CN201133089Y - 屋面梁改为楼面梁的荷载转移装置 - Google Patents
屋面梁改为楼面梁的荷载转移装置 Download PDFInfo
- Publication number
- CN201133089Y CN201133089Y CNU2007200384312U CN200720038431U CN201133089Y CN 201133089 Y CN201133089 Y CN 201133089Y CN U2007200384312 U CNU2007200384312 U CN U2007200384312U CN 200720038431 U CN200720038431 U CN 200720038431U CN 201133089 Y CN201133089 Y CN 201133089Y
- Authority
- CN
- China
- Prior art keywords
- girder
- load
- roofing
- floor
- transferring device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
屋面梁改为楼面梁的荷载转移装置,即房屋增层时,屋面梁改为楼面梁因承载力不足,一般需对其采用扩大截面等方法施工,而下层又不能进入施工,采用对屋面梁卸载,即用悬挂结构将屋面梁上的部分荷载转移到新增上层梁上去的荷载转移装置。在新增上层楼面梁(9)能够承受外来荷载作用时,将下层梁(8)的部分荷载通过设立在原屋面梁与上层新梁之间的吊杆(11)向上转移,从而使得原屋面梁在新增砌墙荷载的情况下,不需采取加固措施,而能满足建筑使用功能。其悬挂结构的荷载转移装置包含在原屋面梁上植入的化学锚栓(2)、钢结构底板(1)、连接竖板(4)、预埋在新梁内的PVC管(5)、吊杆(11)、新梁面上的预埋板(6)、螺母(7)。
Description
所属技术领域
本实用新型涉及一种建筑增层时,屋面梁改为楼面梁,因承载力不足而采用的一种装置。土木工程领域。
背景技术
在房屋增层时,屋面结构就变成了楼面结构,因活荷载的增加及新楼面上增砌隔墙的恒载增加,原屋面梁的承载力往往不足,对原屋面梁如因下层不能进入加固施工或原屋面梁新增荷载后,本身承载力虽能满足,但梁上荷载一旦传递给下层柱,柱内力会增大,使得柱需进一步加固,这样就扩大了加固范围,增加了建设投资成本。
为了克服上述矛盾的出现,本实用新型提供一种转移荷载装置.使得原屋面梁不需采取加固措施,而增层中的隔墙仍可砌筑,从而满足建筑使用功能。
本实用新型解决其技术问题所采用的技术方案是
在原屋面梁上沿梁纵向每隔一定距离通过植筋方式,向上设立吊杆,将本层楼面梁上新增墙体荷载转移到上一层楼面梁上,使本层楼面梁几乎不增加外来荷载效应。
这种方法在结构理论上称为“等效荷载法”,即新增墙体的重力荷载在原屋面梁内引起的内力弯矩、剪力由安装在梁面上的吊杆向上作用的反向荷载在该梁内产生的弯矩、剪力抵消。
房屋增层方式可用直接增层或外套框架增层。
墙体吊杆方案示意详见附图1。
图中:(8)为原屋面梁,(9)为新增上层楼面梁,(10)为新增屋面梁,(11)、(12)为吊杆。
转移墙体荷载的吊杆图详见附图2。
图中:(1)为吊杆与原梁连结底板;(2)为化学锚栓;(3)为焊缝;(4)为竖板;(5)为预埋在混凝土梁内的PVC管;(6)为钢板;(7)为螺母;(8)为原屋面梁;(9)为新加上层楼面梁;(11)为吊杆。
附图3为吊杆在墙体中的位置和砂浆保护层做法示意。
图中:(11)为吊杆;(13)为水泥砂浆;(14)为新砌墙体。
本实用新型的有益效果是
(1).外套框架施工仅在原有房屋外围进行,房屋产权人思想工作易做通。
(2).不进入房屋内部施工,房屋使用者不用搬迁过渡,省去过渡费用。
(3).在外围施工期间,房屋使用者工作生活照常。
(4).房屋内部结构装修、水电管线均不损坏,节省这些工程量的拆除和恢复费用。
(5).对比对下层原柱直接加固的费用,悬挂吊杆转移荷载装置的应用明显节省工程造价。
(6).本层楼面梁、墙体、上层楼面梁连为一体,有利于抗震效果。
下面结合附图和实施例对本实用新型进一步说明:
某住宅工程建于2000年7月,地下四层为已出售的商品住宅,地下一层为营业中的桑拿会所及仓库,框架结构,拟增两层,混凝土标号C20。
新增两层框架的首层墙体直接砌筑在原屋面框架梁上,下部框架柱的轴压比就会超限(0.9),故需将此墙体荷载转移到上层楼面梁上去。
