CN210103125U - An adjustable wire pay-off rack suitable for power construction - Google Patents

An adjustable wire pay-off rack suitable for power construction Download PDF

Info

Publication number
CN210103125U
CN210103125U CN201920713265.4U CN201920713265U CN210103125U CN 210103125 U CN210103125 U CN 210103125U CN 201920713265 U CN201920713265 U CN 201920713265U CN 210103125 U CN210103125 U CN 210103125U
Authority
CN
China
Prior art keywords
fixed
mounting seat
slide rail
sliding block
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920713265.4U
Other languages
Chinese (zh)
Inventor
范文静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Four Measurement Electronic Technology Co Ltd
Original Assignee
Shanghai Four Measurement Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Four Measurement Electronic Technology Co Ltd filed Critical Shanghai Four Measurement Electronic Technology Co Ltd
Priority to CN201920713265.4U priority Critical patent/CN210103125U/en
Application granted granted Critical
Publication of CN210103125U publication Critical patent/CN210103125U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型涉及放线架,具体涉及一种适用于电力施工的可调节放线架,包括底座,底座上相对固定有液压杆,液压杆两侧相对固定有第一滑轨,第一滑轨上设有与第一滑轨配合的第一滑块,第一滑块上贯穿并螺纹连接有固定螺栓,第一滑块上固定有支撑板,支撑板侧面固定有与第一滑轨结构相同的第二滑轨,液压杆杆体端部固定有安装座,安装座内部相对设有凹槽,凹槽内壁通过弹簧与横板相连,横板侧面固定有与第二滑轨配合的第二滑块,安装座侧面相对固定有插杆,第二滑轨上设有与插杆配合的插槽,安装座侧面固定有轴承座;本实用新型提供的技术方案能够有效克服现有技术所存在的不能适用不同线径的电缆、放线过程中电缆会出现弯折扭曲的缺陷。

Figure 201920713265

The utility model relates to a wire pay-off frame, in particular to an adjustable wire pay-off frame suitable for electric construction, comprising a base on which a hydraulic rod is relatively fixed, and first sliding rails are relatively fixed on both sides of the hydraulic rod There is a first sliding block matched with the first sliding rail, a fixing bolt is penetrated and screwed on the first sliding block, a supporting plate is fixed on the first sliding block, and the side of the supporting plate is fixed with the same structure as the first sliding rail. The second slide rail, the end of the hydraulic rod body is fixed with a mounting seat, the interior of the mounting seat is oppositely provided with a groove, the inner wall of the groove is connected with the horizontal plate through a spring, and the side of the horizontal plate is fixed with a second sliding rail that cooperates with the second sliding rail. The side of the mounting seat is relatively fixed with an insertion rod, the second slide rail is provided with a slot matched with the insertion rod, and the side of the mounting seat is fixed with a bearing seat; the technical solution provided by the utility model can effectively overcome the existing problems in the prior art. It is not suitable for cables with different wire diameters, and the cable will be bent and twisted during the pay-off process.

Figure 201920713265

Description

一种适用于电力施工的可调节放线架An adjustable wire pay-off rack suitable for power construction

技术领域technical field

本实用新型涉及放线架,具体涉及一种适用于电力施工的可调节放线架。The utility model relates to a wire pay-off frame, in particular to an adjustable wire pay-off frame suitable for electric construction.

背景技术Background technique

在电缆敷设施工中,电缆放线盘质量较重,不方便移动,需要借助放线架进行放线工作,由于不同线径的电缆盘直径不同,因此需要制作多个适用于不同线径的电缆盘支架,造成施工成本投入过大。此外,现有放线架在放线过程中,电缆会出现不同程度的弯折扭曲,影响后续施工。In the cable laying construction, the cable pay-off reel is heavy and inconvenient to move. It is necessary to use the pay-off rack to carry out the work. Since the diameter of the cable reel with different wire diameters is different, it is necessary to make multiple cables suitable for different wire diameters. Disk bracket, resulting in excessive investment in construction costs. In addition, during the pay-off process of the existing pay-off rack, the cables will be bent and twisted to varying degrees, which will affect the subsequent construction.

实用新型内容Utility model content

(一)解决的技术问题(1) Technical problems solved

针对现有技术所存在的上述缺点,本实用新型提供了一种适用于电力施工的可调节放线架,能够有效克服现有技术所存在的不能适用不同线径的电缆、放线过程中电缆会出现弯折扭曲的缺陷。Aiming at the above-mentioned shortcomings of the prior art, the utility model provides an adjustable wire pay-off frame suitable for electric construction, which can effectively overcome the existing problems in the prior art that cannot be applied to cables with different wire diameters, and the cables in the wire-paying process. There will be bending and twisting defects.

