CN105089053A - Pile frame and using and mounting method thereof - Google Patents

Pile frame and using and mounting method thereof Download PDF

Info

Publication number
CN105089053A
CN105089053A CN201510581326.2A CN201510581326A CN105089053A CN 105089053 A CN105089053 A CN 105089053A CN 201510581326 A CN201510581326 A CN 201510581326A CN 105089053 A CN105089053 A CN 105089053A
Authority
CN
China
Prior art keywords
column
oil cylinder
telescopic oil
bearing
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510581326.2A
Other languages
Chinese (zh)
Other versions
CN105089053B (en
Inventor
钱奂云
陈梓林
史筱晖
邓超
李海舰
刘进学
曾素
张峰
朱振新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sunward Intelligent Equipment Co Ltd
Original Assignee
Sunward Intelligent Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sunward Intelligent Equipment Co Ltd filed Critical Sunward Intelligent Equipment Co Ltd
Priority to CN201510581326.2A priority Critical patent/CN105089053B/en
Publication of CN105089053A publication Critical patent/CN105089053A/en
Priority to PCT/CN2016/099087 priority patent/WO2017045625A1/en
Priority to KR1020187006162A priority patent/KR102038877B1/en
Priority to JP2018532501A priority patent/JP6498361B2/en
Application granted granted Critical
Publication of CN105089053B publication Critical patent/CN105089053B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/14Components for drivers inasmuch as not specially for a specific driver construction
    • E02D7/16Scaffolds or supports for drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

The invention discloses a pile frame and a using and mounting method thereof. The file frame mainly comprises a chassis 1, a machine body 2, a stand column 3, an oblique support 4 and an inverted-V-shaped frame 5. The pile frame is characterized in that an outward-stretching connector 4e and a movable connecting base 4g are also arranged on the oblique support 4, a first transition connecting base 5c and a second transition connecting base 5d are also arranged on the inverted-V-shaped frame 5, and fixed connecting bases 2h are further arranged on telescopic rear supporting legs 2d of the machine body 2. According to the pile frame and the using and mounting method thereof, automatic mast erecting and mast falling can be achieved easily and conveniently for the large pile frame, and the stand column and the oblique support can be integrally conveyed without being disassembled; meanwhile, it is guaranteed that the stand column and the support of the pile frame are reasonable in structure, in this way, use cost is reduced, working efficiency is improved, and the stability and safety reliability of a complete machine are improved.

