CN102386582A - Portable type adjustable cable pay-off rack - Google Patents
Portable type adjustable cable pay-off rack Download PDFInfo
- Publication number
- CN102386582A CN102386582A CN2011103925119A CN201110392511A CN102386582A CN 102386582 A CN102386582 A CN 102386582A CN 2011103925119 A CN2011103925119 A CN 2011103925119A CN 201110392511 A CN201110392511 A CN 201110392511A CN 102386582 A CN102386582 A CN 102386582A
- Authority
- CN
- China
- Prior art keywords
- rack
- horizontal stand
- pipe
- brackets
- cable pay
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to power maintenance equipment, in particular to a portable type adjustable cable pay-off rack. The cable pay-off rack comprises two pairs of symmetrically distributed brackets and a shaft which is placed on the brackets and is used for supporting a cable disc; the cable pay-off rack is characterized in that: the brackets comprise horizontal brackets which are horizontally distributed up and down and two parallel vertical brackets which are connected with the upper and lower horizontal brackets; the upper horizontal bracket is fixedly provided with a bearing seat and a jack is installed between the two parallel vertical brackets on the lower horizontal bracket; the two parallel vertical brackets can be retractable structures and the two pairs of the symmetrically distributed brackets are fixedly connected through connection pieces. The portable type adjustable cable pay-off rack provided by the invention has the characteristics of convenience for carrying, assembling, using and adjusting, rational structure and the like; and with the portable type adjustable cable pay-off rack, the pay-off work of the cable discs with different diameters can be met.
Description
Technical field
The present invention relates to a kind of electric power maintenance of equipment, particularly a kind of portable adjustable cable pay off rack.
Background technology
Along with electric network reconstruction, needed a large amount of miscellaneous secondary connection cables in recent years, because the diameter of not collinear footpath cable hank is different; And the quality of cable hank and cable is heavier; In cable unwrapping wire process, need cable hank be propped through support, the rotatable cable dish carries out setting-out work.Because the diameter of cable hank is different, need to prepare a plurality of supports that are applicable to the different-diameter cable hank, cause the waste of fund on the one hand, carry, use inconvenience on the other hand, influenced job schedule and interruption duration.
Summary of the invention
Technical scheme of the present invention is the deficiency that overcomes prior art, provides a kind of easy to carry, rational in infrastructure, can be fit to the portable adjustable cable pay off rack of different cable hank diameters.
For realizing that above-mentioned purpose technical scheme of the present invention is: a kind of portable adjustable cable pay off rack; Comprise the support of two symmetrical distributions and be placed on the axle that is used for the carrying cable dish on the frame; It is characterized in that above-mentioned support comprises the horizontal stand and the two parallel vertical supports that are connected upper and lower horizontal stand of upper and lower horizontal distribution; On last horizontal stand, be fixed with bearing pedestal; Between two parallel vertical supports on the following horizontal stand, jack is installed, two parallel vertical support frames are Collapsible structure, and connector is fixedly linked the support of two symmetrical distributions.
The Collapsible structure of above-mentioned two parallel vertical support frames is the relatively-movable pipe of two suits, on the tube wall of two pipes, has the corresponding hole that is used for plugging in alignment pin, and in the pipe of two suits, last pipe and last horizontal stand are fixed, and following pipe is fixed on down on the horizontal stand.
The correspondence position of horizontal stand and jack is fixed with the retracted support pipe on above-mentioned, and stay pipe is made up of the relatively-movable pipe of two suits, on the tube wall of two pipes, has the corresponding hole that is used for plugging in alignment pin.
Technical scheme of the present invention has following characteristics: 1, carry, easy to assembly.This programme is mainly gone up horizontal stands, two following horizontal stands and connector by two and is formed, just becomes two symmetrical supports after upper and lower two horizontal stands are assembled, and two stands just becomes the cable pay off rack after being fixedly linked through connector.2, use, easy to adjust.Diameter according to cable hank; At first adjustment is fixed on the length of the stay pipe under the horizontal stand; Axle with the carrying cable dish passes bearing pedestal and cable hank then, through horizontal stand in the jack lifting, cable hank and ground is broken away from; Pass through alignment pin then with telescopic vertical support frame fixed-site, can use.3, rational in infrastructure.This device mainly is made up of channel-section steel and steel pipe, and making is simple, cost is low, utilizes jack can adjust the height of entire bracket easily, can satisfy the setting-out work of different-diameter cable hank.
Description of drawings
Accompanying drawing 1 is a structural representation front view of the present invention;
Accompanying drawing 2 is a structural representation vertical view of the present invention;
Accompanying drawing 3 is a structural representation left view of the present invention;
Accompanying drawing 4 is the structural representation vertical view of connector of the present invention.
