CN202159930U - Adjuster for compound conductor spacing of power transmission line - Google Patents

Adjuster for compound conductor spacing of power transmission line Download PDF

Info

Publication number
CN202159930U
CN202159930U CN2011202811440U CN201120281144U CN202159930U CN 202159930 U CN202159930 U CN 202159930U CN 2011202811440 U CN2011202811440 U CN 2011202811440U CN 201120281144 U CN201120281144 U CN 201120281144U CN 202159930 U CN202159930 U CN 202159930U
Authority
CN
China
Prior art keywords
conductor
hook
adjuster
power transmission
carrier bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202811440U
Other languages
Chinese (zh)
Inventor
张森
李强
周吉刚
王�忠
丁冠西
吕扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
State Grid Corp of China SGCC
Original Assignee
LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co filed Critical LIAONING ELECTRIC POWER CO Ltd LIAOYANG POWER SUPPLY Co
Priority to CN2011202811440U priority Critical patent/CN202159930U/en
Application granted granted Critical
Publication of CN202159930U publication Critical patent/CN202159930U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to an adjuster for a compound conductor spacing of a power transmission line, comprising an alloy pipe, wherein the alloy pipe is provided with an adjustable carrier bar, the upper and lower ends of the adjustable carrier bar are respectively equipped with an upper conductor hook and a lower conductor hook, and the bottom of the lower conductor hook is equipped with a crank. The top end of the adjuster is equipped with a fixed conductor hook, the lower end is equipped with a conductor hook for controlling the adjustment of the carrier bar by using the crank, the two conductor hooks are used for fixing separated conductors and the crank at the bottom is used to control the distance between the two conductor hooks, thus freely controlling the compound conductor spacing. The application scope is well targeted, the operation security is high, and the operation is simple and convenient.

Description

The multiple wire pitch adjuster of power transmission sequence
Technical field
The utility model relates to a kind of confession 66kV or the multiple employed adjuster of wire pitch of 220kV power transmission sequence control.
Background technology
When the multiple lead of traditional 66kV and above power transmission sequence is installed inter-phase spacer; The operating personnel can't independently control phase bundle conductor wire spacing; Need the ground staff to use transmission rope coordinating operation personnel to control wire spacing; Therefore need a large amount of manpowers of waste, be the next greatly inconvenience in production work zone, so the applicant designs a kind of instrument that can make the operating personnel independently accomplish the control wire spacing.
The utility model content
The technical problem that the utility model will solve provides a kind of 66kV or the multiple wire pitch adjuster of 220kV power transmission sequence, and this multiple lead phase spacing adjuster has the characteristics that operational security is high, simple to operation, save manpower.
In order to solve the problem that prior art exists, the technical scheme that the utility model adopts is:
The multiple wire pitch adjuster of power transmission sequence includes compo pipe, is provided with the adjustable carrier bar in the described compo pipe, and the two ends up and down of described adjustable carrier bar are separately installed with upper conductor hook and lower wire hook, and the bottom of lower wire hook is equipped with crank.
Advantage and effect that the utility model had are:
The multiple wire pitch adjuster top of the utility model power transmission sequence is equipped with fixing thread hook; The lower end is equipped with the thread hook that can use crank control carrier bar to regulate; Utilize two thread hook immobile phase bundle conductors and utilize the bottom crank to control the distance of two thread hooks, and then can freely control multiple wire pitch.The scope of application is with strong points, and operational security is high, simple to operation.
Description of drawings
Fig. 1 is the overall structure sketch map of the multiple wire pitch adjuster of the utility model power transmission sequence;
Fig. 2 is the user mode reference diagram of the multiple wire pitch adjuster of the utility model power transmission sequence;
Among the figure: compo pipe 1; Adjustable carrier bar 2; Upper conductor hook 3; Crank 4; Lower wire hook 5.
Embodiment
As shown in Figure 1; The multiple wire pitch adjuster of the utility model power transmission sequence; Include hollow compo pipe 1; Be provided with adjustable carrier bar 2 in the described compo pipe 1, the top of described adjustable carrier bar 2 is equipped with the upper conductor hook 3 that is used for fixing upper conductor, and the bottom of described adjustable carrier bar 2 is equipped with the lower wire hook 5 that is used for fixing lower wire; The bottom of described lower wire hook is equipped with the crank 4 that can make upper and lower thread hook up-down adjustment, is used for controlling two spacings between upper and lower thread hook.
As shown in Figure 2, the utility model utilizes two thread hook immobile phase bundle conductors in use and utilizes the distance of two thread hooks of bottom crank control, and then can freely control multiple wire pitch.

