CN202610830U - 支架式挡料墙及伞形屋顶 - Google Patents
支架式挡料墙及伞形屋顶 Download PDFInfo
- Publication number
- CN202610830U CN202610830U CN2012201634161U CN201220163416U CN202610830U CN 202610830 U CN202610830 U CN 202610830U CN 2012201634161 U CN2012201634161 U CN 2012201634161U CN 201220163416 U CN201220163416 U CN 201220163416U CN 202610830 U CN202610830 U CN 202610830U
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- welded
- support
- steel
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
支架式挡料墙及伞形屋顶,整个挡料墙墙面采用槽形钢筋混凝土预制板8,槽形钢筋混凝土板8底部设有与工字钢梁支撑焊接的埋件并通过埋件焊接于钢梁之上;工字钢梁支撑9背部的方钢管支撑10一端与基础上的预埋件焊接,一端与钢梁焊接;槽形钢筋混凝土预制板8在纵向连成一个整体并提供平面外稳定支撑;钢筋混凝土杆件13及坡屋顶钢筋混凝土板14采用钢筋混凝土现浇,现浇时预留连接钢管支撑15所须的预埋件,然后再将钢管支撑15两头焊于预埋件上形成支撑。本实用新型节省材料,使挡料墙的建造简化、方便制作及安装;使中间隧道坡屋顶的上部空间得到利用。
Description
所属技术领域
本实用新型是一种构筑物,是一种用于露天堆存物料的支架式挡料墙及伞形屋顶。
背景技术
在制浆造纸工业园中,需要用到大量的木片作为原材料。因此,需要建造容积很大的木片堆场来储存木片。
木片堆场如图1所示。木片堆场是这样一种结构形式:四面设挡料墙4,木片等物料堆放在挡料墙4之内。堆场的中部设地下隧道以安放设备。在木片堆满的情况下,挡料墙4承受的侧压力以及隧道的坡屋顶承受的木片压力是很大的。所以,结构设计的关键就是如何将挡料墙及坡屋顶做得结实以承受木片的荷载。传统的挡料墙为现浇的钢筋混凝土墙体,每隔一段距离就设一钢筋混凝土的扶壁。这种作法的缺点有两个:一是要用掉较多的钢筋混凝土,二是施工起来不是很方便。
传统的隧道屋面作法见图2。5为一块现浇的整板,它的主要功能在于给下方的设备提供吊点,同时也承受上方木片的荷载。6为坡屋面的顶板。7为一堵整浇的钢筋混凝土墙体。构件5、6、7是这个受力体系中最关键的部件。从结构力学上看,板5因为从墙体中挑出比较远,将近4米;顶板6本身跨度就较大,且要承受其上20多米高的木片堆载;墙7作为1、2的支撑构件。传统作法的弊端有两点,一是建材耗费比较大,二是使用功能上有限制。整板5做成整浇的,其上部比较大的空间便得不到应用。
实用新型内容
本实用新型旨在提供一种克服上述已有技术不足之处的支架式挡料墙及伞形屋顶,达到节省材料,使挡料墙的建造简化、方便制作及安装;使中间隧道坡屋顶的上部空间得到利用。
实用新型的技术方案:支架式挡料墙及伞形屋顶,整个挡料墙墙面采用槽形钢筋混凝土预制板,槽形钢筋混凝土预制板底部设有与工字钢梁支撑焊接的埋件并通过埋件焊接于钢梁之上;工字钢梁支撑背部的方钢管支撑一端与基础上的预埋件焊接,一端与钢梁焊接;槽形钢筋混凝土预制板在纵向连成一个整体并提供平面外稳定支撑;钢筋混凝土杆件及坡屋顶钢筋混凝土板采用钢筋混凝土现浇,现浇时预留连接钢管支撑所须的预埋件,然后再将钢管支撑两头焊于预埋件上形成支撑。
在隧道两端设百叶窗;管道、电缆等放到上部空间。
本实用新型的优点:第一,支架式挡料墙符合力学中受力最优的原理,同时整个结构体系简洁,方便进行受力计算分析,使得用材大大的减小,在满足受力的情况下,整个挡墙轻巧美观,施工上也有很大的便利,可以将杆件及钢筋混凝土板制作好后再现场拼装。第二,伞形坡屋顶结构的优化同样使得材料用量减少,同时杆件代替原有的整板结构后,上方的空间可以利用起来,上方坡屋顶内的空间与下方连通,成为可利用的空间,一些设备的管道及电缆等可以走到上部空间内,同时上部空间可作通风之用。
附图说明
图1为木片堆场整体断面图。
图2为传统作法的隧道横断面。
图3为支架式挡料墙简图。
图4为改进后的隧道横断面图。
图5为改进后隧道端部图。
图中:1-隧道,2-隧道坡屋顶,3-堆料,4-挡料墙,5-现浇整板,6-坡屋面顶板,7-钢筋混凝土墙体,8-槽形钢筋混凝土预制板,9-工字钢梁支撑,10-方钢管支撑,11-混凝土基础,12-设备所须的缺口,13-钢筋混凝土杆件,14-坡屋顶钢筋混凝土板,15-钢管支撑,16-百页窗,17-240厚砖墙,18-管道开孔。
具体实施方式
下面结合和实施例对实用新型做进一步说明。
支架式挡料墙及伞形屋顶。
如图3所示:支架式挡料墙,整个墙面采用槽形钢筋混凝土预制板8,底部设与工字钢梁支撑9焊接的埋件,焊接于钢梁之上。工字钢梁支撑9背部的方钢管支撑10一端与基础上的预埋件焊接,一端与钢梁焊接。槽形钢筋混凝土预制板8连成一个整体并提供平面外稳定支撑。
如图4所示:伞形坡屋顶由钢筋混凝土杆件13和钢杆件15组成,钢筋混凝土杆件13及坡屋顶钢筋混凝土板14采用钢筋混凝土现浇,现浇时预留连接钢管支撑15所须的预埋件,然后再将钢管支撑15两头焊于预埋件上形成支撑。杆件钢管支撑15可以将坡屋顶钢筋混凝土板14的跨度减少近一半,承载力得到很大提高。而坡屋顶钢筋混凝土板14对钢筋混凝土杆件13有拉杆的效应,相当于在悬挑梁端部设置了一道斜拉杆。
图5所示,为了便于通风,可在隧道两端设百叶窗16。
Claims (2)