Embodiment
Like Fig. 1,2,3, shown in 4, left and right sides two stands all by last horizontal stand 2, horizontal stand 7 is formed with the two parallel Collapsible structure vertical support frames 4 that are connected upper and lower horizontal stand down, on horizontal stand on two, all is fixed with bearing pedestal 3.The Collapsible structure of above-mentioned two parallel vertical support frames 4 is the relatively-movable pipe of two suits; On the tube wall of two pipes, have the corresponding hole that is used for plugging in alignment pin 10; In the pipe of two suits; Last pipe and last horizontal stand are fixed, and following pipe is fixed on down on the horizontal stand, and last pipe box is in descending to manage and can relatively move.Jack 6 is installed in down between the two parallel vertical support frames on the horizontal stand.For guaranteeing the use of large-size cable hank 1; At the correspondence position of horizontal stand 2 with jack 6; Be fixed with retracted support pipe 5, stay pipe is made up of the relatively-movable pipe of two suits, on the tube wall of two pipes, has the corresponding hole that is used for plugging in alignment pin.
During use, at first upper and lower horizontal stand is interconnected and is integral through the upward pipe in the vertical support frame 4, following pipe, through connector 8 that the connection of left and right sides two stands is fixing then, fix and can adopt bolt to connect.Cable hank 1 is put between the two stands of the left and right sides; Adjust stay pipe 5 length under the horizontal stand 2, make the size of the height appropriate cable dish of bearing pedestal, utilize pin relatively-movable stay pipe 5 location; Axle 9 with the carrying cable dish penetrates in the hole of bearing pedestal and cable hank centre then; To go up horizontal stand 2 jack-up through jack 6, stay pipe 5, make cable hank 1 disengaging ground, at this moment just can carry out the setting-out work of cable 11.
The form that connects the connector 8 of left and right sides two stands can design according to the section form of following horizontal stand 7, after interlocking like the channel-section steel that adopts two kinds of specifications among Fig. 1,2, utilizes bolt to connect.
Claims (3)
1. portable adjustable cable pay off rack; Comprise the support of two symmetrical distributions and be placed on the axle that is used for the carrying cable dish on the frame; It is characterized in that above-mentioned support comprises the horizontal stand and the two parallel vertical supports (4) that are connected upper and lower horizontal stand of upper and lower horizontal distribution; On last horizontal stand (2), be fixed with bearing pedestal (3); Between two parallel vertical supports (4) on the following horizontal stand (7), jack (6) is installed, two parallel vertical support frames (4) are Collapsible structure, and connector (8) is fixedly linked the support of two symmetrical distributions.
2. portable adjustable cable pay off rack according to claim 1; The Collapsible structure that it is characterized in that above-mentioned two parallel vertical support frames (4) is the relatively-movable pipe of two suits; On the tube wall of two pipes, have the corresponding hole that is used for plugging in alignment pin (10); In the pipe of two suits, last pipe is fixing with last horizontal stand (2), and following pipe is fixed on down on the horizontal stand (7).
3. portable adjustable cable pay off rack according to claim 2; The correspondence position that it is characterized in that horizontal stand (2) and jack (6) on above-mentioned; Be fixed with retracted support pipe (5); Stay pipe is made up of the relatively-movable pipe of two suits, on the tube wall of two pipes, has the corresponding hole that is used for plugging in alignment pin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103925119A CN102386582A (en) | 2011-12-01 | 2011-12-01 | Portable type adjustable cable pay-off rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103925119A CN102386582A (en) | 2011-12-01 | 2011-12-01 | Portable type adjustable cable pay-off rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102386582A true CN102386582A (en) | 2012-03-21 |
Family
ID=45825705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103925119A Pending CN102386582A (en) | 2011-12-01 | 2011-12-01 | Portable type adjustable cable pay-off rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102386582A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102923523A (en) * | 2012-10-09 | 2013-02-13 | 中船澄西船舶修造有限公司 | Payoff bracket of cable reel |