(二)技术方案(2) Technical solutions

为实现以上目的,本实用新型通过以下技术方案予以实现:In order to achieve the above purpose, the present invention is realized through the following technical solutions:

一种适用于电力施工的可调节放线架,包括底座,所述底座上相对固定有液压杆,所述液压杆两侧相对固定有第一滑轨,所述第一滑轨上设有与第一滑轨配合的第一滑块,所述第一滑块上贯穿并螺纹连接有固定螺栓,所述第一滑块上固定有支撑板,所述支撑板侧面固定有与第一滑轨结构相同的第二滑轨,所述液压杆杆体端部固定有安装座,所述安装座内部相对设有凹槽,所述凹槽内壁通过弹簧与横板相连,所述横板侧面固定有与第二滑轨配合的第二滑块,所述安装座侧面相对固定有插杆,所述第二滑轨上设有与插杆配合的插槽;An adjustable wire pay-off frame suitable for electric construction, including a base, a hydraulic rod is relatively fixed on the base, a first sliding rail is relatively fixed on both sides of the hydraulic rod, and the first sliding rail is provided with A first sliding block matched with a first sliding rail, a fixing bolt is threaded through the first sliding block, a supporting plate is fixed on the first sliding block, and a side surface of the supporting plate is fixed with the first sliding rail The second slide rail with the same structure, the end of the hydraulic rod body is fixed with a mounting seat, the interior of the mounting seat is oppositely provided with a groove, the inner wall of the groove is connected with the horizontal plate through a spring, and the side of the horizontal plate is fixed with a groove. the second sliding block matched with the second sliding rail, the side surface of the mounting seat is relatively fixed with an insertion rod, and the second sliding rail is provided with a slot matched with the insertion rod;

所述安装座侧面固定有轴承座,所述轴承座之间连接有转轴,所述转轴上固定有第一侧板,所述转轴上套设有第二侧板、环套,所述环套与第二侧板固定,所述转轴上设有第一螺孔,所述环套上设有与第一螺孔配合的第二螺孔,所述底座上相对固定有安装板,所述安装板之间固定有横杆,所述横杆上转动连接有上矫正轮、下矫正轮。A bearing seat is fixed on the side of the mounting seat, a rotating shaft is connected between the bearing seats, a first side plate is fixed on the rotating shaft, a second side plate and a ring sleeve are sleeved on the rotating shaft, and the ring sleeve is It is fixed with the second side plate. The rotating shaft is provided with a first screw hole, the ring sleeve is provided with a second screw hole matched with the first screw hole, and a mounting plate is relatively fixed on the base. A cross bar is fixed between the plates, and an upper straightening wheel and a lower straightening wheel are rotatably connected to the cross bar.

优选地,所述第一滑轨、第二滑轨均为t形滑轨。Preferably, the first slide rail and the second slide rail are both T-shaped slide rails.

优选地,所述插槽的长度大于插杆的直径。Preferably, the length of the slot is greater than the diameter of the insertion rod.

优选地,所述插槽沿第二滑轨均匀分布设置。Preferably, the slots are evenly distributed along the second slide rail.

优选地,所述第一螺孔沿转轴均匀分布设置。Preferably, the first screw holes are evenly distributed along the rotating shaft.

(三)有益效果(3) Beneficial effects

与现有技术相比,本实用新型所提供的一种适用于电力施工的可调节放线架能够利用液压杆带动安装座在竖直方向内上下移动,移动到合适位置后,借助第一滑轨与第一滑块的配合作用,将插槽插在插杆上,拧紧固定螺栓即可实现对安装座的固定,在转轴上能够调节第二侧板与第一侧板之间的距离,第二侧板调节到合适位置后,将第二螺孔与第一螺孔对准,借助螺栓即可对第二侧板进行固定,从而能够适用于不同线径的电缆放线;将转轴上的电缆穿过上矫正轮、下矫正轮之间再放线,能够借助上矫正轮、下矫正轮对电缆进行矫正,防止放线过程中出现电缆弯折扭曲的情况。Compared with the prior art, an adjustable wire pay-off frame suitable for electric construction provided by the present utility model can use a hydraulic rod to drive the mounting seat to move up and down in the vertical direction, and after moving to a suitable position, it can be moved by means of a first slide. The cooperation between the rail and the first slider, insert the slot on the insertion rod, and tighten the fixing bolt to realize the fixing of the mounting seat, and the distance between the second side plate and the first side plate can be adjusted on the rotating shaft. After the second side plate is adjusted to an appropriate position, align the second screw hole with the first screw hole, and fix the second side plate with bolts, so that it can be applied to cables of different wire diameters; The cable is put through between the upper straightening wheel and the lower straightening wheel, and the cable can be straightened with the help of the upper straightening wheel and the lower straightening wheel to prevent the cable from being bent and twisted during the pay-off process.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍。显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that are required to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型图1左视结构示意图;Fig. 2 is the left side structural schematic diagram of Fig. 1 of the present utility model;

