CN202543926U - Self-erected frame mechanism of pile driving frame - Google Patents
Self-erected frame mechanism of pile driving frame Download PDFInfo
- Publication number
- CN202543926U CN202543926U CN2012200204946U CN201220020494U CN202543926U CN 202543926 U CN202543926 U CN 202543926U CN 2012200204946 U CN2012200204946 U CN 2012200204946U CN 201220020494 U CN201220020494 U CN 201220020494U CN 202543926 U CN202543926 U CN 202543926U
- Authority
- CN
- China
- Prior art keywords
- frame
- platform
- main platform
- erected
- pile driving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Abstract
The utility model discloses a self-erected frame mechanism of a pile driving frame. The self-erected frame comprises a main platform, a stand column, an erected-frame winch, a hoisting frame, a counter weight, supports, bottom plates, an inclined strut, an erected-frame rope and an erected-frame pulley block, wherein a front platform of the main platform is provided with two opposite extended beams of which the lower parts are provided with a supporting seat respectively; the stand column is movably installed in an interval groove between the extended beams of the front platform of the main platform by using a bottom section of the stand column via supporting axles and nuts; each support seat is hinged with one end of the respective support below the support seat, and the other end of the respective support is hinged with the bottom plate; the erected-frame winch is fixedly installed on a central platform of the main platform; the hoisting frame comprises a front support rod and a back support rod and is installed on the central platform of the main platform; and the counter weight is arranged on a back platform of the main platform. With the adoption of the self-erected frame mechanism, the self erection of the stand column of the pile driving frame is implemented; the ground pressure of the pile driving frame is decreased, the safety and stability in hoisting the frame can be ensured, the weight of the whole equipment is reduced, and the structural arrangement of the counter weight is conducted conveniently; and the self-erected frame mechanism is convenient to operate, stable and reliable, and easy to dismount.
Description
Technical field
The utility model relates to a kind of pile driving frame, particularly relates to a kind of pile driving frame from erecting frame mechanism.
Background technology
Because pile driving frame is as machine-tool; Can cooperate several work devices such as multiaxial type auger, full screw earth auger, diesel pile hammer and hydraulic pile hammer to carry out underground pile foundation engineering construction; Satisfy the needs of multiple pile base construction methods such as underground continuous curtain wall, on-the-spot agitation pile, preformed pile and steel pipe pile, extensively apply to foundation constructions such as highrise building, city underground station, speedway, elevated road, high-speed railway, big section steel works, large bridge, river dyke and foundation improvement.Existing pile driving frame, the following two kinds of methods of general employing when its column plays frame, the one, the column of pile driving frame is fixed with hound and main platform behind the upright position and behind the column installation in position again when promoting by auxiliary lifting appliance; Another kind method is exactly from erecting the frame method, and it is in place and install that promptly the frame hoist engine through pile driving frame carries out the lifting of column, the balancing weight through constant weight is set at main platform rear portion,, the lifting hoist engine is set on the main platform and hoisting frame is realized; When pile driving frame column height increases; Pile driving frame was dead-weight balanced when the quantity that just needs to increase balancing weight reached column and promotes, thus the work accident of avoiding pile driving frame to lean forward, but will increase the deadweight of pile driving frame so greatly; Simultaneously; The balancing weight layout also receives the pile driving frame effect on structure, therefore, if through increasing the quantity of balancing weight; Make the manufacturing cost of pile driving frame increase greatly on the one hand, balancing weight is arranged and is received the integrally-built influence of pile driving frame.
Summary of the invention
The purpose of the utility model is according to the deficiency that exists in the prior art, provides a kind of column to promote voluntarily, and easy to operate, reliable and stable, easy-to-dismount pile driving frame is from erecting frame mechanism; Increase the contact area of pile driving frame; Reduce the pile driving frame grounding pressure, guarantee that column plays the frame safety and stability, reduce the balancing weight quality of the required outfit of pile driving frame; Thereby reduce complete machine equipment quality, be convenient to counterweight block structure and arrange.