Description

A kind of pile frame and use mounting method thereof
Technical field
The present invention relates to a kind of pile frame, particularly relate to a kind of pile frame without the need to can found mast movable mast voluntarily by the auxiliary equipment beyond the machine, the invention still further relates to the use mounting method of this pile frame.
Background technology
Pile frame is requisite a kind of plant equipment in construction foundation working, and the mechanized equipments such as various pile driver, pile monkey, auger, all will hang and be arranged on pile frame and construct; When pile frame is classified with walking manner, be mainly divided into walking pile frame and crawler pile frame two kinds; No matter but which kind of pile frame, its structure is generally primarily of compositions such as chassis, fuselage, column, bearing diagonal and dynamical systems; Due to the column of pile frame and bearing diagonal longer, in occasions such as long distance transitions, after all needing movable mast will the dismounting such as column and bearing diagonal disintegrate after could transport, behind new place, need to reinstall again column and bearing diagonal exist side by side after mast and just can enter using state; Therefore, the column of pile frame and the disintegration of bearing diagonal are installed, vertical mast movable mast operation, are important steps in pile frame use procedure.
This kind of pile frame that is known and movable mast found mast method and mainly contain following several at present:
The first pile frame, a kind of crawler pile frame that " piling machinery " chapter 5 as China Machine Press's publication is delivered: this kind of pile frame needs when transition, by split transport after column and the dismounting of bearing diagonal movable mast, to reinstall vertical mast again behind new place; Its shortcoming is: movable mast stands mast operation not only needs crane and hoist engine to participate in operation simultaneously, and less important work device is complicated, operation easier is large, efficiency is low, cost is high; Its advantage is: distance H on fuselage between fulcrum of the bearing diagonal of pile frame and fulcrum all very wide to the distance L of column, and fulcrum is hinged on the rear support leg that directly contacts with ground, and height and position Y low (see Fig. 1, Fig. 2), make the stability of complete machine and operational security better.
The second pile frame, a kind of technical scheme of pile frame disclosed in patent 201510021701.8: pile frame mainly comprises: have the chassis of crawler unit, fuselage, column, the bearing diagonal being provided with telescopic oil cylinder, a cabinet frame, elevating ram; One end of bearing diagonal is articulated with on column, one end of a cabinet frame and elevating ram is articulated with on fuselage respectively; The other end of bearing diagonal, a cabinet frame and elevating ram three is articulated with a place, utilizes the expanding-contracting action of oil cylinder to carry out vertical mast and movable mast; Its advantage is: without the need to participating in operation by the auxiliary equipment such as crane and hoist engine, can carry out vertical mast movable mast without the need to the less important work device of complexity, simple to operate, save human and material resources and time; But its shortcoming is: the distance Ha of bearing diagonal on fuselage between fulcrum and fulcrum are all little than the respective distance H of the first pile frame above-mentioned and L to the distance La of column, and the height and position Ya of fulcrum is high than the height and position Y of the first pile frame and away from the support (see Fig. 1, Fig. 2, Fig. 3, Fig. 4) on ground, make the stability of complete machine be starkly lower than the first pile frame.
Summary of the invention
The object of the present invention is to provide a kind of pile frame and use mounting method, vertical mast movable mast, column and bearing diagonal get final product whole Transporting without the need to disintegrating voluntarily simply and easily can to realize large-scale pile frame, guarantee that pile frame vertical post braced structures is reasonable simultaneously, thus reduce use cost, lifting operating efficiency, raising complete machine stability and security reliability.
The object of the invention is to be realized by following technical proposals:
A kind of pile frame comprises: moveable chassis, fuselage, column, bearing diagonal and man-like shelf.
The move mode of described movable chassis can be walking also can be caterpillar; Described fuselage is provided with fore-stock, front leg strut, middle free bearing, telescopic rear support leg, operating room and dynamical system; Described column is made up of lower pole and top column, column is provided with guide rail and carriage, and lower pole is also provided with hangs thing device, and the fore-stock on the lower end of column and fuselage is hinged; Described carriage can be free to slide on the guide rail of column, and can respectively by hinge and be fixed on column; Described bearing diagonal is by support bar and be connected in respectively and support the stretching device at two ends and telescopic oil cylinder is formed, and one end of bearing diagonal is hinged on the carriage of column, and the other end is hinged on a cabinet frame of man-like shelf, makes column be supported at three point state; Described man-like shelf is made up of the hinged cabinet frame in one end and elevating ram, the pin joint position of one cabinet frame and elevating ram can also be fixed on the middle free bearing of fuselage by bearing pin, and the other end of a cabinet frame and lifting oil is hinged on the front and rear of fuselage respectively.
