fitting
CN209548563U (en) A kind of easy to operate fixation type safety band suspension arrangement
CN206038830U (en) Many insulator spindle withstand voltage test termination of electrodynamic type
CN204304285U (en) A kind of Mume flower contact contact dismantling device
CN220380887U (en) Multistation arrester tensile test frock
CN205452975U (en) PVC electric wire tube connects pipe fitting appurtenance
CN201927726U (en) Sequentially-mounted ground wire
CN220241335U (en) Auxiliary device for manufacturing and installing railway contact net hanger
CN106329388A (en) Method for reducing crimping reject ratio of large-section lead strain clamp
CN105185088B (en) The wireless rapid meter reading method of measuring instrument
CN204651772U (en) A kind of somersault coaster for crossing over horizontal double bundle conductor conductor spacer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant