CN202577305U - 钢柱定位器 - Google Patents

钢柱定位器 Download PDF

Info

Publication number
CN202577305U
CN202577305U CN 201220235103 CN201220235103U CN202577305U CN 202577305 U CN202577305 U CN 202577305U CN 201220235103 CN201220235103 CN 201220235103 CN 201220235103 U CN201220235103 U CN 201220235103U CN 202577305 U CN202577305 U CN 202577305U
Authority
CN
China
Prior art keywords
steel column
pedestal
jack
screw rod
pallet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220235103
Other languages
English (en)
Inventor
吴天凯
亓立刚
张志威
王海
崔爱珍
刘彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN 201220235103 priority Critical patent/CN202577305U/zh
Application granted granted Critical
Publication of CN202577305U publication Critical patent/CN202577305U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种钢柱定位器,包括:一基座,所述基座锚固于混凝土平台上;一托盘,所述托盘连接于所述基座上,且所述托盘上环设有复数第一插孔;复数螺杆插盒,所述螺杆插盒对应所述第一插孔设置于所述托盘的内侧,所述螺杆插盒内对应所述第一插孔设有复数第二插孔;复数螺杆,所述螺杆的第一端形成一手柄,所述螺杆的第二端穿过所述第一插孔和所述第二插孔;复数千斤顶,所述千斤顶设置于所述基座与所述托盘之间。本实用新型钢柱定位器通过调节所述螺杆调整钢柱水平位置和固定钢柱,通过所述钢柱定位器四角处的所述千斤顶调节钢柱的垂直度,以保证钢柱的精确定位和保证钢柱柱身垂直度满足设计要求。

Description

钢柱定位器
技术领域
本实用新型涉及一种工程桩柱的定位装置。
背景技术
在深基坑盖挖逆作施工工艺流程中,中间工程桩柱的施工是关键工序之一,其施工质量将直接影响后续施工工序的进行,严重影响工程工期和造价。而中间桩柱施工工序的重点、难点是保证中间桩柱的精确定位和保证桩身垂直度满足设计要求。目前,工程中常采用吊车固定桩位,人工调整桩身位置和垂直度的方案,此方案不仅耗时耗资较大,还存在一定的安全隐患,并且施工质量难以保证,返工率较大,造成了不必要的浪费。
实用新型内容
为解决上述现有技术所存在的不足,本实用新型提供了一种精确定位钢柱的钢柱定位器。
为实现上述技术效果,本实用新型公开了一种钢柱定位器包括:
一基座,所述基座锚固于混凝土平台上;
一托盘,所述托盘连接于所述基座上,且所述托盘上环设有复数第一插孔;
复数螺杆插盒,所述螺杆插盒对应所述第一插孔设置于所述托盘的内侧,所述螺杆插盒内对应所述第一插孔设有复数第二插孔;
复数螺杆,所述螺杆的第一端形成一手柄,所述螺杆的第二端穿过所述第一插孔和所述第二插孔;
复数千斤顶,所述千斤顶设置于所述基座与所述托盘之间。
本实用新型进一步的改进在于,所述基座与所述托盘之间通过复数螺栓连接。
本实用新型进一步的改进在于,所述螺杆插盒的下端通过一固定于所述基座顶部的插槽与所述基座连接,所述螺杆插盒的上端通过一固定钢板用螺栓与所述托盘顶面连接。
本实用新型进一步的改进在于,所述基座的四边角处分别设有一第一角钢,对应所述第一角钢在所述托盘上设有第二角钢,所述千斤顶的底部设置于所述第一角钢上,所述千斤顶杆体的顶端顶住所述第二角钢。
本实用新型由于采用了以上技术方案,使其具有以下有益效果是:通过调节所述螺杆调整钢柱水平位置和固定钢柱,通过所述钢柱定位器边角处的所述千斤顶调节钢柱的垂直度,以保证钢柱的精确定位和保证钢柱柱身垂直度满足设计要求。
附图说明
图1为本实用新型钢柱定位器的结构示意图。
图2为本实用新型钢柱定位器的结构俯视图。
图3为本实用新型钢柱定位器的局部放大透视图。
具体实施方式
下面结合附图和具体实施方式以十字型钢柱为例对本实用新型作进一步详细的说明。
首先参阅图1所示,本实用新型的钢柱定位器主要由一锚固于混凝土平台上的基座1、一固定于基座1上的托盘2、插设于托盘2上的复数螺杆4和设置于所述定位器四边角的千斤顶5组成,其中:
配合图2所示,基座1和托盘2分别由四块钢板呈井字形焊接而成,基座1与托盘2之间通过螺栓8固定,在托盘2四周中部分别设有第一插孔21,在托盘2的内侧配合螺杆4设有一螺杆插盒3,用以进一步固定螺杆4,螺杆插盒3内设有第二插孔31,螺杆4的第一端401于托盘2的外侧形成一手柄,螺杆4的第二端402穿过第一插孔21和第二插孔31用以顶住十字型钢柱10,通过调节螺杆4调整十字型钢柱10的水平位置,调整完毕后紧固螺杆4以固定十字型钢柱10。
结合图1所示,钢柱定位器的四边角处分别设有四个千斤顶5用以调节十字型钢柱10的垂直度,其中,基座1的四边角处分别设有一第一角钢6,对应第一角钢6在托盘2上设有第二角钢7,千斤顶5的底部设置于第一角钢6上,千斤顶5杆体的顶端顶住第二角钢7。
作为本实用新型的一较佳实施方式,如图3所示,螺杆插盒3的下端通过一固定于基座1顶部的插槽11与基座1连接,螺杆插盒3的上端通过一固定钢板13用螺栓8与托盘2顶面连接。
在使用本实用新型时,依照十字型钢柱10的定位安装基座1,通过螺栓8将托盘2初步固定于基座1上并吊放十字型钢柱10,在托盘2内侧安装螺杆插盒3并插入螺杆4,通过调节螺杆4调整十字型钢柱10的水平位置,调整完毕后紧固螺杆4,调整千斤顶5至钢柱定位器表面水平,并重新检验十字型钢柱10的垂直度,反复调整至符合设计要求后,将连接基座1和托盘2的螺栓8上紧,这样就完成了十字型钢柱10位置度与垂直度的精准定位。
以上结合附图实施例对本实用新型进行了详细说明,本领域中普通技术人员可根据上述说明对本实用新型做出种种变化例。因而,实施例中的某些细节不应构成对本实用新型的限定,本实用新型将以所附权利要求书界定的范围作为本实用新型的保护范围。