It is characterized in that: the cylinder barrel of the telescopic oil cylinder of bearing diagonal is also provided with an overhanging connector, the expansion link of the telescopic oil cylinder of bearing diagonal is also hinged with an active connecting base, one cabinet frame of man-like shelf is also provided with one group of transition Connection Block first and transition Connection Block second, fuselage the rear support leg of transverse direction and longitudinal extension can also be provided with one group of fixed connecting base, the telescopic oil cylinder of bearing diagonal can be hinged in the transition Connection Block second of a cabinet frame by overhanging connector and bearing pin; Active connecting base on the expansion link of the telescopic oil cylinder of bearing diagonal can be connected and fixed in the transition Connection Block first of a cabinet frame by bearing pin, also can be connected and fixed fuselage can transverse direction and longitudinal extension rear support leg fixed connecting base on.
Above-mentioned pile frame uses mounting method to have following steps:
1, the chassis of pile frame, fuselage, lower pole, bearing diagonal and man-like shelf under non-disintegration state whole Transporting to construction plant; Now, the active connecting base on the expansion link of bearing diagonal telescopic oil cylinder is connected and fixed by the transition Connection Block first on bearing pin and a cabinet frame; Carriage is connected and fixed by bearing pin and lower pole.
2, use the thing device that hangs of lower pole to be sling by the top column transporting to construction plant, by the movement on chassis by top column handling to installation site, lie in a horizontal plane on stand.
3, utilize the extend action of the elevating ram of man-like shelf, lower pole is adjusted to level, and utilize the movement on chassis lower pole to be aligned with top column to be connected; And the bearing pin that carriage and lower pole are connected and fixed is extracted releasing fixed constraint.
4, the front leg strut on fuselage is supported to ground, rear support leg is extended laterally into desired location and longitudinally stretches out and support to ground; The stretching device of bearing diagonal and the expansion link of telescopic oil cylinder protruding, the carriage on column thereupon along slide to desired location, with bearing pin by carriage and column hinged fixing.
5, the telescopic oil cylinder of bearing diagonal expansion link shrinks, column is thereupon upwards to hoist for axle center rotates with the pin joint of fore-stock.
6, it is characterized in that also there are following steps:
1., when the expansion link of the telescopic oil cylinder of bearing diagonal is retracted to desired location, column upwards rises and is raised to set angle β, and the overhanging connector on the cylinder barrel of the telescopic oil cylinder of bearing diagonal has also aligned with the transition Connection Block second on a cabinet frame and has been in and has been connected state.
2., use bearing pin to fix hinged to the overhanging connector on the cylinder barrel of telescopic oil cylinder and the transition Connection Block second on a cabinet frame, afterwards the bearing pin that transition Connection Block first on the active connecting base of the expansion link of telescopic oil cylinder and a cabinet frame is connected and fixed is extracted, remove constraint between the two.
3., the expansion link of the telescopic oil cylinder of bearing diagonal is protruding together with the active connecting base on it, until the active connecting base on expansion link and the fixed connecting base on scalable rear support leg align, use bearing pin to be connected and fixed by the fixed connecting base on the active connecting base on telescopic oil cylinder expansion link and scalable rear support leg.
4., the bearing pin that the overhanging connector on the cylinder barrel of telescopic oil cylinder and the transition Connection Block second on a cabinet frame are connected and fixed is extracted the constraint of releasing.
5., the expansion link of the telescopic oil cylinder of bearing diagonal shrink, column thereupon to continue upwards to hoist for axle center rotates with the pin joint of fore-stock until reach the plumbness becoming 90 degree with ground; The elevating ram of man-like shelf shrinks, and make man-like shelf to desired location, and be fixed on the middle free bearing of fuselage by bearing pin by man-like shelf, so far, the operation of pile frame self-support mast completes.
7, the movable mast operation of pile frame is undertaken by the reverse order of above step.
