CN201186838Y - Vertical type coil holder - Google Patents

Vertical type coil holder Download PDF

Info

Publication number
CN201186838Y
CN201186838Y CNU2008200342070U CN200820034207U CN201186838Y CN 201186838 Y CN201186838 Y CN 201186838Y CN U2008200342070 U CNU2008200342070 U CN U2008200342070U CN 200820034207 U CN200820034207 U CN 200820034207U CN 201186838 Y CN201186838 Y CN 201186838Y
Authority
CN
China
Prior art keywords
nut
jacking block
body frame
upright columns
respectively arranged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200342070U
Other languages
Chinese (zh)
Inventor
李东升
胡夏升
黄晨
王建群
黄建成
马国俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DANYANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
DANYANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DANYANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co filed Critical DANYANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority to CNU2008200342070U priority Critical patent/CN201186838Y/en
Application granted granted Critical
Publication of CN201186838Y publication Critical patent/CN201186838Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Unwinding Of Filamentary Materials (AREA)

Abstract

The utility model relates to an auxiliary device for construction of electric power equipment, in particular to a vertical pay-off frame. Two vertical upright columns are fixed on the main frame in parallel; a four-connecting rod mechanism is also arranged in the main frame, the four-connecting rod mechanism comprises four connecting rods, and an upper support, a lower support, a nut and a jacking block are respectively arranged on the four articulated points between the four connecting rods; the upper support and the lower support are respectively provided with two guide holes, and the upper and the lower supports are sleeved with the two upright columns through the guide holes and vertically moved along the upright columns; a lead screw is arranged between the nut and the jacking block, the rear end of the lead screw is propped against the jacking block, and the thread section of the lead screw is connected with the nut in a matching manner; a plurality of positioning holes are distributed on the two upright columns from up to down, a positioning baffle rod which can be partially inserted into the arbitrary positioning hole is respectively arranged on each upright column, and the exposed part of the positioning baffle rod is blocked at the bottom part of the lower support. The auxiliary device has the advantages of good structural stability, wide width adjusting range, convenient adjustment and small running resistance.