Claims (4)

1.一种钢柱定位器,其特征在于:所述钢柱定位器包括:
一基座,所述基座锚固于混凝土平台上;
一托盘,所述托盘连接于所述基座上,且所述托盘上环设有复数第一插孔;
复数螺杆插盒,所述螺杆插盒对应所述第一插孔设置于所述托盘的内侧,所述螺杆插盒内对应所述第一插孔设有复数第二插孔;
复数螺杆,所述螺杆的第一端形成一手柄,所述螺杆的第二端穿过所述第一插孔和所述第二插孔;
复数千斤顶,所述千斤顶设置于所述基座与所述托盘之间。
2.如权利要求1所述的钢柱定位器,其特征在于:所述基座与所述托盘之间通过复数螺栓连接。
3.如权利要求1所述的钢柱定位器,其特征在于:所述螺杆插盒的下端通过一固定于所述基座顶部的插槽与所述基座连接,所述螺杆插盒的上端通过一固定钢板用螺栓与所述托盘顶面连接。
4.如权利要求1所述的钢柱定位器,其特征在于:所述基座的四边角处分别设有一第一角钢,对应所述第一角钢在所述托盘上设有第二角钢,所述千斤顶的底部设置于所述第一角钢上,所述千斤顶杆体的顶端顶住所述第二角钢。
CN 201220235103 2012-05-23 2012-05-23 钢柱定位器 Expired - Fee Related CN202577305U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220235103 CN202577305U (zh) 2012-05-23 2012-05-23 钢柱定位器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220235103 CN202577305U (zh) 2012-05-23 2012-05-23 钢柱定位器

Publications (1)

Publication Number Publication Date
CN202577305U true CN202577305U (zh) 2012-12-05

Family

ID=47246734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220235103 Expired - Fee Related CN202577305U (zh) 2012-05-23 2012-05-23 钢柱定位器

Country Status (1)