For reaching above purpose, the utility model is to realize through following technical scheme:
A kind of pile driving frame is from erecting frame mechanism; Comprise main platform, column, a frame hoist engine, hoisting frame, counterweight, support, base plate, the diagonal brace that has oil cylinder under it, a frame rope and play the frame assembly pulley; It is characterized in that: the front platform of said main platform is provided with two relative beams that stretch out; And between them, forming an interval trough, the bottom of stretching out beam is respectively equipped with bearing; Said column is movably installed in stretching out in the interval trough between the beam of main platform front platform by the column coxopodite through bolster, nut; Said bearing is articulated and connected with an end that is positioned at the support under it, and the other end of support is connected with base plate hinged; Said frame hoist engine is installed in the middle deck of main platform; Said hoisting frame is installed on the middle deck of main platform through front support rod and back stay; Said counterweight places the back platform of main platform; Said column is connected with an end of diagonal brace, and the other end of diagonal brace is connected on the main platform through the diagonal brace oil cylinder; The wire rope that said frame hoist engine drawn is connected with an end of a frame rope through the frame assembly pulley that rises that is installed on hoisting frame top; The other end of said frame rope is connected the medium position at the column back side.
The utility model can be, the rear portion of said support is provided with fulcrum, and it contacts with equal ground with the baseplane of base plate.
The utility model pile driving frame has following good effect and advantage from erecting frame mechanism:
Through playing frame hoist engine, hoisting frame, play the frame rope and playing the frame assembly pulley, can realize that column promotes voluntarily, and easy to operate, reliable and stable; Simultaneously; The beam bottom of stretching out of main platform front platform is provided with support and base plate, increases the contact area of pile driving frame, reduces the pile driving frame grounding pressure; Guarantee that column plays the frame safety and stability; Reduce the balancing weight quality of the required outfit of pile driving frame, thereby reduce complete machine equipment quality, be convenient to the structural configuration of balancing weight.
Description of drawings
Fig. 1 is that the utility model pile driving frame is from the structural representation that erects frame mechanism;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the local amplification view of the anterior A of Fig. 1;
Fig. 4 is the left view of Fig. 3.
The specific embodiment
Said embodiment is further described the utility model below in conjunction with accompanying drawing.
Like Fig. 1, Fig. 2, Fig. 3 and shown in Figure 4; A kind of pile driving frame is from erecting frame mechanism; Comprise main platform 1, column 2, play frame hoist engine 3, hoisting frame 4, counterweight 5, support 6, base plate 7, its have down oil cylinder diagonal brace 8, play frame rope 9 and play frame assembly pulley 10; It is characterized in that: the front platform of said main platform 1 is provided with two relative beams 11 that stretch out, and between them, forms an interval trough 13, and the bottom of stretching out beam 11 is respectively equipped with bearing 12; Said column 2 is movably installed in stretching out in the interval trough 13 between the beam 11 of main platform 1 front platform by the column coxopodite through bolster, nut; Said bearing 12 is articulated and connected with an end that is positioned at the support 6 under it, and the other end of support 6 and base plate 7 are articulated and connected; The rear portion of said support 6 is provided with fulcrum 61, and it contacts with equal ground with the baseplane of base plate 7; Said frame hoist engine 3 is installed in the middle deck of main platform 1; Said hoisting frame 4 comprises front support rod 41 and back stay 42, and is installed on the middle deck of main platform 1; Said counterweight 5 places the back platform of main platform 1; Said column 2 is connected with an end of diagonal brace 8, and the other end of diagonal brace 8 is connected on the main platform 1 through the diagonal brace oil cylinder; The wire rope that said frame hoist engine 3 drawn is connected with an end of a frame rope 9 through the frame assembly pulley 10 that rises that is installed on hoisting frame 4 tops; The other end of said frame rope 9 is connected the medium position at column 2 back sides.