Description

Vertical pay off rack
Technical field
The utility model relates to the auxiliary device of electrical equipment construction, specifically is a kind of vertical pay off rack.
Background technology
Vertical pay off rack is the auxiliary device that is used for power transmission sequence payingoff construction process, described payingoff construction process is meant: thereby when using machinery strand mill or winch to receive steel rope traction lead, in drum, penetrate paying out reel and be erected at it is freely rotated, lead by constantly from drum the exhibition of hauling out puts.The vertical pay off rack that in said process, uses, its structure generally as shown in Figure 1, it comprises body frame 11 and is installed in oil jack 12 on the body frame that the top of oil jack is provided with an axle sleeve 13.
In the work progress, drum is placed ground, a pay off rack is respectively put on both sides.Because body frame 11 altitude hold need be filled up below pay off rack with the indefinite chock of quantity, institute's mat thickness is decided according to the drum size.Then the steel bobbin is penetrated in the axle sleeve 13 of drum and two pay off racks, the handle of use jack is pressing up and down, to regulate the drum height.
There is following problem in the use of this structure:
1, sets up complicated difficulty.Because the body frame aspect ratio is less, need the pad chock below, chock is not of uniform size, smooth degree varies is especially set up the comparison difficulty on irregular landform, consume plenty of time and manpower, sometimes in order to adapt to big drum, need dig pit, operate very inconvenient on ground.
2, stability is not high.Because the height of body frame is less, on the pad behind the chock, can not make between body frame and the chock and firmly connect, and in the unwrapping wire process, especially in longer strain section unwrapping wire, because lead is on ground and aerial unbalance stress, can produce bigger tension force, especially after running into mao bamboon and getting over coil holder and trees obstacle, therefore lead need produce very big tension force could break through these obstacles, is that drum can produce great impact power to line top, causes that drum rapidly rotates, jolts, severe vibration, then need drum is braked this moment, uses drill rod usually.In practice of construction, because the stability problem of pay off rack, drum rolls out coil holder and strides the phenomenon of collapsing and take place often from coil holder.This not only can threaten the personnel's of drum place personal safety, and the staff also needs again the good drum of frame, has wasted the time, has influenced construction speed.In addition, it is also unfavorable to the service life of facility that coil holder unstable and striding collapsed, and facts have proved, its service life has been shortened in operating vibration and topple and destroyed the oil sealing of oil jack easily, has increased the cost of Work tool.
3, the adjusting difficulty is big.Use jack to regulate difficulty of drum aspect ratio, it is time-consuming require great effort, and cause jack oil sealing destruction cause malfunctioning after, this phenomenon is obviously aggravated.Seriously increase difficulty of construction, influenced construction speed and efficient.
4, the rotating element component wear is serious.Wearing and tearing aggravate axle sleeve with bobbin in long-term use, and it is malfunctioning to cause drum to rotate; When the drum rotation is obstructed, need bigger tractive force, tension force savings back discharges and causes drum to jolt seriously, and the danger of overturning is arranged.
Summary of the invention
The trapezoidal technical matters to be solved of this practicality is, provides that a kind of structural stability of using is good, height adjustment range is big in power transmission sequence payingoff construction process, easy to adjust, vertical pay off rack that running resistance is little.
Vertical pay off rack of the present utility model includes the body frame of a framed structure, is fixed with two vertical columns on body frame side by side; Also be provided with a four-bar linkage in the body frame, this four pipe links mechanism includes four pipe links, be respectively arranged with superposed upper bracket on four hinge-points between four connections, be positioned at the bottom lower bracket, be positioned at anterior nut and be positioned at the jacking block at rear portion; Be respectively arranged with two pilot holes on described upper bracket and the lower bracket, upper and lower support also can move along column is upper and lower by pilot hole and two root post sockets; Be provided with a rhizoid bar between described nut and the jacking block, the rear end of screw mandrel withstands on the jacking block, and the thread segment and the nut of screw mandrel are connected; Be placed with a plurality of knock holees from top to bottom on two root posts, and every root post is provided with a location pin that can partly insert in any knock hole, the exposed portions serve of location pin is blocked in the bottom of above-mentioned lower bracket.
The top of described upper bracket has a groove that is used for settling bobbin, has been arranged side by side a pair of roller in the bottom of groove.
The utility model sound construction, set up with easy to adjust.Because it has adopted the height adjustment mechanism of four-bar linkage structure, the height and position of four-bar linkage itself can be adjusted the location on column simultaneously, thereby improved its height adjustment range greatly, save the in use required chock of traditional vertical pay off rack, guaranteed the stability and the safety of operation.In addition, in the operational process, the bobbin end can be rotated at roller surface, thereby has reduced the wearing and tearing of bobbin and body frame, has improved service life, has guaranteed safe in operation.
Description of drawings
Fig. 1 is the structural representation of vertical pay off rack in the prior art;
Fig. 2 is a Facad structure scheme drawing of the present utility model;
Fig. 3 is a construction profile scheme drawing of the present utility model.
The specific embodiment
As Fig. 2, shown in Figure 3, embodiment of the present utility model has the body frame 21 of a tetragonous cone table shape, two root posts 22 are fixed between the base plate and top board of body frame, a four-bar linkage 23 can be upper and lower mobile on column, in the four pipe link mechanisms, be respectively arranged with upper bracket 232, lower bracket 233, nut 234, jacking block 235 on four hinge-points between four connecting rods 231; Be respectively arranged with two pilot holes 236 on upper bracket and the lower bracket, upper and lower support also can move along column is upper and lower by pilot hole and two root post sockets; Be provided with a rhizoid bar 237 between nut and the jacking block, the rear end of screw mandrel withstands on the jacking block, and the thread segment and the nut of screw mandrel are connected, when rotary screw just can be regulated height distance between the upper and lower support; The height and position of whole four bindiny mechanisms is limited by the location pin 24 that is positioned at its below, and the location pin can be inserted in any one knock hole 221 that is arranged on the column.
As shown in Figure 3, the top of upper bracket has a groove 238 that is used for settling bobbin, has been arranged side by side a pair of roller 239 in the bottom of groove.In the unwrapping wire process, the end of bobbin just is placed between two rollers and is supported by two rollers, and bobbin relatively rotates with roller during unwrapping wire like this, and the friction of formation is a friction of rolling, thereby has reduced wearing and tearing.

