CN202559360U
CN202559360U CN2012201449527U CN201220144952U CN202559360U CN 202559360 U CN202559360 U CN 202559360U CN 2012201449527 U CN2012201449527 U CN 2012201449527U CN 201220144952 U CN201220144952 U CN 201220144952U CN 202559360 U CN202559360 U CN 202559360U
Authority
CN
China
Prior art keywords
foundation pit
energy
stiffness
putting
pit supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201449527U
Other languages
English (en)
Inventor
李仁民
刘松玉
王首超
蔡钟业
陈晓凤
童立元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2012201449527U priority Critical patent/CN202559360U/zh
Application granted granted Critical
Publication of CN202559360U publication Critical patent/CN202559360U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

一种纵向变刚度基坑支护结构,涉及岩土工程的技术领域,尤其涉及一种纵向变刚度基坑支护结构的技术领域。本实用新型包括用于基坑挡土和止水的支护桩、用于抵抗较小内力的第一加劲体、用于抵抗较大内力的第二加劲体,支护桩的内部分别布置至少一组纵向布置的第一加劲体、第二加劲体。本实用新型实现了结构刚度可调整、科学合理、经济环保的目的。

Description

一种纵向变刚度基坑支护结构
技术领域
本实用新型涉及岩土工程的技术领域,尤其涉及一种纵向变刚度基坑支护结构的技术领域。
背景技术
目前基坑设计中,首先计算考虑坑外水土作用及坑外超载作用下,支护体系的最大内力。据此最大内力,进行支护结构的选型、设计。然而,支护结构的内力在纵向变化很大,统一按照最大内力进行设计,资源浪费严重。
发明内容
本实用新型目的是提供一种结构刚度可调整、科学合理、经济环保的基坑支护结构。
一种纵向变刚度基坑支护结构,包括用于基坑挡土和止水的支护桩、用于抵抗较小内力的第一加劲体、用于抵抗较大内力的第二加劲体,支护桩的内部分别布置至少一组纵向布置的第一加劲体、第二加劲体。
本实用新型采用上述技术方案,与现有技术相比具有如下优点:本实用新型采用纵向变刚度基坑支护结构,可以充分发挥加劲体的优点,比其它基坑支护结构形式更加经济合理。使设计更具有科学性、合理性,同时达到节约资源、节省造价的目的。纵向变刚度基坑支护结构是在充分研究支护结构内力沿纵向分布的基础上。针对性的设计支护结构的刚度,对结构内力大的部位采用大刚度支护结构,对结构内力较小的部位采用小刚度支护结构。使设计更具有科学性、合理性,同时达到节约资源、节省造价的目的。
附图说明
图1是本实用新型的一种结构示意图。
图2是本实用新型的一种结构示意图。
具体实施方式
下面结合附图对本实用新型的技术方案进行详细说明:
如图1所示,一种纵向变刚度基坑支护结构,包括用于基坑挡土和止水的支护桩1、用于抵抗较小内力的第一加劲体2、用于抵抗较大内力的第二加劲体3,支护桩1的内部分别布置至少一组纵向布置的第一加劲体2、第二加劲体3。
如图2所示,支护桩1的内部布置五组第一加劲体2、第二加劲体3。
基于本实用新型的纵向变刚度基坑支护结构的施工方法,包括以下步骤:
第一步:根据场地条件和计算分析,确定支护桩1的型式、间距、桩长,确定用于抵抗较小内力的加劲体2的型式、纵向分布、间距、长度,确定用于抵抗较大内力的加劲体3的型式、纵向分布、间距、长度;
第二步:施工支护桩1、加劲体2、加劲体3;
第三步:开挖基坑内部土体,施工坑内支撑体系;
第四步:对基坑坑底进行清理、整平,浇筑垫层,施工底板及主体结构;
第五步:回填土,视情况回收加劲体2、加劲体3。
本实用新型可以应用于目前常用的基坑支护结构中。例如:对于常规的排桩支护结构,支护桩1采用钻孔灌注桩形式时,加劲体2、3可采用普通钢筋。支护桩1采用SMW工法时,加劲体2可采用H型钢,3可以采用H型钢或普通钢板焊接在加劲体2上。支护采用钢板桩组合结构时,加劲体1采用钢板桩,加劲体2、3采用H型钢或普通钢板焊接在钢板桩上。