图3为本实用新型图1中第二滑轨结构示意图;3 is a schematic structural diagram of the second slide rail in FIG. 1 of the present utility model;

图中:In the picture:

1、底座;2、第一滑轨;3、第一滑块;4、固定螺栓;5、支撑板;6、第二滑轨;7、液压杆;9、安装座;10、凹槽;11、弹簧;12、横板;13、第二滑块;14、插杆;15、插槽;16、轴承座;17、转轴;18、第一侧板;19、第一螺孔;20、第二侧板;21、环套;22、第二螺孔;23、安装板;24、横杆;25、上矫正轮;26、下矫正轮。1. Base; 2. The first sliding rail; 3. The first sliding block; 4. The fixing bolt; 5. The support plate; 6. The second sliding rail; 7. The hydraulic rod; 11, spring; 12, horizontal plate; 13, second slider; 14, plunger; 15, slot; 16, bearing seat; 17, shaft; 18, first side plate; 19, first screw hole; 20 21, the ring sleeve; 22, the second screw hole; 23, the mounting plate; 24, the cross bar; 25, the upper correction wheel; 26, the lower correction wheel.

具体实施方式Detailed ways

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present utility model more clear, the technical solutions in the embodiments of the present utility model will be described clearly and completely below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

一种适用于电力施工的可调节放线架,如图1至图3所示,包括底座1,底座1上相对固定有液压杆7,液压杆7两侧相对固定有第一滑轨2,第一滑轨2上设有与第一滑轨2配合的第一滑块3,第一滑块3上贯穿并螺纹连接有固定螺栓4,第一滑块3上固定有支撑板5,支撑板5侧面固定有与第一滑轨2结构相同的第二滑轨6,液压杆7杆体端部固定有安装座9,安装座9内部相对设有凹槽10,凹槽10内壁通过弹簧11与横板12相连,横板12侧面固定有与第二滑轨6配合的第二滑块13,安装座9侧面相对固定有插杆14,第二滑轨6上设有与插杆14配合的插槽15;An adjustable wire pay-off frame suitable for electric construction, as shown in Figures 1 to 3, includes a base 1, a hydraulic rod 7 is relatively fixed on the base 1, and a first slide rail 2 is relatively fixed on both sides of the hydraulic rod 7, The first sliding rail 2 is provided with a first sliding block 3 that cooperates with the first sliding rail 2 , the first sliding block 3 is threaded through and is connected with a fixing bolt 4 , and a supporting plate 5 is fixed on the first sliding block 3 to support A second slide rail 6 with the same structure as the first slide rail 2 is fixed on the side of the plate 5, a mounting seat 9 is fixed at the end of the hydraulic rod 7, and a groove 10 is oppositely provided inside the mounting seat 9, and the inner wall of the groove 10 passes through a spring 11. Connected to the horizontal plate 12, the side of the horizontal plate 12 is fixed with a second sliding block 13 that cooperates with the second sliding rail 6, the side of the mounting seat 9 is relatively fixed with an insertion rod 14, and the second sliding rail 6 is provided with a matching insertion rod 14. of slot 15;

安装座9侧面固定有轴承座16,轴承座16之间连接有转轴17,转轴17上固定有第一侧板18,转轴17上套设有第二侧板20、环套21,环套21与第二侧板20固定,转轴17上设有第一螺孔19,环套21上设有与第一螺孔19配合的第二螺孔22,底座1上相对固定有安装板23,安装板23之间固定有横杆24,横杆24上转动连接有上矫正轮25、下矫正轮26。A bearing seat 16 is fixed on the side of the mounting seat 9, a rotating shaft 17 is connected between the bearing seats 16, a first side plate 18 is fixed on the rotating shaft 17, and a second side plate 20, a ring sleeve 21, and a ring sleeve 21 are sleeved on the rotating shaft 17. It is fixed with the second side plate 20, the rotating shaft 17 is provided with a first screw hole 19, the ring sleeve 21 is provided with a second screw hole 22 matched with the first screw hole 19, and a mounting plate 23 is relatively fixed on the base 1 for installation. A cross bar 24 is fixed between the plates 23 , and an upper straightening wheel 25 and a lower straightening wheel 26 are rotatably connected to the cross bar 24 .