Pile frame of the present invention has following good effect and advantage:
1, according to the present invention, large-scale pile frame achieves simple and convenient, safe and reliable vertical voluntarily mast and movable mast, significantly can promote operating efficiency;
2, according to the present invention, the vertical mast of large-scale pile frame and movable mast participate in operation without the need to adopting the auxiliary machinery such as hoist engine and crane and device, significantly can reduce the use cost of personnel and equipment;
3, according to the present invention, during large-scale pile frame transition transport, column and bearing diagonal get final product whole Transporting without the need to disintegrating, and can reduce personnel and equipment use cost, can increase work efficiency again;
4, according to the present invention, under the prerequisite realizing pile frame whole Transporting and vertical mast and movable mast voluntarily, active connecting base on the bearing diagonal telescopic oil cylinder expansion link of pile frame can be hinged on the rear support leg that directly contacts with ground, make the lateral separation Hc of the bearing diagonal of pile frame on fuselage between fulcrum and fulcrum enough roomy to the fore-and-aft distance Lc of column, and fulcrum height and position Yc low (see Fig. 5, Fig. 6), thus improve complete machine stability and security reliability.
Accompanying drawing explanation
Fig. 1 is the front view of the first pile frame of prior art.
Fig. 2 is the A direction view of the first pile frame shown in Fig. 1.
Fig. 3 is the front view of the second pile frame of prior art.
Fig. 4 is the B direction view of the pile frame of the second shown in Fig. 3.
Fig. 5 is the front view of embodiments of the invention 1, pile frame.
Fig. 6 is the C direction view of pile frame shown in Fig. 5.
Fig. 7 is the structural representation of the present invention in travel position.
Fig. 8 is the state diagram of the present invention's column lifting in top when assembled state.
Fig. 9 is the present invention's state diagram that top column is connected with lower pole when assembled state.
Figure 10 is the present invention's state diagram that carriage slides when assembled state.
Figure 11 is that the present invention is when when assembled state, vertical rod is β with the angle on ground and the state diagram that is not connected with fixed connecting base of active connecting base.
Figure 12 be Figure 11 D to enlarged drawing.
Figure 13 be after the 4th latch is extracted Figure 11 D to enlarged drawing.
Figure 14 is the state diagram of the present invention when vertical rod is β with the angle on ground when assembled state and the state diagram that is connected with fixed connecting base of active connecting base.
fig. 15 are fig. 14E to amplification figure.
Figure 16 is the state diagram that the present invention is moved to duty by assembled state.
Figure 17 is the structural representation of duty of the present invention.
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described.
Embodiment 1: a kind of pile frame
See Fig. 5, Fig. 6, Figure 11, Figure 12, Figure 13, Figure 14, Figure 15.
A kind of pile frame comprises: moveable chassis 1, fuselage 2, column 3, bearing diagonal 4 and man-like shelf 5.
The move mode of described movable chassis 1 can be walking also can be caterpillar; Described fuselage 2 is provided with fore-stock 2a, front leg strut 2b, middle free bearing 2c, telescopic rear support leg 2d, operating room 2e and dynamical system 2f; Described column 3 is made up of lower pole 3a and top column 3b, column 3 is provided with guide rail 3c and carriage 3d, lower pole 3a and is also provided with and hangs thing device 3e, and the fore-stock 2a on the lower end of column 3 and fuselage 2 is hinged; Described carriage 3d can be free to slide on the guide rail 3c of column 3, and can be hinged by the second bearing pin 3f, the 3rd bearing pin 3g and be fixed on column 3 respectively; Described bearing diagonal 4 is by support bar 4a and be connected in the stretching device 4b at support bar 4a two ends and telescopic oil cylinder 4c respectively and form, one end of bearing diagonal is hinged on the carriage 3d of column 3, the other end is hinged on a cabinet frame 5a of man-like shelf 5, makes column 3 in supported at three point state; Described man-like shelf 5 is made up of the hinged cabinet frame 5a in one end and elevating ram 5b, the pin joint position of one cabinet frame 5a and elevating ram 5b can also be fixed on the middle free bearing 2c of fuselage 2 by the first bearing pin 2g, and the other end of a cabinet frame 5a and elevating ram 5b is hinged on the front and rear of fuselage 2 respectively.
