CN205955254U - A can dismantle and prevent guardrail bar for steel construction construction - Google Patents

A can dismantle and prevent guardrail bar for steel construction construction Download PDF

Info

Publication number
CN205955254U
CN205955254U CN201620811053.6U CN201620811053U CN205955254U CN 205955254 U CN205955254 U CN 205955254U CN 201620811053 U CN201620811053 U CN 201620811053U CN 205955254 U CN205955254 U CN 205955254U
Authority
CN
China
Prior art keywords
construction
steel
clamping part
pair
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620811053.6U
Other languages
Chinese (zh)
Inventor
崔阁
代凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Ershiye Construction Co Ltd filed Critical Shanghai Ershiye Construction Co Ltd
Priority to CN201620811053.6U priority Critical patent/CN205955254U/en
Application granted granted Critical
Publication of CN205955254U publication Critical patent/CN205955254U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to a steel construction construction field specifically is a can dismantle and prevent guardrail bar for steel construction construction, characterized by: it includes many stands, and the top of every stand is equipped with the wire rope handling ring, and the bottom of stand is equipped with the clamping part, the clamping part include the grooved riser in side and level setting at a pair of otic placode at riser top both ends, the otic placode is opened has the through -hole, the downthehole nut that has inlayed, a pair of bolt sets up respectively in the nut of two otic placodes. Originally, prevent that guardrail bar passes through the bottom clamping part and is connected with steel flange, constructor imports into personal safety rope in the wire rope handling ring and carries out the decoupling device operation of walking, adjacent components are installed feeds through the safety rope after finishing, it goes upward away the installation jobs who goes on on next step so to be convenient for the workman at the girder steel. The dead weight of this railing is light, and simple to operate easily dismantles, can effectually play the effect of protection high altitude working worker safety.

Description

Detachable protective railing for Construction of Steel Structure
Technical field
The utility model is related to field of steel structure construction, specifically a kind of detachable guard rail for Construction of Steel Structure Bar.
Background technology
During structural steelwork is installed, work high above the ground is more, and falling from high altitude is multiple accident, and have an accident Consequence ratio is more serious, and the injury to personnel is larger, and the employing of therefore safeguard procedures is very necessary.Common guard rail is using weldering The mode that connects connects with girder steel, due to overhead welding difficult quality guarantee, therefore easily leaves potential safety hazard;Meanwhile, after welding Guard rail can only be removed by the way of cutting, thus there is inconvenient operation and cannot reuse.
Content of the invention
The purpose of this utility model is, provides a kind of guard rail for high-altitude steel structure construction, it has installation Reliable, remove convenient advantage.
In order to achieve the above object, the utility model is realized in:
A kind of detachable protective railing for Construction of Steel Structure;It includes many root posts, and the top of every root post is provided with Wire rope handling ring, the bottom of column is provided with clamping part, and described clamping part includes the riser of groove at side surface and is horizontally set on riser top A pair of otic placode at two ends, otic placode has through hole, and in the hole is embedded with nut, and a pair of bolts is separately positioned in the nut of two pieces of otic placodes.
The described detachable protective railing for Construction of Steel Structure;The top of every root post is respectively provided with least three and wears Becket bridle.
This guard rail is connected with steel beam flange by bottom clamping portion, and workmen is by incoming for carry-on safety rope wire rope handling ring In and carry out decoupling device walking operation, after adjacent members install, safety rope is connected, is so easy to workman up in girder steel Walk to carry out the installation exercise of next step.The deadweight of this railing is light, easy for installation it is easy to dismounting, can effectively play protection high-altitude and make The effect of industry personal security.
Brief description
Fig. 1 is the schematic diagram after this railing is installed.
Fig. 2 is rail structure schematic diagram.
Fig. 3 is for 1-1 in Fig. 2 to sectional view.
Specific embodiment
Further illustrate the utility model below by way of specific embodiment.
As shown in Figure 1, Figure 2 and Figure 3, a kind of detachable protective railing for Construction of Steel Structure;It includes many root posts 1, the top of every root post 1 is provided with wire rope handling ring 2, and the bottom of column 1 is provided with clamping part 3, and described clamping part 3 includes groove at side surface Riser and a pair of the otic placode 4 being horizontally set on riser top two ends, otic placode 4 has through hole, and in the hole is embedded with nut 6, a pair of bolts 5 It is separately positioned in the nut 6 of two pieces of otic placodes 4.
The described detachable protective railing for Construction of Steel Structure;The top of every root post 1 is respectively provided with least three Wire rope handling ring 2.
The using method of this guard rail is:Before H profile steel beam lifts, by the flute profile of this guard rail 3 small steel plate Mouthful snap in H profile steel beam top flange and hold out against, fasten two bolts of 5 smallclothes afterwards by railing fixation;In 2 smallclothes semicircular arcs Wear safety rope in round steel and strain.After steel girder erection, workman safety belt is fixed on safety rope and carries out decoupling device walking operation. Safety rope is connected after installing by adjacent members, is easy to workman and walks to carry out the installation exercise of next step girder steel is up.