第一滑轨2、第二滑轨6均为t形滑轨,插槽15的长度大于插杆14的直径,插槽15沿第二滑轨6均匀分布设置,第一螺孔19沿转轴17均匀分布设置。The first slide rail 2 and the second slide rail 6 are both T-shaped slide rails, the length of the slot 15 is greater than the diameter of the insertion rod 14, the slots 15 are evenly distributed along the second slide rail 6, and the first screw hole 19 is along the rotation axis. 17 Evenly distribute settings.

利用液压杆7能够带动安装座9在竖直方向内上下移动,移动到合适位置后,借助第一滑轨2与第一滑块3的配合作用,将插槽15插在插杆14上,拧紧固定螺栓4即可实现对安装座9的固定;在转轴17上能够调节第二侧板20与第一侧板18之间的距离,第二侧板20调节到合适位置后,将第二螺孔22与第一螺孔19对准,借助螺栓即可对第二侧板20进行固定,从而能够适用于不同线径的电缆放线。第二滑轨6与第二滑块13配合能够提高安装座9在竖直方向内上下移动的稳定性。The hydraulic rod 7 can drive the mounting seat 9 to move up and down in the vertical direction. After moving to an appropriate position, the slot 15 is inserted into the insertion rod 14 by the cooperation of the first slide rail 2 and the first slide block 3 , The mounting seat 9 can be fixed by tightening the fixing bolts 4; the distance between the second side plate 20 and the first side plate 18 can be adjusted on the rotating shaft 17. The screw holes 22 are aligned with the first screw holes 19 , and the second side plate 20 can be fixed by means of bolts, so that it can be applied to cables with different wire diameters. The cooperation of the second sliding rail 6 and the second sliding block 13 can improve the stability of the mounting base 9 moving up and down in the vertical direction.

将转轴17上的电缆穿过上矫正轮25、下矫正轮26之间再放线,能够借助上矫正轮25、下矫正轮26对电缆进行矫正,防止放线过程中出现电缆弯折扭曲的情况。Pass the cable on the rotating shaft 17 between the upper straightening wheel 25 and the lower straightening wheel 26 and then pay off the cable, and the cable can be straightened with the help of the upper straightening wheel 25 and the lower straightening wheel 26 to prevent the cable from being bent and twisted during the pay-off process. Happening.

本实用新型所提供的一种适用于电力施工的可调节放线架能够利用液压杆带动安装座在竖直方向内上下移动,移动到合适位置后,借助第一滑轨与第一滑块的配合作用,将插槽插在插杆上,拧紧固定螺栓即可实现对安装座的固定,在转轴上能够调节第二侧板与第一侧板之间的距离,第二侧板调节到合适位置后,将第二螺孔与第一螺孔对准,借助螺栓即可对第二侧板进行固定,从而能够适用于不同线径的电缆放线;将转轴上的电缆穿过上矫正轮、下矫正轮之间再放线,能够借助上矫正轮、下矫正轮对电缆进行矫正,防止放线过程中出现电缆弯折扭曲的情况。An adjustable wire pay-off frame suitable for electric construction provided by the utility model can use a hydraulic rod to drive the mounting seat to move up and down in the vertical direction. With the function of cooperation, insert the slot on the insertion rod, and tighten the fixing bolt to fix the mounting seat. The distance between the second side plate and the first side plate can be adjusted on the rotating shaft, and the second side plate can be adjusted to a suitable After positioning, align the second screw hole with the first screw hole, and fix the second side plate with bolts, so that it can be used for cable pay-off of different wire diameters; pass the cable on the rotating shaft through the upper straightening wheel , and then pay off the cable between the lower straightening wheels, the cable can be straightened with the help of the upper straightening wheel and the lower straightening wheel, so as to prevent the cable from being bent and twisted during the pay-off process.

以上实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不会使相应技术方案的本质脱离本实用新型各实施例技术方案的精神和范围。The above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still be used for the foregoing implementations. The technical solutions described in the examples are modified, or some technical features thereof are equivalently replaced; and these modifications or replacements will not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (5)

1.一种适用于电力施工的可调节放线架,其特征在于:包括底座(1),所述底座(1)上相对固定有液压杆(7),所述液压杆(7)两侧相对固定有第一滑轨(2),所述第一滑轨(2)上设有与第一滑轨(2)配合的第一滑块(3),所述第一滑块(3)上贯穿并螺纹连接有固定螺栓(4),所述第一滑块(3)上固定有支撑板(5),所述支撑板(5)侧面固定有与第一滑轨(2)结构相同的第二滑轨(6),所述液压杆(7)杆体端部固定有安装座(9),所述安装座(9)内部相对设有凹槽(10),所述凹槽(10)内壁通过弹簧(11)与横板(12)相连,所述横板(12)侧面固定有与第二滑轨(6)配合的第二滑块(13),所述安装座(9)侧面相对固定有插杆(14),所述第二滑轨(6)上设有与插杆(14)配合的插槽(15);1. An adjustable wire pay-off frame suitable for electric construction, characterized in that it comprises a base (1), a hydraulic rod (7) is relatively fixed on the base (1), and two sides of the hydraulic rod (7) are relatively fixed. A first sliding rail (2) is relatively fixed, and a first sliding block (3) matched with the first sliding rail (2) is arranged on the first sliding rail (2), and the first sliding block (3) A fixing bolt (4) is penetrated and screwed on the upper part, a support plate (5) is fixed on the first sliding block (3), and a side surface of the support plate (5) is fixed with the same structure as the first slide rail (2). The second slide rail (6) of the hydraulic rod (7) is fixed with a mounting seat (9) at the end of the rod body, and a groove (10) is oppositely provided inside the mounting seat (9), and the groove (10) ) The inner wall is connected with the transverse plate (12) through the spring (11), the side of the transverse plate (12) is fixed with a second sliding block (13) matched with the second sliding rail (6), the mounting seat (9) An insertion rod (14) is relatively fixed on the side surface, and a slot (15) matched with the insertion rod (14) is provided on the second slide rail (6); 所述安装座(9)侧面固定有轴承座(16),所述轴承座(16)之间连接有转轴(17),所述转轴(17)上固定有第一侧板(18),所述转轴(17)上套设有第二侧板(20)、环套(21),所述环套(21)与第二侧板(20)固定,所述转轴(17)上设有第一螺孔(19),所述环套(21)上设有与第一螺孔(19)配合的第二螺孔(22),所述底座(1)上相对固定有安装板(23),所述安装板(23)之间固定有横杆(24),所述横杆(24)上转动连接有上矫正轮(25)、下矫正轮(26)。A bearing seat (16) is fixed on the side of the mounting seat (9), a rotating shaft (17) is connected between the bearing seats (16), and a first side plate (18) is fixed on the rotating shaft (17). A second side plate (20) and an annular sleeve (21) are sleeved on the rotating shaft (17), the annular sleeve (21) is fixed with the second side plate (20), and a second side plate (20) is sleeved on the rotating shaft (17). A screw hole (19), the ring sleeve (21) is provided with a second screw hole (22) matched with the first screw hole (19), and a mounting plate (23) is relatively fixed on the base (1) A cross bar (24) is fixed between the mounting plates (23), and an upper straightening wheel (25) and a lower straightening wheel (26) are rotatably connected to the cross bar (24). 2.根据权利要求1所述的适用于电力施工的可调节放线架,其特征在于:所述第一滑轨(2)、第二滑轨(6)均为t形滑轨。2 . The adjustable wire pay-off frame suitable for electric construction according to claim 1 , wherein the first slide rail ( 2 ) and the second slide rail ( 6 ) are T-shaped slide rails. 3 . 3.根据权利要求1所述的适用于电力施工的可调节放线架,其特征在于:所述插槽(15)的长度大于插杆(14)的直径。3 . The adjustable wire pay-off stand suitable for electric construction according to claim 1 , wherein the length of the slot ( 15 ) is greater than the diameter of the insertion rod ( 14 ). 4 . 4.根据权利要求3所述的适用于电力施工的可调节放线架,其特征在于:所述插槽(15)沿第二滑轨(6)均匀分布设置。4. The adjustable wire pay-off rack suitable for electric construction according to claim 3, wherein the slots (15) are evenly distributed along the second slide rail (6). 5.根据权利要求1所述的适用于电力施工的可调节放线架,其特征在于:所述第一螺孔(19)沿转轴(17)均匀分布设置。5 . The adjustable wire pay-off frame suitable for electric construction according to claim 1 , wherein the first screw holes ( 19 ) are evenly distributed along the rotating shaft ( 17 ). 6 .
CN201920713265.4U 2019-05-17 2019-05-17 An adjustable wire pay-off rack suitable for power construction Active CN210103125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920713265.4U CN210103125U (en) 2019-05-17 2019-05-17 An adjustable wire pay-off rack suitable for power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920713265.4U CN210103125U (en) 2019-05-17 2019-05-17 An adjustable wire pay-off rack suitable for power construction

Publications (1)

Publication Number Publication Date
CN210103125U true CN210103125U (en) 2020-02-21

Family

ID=69561601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920713265.4U Active CN210103125U (en) 2019-05-17 2019-05-17 An adjustable wire pay-off rack suitable for power construction

Country Status (1)

Country Link
CN (1) CN210103125U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111299353A (en) * 2020-02-28 2020-06-19 重庆市荣昌区永世光电设备有限公司 Blowing frame strutting arrangement
CN111299350A (en) * 2020-02-28 2020-06-19 重庆市荣昌区永世光电设备有限公司 Steel plate discharge revolving rack
CN113772494A (en) * 2021-10-15 2021-12-10 安徽英杰精工机械有限公司 An oblique support vertical wrapping device for cable pay-off

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111299353A (en) * 2020-02-28 2020-06-19 重庆市荣昌区永世光电设备有限公司 Blowing frame strutting arrangement
CN111299350A (en) * 2020-02-28 2020-06-19 重庆市荣昌区永世光电设备有限公司 Steel plate discharge revolving rack
CN113772494A (en) * 2021-10-15 2021-12-10 安徽英杰精工机械有限公司 An oblique support vertical wrapping device for cable pay-off

Similar Documents

Publication Publication Date Title
CN106384975B (en) A kind of cable rapid abutting joint auxiliary device
CN205772409U (en) A kind of electric power cable storage device
CN108736379B (en) Electric power construction leading truck
CN209626807U (en) A kind of construction of ultra-high-tension power transmission line lives across device
CN105845430B (en) Enamel-cover paper coil winding device and control method with alignment means
CN205471962U (en) Wire pay -off device
CN104134951A (en) Bus conductor assembly tool
CN212857202U (en) Cold-drawing precise seamless steel tube straightening device
CN114460665A (en) Traction type underground pipeline detector and traction movement detection method thereof
CN212245642U (en) Cable unwrapping wire support of high stability
CN207451261U (en) An automatic pay-off machine
CN201785098U (en) Wire coil bracket
CN113007513A (en) Adjustable mounting bracket
CN204290174U (en) Specific purpose tool when installing for conducting rod
CN204548866U (en) A kind of rack being convenient to sleeve pipe plated film
CN209853467U (en) A wire-releasing device for electric power construction
CN210476698U (en) Novel supporting mechanism for pipe penetrating processing of pipe wrapping
CN220291532U (en) A kind of wire construction pulley for transmission line engineering
CN210517609U (en) Automatic cable pipe penetrating device for electric power installation
CN210312912U (en) Can prevent winding electric power construction pay off rack
CN118723685B (en) Low-cost combined pay-off rack
CN207774508U (en) A kind of cable automatic drawing line apparatus easy to remove
CN119833310B (en) Vertical wire device for vertical winding wire of dry-type high-voltage coil
CN205123125U (en) Two split conductor fixed platform
CN215544516U (en) Straightener support convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Shanghai Muyun Technology Co.,Ltd.

Assignor: SHANGHAI SILIANG ELECTRONIC TECHNOLOGY CO.,LTD.

Contract record no.: X2024980011678

Denomination of utility model: An adjustable pay off rack suitable for power construction

Granted publication date: 20200221

License type: Common License

Record date: 20240809

EE01 Entry into force of recordation of patent licensing contract
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An adjustable pay off rack suitable for power construction

Granted publication date: 20200221

Pledgee: Bank of Ningbo Limited by Share Ltd. Shanghai branch

Pledgor: SHANGHAI SILIANG ELECTRONIC TECHNOLOGY CO.,LTD.

Registration number: Y2025310000608

PE01 Entry into force of the registration of the contract for pledge of patent right