CN202544491U - Safety protection barrier - Google Patents

Safety protection barrier Download PDF

Info

Publication number
CN202544491U
CN202544491U CN2012200628021U CN201220062802U CN202544491U CN 202544491 U CN202544491 U CN 202544491U CN 2012200628021 U CN2012200628021 U CN 2012200628021U CN 201220062802 U CN201220062802 U CN 201220062802U CN 202544491 U CN202544491 U CN 202544491U
Authority
CN
China
Prior art keywords
support post
firm banking
reset device
elastic reset
safety protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200628021U
Other languages
Chinese (zh)
Inventor
杨洪
牛宇
苑勇
刘泽光
贾中华
康沪雁
陈春颖
韩社军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron And Steel Co Ltd Handan Branch
Original Assignee
Hebei Iron And Steel Co Ltd Handan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron And Steel Co Ltd Handan Branch filed Critical Hebei Iron And Steel Co Ltd Handan Branch
Priority to CN2012200628021U priority Critical patent/CN202544491U/en
Application granted granted Critical
Publication of CN202544491U publication Critical patent/CN202544491U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a safety protection barrier, which comprises a support vertical rod, wherein the support vertical rod is connected with a fixed base via a set bolt, the fixed base is fixedly connected on the ground or a high-altitude platform, positioning rings or positioning holes are arranged at the upper part of the support vertical rod, and a protection steel rope passes through a plurality of positioning rings or positioning holes on the support vertical rod. In the safety protection barrier, the support vertical rod is fixedly connected on the fixed base via the set bolt, and when hoisting is required, the safety protection barrier can be rapidly disassembled and is effectively prevented from being damaged due to collision. The safety protection barrier is economic and practical, is convenient to install and use, and can be widely applied to surrounding of equipment and the high-altitude platform.

Description

Safe protective railing
Technical field
The utility model relates to a kind of security protection and establishes device, especially a kind of safe protective railing.
Background technology
Each industrial enterprise and metallurgy, steelmaker all can be provided with safe protective railing around equipment at present, around High Altitude Platform, install and fix the formula security guardrail simultaneously, so that the equipment deathtrap is isolated, improve Field Force's safety factor.The conventional security guardrail of national security regulations of rules generally is to be weldingly fixed on around the equipment by steel pipe, generally is fixed, and there is certain defective in this mode, mainly show following some:
1, the plant maintenance of production scene needs the hanging device parts, and some security guardrail has influenced the lifting of equipment because the site space restriction can only be installed in from the very near place of equipment.Equipment unavoidable meeting damage guard rail in hoisting process causes unnecessary loss simultaneously.
2, in factory's final product storage; The finished product slab and the roll coil of strip produced need handling, entrucking, and in order to improve safety factor, on-the-spot meeting is to installing guard rail around personnel channel and the equipment; But accidents such as misoperation can take place in overhead traveling crane handling process, can cause the damage of security guardrail.
In view of above situation, necessary railing to easy damage carries out new transformation, improves the life-span and the safety of security guardrail.
The utility model content
The technical problem that the utility model will solve provides a kind of safe protective railing that is difficult for smashing.
For solving the problems of the technologies described above, the technical scheme that the utility model is taked is: it includes support post, and described support post is connected with firm banking through positioning bolt, and firm banking is fixed on ground or the High Altitude Platform; Be provided with locating ring or locating hole on the top of support post, have the protection cable wire to pass locating ring or locating hole on several support posts.
Be provided with the elastic reset device between said support post of the utility model and the firm banking, positioning bolt is with support post, elastic reset device and the firm banking structure that is connected as a single entity.
The described elastic reset device of the utility model is connected in sequence by both forward and reverse directions by the flexure strip of several bowl-types; Elastic rubber pipe is installed in flexure strip, when support post resets, plays the effect of buffering; Middle part at the elastic reset device has through hole, and it is affixed with support post and firm banking that positioning bolt passes through hole.
Adopt the beneficial effect that technique scheme produced to be: the utility model is fixed in support post on the firm banking through positioning bolt, when needs lift, can prevent that effectively guard rail from being smashed fast with the dismounting of this guard rail.The utility model is economical and practical, convenient for installation and maintenance, can be widely used in around the equipment and High Altitude Platform.
The utility model is designed with the elastic reset device, utilizes the elastic deformation of elastic reset device, can make it to bear the bump and do not damage; Utilize elastic reset device reset function; Support post can progressively slowly reset after being clashed into run-off the straight; Stopped the generation of accidents such as elastomeric bounce-back bump; Improve the safety factor of guard rail, satisfied the national regulation of " fixed industrial protection railing safety specification " and GB4053.4-1983 " fixed Industrial Steel platform ", improved the Practical Performance of guard rail simultaneously.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation.
Fig. 1 is the structural representation of the utility model.
The specific embodiment
Shown in Figure 1, the safety guard rail includes support post 1, and support post 1 is welded by steel pipe; Welding or position with modes such as expansion bolts firm banking 4 is installed on ground or High Altitude Platform; Between firm banking 4 and support post 1, be provided with elastic reset device 3; Positioning bolt 6 is with support post 1, elastic reset device 3 and firm banking 4 structure that is connected as a single entity.Be provided with locating ring 8 on the top of support post 1, also can adopt the locating hole structure; As required, around the equipment or High Altitude Platform around a plurality of firm bankings 4 of location and installation, support post 1 is installed in firm banking 4 after, promptly available protection cable wire 7 passes the locating ring 8 on these support posts, thereby reaches the effect of protection caution.
Shown in Figure 1, the described elastic reset device 3 of safety guard rail is connected in sequence by both forward and reverse directions by the flexure strip of several bowl-types 2, and described flexure strip 2 can be processed by the steel plate elastomeric material; Middle part at the flexure strip 2 of bowl-type all has through hole, and elastic rubber pipe 9 is installed in flexure strip, when support post resets, plays the effect of buffering, and can to pass through hole affixed with support post 1 and firm banking 4 for positioning bolt 6 like this.The periphery of said elastic reset device 3 preferably is arranged with the crust 5 of barreled, and crust is processed by elastomeric material, for example rubber etc.; Like this can be under the situation of the elastic reset function that does not influence elastic reset device 3, the flexure strip 2 of bowl-type is coated, make it that more outward appearance is more regular and not fragile.
The safety guard rail can be set the position of safe protective railing according to the scope in site safety zone; The position of guard rail can be according to site safety needs installing/dismounting at any time; Consider factors such as safety factor and installation cost simultaneously, the spacing of guard rail, highly also can adjust according to on-site actual situations.Check through modes such as reality use, bump tests, this guard rail can bear 30 tons of horizontal 1 meter bumps of coil of strip, and the support post inclination maximum can reach 40 ° in knockout process; Under the normal 200KG thrust of adult, the support post inclination maximum reaches 8 °, has played security protection, crashproof designing requirement.Especially designed elastic reset device, after support post is clashed into run-off the straight, can progressively slowly reset, stopped the generation of accidents such as elastomeric bounce-back bump, improved the safety factor of guard rail with pooling feature.