After column coxopodite, a frame hoist engine 3, hoisting frame 4, counterweight 5 be installed at the main platform 1 of pile driving frame, play parts such as a frame rope 9 and a frame assembly pulley 10; The pile driving frame main frame is started to the place of a spaciousness; Length connects column 2, diagonal brace 8 as requested; The column 2 that will meet length requirement is shelved on the stand; With the front platform of main platform 1 stretch out between the beam 11 between column coxopodite in the groove 13 be fixedly connected, an end of diagonal brace 8 is connected to the relevant position of column 2, with rise steel wire penetrating that frame hoist engine 3 draws be positioned at hoisting frame 4 tops, with play the frame assembly pulley 10 that frame rope 9 is connected; With bearing pin the bearing 12 that stretch out beam 11 bottoms of support 6 with the front platform of main platform 1 is articulated and connected; The bottom of support 6 is articulated and connected with bearing pin and base plate 7; At this moment; The fulcrum 61 of support 6 all contacts with ground with the baseplane of base plate 7, increases the contact area of pile driving frame, reduces the pile driving frame grounding pressure.Start a frame hoist engine 3 of pile driving frame; Wire rope has reeled frame rope 9 through playing a frame assembly pulley 10, slowly begins to be pulled upwardly column 2, when the angle of 70-80 ° of formation between column 2 and the horizontal plane; Stopped frame hoist engine 3; Use the hoist engine of the pile driving frame diagonal brace 8 of slinging, and handle the diagonal brace oil cylinder and make diagonal brace 8 reach the length that can normally be connected to diagonal brace seat on the main platform 1, and connect diagonal brace 8.The support that stretches out beam 11 bottoms 6 that will be installed on the front platform of main platform 1 is then removed with base plate 7, thereby accomplishes pile driving frame from erecting the frame operation.Start the pile driving frame running gear, pile driving frame is moved and run to construction location, just can carry out corresponding pile foundation job execution technology after apparatus for work such as multiaxial type auger, full screw earth auger, diesel pile hammer and hydraulic pile hammer are installed.
Claims (2)
1. a pile driving frame is from erecting frame mechanism; Comprise main platform (1), column (2), a frame hoist engine (3), hoisting frame (4), counterweight (5), support (6), base plate (7), the diagonal brace (8) that has oil cylinder under it, a frame rope (9) and play frame assembly pulley (10); It is characterized in that: the front platform of said main platform (1) is provided with two relative beams (11) that stretch out; And between them, forming an interval trough (13), the bottom of stretching out beam (11) is respectively equipped with bearing (12); Said column (2) is movably installed in stretching out in the interval trough (13) between the beam (11) of main platform (1) front platform by the column coxopodite through bolster, nut; Said bearing (12) is articulated and connected with an end that is positioned at the support (6) under it, and the other end of support (6) and base plate (7) are articulated and connected; Said frame hoist engine (3) is installed in the middle deck of main platform (1); Said hoisting frame (4) comprises front support rod (41) and back stay (42), and is installed on the middle deck of main platform (1); Said counterweight (5) places the back platform of main platform (1); Said column (2) is connected with an end of diagonal brace (8), and the other end of diagonal brace (8) is connected on the main platform (1) through the diagonal brace oil cylinder; The wire rope that said frame hoist engine (3) drawn is connected with an end that plays frame rope (9) through the frame assembly pulley (10) that rises that is installed on hoisting frame (4) top; The other end of said frame rope (9) is connected the medium position at column (2) back side.