It is characterized in that: the cylinder barrel 4d of the telescopic oil cylinder 4c of bearing diagonal 4 is also provided with an overhanging connector 4e, the expansion link 4f of the telescopic oil cylinder 4c of bearing diagonal 4 is also hinged with an active connecting base 4g, one cabinet frame 5a of man-like shelf 5 is also provided with one group of transition Connection Block first 5c and transition Connection Block second 5d, fuselage 2 the rear support leg 2d of transverse direction and longitudinal extension can also be provided with one group of fixed connecting base 2h, the telescopic oil cylinder 4c of bearing diagonal 4 can be hinged on the transition Connection Block second 5d of a cabinet frame 5a by overhanging connector 4e and bearing pin 5e; Active connecting base 4g on the expansion link 4f of the telescopic oil cylinder 4c of bearing diagonal can be connected and fixed on the transition Connection Block first 5c of a cabinet frame 5a by bearing pin 4h, also can be connected and fixed fuselage 2 can transverse direction and longitudinal extension rear support leg 2d fixed connecting base 2h on.
Embodiment 2: a kind of use mounting method of pile frame.
See Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, Figure 15, Figure 16, Figure 17.
The use mounting method of above-mentioned pile frame has following steps:
1, the chassis 1 of pile frame, fuselage 2, lower pole 3a, bearing diagonal 4 and man-like shelf 5 under non-disintegration state whole Transporting to construction plant; Now, the active connecting base 4g on the expansion link 4f of bearing diagonal telescopic oil cylinder 4c is connected and fixed by the transition Connection Block first 5c on bearing pin 4h and a cabinet frame 5a; Carriage 3d is connected and fixed by the 3rd bearing pin 3g and lower pole 3a; See Fig. 7.
2, use the thing device 3e that hangs of lower pole 3a to be sling by the top column 3b transporting to construction plant, by the movement on chassis 1 by top column 3b handling to installation site, lie in a horizontal plane on stand 6; See Fig. 8.
3, utilize the extend action of the elevating ram 5b of man-like shelf 5, lower pole 3a is adjusted to level, and utilize the movement on chassis 1 to be aligned with top column 3b by lower pole 3a to be connected; And the 3rd bearing pin 3g be connected and fixed by carriage 3d and lower pole 3a extracts releasing fixed constraint; See Fig. 9.
4, the front leg strut 2b on fuselage 2 is supported to ground, rear support leg 2d is extended laterally into desired location and longitudinally stretches out and support to ground; The stretching device 4b of the bearing diagonal 4 and expansion link 4f of telescopic oil cylinder 4c is protruding, and the carriage 3d on column 3 slides into desired location along guide rail 3c thereupon, with the second bearing pin 3f by carriage 3d and column 3 hinged fixing; See Figure 10.
5, the telescopic oil cylinder 4c of bearing diagonal 4 expansion link 4f shrinks, column 3 is thereupon upwards to hoist for axle center rotates with the pin joint of fore-stock 2a; See Figure 11.
6, it is characterized in that also there are following steps:
1., when the expansion link 4f of the telescopic oil cylinder 4c of bearing diagonal 4 is retracted to desired location, column 3 upwards rises and is raised to set angle β, and the overhanging connector 4e on the cylinder barrel 4d of the telescopic oil cylinder 4c of bearing diagonal 4 has also aligned with the transition Connection Block second 5d on a cabinet frame 5a and has been in and has been connected state; See Figure 11, Figure 12.
2., use bearing pin 5e to fix hinged for the overhanging connector 4e on the cylinder barrel 4d of telescopic oil cylinder 4c and the transition Connection Block second 5d on a cabinet frame 5a, afterwards the bearing pin 4h that transition Connection Block first 5c on the active connecting base 4g of the expansion link 4f of telescopic oil cylinder 4c and a cabinet frame 5a is connected and fixed is extracted, remove constraint between the two; See Figure 13.
3., the expansion link 4f of the telescopic oil cylinder 4c of bearing diagonal 4 is protruding together with the active connecting base 4g on it, until the active connecting base 4g on expansion link 4f and the fixed connecting base 2h on scalable rear support leg 2d aligns, use bearing pin 4h to be connected and fixed by the fixed connecting base 2h on the active connecting base 4g on telescopic oil cylinder expansion link 4f and scalable rear support leg 2d; See Figure 14.
4., the bearing pin 5e that the overhanging connector 4e on the cylinder barrel 4d of telescopic oil cylinder 4c and the transition Connection Block second 5d on a cabinet frame 5a is connected and fixed is extracted the constraint of releasing; See Figure 15.
5., the expansion link 4f of the telescopic oil cylinder 4c of bearing diagonal 4 shrink, column 3 thereupon to continue upwards to hoist for axle center rotates with the pin joint of fore-stock 2a until reach the plumbness becoming 90 degree with ground; The elevating ram 5b of man-like shelf 5 shrinks, and makes man-like shelf 5 to desired location, and is fixed on the middle free bearing 2c of fuselage 2 by the first bearing pin 2g by man-like shelf 5, and so far, the operation of pile frame self-support mast completes; See Figure 16, Figure 17.
7, the movable mast operation of pile frame is undertaken by the reverse order of above step.
In conjunction with above-described embodiment, describe the present invention, but by doing some suitable changes to the modular construction of above-mentioned pile frame and combination, some suitable adjustment are done to using the details of mounting method and step thereof, just within the scope of the invention, various different pile frame can be derived and uses mounting method accordingly.