Claims (3)

1. safe protective railing, it includes support post (1), it is characterized in that: described support post (1) is connected with firm banking (4) through positioning bolt (6), and firm banking (4) is fixed on ground or the High Altitude Platform; Be provided with locating ring (8) or locating hole on the top of support post (1), have protection cable wire (7) to pass locating ring (8) or locating hole on several support posts.
2. safe protective railing according to claim 1; It is characterized in that: be provided with elastic reset device (3) between said support post (1) and the firm banking (4), positioning bolt (6) is with support post (1), elastic reset device (3) and firm banking (4) structure that is connected as a single entity.
3. safe protective railing according to claim 2 is characterized in that: described elastic reset device (3) is connected in sequence by both forward and reverse directions by the flexure strip (2) of several bowl-types; Elastic rubber pipe (9) is installed in flexure strip (2); Middle part at the elastic reset device has through hole, and it is affixed with support post and firm banking that positioning bolt passes through hole.
CN2012200628021U 2012-02-24 2012-02-24 Safety protection barrier Expired - Fee Related CN202544491U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200628021U CN202544491U (en) 2012-02-24 2012-02-24 Safety protection barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200628021U CN202544491U (en) 2012-02-24 2012-02-24 Safety protection barrier

Publications (1)

Publication Number Publication Date
CN202544491U true CN202544491U (en) 2012-11-21

Family

ID=47165143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200628021U Expired - Fee Related CN202544491U (en) 2012-02-24 2012-02-24 Safety protection barrier

Country Status (1)

Country Link
CN (1) CN202544491U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452379A (en) * 2013-08-09 2013-12-18 浙江元森态家具有限公司 Fence
CN103452380A (en) * 2013-08-09 2013-12-18 浙江元森态家具有限公司 Fence installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452379A (en) * 2013-08-09 2013-12-18 浙江元森态家具有限公司 Fence
CN103452380A (en) * 2013-08-09 2013-12-18 浙江元森态家具有限公司 Fence installation method

Similar Documents

Publication Publication Date Title
CN202247688U (en) Aerodynamic force prevention protecting shed frame for overpassing of high-speed railways
CN202706503U (en) Electric lifting discharging platform for main building construction
CN208329748U (en) The overhaul of the equipments platform easily assembled and disassembled in the water wheel chamber of power station
CN205653086U (en) Tower crane who possesses climbing ladder and lift
CN202544491U (en) Safety protection barrier
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN104259738A (en) Replacement method of revolving bearing of material taking machine
CN106144929A (en) One population hoist device and construction method
CN102677925A (en) Plant building for configuring crane
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN203513223U (en) High-altitude operating platform
CN205955254U (en) A can dismantle and prevent guardrail bar for steel construction construction
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN210262735U (en) Hanging basket for construction of double-hoop method bent cap
CN203462768U (en) Movable support for fixing safety rope
CN103323224B (en) A kind of anti-falling safe pick-up unit
CN206616460U (en) A kind of adhesion type bridge maintenance nacelle device
CN205777531U (en) Floor slab construction beam string shuttering supporting equipment
CN105256719B (en) Bridge guardrail provided with sliding rails
CN212406943U (en) Large-scale wind turbine generator system cabin afterbody platform
CN203794493U (en) Lifting device applicable to narrow and small space
US20170121157A1 (en) Security System for Operations in Wind Generators
CN105253793A (en) Construction method for traction transporting and hoisting of zinc pot in zinc plating workshop
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN204038917U (en) Dismountable external hanging service platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20150224

EXPY Termination of patent right or utility model