2. pile driving frame according to claim 1 is characterized in that from erecting frame mechanism the rear portion of said support (6) is provided with fulcrum (61), and it all contacts with ground with the baseplane of base plate (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200204946U CN202543926U (en) | 2012-01-17 | 2012-01-17 | Self-erected frame mechanism of pile driving frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012200204946U CN202543926U (en) | 2012-01-17 | 2012-01-17 | Self-erected frame mechanism of pile driving frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202543926U true CN202543926U (en) | 2012-11-21 |
Family
ID=47164580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012200204946U Withdrawn - After Issue CN202543926U (en) | 2012-01-17 | 2012-01-17 | Self-erected frame mechanism of pile driving frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202543926U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437356A (en) * | 2013-08-12 | 2013-12-11 | 中铁港航局集团有限公司 | Pile driving mechanism for pile sinking at overwater contracted shallow water area |
CN105089053A (en) * | 2015-09-14 | 2015-11-25 | 山河智能装备股份有限公司 | Pile frame and using and mounting method thereof |
CN108532601A (en) * | 2018-06-30 | 2018-09-14 | 徐州万盛工程设备有限公司 | A kind of column of highway barrier stake pile-driving and-pulling machine |
CN110939130A (en) * | 2019-08-22 | 2020-03-31 | 广东力源液压机械有限公司 | Pile driving operation method with telescopic upright column and crawler-type pile driver |
CN114778806A (en) * | 2022-04-13 | 2022-07-22 | 国网江苏省电力有限公司连云港供电分公司 | Model test device of slip casting formula screw pile |
-
2012
- 2012-01-17 CN CN2012200204946U patent/CN202543926U/en not_active Withdrawn - After Issue
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437356A (en) * | 2013-08-12 | 2013-12-11 | 中铁港航局集团有限公司 | Pile driving mechanism for pile sinking at overwater contracted shallow water area |
CN103437356B (en) * | 2013-08-12 | 2016-01-27 | 中铁港航局集团有限公司 | A kind of piling mechanism for the narrow shallow water area pile sinking of bundle waterborne |
CN105089053A (en) * | 2015-09-14 | 2015-11-25 | 山河智能装备股份有限公司 | Pile frame and using and mounting method thereof |
WO2017045625A1 (en) * | 2015-09-14 | 2017-03-23 | 山河智能装备股份有限公司 | Pile frame and method of using and mounting same |
CN108532601A (en) * | 2018-06-30 | 2018-09-14 | 徐州万盛工程设备有限公司 | A kind of column of highway barrier stake pile-driving and-pulling machine |
CN108532601B (en) * | 2018-06-30 | 2023-10-17 | 徐州万盛工程设备有限公司 | Upright post of highway guardrail pile driving and pulling machine |
CN110939130A (en) * | 2019-08-22 | 2020-03-31 | 广东力源液压机械有限公司 | Pile driving operation method with telescopic upright column and crawler-type pile driver |
CN110939130B (en) * | 2019-08-22 | 2024-04-05 | 广东力源液压机械有限公司 | Column telescopic pile driving operation method and crawler pile driver |
CN114778806A (en) * | 2022-04-13 | 2022-07-22 | 国网江苏省电力有限公司连云港供电分公司 | Model test device of slip casting formula screw pile |
CN114778806B (en) * | 2022-04-13 | 2023-11-14 | 国网江苏省电力有限公司连云港供电分公司 | Model test device of slip casting formula screw pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202543926U (en) | Self-erected frame mechanism of pile driving frame | |
CN204875552U (en) | Frame bridge crane vertical lift structure | |
CN201186838Y (en) | Vertical type coil holder | |
CN104612152A (en) | Pile frame and installation method of pile frame | |
CN111472789B (en) | Pipe jacking construction process | |
CN201671551U (en) | Inclined oil well drilling machine base | |
CN205576749U (en) | Pontic roof beam structure promotes and rackwork | |
CN205099249U (en) | A device for assembling hoist activity landing leg | |
CN202508847U (en) | Self-driven hydraulic pushing lift truck | |
CN206800215U (en) | Bridge incremental launching Bridge Erector | |
CN205421023U (en) | Public road bridge roof beam strutting arrangement | |
CN202227365U (en) | Form traveler for guide wall of underground continuous wall | |
CN216474543U (en) | Stay cable crane for offshore cable-stayed bridge construction | |
CN207078935U (en) | A kind of portable full circle swinging mast loop wheel machine anchor | |
CN213738414U (en) | Multi-upright-column synchronous jacking joint adding system | |
CN213807579U (en) | Derrick device for four-single upright column drilling machine | |
CN107217669B (en) | Pile pulling equipment and quick moving method thereof | |
CN210561782U (en) | Pier support is changed with supplementary construction equipment | |
CN204416961U (en) | Single mast single-sheaved block group lifting derrick | |
CN204590018U (en) | A kind of pile frame | |
CN107237515A (en) | The support meanss and its application method of circular steel truss structure | |
CN202206102U (en) | Unwinding rack used for construction site | |
CN201581815U (en) | Vertical hoisting base jacked by hydraulic cylinder | |
CN206090564U (en) | Novel piling machine | |
CN206267039U (en) | A kind of jack support platform of hollow slab girder jack-up construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20121121 Effective date of abandoning: 20141008 |
|
C20 | Patent right or utility model deemed to be abandoned or is abandoned |