CN202544491U - Safety protection barrier - Google Patents
Safety protection barrier Download PDFInfo
- Publication number
- CN202544491U CN202544491U CN2012200628021U CN201220062802U CN202544491U CN 202544491 U CN202544491 U CN 202544491U CN 2012200628021 U CN2012200628021 U CN 2012200628021U CN 201220062802 U CN201220062802 U CN 201220062802U CN 202544491 U CN202544491 U CN 202544491U
- Authority
- CN
- China
- Prior art keywords
- support post
- firm banking
- reset device
- elastic reset
- safety protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a safety protection barrier, which comprises a support vertical rod, wherein the support vertical rod is connected with a fixed base via a set bolt, the fixed base is fixedly connected on the ground or a high-altitude platform, positioning rings or positioning holes are arranged at the upper part of the support vertical rod, and a protection steel rope passes through a plurality of positioning rings or positioning holes on the support vertical rod. In the safety protection barrier, the support vertical rod is fixedly connected on the fixed base via the set bolt, and when hoisting is required, the safety protection barrier can be rapidly disassembled and is effectively prevented from being damaged due to collision. The safety protection barrier is economic and practical, is convenient to install and use, and can be widely applied to surrounding of equipment and the high-altitude platform.
Description
Technical field
The utility model relates to a kind of security protection and establishes device, especially a kind of safe protective railing.
Background technology
Each industrial enterprise and metallurgy, steelmaker all can be provided with safe protective railing around equipment at present, around High Altitude Platform, install and fix the formula security guardrail simultaneously, so that the equipment deathtrap is isolated, improve Field Force's safety factor.The conventional security guardrail of national security regulations of rules generally is to be weldingly fixed on around the equipment by steel pipe, generally is fixed, and there is certain defective in this mode, mainly show following some:
1, the plant maintenance of production scene needs the hanging device parts, and some security guardrail has influenced the lifting of equipment because the site space restriction can only be installed in from the very near place of equipment.Equipment unavoidable meeting damage guard rail in hoisting process causes unnecessary loss simultaneously.
2, in factory's final product storage; The finished product slab and the roll coil of strip produced need handling, entrucking, and in order to improve safety factor, on-the-spot meeting is to installing guard rail around personnel channel and the equipment; But accidents such as misoperation can take place in overhead traveling crane handling process, can cause the damage of security guardrail.
In view of above situation, necessary railing to easy damage carries out new transformation, improves the life-span and the safety of security guardrail.
The utility model content
The technical problem that the utility model will solve provides a kind of safe protective railing that is difficult for smashing.
For solving the problems of the technologies described above, the technical scheme that the utility model is taked is: it includes support post, and described support post is connected with firm banking through positioning bolt, and firm banking is fixed on ground or the High Altitude Platform; Be provided with locating ring or locating hole on the top of support post, have the protection cable wire to pass locating ring or locating hole on several support posts.
Be provided with the elastic reset device between said support post of the utility model and the firm banking, positioning bolt is with support post, elastic reset device and the firm banking structure that is connected as a single entity.
The described elastic reset device of the utility model is connected in sequence by both forward and reverse directions by the flexure strip of several bowl-types; Elastic rubber pipe is installed in flexure strip, when support post resets, plays the effect of buffering; Middle part at the elastic reset device has through hole, and it is affixed with support post and firm banking that positioning bolt passes through hole.
Adopt the beneficial effect that technique scheme produced to be: the utility model is fixed in support post on the firm banking through positioning bolt, when needs lift, can prevent that effectively guard rail from being smashed fast with the dismounting of this guard rail.The utility model is economical and practical, convenient for installation and maintenance, can be widely used in around the equipment and High Altitude Platform.
The utility model is designed with the elastic reset device, utilizes the elastic deformation of elastic reset device, can make it to bear the bump and do not damage; Utilize elastic reset device reset function; Support post can progressively slowly reset after being clashed into run-off the straight; Stopped the generation of accidents such as elastomeric bounce-back bump; Improve the safety factor of guard rail, satisfied the national regulation of " fixed industrial protection railing safety specification " and GB4053.4-1983 " fixed Industrial Steel platform ", improved the Practical Performance of guard rail simultaneously.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation.
Fig. 1 is the structural representation of the utility model.
The specific embodiment
Shown in Figure 1, the safety guard rail includes support post 1, and support post 1 is welded by steel pipe; Welding or position with modes such as expansion bolts firm banking 4 is installed on ground or High Altitude Platform; Between firm banking 4 and support post 1, be provided with elastic reset device 3; Positioning bolt 6 is with support post 1, elastic reset device 3 and firm banking 4 structure that is connected as a single entity.Be provided with locating ring 8 on the top of support post 1, also can adopt the locating hole structure; As required, around the equipment or High Altitude Platform around a plurality of firm bankings 4 of location and installation, support post 1 is installed in firm banking 4 after, promptly available protection cable wire 7 passes the locating ring 8 on these support posts, thereby reaches the effect of protection caution.