Claims (1)

1.一种纵向变刚度基坑支护结构,其特征在于包括用于基坑挡土和止水的支护桩(1)、用于抵抗较小内力的第一加劲体(2)、用于抵抗较大内力的第二加劲体(3),支护桩(1)的内部分别布置至少一组纵向布置的第一加劲体(2)、第二加劲体(3)。
CN2012201449527U 2012-04-09 2012-04-09 一种纵向变刚度基坑支护结构 Expired - Fee Related CN202559360U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201449527U CN202559360U (zh) 2012-04-09 2012-04-09 一种纵向变刚度基坑支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201449527U CN202559360U (zh) 2012-04-09 2012-04-09 一种纵向变刚度基坑支护结构

Publications (1)

Publication Number Publication Date
CN202559360U true CN202559360U (zh) 2012-11-28

Family

ID=47209029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201449527U Expired - Fee Related CN202559360U (zh) 2012-04-09 2012-04-09 一种纵向变刚度基坑支护结构

Country Status (1)

Country Link
CN (1) CN202559360U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755745A (zh) * 2018-04-26 2018-11-06 易朋莹 一种新型型钢悬臂支护结构及其设计计算方法
CN111851520A (zh) * 2020-07-28 2020-10-30 上海市基础工程集团有限公司 叠合变阶水泥土连续钢墙结构及设置方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755745A (zh) * 2018-04-26 2018-11-06 易朋莹 一种新型型钢悬臂支护结构及其设计计算方法
CN111851520A (zh) * 2020-07-28 2020-10-30 上海市基础工程集团有限公司 叠合变阶水泥土连续钢墙结构及设置方法

Similar Documents

Publication Publication Date Title
CN202559362U (zh) 一种双排钢板桩与h型钢组合基坑支护结构
CN202559361U (zh) 一种预制高强混凝土薄壁钢管桩基坑支护结构
CN102995643B (zh) 一种地下空间钢桁架基坑支护结构及其施工方法
CN202117068U (zh) 微型桩板式复合基础
CN104912082A (zh) 一种倾斜装配式双排钢板桩基坑支护结构及其施工方法
CN103061346A (zh) 采用螺栓连接的钢板桩和h型钢组合基坑支护结构
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN204898672U (zh) 一种废弃桩基的拔除装置
CN202559360U (zh) 一种纵向变刚度基坑支护结构
CN105350503A (zh) 一种水电站地下厂房厂变交通洞结构及其施工方法
CN203096745U (zh) 多排桩基坑支护结构
CN203383220U (zh) 一种减小双排桩水平变形的基坑支护结构
CN202745063U (zh) 深基坑钢板桩加锚索支护体系施工结构
CN202559363U (zh) 一种钢结构地下连续墙基坑支护结构
CN201924365U (zh) 一种钢板桩管桩组合基坑支护结构
CN201232180Y (zh) 新型板桩墙
CN102619214B (zh) 一种u形接口钢板桩及其在基坑围护中的应用
CN205502053U (zh) 增强型海上风电场单桩基础
CN205062775U (zh) 一种水电站地下厂房岩壁吊车梁过进厂交通洞结构
CN204023580U (zh) 一种倾斜装配式双排钢板桩基坑支护结构
CN103088831A (zh) 一种整体装配式双排钢桩基坑支护结构
CN203034462U (zh) 一种地下空间钢桁架基坑支护结构
CN201169781Y (zh) 一种盖挖基坑结构
CN203200758U (zh) 采用螺栓连接的钢板桩和h型钢组合基坑支护结构
CN103215965A (zh) 层板式高桩承台塔吊基础结构及施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20160409

CF01 Termination of patent right due to non-payment of annual fee