CN103062595A (en) * | 2012-12-14 | 2013-04-24 | 西北有色金属研究院 | Adjustable electromagnetic induction heater supporting frame |
CN104242158A (en) * | 2014-09-29 | 2014-12-24 | 国家电网公司 | Pay-off rack |
CN104393555A (en) * | 2014-11-27 | 2015-03-04 | 安徽顺驰电缆有限公司 | Adjustable cable releasing frame |
CN105071282A (en) * | 2015-08-06 | 2015-11-18 | 国网浙江省电力公司丽水供电公司 | Wire releasing rack |
CN105680366A (en) * | 2014-11-19 | 2016-06-15 | 中国石油化工股份有限公司 | Hydraulic cable collecting-releasing apparatus |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2816325Y (en) * | 2005-09-14 | 2006-09-13 | 洛阳风动工具有限公司 | Horizontal support for track type rock driller |
CN200978160Y (en) * | 2006-12-04 | 2007-11-21 | 新疆新能源股份有限公司 | Working support for paying off |
CN201186838Y (en) * | 2008-04-18 | 2009-01-28 | 江苏省电力公司丹阳市供电公司 | Vertical type coil holder |
CN201263057Y (en) * | 2008-09-10 | 2009-06-24 | 中建五局第三建设有限公司 | Cable pay-off rack |
CN202363802U (en) * | 2011-12-01 | 2012-08-01 | 宁夏电力公司固原供电局 | Portable adjustable cable pay-off rack |
-
2011
- 2011-12-01 CN CN2011103925119A patent/CN102386582A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2816325Y (en) * | 2005-09-14 | 2006-09-13 | 洛阳风动工具有限公司 | Horizontal support for track type rock driller |
CN200978160Y (en) * | 2006-12-04 | 2007-11-21 | 新疆新能源股份有限公司 | Working support for paying off |
CN201186838Y (en) * | 2008-04-18 | 2009-01-28 | 江苏省电力公司丹阳市供电公司 | Vertical type coil holder |
CN201263057Y (en) * | 2008-09-10 | 2009-06-24 | 中建五局第三建设有限公司 | Cable pay-off rack |
CN202363802U (en) * | 2011-12-01 | 2012-08-01 | 宁夏电力公司固原供电局 | Portable adjustable cable pay-off rack |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102923523A (en) * | 2012-10-09 | 2013-02-13 | 中船澄西船舶修造有限公司 | Payoff bracket of cable reel |
CN103062595A (en) * | 2012-12-14 | 2013-04-24 | 西北有色金属研究院 | Adjustable electromagnetic induction heater supporting frame |
CN103062595B (en) * | 2012-12-14 | 2015-06-10 | 西北有色金属研究院 | Adjustable electromagnetic induction heater supporting frame |
CN104242158A (en) * | 2014-09-29 | 2014-12-24 | 国家电网公司 | Pay-off rack |
CN105680366A (en) * | 2014-11-19 | 2016-06-15 | 中国石油化工股份有限公司 | Hydraulic cable collecting-releasing apparatus |
CN105680366B (en) * | 2014-11-19 | 2018-06-19 | 中国石油化工股份有限公司 | Fluid pressure type cable winding apparatus |
CN104393555A (en) * | 2014-11-27 | 2015-03-04 | 安徽顺驰电缆有限公司 | Adjustable cable releasing frame |
CN105071282A (en) * | 2015-08-06 | 2015-11-18 | 国网浙江省电力公司丽水供电公司 | Wire releasing rack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102386582A (en) | Portable type adjustable cable pay-off rack | |
CN202363802U (en) | Portable adjustable cable pay-off rack | |
CN102653360A (en) | Multifunctional soft bundled cable take-up and pay-off device | |
CN201641092U (en) | Electronic white board support | |
CN210103125U (en) | Adjustable pay-off rack suitable for electric power construction | |
CN201914762U (en) | Portable payoff bracket for cable unwinding shaft | |
CN208565819U (en) | A kind of adjustable suspension and support | |
CN205023730U (en) | Portal frame | |
CN207010098U (en) | A kind of electric wire payout stand | |
CN208631793U (en) | A kind of cable unwinding device | |
CN203826853U (en) | Exterior angle paying-off tackle for straight line angle pole of distribution line | |
CN105398874A (en) | Cable reel bracket | |
CN202997427U (en) | Portable electric cable pay-off rack | |
CN202107373U (en) | Cable and steel wire rope roller support device | |
CN102390755A (en) | Cable and steel wire rope roller supporting device | |
CN103343646B (en) | A kind of movable communication tower | |
CN103148912A (en) | Mounting bracket for mounting non-contact water level monitoring equipment | |
CN210682737U (en) | Height-adjustable cable reel paying-off support convenient for labor-saving paying-off | |
CN219652380U (en) | Mountain region photovoltaic cable pay-off | |
CN202772540U (en) | Bearing wire placing device | |
CN202163953U (en) | Aluminum rod cable discharging frame | |
CN104767139B (en) | Operating platform for hanging ground wire on high voltage side of transformer | |
CN205151362U (en) | Assembled cable drawing drum | |
CN204559007U (en) | A kind of cable exit height is convenient to the cable frame regulated | |
CN210312858U (en) | Copper alloy section bar pay off rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120321 |