Shown in Figure 1, the described elastic reset device 3 of safety guard rail is connected in sequence by both forward and reverse directions by the flexure strip of several bowl-types 2, and described flexure strip 2 can be processed by the steel plate elastomeric material; Middle part at the flexure strip 2 of bowl-type all has through hole, and elastic rubber pipe 9 is installed in flexure strip, when support post resets, plays the effect of buffering, and can to pass through hole affixed with support post 1 and firm banking 4 for positioning bolt 6 like this.The periphery of said elastic reset device 3 preferably is arranged with the crust 5 of barreled, and crust is processed by elastomeric material, for example rubber etc.; Like this can be under the situation of the elastic reset function that does not influence elastic reset device 3, the flexure strip 2 of bowl-type is coated, make it that more outward appearance is more regular and not fragile.
The safety guard rail can be set the position of safe protective railing according to the scope in site safety zone; The position of guard rail can be according to site safety needs installing/dismounting at any time; Consider factors such as safety factor and installation cost simultaneously, the spacing of guard rail, highly also can adjust according to on-site actual situations.Check through modes such as reality use, bump tests, this guard rail can bear 30 tons of horizontal 1 meter bumps of coil of strip, and the support post inclination maximum can reach 40 ° in knockout process; Under the normal 200KG thrust of adult, the support post inclination maximum reaches 8 °, has played security protection, crashproof designing requirement.Especially designed elastic reset device, after support post is clashed into run-off the straight, can progressively slowly reset, stopped the generation of accidents such as elastomeric bounce-back bump, improved the safety factor of guard rail with pooling feature.
Claims (3)
1. safe protective railing, it includes support post (1), it is characterized in that: described support post (1) is connected with firm banking (4) through positioning bolt (6), and firm banking (4) is fixed on ground or the High Altitude Platform; Be provided with locating ring (8) or locating hole on the top of support post (1), have protection cable wire (7) to pass locating ring (8) or locating hole on several support posts.
2. safe protective railing according to claim 1; It is characterized in that: be provided with elastic reset device (3) between said support post (1) and the firm banking (4), positioning bolt (6) is with support post (1), elastic reset device (3) and firm banking (4) structure that is connected as a single entity.
3. safe protective railing according to claim 2 is characterized in that: described elastic reset device (3) is connected in sequence by both forward and reverse directions by the flexure strip (2) of several bowl-types; Elastic rubber pipe (9) is installed in flexure strip (2); Middle part at the elastic reset device has through hole, and it is affixed with support post and firm banking that positioning bolt passes through hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200628021U CN202544491U (en) | 2012-02-24 | 2012-02-24 | Safety protection barrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200628021U CN202544491U (en) | 2012-02-24 | 2012-02-24 | Safety protection barrier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202544491U true CN202544491U (en) | 2012-11-21 |
Family
ID=47165143
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200628021U Expired - Fee Related CN202544491U (en) | 2012-02-24 | 2012-02-24 | Safety protection barrier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202544491U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452379A (en) * | 2013-08-09 | 2013-12-18 | 浙江元森态家具有限公司 | Fence |
CN103452380A (en) * | 2013-08-09 | 2013-12-18 | 浙江元森态家具有限公司 | Fence installation method |
-
2012
- 2012-02-24 CN CN2012200628021U patent/CN202544491U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452379A (en) * | 2013-08-09 | 2013-12-18 | 浙江元森态家具有限公司 | Fence |
CN103452380A (en) * | 2013-08-09 | 2013-12-18 | 浙江元森态家具有限公司 | Fence installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202247688U (en) | Aerodynamic force prevention protecting shed frame for overpassing of high-speed railways | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN208329748U (en) | The overhaul of the equipments platform easily assembled and disassembled in the water wheel chamber of power station | |
CN205653086U (en) | Tower crane who possesses climbing ladder and lift | |
CN202544491U (en) | Safety protection barrier | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN104259738A (en) | Replacement method of revolving bearing of material taking machine | |
CN106144929A (en) | One population hoist device and construction method | |
CN102677925A (en) | Plant building for configuring crane | |
CN101818563B (en) | Jack-up integral lifting mobile platform and using method | |
CN203513223U (en) | High-altitude operating platform | |
CN205955254U (en) | A can dismantle and prevent guardrail bar for steel construction construction | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN210262735U (en) | Hanging basket for construction of double-hoop method bent cap | |
CN203462768U (en) | Movable support for fixing safety rope | |
CN103323224B (en) | A kind of anti-falling safe pick-up unit | |
CN206616460U (en) | A kind of adhesion type bridge maintenance nacelle device | |
CN205777531U (en) | Floor slab construction beam string shuttering supporting equipment | |
CN105256719B (en) | Bridge guardrail provided with sliding rails | |
CN212406943U (en) | Large-scale wind turbine generator system cabin afterbody platform | |
CN203794493U (en) | Lifting device applicable to narrow and small space | |
US20170121157A1 (en) | Security System for Operations in Wind Generators | |
CN105253793A (en) | Construction method for traction transporting and hoisting of zinc pot in zinc plating workshop | |
CN204185146U (en) | Construction of Steel Structure overhang crane between skyscraper two tall buildings | |
CN204038917U (en) | Dismountable external hanging service platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121121 Termination date: 20150224 |
|
EXPY | Termination of patent right or utility model |