1.支架式挡料墙及伞形屋顶,其特征在于:整个挡料墙墙面采用槽形钢筋混凝土预制板(8),槽形钢筋混凝土预制板(8)底部设有与工字钢梁支撑焊接的埋件并通过埋件焊接于钢梁之上;工字钢梁支撑(9)背部的方钢管支撑(10)一端与基础上的预埋件焊接,一端与钢梁焊接;槽形钢筋混凝土预制板(8)在纵向连成一个整体并提供平面外稳定支撑;钢筋混凝土杆件(13)及坡屋顶钢筋混凝土板(14)采用钢筋混凝土现浇,现浇时预留连接钢管支撑(15)所须的预埋件,然后再将钢管支撑(15)两头焊于预埋件上形成支撑。
2.根据权利要求1的支架式挡料墙及伞形屋顶,其特征在于:在隧道两端设百叶窗。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201634161U CN202610830U (zh) | 2012-04-17 | 2012-04-17 | 支架式挡料墙及伞形屋顶 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201634161U CN202610830U (zh) | 2012-04-17 | 2012-04-17 | 支架式挡料墙及伞形屋顶 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202610830U true CN202610830U (zh) | 2012-12-19 |
Family
ID=47344542
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201634161U Expired - Lifetime CN202610830U (zh) | 2012-04-17 | 2012-04-17 | 支架式挡料墙及伞形屋顶 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202610830U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619373A (zh) * | 2012-04-17 | 2012-08-01 | 中国轻工业长沙工程有限公司 | 支架式挡料墙及伞形屋顶 |
CN103089024A (zh) * | 2013-02-05 | 2013-05-08 | 中国十七冶集团有限公司 | 玻璃钢屋顶构架装置 |
CN107577265A (zh) * | 2017-09-30 | 2018-01-12 | 广州未名雷蒙特实验室科技有限公司 | 一种新型的智能3d模拟舱 |
-
2012
- 2012-04-17 CN CN2012201634161U patent/CN202610830U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619373A (zh) * | 2012-04-17 | 2012-08-01 | 中国轻工业长沙工程有限公司 | 支架式挡料墙及伞形屋顶 |
CN103089024A (zh) * | 2013-02-05 | 2013-05-08 | 中国十七冶集团有限公司 | 玻璃钢屋顶构架装置 |
CN107577265A (zh) * | 2017-09-30 | 2018-01-12 | 广州未名雷蒙特实验室科技有限公司 | 一种新型的智能3d模拟舱 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202831402U (zh) | 一种内接圆管外套矩形钢管混凝土柱 | |
CN102493602B (zh) | 延阻钢筋局部屈曲延性混凝土柱及其制作方法 | |
CN108104308B (zh) | 一种可修复的多级耗能干式混合装配式混凝土剪力墙 | |
CN203939288U (zh) | 防风网结构 | |
CN201288328Y (zh) | 梁板一体预制拼装式塔机固定基础 | |
CN103046669B (zh) | 预制高强钢筋混凝土设低强消能条带剪力墙及作法 | |
CN104652475A (zh) | 一种桁架式挡土墙 | |
CN202610830U (zh) | 支架式挡料墙及伞形屋顶 | |
CN201962844U (zh) | 内置钢管钢板的空心组合板 | |
CN103046644A (zh) | 多层房屋冷弯薄壁型钢梁柱结构体系 | |
CN204401649U (zh) | 拱形抗压纵向预应力拼装式地下管廊 | |
CN101285329B (zh) | 弦支混凝土集成楼盖结构及其施工方法 | |
CN203373735U (zh) | 外置纵向腹板的混凝土预制管桩 | |
CN100422468C (zh) | 大跨度大柱距拟肋型楼盖式预应力钢网格屋盖结构 | |
CN102619373A (zh) | 支架式挡料墙及伞形屋顶 | |
CN202936804U (zh) | 后张法预应力桩 | |
CN202369931U (zh) | 一种拱圈支架 | |
CN202247719U (zh) | 对应形波纹预应力抗沉降桥梁涵管 | |
CN201133089Y (zh) | 屋面梁改为楼面梁的荷载转移装置 | |
CN203174882U (zh) | 房屋建筑用抗震组合梁 | |
CN201794215U (zh) | 一种先张法预应力钢筋砼预制梁 | |
CN103498512B (zh) | 一种装配式建筑墙梁稳定连接结构 | |
CN203361184U (zh) | 一种架空输电线路杆塔基础型式 | |
CN203361431U (zh) | 预制女儿墙钢筋连接结构 | |
CN208251057U (zh) | 后张桩复合地基 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20121219 |