Claims (2)

1, a kind of vertical pay off rack includes the body frame (21) of a framed structure, it is characterized in that: be fixed with two vertical columns (22) on body frame side by side; Also be provided with a four-bar linkage (23) in the body frame, this four pipe links mechanism includes four pipe links (231), be respectively arranged with superposed upper bracket (232) on four hinge-points between four connections, be positioned at the bottom lower bracket (233), be positioned at anterior nut (234) and be positioned at the jacking block (235) at rear portion; Be respectively arranged with two pilot holes (236) on described upper bracket and the lower bracket, upper and lower support connects by pilot hole and two root post covers (22) and can move along column is upper and lower; Be provided with a rhizoid bar (237) between described nut and the jacking block, the rear end of screw mandrel withstands on the jacking block, and the thread segment and the nut of screw mandrel are connected; Be placed with a plurality of knock holees (221) from top to bottom on two root posts, and every root post is provided with a location pin (24) that can partly insert in any knock hole, the exposed portions serve of location pin is blocked in the bottom of above-mentioned lower bracket (133).
2, vertical pay off rack according to claim 1 is characterized in that: the top of described upper bracket (232) has a groove (238) that is used for settling bobbin, has been arranged side by side a pair of roller (239) in the bottom of groove.
CNU2008200342070U 2008-04-18 2008-04-18 Vertical type coil holder Expired - Lifetime CN201186838Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200342070U CN201186838Y (en) 2008-04-18 2008-04-18 Vertical type coil holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200342070U CN201186838Y (en) 2008-04-18 2008-04-18 Vertical type coil holder

Publications (1)

Publication Number Publication Date
CN201186838Y true CN201186838Y (en) 2009-01-28

Family

ID=40309856

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200342070U Expired - Lifetime CN201186838Y (en) 2008-04-18 2008-04-18 Vertical type coil holder

Country Status (1)

Country Link
CN (1) CN201186838Y (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102070042A (en) * 2010-12-01 2011-05-25 河南省电力公司南阳供电公司 Adjustable pay-off stand
CN102139814A (en) * 2010-02-02 2011-08-03 海德堡印刷机械股份公司 Apparatus for height adjustment of front/top lay
CN102386582A (en) * 2011-12-01 2012-03-21 宁夏电力公司固原供电局 Portable type adjustable cable pay-off rack
CN103337826A (en) * 2013-07-03 2013-10-02 国家电网公司 Paying-off device
CN104393533A (en) * 2014-11-27 2015-03-04 国网山东肥城市供电公司 Tractor-mounted winch wheel-blocked rack for high-voltage wire releasing/tightening construction
CN104393555A (en) * 2014-11-27 2015-03-04 安徽顺驰电缆有限公司 Adjustable cable releasing frame
CN105398874A (en) * 2015-11-16 2016-03-16 中国十七冶集团有限公司 Cable reel bracket
CN105600584A (en) * 2015-12-28 2016-05-25 广船国际有限公司 Tooling for cable pulling or replacing of ship
CN105790199A (en) * 2014-06-28 2016-07-20 国家电网公司 Pulley mechanism of power cable unwinding for power construction
CN107472989A (en) * 2017-07-27 2017-12-15 南通博旭时装有限公司 A kind of feeding machanism of Weaving device
CN112897205A (en) * 2021-01-07 2021-06-04 李松涛 Optical cable is laid and is used pay-off