Claims (1)

1. power transmission sequence is answered the wire pitch adjuster; It is characterized in that: include compo pipe; Be provided with the adjustable carrier bar in the described compo pipe, the two ends up and down of described adjustable carrier bar are separately installed with upper conductor hook and lower wire hook, and the bottom of lower wire hook is equipped with crank.
CN2011202811440U 2011-08-04 2011-08-04 Adjuster for compound conductor spacing of power transmission line Expired - Lifetime CN202159930U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202811440U CN202159930U (en) 2011-08-04 2011-08-04 Adjuster for compound conductor spacing of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202811440U CN202159930U (en) 2011-08-04 2011-08-04 Adjuster for compound conductor spacing of power transmission line

Publications (1)

Publication Number Publication Date
CN202159930U true CN202159930U (en) 2012-03-07

Family

ID=45767553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202811440U Expired - Lifetime CN202159930U (en) 2011-08-04 2011-08-04 Adjuster for compound conductor spacing of power transmission line

Country Status (1)

Country Link
CN (1) CN202159930U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820628A (en) * 2012-08-28 2012-12-12 邯郸供电公司 Special tool for replacing split conductor spacer rod
CN103928864A (en) * 2014-04-09 2014-07-16 国家电网公司 66kV-220kV power transmission line composite wire seam electrified adjusting method
CN104505772A (en) * 2015-01-27 2015-04-08 国网河北省电力公司衡水供电分公司 Split conductor clamping device and method using split conductor clamping device to replace spacers
CN104967056A (en) * 2015-05-18 2015-10-07 国家电网公司 Power transmission line fixer
CN106329398A (en) * 2016-10-11 2017-01-11 江阴市广跃电子有限公司 Parallel double-station wire tensioner
CN110518493A (en) * 2019-09-17 2019-11-29 国网辽宁省电力有限公司辽阳供电公司 It is a kind of to answer wire spacing adjustment device and method of adjustment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820628A (en) * 2012-08-28 2012-12-12 邯郸供电公司 Special tool for replacing split conductor spacer rod
CN103928864A (en) * 2014-04-09 2014-07-16 国家电网公司 66kV-220kV power transmission line composite wire seam electrified adjusting method
CN103928864B (en) * 2014-04-09 2016-08-31 国家电网公司 220kV-66kV electric transmission line hot-line adjusts the method for multiple wire linear slit
CN104505772A (en) * 2015-01-27 2015-04-08 国网河北省电力公司衡水供电分公司 Split conductor clamping device and method using split conductor clamping device to replace spacers
CN104505772B (en) * 2015-01-27 2017-03-08 国网河北省电力公司衡水供电分公司 Split conductor fixing-line device and the method changing conductor spacer with this fixing-line device
CN104967056A (en) * 2015-05-18 2015-10-07 国家电网公司 Power transmission line fixer
CN106329398A (en) * 2016-10-11 2017-01-11 江阴市广跃电子有限公司 Parallel double-station wire tensioner
CN106329398B (en) * 2016-10-11 2018-12-11 江阴市广跃电子有限公司 A kind of parallel double-station conducting wire stretcher
CN110518493A (en) * 2019-09-17 2019-11-29 国网辽宁省电力有限公司辽阳供电公司 It is a kind of to answer wire spacing adjustment device and method of adjustment

Similar Documents

Publication Publication Date Title
CN202159930U (en) Adjuster for compound conductor spacing of power transmission line
CN202405722U (en) Adjusting and fixing device for space between adjacent overhead conductors
CN201836082U (en) Lifting type ceiling fan
CN203352049U (en) Overhead line pulling-up assisting device
CN103928865A (en) Manual wire lifting device for stringing construction
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN201466572U (en) Special crawling ladder for installation and replacement of high-tension overhead line composite insulator
CN203911363U (en) Overhead ground wire lifter
CN203412347U (en) Jumper wire over-wind type Z-shaped side slope power transmission line strain tower
CN203377542U (en) Divided conductor sub conductor interval controller
CN203774688U (en) Wire supporting construction manual wire lifting device
CN208015234U (en) A kind of novel line apparatus
CN203251019U (en) A line strain clamp winding device
CN202050189U (en) High-altitude line working clearance physical power adjusting device
CN204927962U (en) Compound conductor space adjuster
CN202872257U (en) Opening type slide cable hook
CN204243605U (en) Power line tension string composite insulator changes hook special
CN202970094U (en) Guyed tower applied to transmission line project
CN202126876U (en) Cable-threading tensioning wheel
CN203577185U (en) Shifting mechanism in times of power transmission and distribution line repair
CN203932929U (en) The erecting device of the anti-fall guide rail of level on a kind of electric pole
CN202872255U (en) Spanning support for traction cable
CN203441350U (en) Electrical power emergency repair ladder
CN202055739U (en) Power transmission circuit outgoing line operation horizontal ladder
CN205159921U (en) A insulating pole of embracing that is used for changing with electricity with many times transmission line strain insulator string in tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120912

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120912

Address after: 111000 Liaoyang City, Liaoning province Taizihe District South Street No. 81

Patentee after: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

Patentee after: State Grid Corporation of China

Address before: 111000, 81, south suburb street, Liaoyang City, Liaoning, Liaoyang

Patentee before: Liaoning Electric Power Co., Ltd. Liaoyang Power Supply Company

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120307