Country Link
CN (1) CN202577305U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103434933A (zh) * 2013-08-13 2013-12-11 中国核工业华兴建设有限公司 一种大型构件吊装就位装置及就位方法
CN104594334A (zh) * 2013-10-29 2015-05-06 林清辉 一种改良结构的松木桩的安装装置
CN104727320A (zh) * 2013-10-29 2015-06-24 林清辉 一种带控制器的松木桩的安装装置
CN105604336A (zh) * 2016-01-25 2016-05-25 中国十九冶集团有限公司 钢柱安装定位装置及安装定位方法
CN106351400A (zh) * 2016-10-11 2017-01-25 中国建筑股份有限公司海拓工程分公司 一种预制混凝土八角柱装配装置及其安装方法
CN107476321A (zh) * 2017-07-19 2017-12-15 中国葛洲坝集团第五工程有限公司 钢围堰下放滑箱微调大弧面定位装置及操作方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103434933A (zh) * 2013-08-13 2013-12-11 中国核工业华兴建设有限公司 一种大型构件吊装就位装置及就位方法
CN103434933B (zh) * 2013-08-13 2015-02-18 中国核工业华兴建设有限公司 一种大型构件吊装就位装置及就位方法
CN104594334A (zh) * 2013-10-29 2015-05-06 林清辉 一种改良结构的松木桩的安装装置
CN104727320A (zh) * 2013-10-29 2015-06-24 林清辉 一种带控制器的松木桩的安装装置
CN103590403B (zh) * 2013-10-29 2015-07-01 林清辉 一种松木桩的安装装置
CN104594334B (zh) * 2013-10-29 2016-03-23 林清辉 一种改良结构的松木桩的安装装置
CN104727320B (zh) * 2013-10-29 2016-08-31 林清辉 一种带控制器的松木桩的安装装置
CN105604336A (zh) * 2016-01-25 2016-05-25 中国十九冶集团有限公司 钢柱安装定位装置及安装定位方法
CN106351400A (zh) * 2016-10-11 2017-01-25 中国建筑股份有限公司海拓工程分公司 一种预制混凝土八角柱装配装置及其安装方法
CN107476321A (zh) * 2017-07-19 2017-12-15 中国葛洲坝集团第五工程有限公司 钢围堰下放滑箱微调大弧面定位装置及操作方法

Similar Documents

Publication Publication Date Title
CN202577305U (zh) 钢柱定位器
CN203604918U (zh) 大型设备的水平位置校正装置
CN103107219A (zh) 光伏板系统、光伏板固定装置及装设光伏板系统的方法
CN103397701A (zh) 预埋螺栓双层定位板可调定位结构及施工方法
CN104196231A (zh) 一种混凝土楼板铝合金模板及其施工方法
CN101745748A (zh) 钻井平台的桩腿与桩靴的焊接方法
CN210049487U (zh) 一种箱形钢柱脚刚接节点
CN213897059U (zh) 一种防沉板结构及导管架平台
CN208792357U (zh) 一种用于海上导管架式风机基础施工的控制平台
CN203682275U (zh) 用于非标准集装箱的吊装梁及非标准集装箱
CN215622599U (zh) 一种轴舵系安装辅助工装
CN203049608U (zh) 通信铁塔基础预埋地脚螺栓装置
CN203420359U (zh) 钢结构支撑系统中承受超大荷载的梁柱连接的刚接节点
CN202718125U (zh) 一种贝雷钢栈桥桩基施工定位导向架
CN208182560U (zh) 一种应用于自升式平台的中心高和中心距可调整升降系统
CN204689525U (zh) 一种便于测量的设备顶升装置
CN105480842B (zh) 一种后浇设备支撑梁及其施工方法
CN205178966U (zh) 太阳能电池板框架卡接结构
JP2019090266A (ja) 主脚材据付方法および主脚材据付治具
CN204663027U (zh) 用于网架安装的支撑装置
CN203141022U (zh) 用于控制核电站预埋件与调节支撑焊接变形量的工具
CN103523175B (zh) 一种风电机组导管架底端固定装置
CN218090545U (zh) 一种墩-桩钢混过渡接头钢板水准度及平面位置调节装置
CN202809639U (zh) 施工电梯钢梁基础
CN206681491U (zh) 工地用可拆卸式拼装围墙

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20190523

CF01 Termination of patent right due to non-payment of annual fee