设计方案为:将原屋面纵横框架梁及次梁沿梁纵向每隔1.0m设置1根吊杆,向上施加拉力F,此力值等于新增的首层(按框架应为第6层)墙体1m长范围内的自重,这样布置使上层梁承受的荷载接近均布线荷载形式,本工程采用粉煤灰轻渣空心砌块(容重8.0KN/m3),详见附图1。吊杆拉力:
F=γGγQlbQHQ
=1.35×10×1.0×0.3×2.5=10.13KN
式中:γG——荷载分项系数,γQ——墙体容重(10KN/m3含粉刷层),l——单根螺杆承载墙长,bQ——墙厚,HQ——墙体净高。
墙体吊杆拉力设计控制方法
选用净截面直径Ф10螺杆,HPB235级,螺杆应力:
墙体吊杆通过钢拉杆的伸长量来控制拉力(可由试验室出具F—Δl曲线作修正)。
式中:Δl—吊杆伸长量,F—单根螺栓承担的墙体自重,H—层高,ES—螺杆用钢材弹性模量,AS—螺杆有效受拉面积(M14,直径扣去4mm螺纹高度)。
上一层墙体也通过吊杆悬挂到屋面梁上去,这样使新做各层梁受力较均匀。
具体实施方式
(1)将原屋面保温层、防水层拆除,露出混凝土基层,弹线放样找出原屋面梁的位置,对所需安装墙体吊杆的梁表面标出吊杆安装点位置;
(2)在吊杆安装点位置处钻孔,植入图2中的(2)化学锚栓;
(3)将吊杆的下部连结节点底板通过化学锚栓固定在原屋面梁上,间距一般取1m/根
(4)吊杆穿越上层楼(屋)面梁部分套上PVC管,并预埋在梁的混凝土中;
(5)待上层楼(屋)面梁能够承受外荷载时,对吊杆上端用螺母旋紧加力,并用游标卡尺量出螺杆高出螺母的伸长量,即为吊杆的伸长量设计控制值,具体设计方法在实施例中已经叙述,这里不再重复。
(6)此时下层梁(即原屋面梁)已能承受新砌墙体荷载,在原屋面梁上开始砌筑墙体;
(7)砌筑新墙体时,吊杆外围用砂浆填实进行保护;
(8)吊杆采用镀锌方法保护,上下连接节点处或采用镀锌保护或采用环氧涂层保护。
Claims (1)
1. 屋面梁改为楼面梁的荷载转移装置,本结构装置其特征是在原屋面梁(8)上植入化学锚栓(2)、安装钢结构底板(1)、连接竖板(4)、预埋在新梁内的PVC管(5)、吊杆(11)、新梁面上的预埋板(6),通过旋出螺母(7)的伸长控制量将所需部分荷载转移到上层新梁(9)上去。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007200384312U CN201133089Y (zh) | 2007-07-09 | 2007-07-09 | 屋面梁改为楼面梁的荷载转移装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007200384312U CN201133089Y (zh) | 2007-07-09 | 2007-07-09 | 屋面梁改为楼面梁的荷载转移装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201133089Y true CN201133089Y (zh) | 2008-10-15 |
Family
ID=40061362
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2007200384312U Expired - Fee Related CN201133089Y (zh) | 2007-07-09 | 2007-07-09 | 屋面梁改为楼面梁的荷载转移装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201133089Y (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102900240A (zh) * | 2012-10-18 | 2013-01-30 | 东南大学 | 一种用于建筑中结构柱的卸载方法 |
| CN103835524A (zh) * | 2014-03-09 | 2014-06-04 | 湖南金海钢结构股份有限公司 | 受荷情况下楼面钢梁设计变更截面改小处理方法 |
| CN113374275A (zh) * | 2021-05-08 | 2021-09-10 | 北京市机械施工集团有限公司 | 一种房中房形式的钢结构整体提升施工方法 |
| CN114482609A (zh) * | 2022-03-01 | 2022-05-13 | 中建八局第三建设有限公司 | 一种多层箱式板房加固方法 |