Claims (3)

1. a pile frame, comprises moveable chassis (1), fuselage (2), column (3), bearing diagonal (4) and man-like shelf (5); The move mode of described movable chassis (1) can be walking also can be caterpillar; Described fuselage (2) is provided with fore-stock (2a), front leg strut (2b), middle free bearing (2c), can the rear support leg (2d) of transverse direction and longitudinal extension, operating room (2e) and dynamical system (2f); Described column (3) is made up of lower pole (3a) and top column (3b), column (3) is provided with guide rail (3c) and carriage (3d), lower pole (3a) is also provided with hangs thing device (3e), and the fore-stock (2a) on the lower end of column (3) and fuselage (2) is hinged; Described carriage (3d) can be free to slide on the guide rail (3c) of column (3), and can respectively by the second bearing pin (3f), the 3rd bearing pin (3g) is hinged and be fixed on column (3); Described bearing diagonal (4) is by support bar (4a) and be connected in the stretching device (4b) at support bar (4a) two ends respectively and telescopic oil cylinder (4c) is formed, one end of bearing diagonal is hinged on the carriage (3d) of column (3), the other end is hinged on a cabinet frame (5a) of man-like shelf (5), makes column (3) in supported at three point state; Described man-like shelf (5) is made up of the hinged cabinet frame (5a) in one end and elevating ram (5b), the pin joint position of one cabinet frame (5a) and elevating ram (5b) can also be fixed on the middle free bearing (2c) of fuselage (2) by the first bearing pin (2g), the other end of one cabinet frame (5a) and elevating ram (5b) is hinged on the front and rear of fuselage (2) respectively
It is characterized in that: the cylinder barrel (4d) of the telescopic oil cylinder (4c) of described bearing diagonal (4) is also provided with an overhanging connector (4e), the expansion link (4f) of the telescopic oil cylinder (4c) of bearing diagonal (4) is also hinged with an active connecting base (4g); One cabinet frame (5a) of described man-like shelf (5) is also provided with one group of transition Connection Block first (5c) and transition Connection Block second (5d); Described fuselage (2) the rear support leg (2d) of transverse direction and longitudinal extension can also be provided with one group of fixed connecting base (2h).
2. pile frame according to claim 1, is characterized in that: the telescopic oil cylinder (4c) of described bearing diagonal (4) can be hinged in the transition Connection Block second (5d) of a cabinet frame (5a) by overhanging connector (4e) and bearing pin (5e); Active connecting base (4g) on the expansion link (4f) of the telescopic oil cylinder (4c) of described bearing diagonal (4) by bearing pin (4h) can be connected and fixed upper in the transition Connection Block first (5c) of a cabinet frame (5a), also can be connected and fixed fuselage (2) can transverse direction and longitudinal extension rear support leg (2d) fixed connecting base (2h) on.
3. a use mounting method for pile frame, according to the described pile frame of one of claims 1 to 3, comprises the steps:
The chassis (1) of a, pile frame, fuselage (2), lower pole (3a), bearing diagonal (4) and man-like shelf (5) under non-disintegration state whole Transporting to construction plant; Active connecting base (4g) on the expansion link (4f) of bearing diagonal telescopic oil cylinder (4c) is connected and fixed by the 4th bearing pin (4h) and the transition Connection Block first (5c) on a cabinet frame (5a); Carriage (3d) is connected and fixed by the 3rd bearing pin (3g) and lower pole (3a);
The top column (3b) transporting to construction plant is sling by the thing device (3e) that hangs of b, use lower pole (3a), by the movement of chassis (1) by top column (3b) handling to installation site, lie in a horizontal plane on stand (6);
C, utilize the extend action of the elevating ram (5b) of man-like shelf (5), lower pole (3a) is adjusted to level, and utilizes the movement on chassis (1) lower pole (3a) to be aligned with top column (3b) to be connected; And the 3rd bearing pin (3g) that carriage (3d) and lower pole (3a) are connected and fixed is extracted releasing fixed constraint;
D, the front leg strut (2b) on fuselage (2) is supported to ground, rear support leg (2d) is extended laterally into desired location and longitudinally stretches out and support to ground; The stretching device (4b) of bearing diagonal (4) and the expansion link (4f) of telescopic oil cylinder (4c) protruding, carriage (3d) on column (3) slides into desired location along guide rail (3c) thereupon, with the second bearing pin (3f) by hinged to carriage (3d) and column (3) fixing;
The expansion link (4f) of the telescopic oil cylinder (4c) of e, bearing diagonal (4) shrinks, and column (3) is that axle center rotates and upwards hoists with the pin joint of fore-stock (2a) under the drive of bearing diagonal (4);
It is characterized in that: also comprise the steps:
F, when the expansion link (4f) of the telescopic oil cylinder (4c) of bearing diagonal (4) is retracted to desired location, column (3) upwards rises and is raised to set angle β, and the overhanging connector (4e) on the cylinder barrel (4d) of the telescopic oil cylinder (4c) of bearing diagonal (4) has also aligned with the transition Connection Block second (5d) on a cabinet frame (5a) and has been in and has been connected state; Use the 5th bearing pin (5e) by hinged for the transition Connection Block second (5d) on the overhanging connector (4e) on the cylinder barrel (4d) of telescopic oil cylinder (4c) and a cabinet frame (5a) fixing, afterwards the 4th bearing pin (4h) that upper to the active connecting base (4g) of the expansion link (4f) of telescopic oil cylinder (4c) and a cabinet frame (5a) transition Connection Block first (5c) is connected and fixed is extracted, remove constraint between the two;
The expansion link (4f) of the telescopic oil cylinder (4c) of g, bearing diagonal (4) is protruding together with the active connecting base (4g) on it, until the active connecting base (4g) on expansion link (4f) aligns with the fixed connecting base (2h) on rear support leg (2d), the 4th bearing pin (4h) is used the active connecting base (4g) on telescopic oil cylinder expansion link (4f) and the fixed connecting base (2h) on scalable rear support leg (2d) to be connected and fixed;
H, the 5th bearing pin (5e) that the transition Connection Block second (5d) on the overhanging connector (4e) on the cylinder barrel (4d) of telescopic oil cylinder (4c) and a cabinet frame (5a) is connected and fixed is extracted the constraint of releasing;
The expansion link (4f) of the telescopic oil cylinder (4c) of i, bearing diagonal (4) shrinks, column (3) is that axle center rotates and continues upwards to hoist until reach the plumbness becoming 90 degree with ground with the pin joint of fore-stock (2a) under the drive of bearing diagonal (4); The elevating ram (5b) of man-like shelf (5) shrinks, make man-like shelf (5) to initial position, and by the first bearing pin (2g), man-like shelf (5) is fixed on the middle free bearing (2c) of fuselage (2), so far, the operation of pile frame self-support mast completes;
The movable mast operation of j, pile frame is undertaken by the reverse order of above step.
CN201510581326.2A 2015-09-14 2015-09-14 Pile frame and using and mounting method thereof Active CN105089053B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201510581326.2A CN105089053B (en) 2015-09-14 2015-09-14 Pile frame and using and mounting method thereof
PCT/CN2016/099087 WO2017045625A1 (en) 2015-09-14 2016-09-14 Pile frame and method of using and mounting same
KR1020187006162A KR102038877B1 (en) 2015-09-14 2016-09-14 Pile frame and its installation method
JP2018532501A JP6498361B2 (en) 2015-09-14 2016-09-14 Pile frame and its use and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510581326.2A CN105089053B (en) 2015-09-14 2015-09-14 Pile frame and using and mounting method thereof