Claims (2)

1. a kind of detachable protective railing for Construction of Steel Structure;It is characterized in that:It includes many root posts, the top of every root post Portion is provided with wire rope handling ring, and the bottom of column is provided with clamping part, and described clamping part includes the riser of groove at side surface and is horizontally set on vertical A pair of otic placode at top of the plate portion two ends, otic placode has through hole, and in the hole is embedded with nut, and a pair of bolts is separately positioned on the spiral shell of two pieces of otic placodes In female.
2. the detachable protective railing for Construction of Steel Structure according to claim 1;It is characterized in that:The top of every root post Portion is respectively provided with least three wire rope handling rings.
CN201620811053.6U 2016-07-29 2016-07-29 A can dismantle and prevent guardrail bar for steel construction construction Active CN205955254U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620811053.6U CN205955254U (en) 2016-07-29 2016-07-29 A can dismantle and prevent guardrail bar for steel construction construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620811053.6U CN205955254U (en) 2016-07-29 2016-07-29 A can dismantle and prevent guardrail bar for steel construction construction

Publications (1)

Publication Number Publication Date
CN205955254U true CN205955254U (en) 2017-02-15

Family

ID=57973306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620811053.6U Active CN205955254U (en) 2016-07-29 2016-07-29 A can dismantle and prevent guardrail bar for steel construction construction

Country Status (1)

Country Link
CN (1) CN205955254U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612330A (en) * 2018-06-25 2018-10-02 宁波建工工程集团有限公司 The safe rope support of steel structure high-altitude operation and its construction method of installation
CN109537919A (en) * 2018-09-29 2019-03-29 沪东中华造船(集团)有限公司 A kind of quick erection method being segmented tongue and groove fence
CN111719938A (en) * 2020-06-12 2020-09-29 五冶集团上海有限公司 Method for manufacturing and installing temporary safety guardrail for steel beam installation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612330A (en) * 2018-06-25 2018-10-02 宁波建工工程集团有限公司 The safe rope support of steel structure high-altitude operation and its construction method of installation
CN108612330B (en) * 2018-06-25 2023-11-28 宁波建工工程集团有限公司 Steel structure safety rope bracket for high-altitude operation and installation and construction method thereof
CN109537919A (en) * 2018-09-29 2019-03-29 沪东中华造船(集团)有限公司 A kind of quick erection method being segmented tongue and groove fence
CN111719938A (en) * 2020-06-12 2020-09-29 五冶集团上海有限公司 Method for manufacturing and installing temporary safety guardrail for steel beam installation

Similar Documents

Publication Publication Date Title
CN205955254U (en) A can dismantle and prevent guardrail bar for steel construction construction
CN103352559B (en) Storage tank keeps in repair special hanging movable job platform
CN102691474A (en) Maintenance platform
CN110241741B (en) Large-scale bridge anticollision rail outside overhauls platform
CN206290066U (en) A kind of electric pole for being easy to climb
CN211357506U (en) Pulley type anti-falling device
CN202544491U (en) Safety protection barrier
CN220762612U (en) Fixed protection device for boiler overhaul
CN206616460U (en) A kind of adhesion type bridge maintenance nacelle device
CN205637829U (en) New bow cap rail device
CN219175014U (en) Bridge floor construction auxiliary device
CN116173439B (en) Anti-falling device for power transmission tower
CN213449792U (en) Overwater operation protection system
CN215255147U (en) Interim rail guard of detachable
CN215801105U (en) A operation platform for hanging basket construction balladeur train is dismantled
CN205932986U (en) Industry factory building crane is walked guidance tape and is prevented guardrail bar
CN220882189U (en) Arc pad dismounting tool
CN103418094A (en) Anti-falling safe device for strain tower climbing
CN209670893U (en) Air cooling compressor ladder falling proof device
CN217627476U (en) Steel wire rope locking device for hanging mechanism of high-altitude operation hanging basket
CN202427077U (en) Falling-prevention brake fixing box for derrick
CN213838485U (en) Novel be convenient for pipeline inner wall to maintain and use device
CN220336393U (en) Building engineering building climbing frame
CN216025207U (en) Roller leather replacing device of four-roller crusher
CN202704977U (en) Boring tower cage elevating mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190730

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: China Twenty Metallurgical Group Co., Ltd.

Patentee after: Shanghai twenty Metallurgical Construction Co., Ltd.