-
2007
- 2007-07-09 CN CNU2007200384312U patent/CN201133089Y/zh not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102900240A (zh) * | 2012-10-18 | 2013-01-30 | 东南大学 | 一种用于建筑中结构柱的卸载方法 |
| CN102900240B (zh) * | 2012-10-18 | 2014-11-05 | 东南大学 | 一种用于建筑中结构柱的卸载方法 |
| CN103835524A (zh) * | 2014-03-09 | 2014-06-04 | 湖南金海钢结构股份有限公司 | 受荷情况下楼面钢梁设计变更截面改小处理方法 |
| CN103835524B (zh) * | 2014-03-09 | 2017-01-25 | 湖南金海钢结构股份有限公司 | 受荷情况下楼面钢梁设计变更截面改小处理方法 |
| CN113374275A (zh) * | 2021-05-08 | 2021-09-10 | 北京市机械施工集团有限公司 | 一种房中房形式的钢结构整体提升施工方法 |
| CN113374275B (zh) * | 2021-05-08 | 2022-10-14 | 北京市机械施工集团有限公司 | 一种房中房形式的钢结构整体提升施工方法 |
| CN114482609A (zh) * | 2022-03-01 | 2022-05-13 | 中建八局第三建设有限公司 | 一种多层箱式板房加固方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103046755B (zh) | 牧区装配式轻钢集成房屋的建造方法 | |
| CN101914925B (zh) | 利用优化复合预制拱墙作外墙的地下室 | |
| CN204940928U (zh) | 可移动式铝合金房屋 | |
| CN204876257U (zh) | 铝合金房屋的屋面系统 | |
| CN107905251A (zh) | 一种模块预应力装配式挡土墙及其装配方法 | |
| CN101418569A (zh) | 预制拱片、支护与主体结构结合的优化复合拱墙 | |
| CN107190884A (zh) | 一种新型多高层热轧型钢‑复合轻钢剪力墙组合结构体系 | |
| CN111104711A (zh) | 一种建筑结构合理化的节材控制方法 | |
| CN103046644A (zh) | 多层房屋冷弯薄壁型钢梁柱结构体系 | |
| CN210887559U (zh) | 低多层钢结构住宅体系 | |
| CN110295622B (zh) | 一种桁排架组合结构挡土墙 | |
| CN106677338A (zh) | 带耗能梁的钢框架与交叉型中心支撑的抗震建筑结构 | |
| CN110439291A (zh) | 一种适用于低层建筑的装配式生产施工方法 | |
| CN106284644B (zh) | 一种适用于工业化生产的居住建筑结构体系及其建造方法 | |
| CN107313551A (zh) | 一种钢筋桁架混凝土预制墙板及结构体系及其施工方法 | |
| CN112211424B (zh) | 外套门式刚架加固既有砌体建筑的加固体系及施工方法 | |
| CN207376945U (zh) | 一种钢筋桁架混凝土预制墙板及结构体系 | |
| CN204940537U (zh) | 一种可移动式铝合金房屋 | |
| CN116163571B (zh) | 工业化钢结构减震房屋框架体系 | |
| CN204919802U (zh) | 铝合金房屋的前立面系统 | |
| CN102127942A (zh) | 节能抗震填芯无梁建筑楼板 | |
| CN219012118U (zh) | 工业化钢结构减震房屋框架体系 | |
| CN203034638U (zh) | 绝热型结构连接器 | |
| CN2931627Y (zh) | 框架、墙板组合楼房 | |
| CN111549933A (zh) | 一种采用全干式连接的低层装配式房屋结构及装配方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081015 Termination date: 20110709 |