Publications (2)

Publication Number Publication Date
CN105089053A true CN105089053A (en) 2015-11-25
CN105089053B CN105089053B (en) 2017-02-01

Family

ID=54570312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510581326.2A Active CN105089053B (en) 2015-09-14 2015-09-14 Pile frame and using and mounting method thereof

Country Status (4)

Country Link
JP (1) JP6498361B2 (en)
KR (1) KR102038877B1 (en)
CN (1) CN105089053B (en)
WO (1) WO2017045625A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017045625A1 (en) * 2015-09-14 2017-03-23 山河智能装备股份有限公司 Pile frame and method of using and mounting same
CN115897579A (en) * 2022-11-25 2023-04-04 临清市安竣建设有限公司 A quick piling device for construction engineering construction
WO2023178638A1 (en) * 2022-03-25 2023-09-28 山河智能装备股份有限公司 Pile frame

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA3004561A1 (en) * 2018-05-09 2019-11-09 Soletanche Freyssinet Apparatus and method for subsea wall insertion
CN108808376B (en) * 2018-06-27 2024-06-21 武汉合智数字能源技术有限公司 Charging pile automatic docking device
CN108978657A (en) * 2018-09-21 2018-12-11 中国人民解放军军事科学院国防工程研究院 A kind of multi-functional universal fixed device of plant stake device-specific
CN110526138B (en) * 2019-07-31 2024-07-23 中铁九桥工程有限公司 Amplitude-variable girder erection crane
CN110952550B (en) * 2019-10-28 2024-02-27 广东力源液压机械有限公司 Suspended self-supporting pile driving method and pile driver
CN114855745A (en) * 2022-06-21 2022-08-05 无锡中惠天泽智能科技有限公司 Reversible soil parameter testing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11324551A (en) * 1998-05-15 1999-11-26 Sanwa Kizai Co Ltd Mast supporting device for running carriage in working machine for foundation work
CN202202322U (en) * 2011-08-30 2012-04-25 毛杰 Pile filling machine folding main frame
CN202543926U (en) * 2012-01-17 2012-11-21 上海工程机械厂有限公司 Self-erected frame mechanism of pile driving frame
CN202990884U (en) * 2012-11-03 2013-06-12 广东力源液压机械有限公司 Novel piling machine working device
CN103866768A (en) * 2014-03-25 2014-06-18 张家港市兴鸿达基础有限公司 Pile driver pile frame structure
CN205077486U (en) * 2015-09-14 2016-03-09 山河智能装备股份有限公司 Pile frame