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9194467B2 (en) 2010-02-02 2015-11-24 Heidelberger Druckmaschinen Ag Apparatus for front/top lay vertical adjustment and sheet-fed rotary printing press having the apparatus
CN102139814A (en) * 2010-02-02 2011-08-03 海德堡印刷机械股份公司 Apparatus for height adjustment of front/top lay
CN102070042A (en) * 2010-12-01 2011-05-25 河南省电力公司南阳供电公司 Adjustable pay-off stand
CN102386582A (en) * 2011-12-01 2012-03-21 宁夏电力公司固原供电局 Portable type adjustable cable pay-off rack
CN103337826A (en) * 2013-07-03 2013-10-02 国家电网公司 Paying-off device
CN103337826B (en) * 2013-07-03 2015-12-23 国家电网公司 A kind of wire dispenser
CN105790199A (en) * 2014-06-28 2016-07-20 国家电网公司 Pulley mechanism of power cable unwinding for power construction
CN105790199B (en) * 2014-06-28 2017-07-04 国家电网公司 The power construction pulley mechanism of electric power cable unwrapping wire
CN104393555A (en) * 2014-11-27 2015-03-04 安徽顺驰电缆有限公司 Adjustable cable releasing frame
CN104393533A (en) * 2014-11-27 2015-03-04 国网山东肥城市供电公司 Tractor-mounted winch wheel-blocked rack for high-voltage wire releasing/tightening construction
CN104393533B (en) * 2014-11-27 2017-01-11 国家电网公司 Tractor-mounted winch wheel-blocked rack for high-voltage wire releasing/tightening construction
CN105398874A (en) * 2015-11-16 2016-03-16 中国十七冶集团有限公司 Cable reel bracket
CN105600584A (en) * 2015-12-28 2016-05-25 广船国际有限公司 Tooling for cable pulling or replacing of ship
CN107472989A (en) * 2017-07-27 2017-12-15 南通博旭时装有限公司 A kind of feeding machanism of Weaving device
CN112897205A (en) * 2021-01-07 2021-06-04 李松涛 Optical cable is laid and is used pay-off

Similar Documents

Publication Publication Date Title
CN201186838Y (en) Vertical type coil holder
CN202721425U (en) Portable fast lifting cable paying off rack
CN107879269A (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN115557322A (en) Cable rack for bypass operation of power distribution network and operation method
CN202543926U (en) Self-erected frame mechanism of pile driving frame
CN210635607U (en) Portal crane capable of preventing lifting hook from shaking
CN208284917U (en) A kind of fast power-saving cable laying auxiliary device
CN201330565Y (en) Semi-trailing drilling platform for oil drilling and repairing equipment
CN207346915U (en) Liftable cable pay-off rack
CN211115727U (en) Hydraulic and hydroelectric engineering is with overhauing cat ladder equipment
CN112761533B (en) Derrick lifting oil cylinder overturning mechanism and overturning method thereof
CN212825343U (en) Quick overhaul device convenient to adjust for overhaul of mine engineering machinery apparatus
CN209940321U (en) Wall-riding hoisting equipment for movable curtain wall
CN114476832A (en) Optical fiber manufacturing winding device with compression structure
CN209823289U (en) Cable pay-off rack
CN103510742B (en) Multifunctional rotary derrick
CN206144534U (en) Two vertical support of stepping down suspending weight subassemblies and two vertical chain beam -pumping units of stepping down
CN106429951A (en) Portable automobile maintenance lifting device having assurance function
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN111703959A (en) Cable pay-off for communication engineering
CN201923647U (en) Pipe kicking device of oil-field derrick pipe conveying machine
CN216037957U (en) Heavy pay off rack of assembled large length cable of taking arresting gear
CN215485823U (en) Ascending frame for electrical fault maintenance
CN219585512U (en) Cable unreeling frame for power construction
CN204251092U (en) The bracket system of steel rope reel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER CO. STATE ELECTRIC NET CROP

Effective date: 20121105

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121105

Address after: 212300 No. 218, Danyang Development Zone, Jiangsu, Yuquanlu Road

Patentee after: Danyang Power Supply Company of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 212300 No. 218, Danyang Development Zone, Jiangsu, Yuquanlu Road

Patentee before: Danyang Power Supply Company of Jiangsu Electric Power Company

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090128