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5726448U (en) * 1980-07-21 1982-02-10
JPS57169131A (en) * 1981-04-11 1982-10-18 Nippon Sharyo Seizo Kaisha Ltd Housing of pile driver
JPS6260631U (en) * 1985-09-30 1987-04-15
DE9110495U1 (en) * 1991-08-24 1991-10-17 Ing. G. Klemm, Bohrtechnik GmbH, 5962 Drolshagen Mobile drilling rig
DE4231553C1 (en) * 1992-09-21 1993-12-02 Bauer Spezialtiefbau Mast support for crane or drilling rig car - has support swivel arm movable over car cabin
JP3532402B2 (en) * 1997-12-04 2004-05-31 日立建機株式会社 Construction machinery with leader
JP3310241B2 (en) * 1999-07-28 2002-08-05 日本車輌製造株式会社 Pile driver leader standing method and apparatus
KR101114514B1 (en) 2010-03-31 2012-02-24 주식회사 다윈전자 Power semiconductor module
CN104612152B (en) * 2015-01-16 2016-04-13 山河智能装备股份有限公司 A kind of pile frame and mounting method thereof
CN105089053B (en) * 2015-09-14 2017-02-01 山河智能装备股份有限公司 Pile frame and using and mounting method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11324551A (en) * 1998-05-15 1999-11-26 Sanwa Kizai Co Ltd Mast supporting device for running carriage in working machine for foundation work
CN202202322U (en) * 2011-08-30 2012-04-25 毛杰 Pile filling machine folding main frame
CN202543926U (en) * 2012-01-17 2012-11-21 上海工程机械厂有限公司 Self-erected frame mechanism of pile driving frame
CN202990884U (en) * 2012-11-03 2013-06-12 广东力源液压机械有限公司 Novel piling machine working device
CN103866768A (en) * 2014-03-25 2014-06-18 张家港市兴鸿达基础有限公司 Pile driver pile frame structure
CN205077486U (en) * 2015-09-14 2016-03-09 山河智能装备股份有限公司 Pile frame

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017045625A1 (en) * 2015-09-14 2017-03-23 山河智能装备股份有限公司 Pile frame and method of using and mounting same
WO2023178638A1 (en) * 2022-03-25 2023-09-28 山河智能装备股份有限公司 Pile frame
CN115897579A (en) * 2022-11-25 2023-04-04 临清市安竣建设有限公司 A quick piling device for construction engineering construction

Also Published As

Publication number Publication date
JP6498361B2 (en) 2019-04-10
KR20180037026A (en) 2018-04-10
CN105089053B (en) 2017-02-01
JP2018530690A (en) 2018-10-18
WO2017045625A1 (en) 2017-03-23
KR102038877B1 (en) 2019-10-31

Similar Documents

Publication Publication Date Title
CN105089053A (en) Pile frame and using and mounting method thereof
CN103089286B (en) Driving face self-moving temporary support hydraulic support and support method thereof
CN204875552U (en) Frame bridge crane vertical lift structure
JP6483268B2 (en) Pile frame and assembly method thereof
CN203769796U (en) Multifunctional operation platform for tunnel
CN109441361B (en) Pile frame and mast erecting method thereof
CN105366587A (en) Heavy load moving and jacking mechanism
CN205077486U (en) Pile frame
CN213626572U (en) Tool type external cantilever operation platform
CN202594653U (en) Lifting platform
CN203050754U (en) Self-moving temporary supporting hydraulic support for driving working face
CN204492635U (en) A kind of hydraulic foldable cat ladder
CN103982141B (en) A kind of novel rapid transporting drilling machine derrick substructure structure
CN205591951U (en) Strut leading section of actual mining roadway from moving formula hydraulic equipment
CN201420239Y (en) Hydraulic locking mechanism
CN205921277U (en) 10 kilovolt high -voltage board transfer car(buggy)
CN201144414Y (en) Split folding drill floor
CN209308697U (en) Subsidence-style tunnel roof plate template trolley device
CN114044474A (en) Safety protection type power maintenance device
CN201040675Y (en) Special-purpose hanger device for mounting elevator
CN105064396B (en) A kind of mass concrete movable up-down operation platform
CN202273594U (en) Three-section connecting rod support device for rotary drilling rig
CN204661174U (en) A kind of hydraulically extensible boom device of climbing type tower machine
CN203867478U (en) Novel structure for rapidly transporting derrick and substructure
CN203699790U (en) Foldable type hydraulic lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant