CN202530722U - Guiding rule used for plastering building - Google Patents
Guiding rule used for plastering building Download PDFInfo
- Publication number
- CN202530722U CN202530722U CN2012201416862U CN201220141686U CN202530722U CN 202530722 U CN202530722 U CN 202530722U CN 2012201416862 U CN2012201416862 U CN 2012201416862U CN 201220141686 U CN201220141686 U CN 201220141686U CN 202530722 U CN202530722 U CN 202530722U
- Authority
- CN
- China
- Prior art keywords
- usefulness
- saw blade
- building
- plastering
- guiding ruler
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a guiding rule used for plastering a building. The guiding rule comprises a saw bit, a clamping part used for clamping the saw bit, and a bolt for connection of the saw bit and the clamping part, wherein the saw bit is provided with saw teeth along a length direction, the clamping part is a board with an approximately isosceles triangle shaped cross section, and a top angle is expanded to form two splints for clamping the saw bit. According to the guiding rule used for plastering the building, when half-dry mortar is plastered, the guiding rule is beneficial for improving smoothness, the hollowing phenomenon can be avoided, meanwhile, the better sticking environment can be provided for a future potty cover face; in comparison with the conventional manual plastering, continuity of integrated construction is ensured, a process of grinding abrasive paper is reduced, and the construction efficiency of the whole decoration engineering is improved. During site operation, technical limitation of the engineering is not considered, the guiding rule is matched with a rib stamping template, so that plastering workers, which are deficient increasingly, can be reduced in a large area, and theory of low cost and high benefit can be realized.
Description
Technical field
The utility model relates to a kind of building operations instrument, the plaster guiding ruler of usefulness of especially a kind of building.
Background technology
In existing building decoration engineering; The flow process of plastering of interior wall cement mortar generally is: manual work is plastered and can be begun to smear bottom ash in about 2 hours in the floating screed completion usually, should smear the thin ash of one deck before smearing earlier, requires matrix is smeared sternly; The compacting of exerting oneself when smearing is clamp-oned in the fine gap mortar; Then thicken, smear to concordant, scrape levelling with guiding ruler again and put in order, rub hair with the hands with wood float at last with floating screed.Adopt common artificial plastering method levelling to have many drawbacks, for example, this method is had relatively high expectations to the workman, and planeness is difficult for reaching code requirement; The work progress very complicated influences efficiency of construction; " hollowing " appears in this method easily, can cause phenomenons such as metope cracking, mortar come off; This work progress is slow, incurs loss through delay programming; This method technical limitations of having plastered influences construction quality.
Summary of the invention
The technical problem that the utility model will solve provides that a kind of operation is easier, levelling efficient is higher, satisfy the plaster guiding ruler of usefulness of building that mechanical execution requires.
In order to solve the problems of the technologies described above, the guiding ruler that the utility model provides a kind of building to plaster usefulness comprises that one is provided with the saw blade of sawtooth and the clamping part that is connected with said saw blade along its length.
The shape of cross section of said clamping part is approximately isosceles triangle, and open at its drift angle place is the clamping plate of two clamping saw blades.
Said clamping plate and saw blade are with bolton.
Said clamping part and saw blade length are suitable.
At least two bolton clamping plate and saw blade.
Said bolt has two, is separately positioned on the clamping part two ends, and one near sawtooth, and one away from sawtooth.
The length of said saw blade is 1.7 meters to 2.3 meters, and width is 0.1 meter to 0.2 meter, and thickness is 1 millimeter.
Said sawtooth is 30 millimeters to 70 millimeters apart from the distance of clamping plate approach end end.
The width that said saw blade is held part is 40 millimeters to 60 millimeters.
Said clamping part is 2 centimetres away from the end face width of saw blade.
Compared with prior art, the plaster guiding ruler of usefulness of the utility model building has sawtooth, half-dried mortar being carried out help improving planeness when floating, avoids occurring the hollowing phenomenon, in the future putty capping better bonding environment is provided simultaneously; Plaster than existing manual, can guarantee the continuity of integrated construction, reduce the process of sand papering, improve the efficiency of construction of whole decorative engineering.Need not consider the technical limitations of engineering during field operation, cooperate the floating screed template to use the ability large tracts of land to reduce the workman that plasters of worsening shortages, realize theory low-cost, high benefit.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment, the utility model is done to specify further:
Fig. 1 builds the front view of the guiding ruler of the usefulness of plastering for the utility model.
Fig. 2 builds the left view of the guiding ruler of the usefulness of plastering for the utility model.
Fig. 3 builds the upward view of the guiding ruler of the usefulness of plastering for the utility model.
The specific embodiment
Be depicted as the structure chart that the utility model is built the guiding ruler of the usefulness of plastering like Fig. 1 to 3, it comprises saw blade 30, the clamping part 20 of clamping saw blade 30 and the bolt 10 of fastening said saw blade 30 with clamping part 20.Length direction along saw blade 30 is provided with sawtooth, and this sawtooth is general sawtooth.Said saw blade 30 length are 1.7 meters to 2.3 meters, and length is preferably 2 meters in the present embodiment, so that cooperate the floating screed template that is spaced apart 1.5 meters to use, saw blade 30 width are 0.1 meter to 0.2 meter, and thickness is 1 millimeter.
For making things convenient for machinery or artificial construction, a clamping part 20 is connected the opposite side of saw blade 30 relative sawtooth, and is provided with along its length, and the length of clamping part 20 is preferably suitable with saw blade 30.Said clamping part 20 is aluminum alloy plate materials of the approximate isosceles triangle of shape of cross section, and open at its drift angle place is the clamping plate 21 of two clamping saw blades 30.Its base, just clamping part 20 is 2 centimetres away from the width of the end face of saw blade 30, holds tight in one's hands to make things convenient for the workman.The sawtooth of said saw blade 30 is 30 millimeters to 70 millimeters apart from the distance of clamping plate 21 ends, and saw blade 30 is 40 millimeters to 60 millimeters by the width of clamping plate 21 retained parts.In the present embodiment, the width of saw blade 30 is 0.1 meter, and the sawtooth of saw blade 30 is 50 millimeters apart from the distance of clamping plate 21 adjacent end ends, and the width that saw blade 30 is held part is 50 millimeters.
For saw blade 30 is fixed in the clamping plate 21 of clamping part 20, fastening said clamping plate 21 of at least 2 bolts 10 (joining corresponding nut) and saw blade 30 clamp saw blade 30; As shown in Figure 1; Said bolt 10 has two, is separately positioned on clamping part 20 two ends, and one near sawtooth; One away from sawtooth, can realize fixation.
The plaster guiding ruler of usefulness of the building of the utility model is to finish in the mechanization whitewashing, and artificial filling cavity or groove finish, and the construction metope need effectively leave standstill 12 hours~24 hours, treats that mortar begins operation when drying in the air to half-dried hardening state closely.When the guiding ruler of utilization the utility model is polished the body of wall mortar; The palm of the hand inwardly, its base is close to the palm of the hand; Point and hold clamping part 20 in two sides tight in one's hands; Sawtooth is wall covering surface inwardly, and saw blade 30 becomes 30 °~60 ° inclinations with metope, polishes from the bottom to top to smooth along two adjacent 1.5 meters plastic formworks then.Can be accustomed to the adjustment angle of inclination according to the user.After construction finished, the mortar waste material that cleaning polishes out on the ground cleaned guiding ruler, so that next time, construction was reused.
The degree of plainness for wall surface inspection after the guiding ruler polishing of usefulness of plastering of the utility model building, degree of plainness for wall surface at 3 millimeters with interior (allowable variation of 2 meters guiding rulers of national regulation is not more than 3 millimeters); Construction back metope does not have hollowing, crackle and watermark; The verticality inspection of negative and positive angle, construction back, body of wall detects and is lower than 3 millimeters (national regulation detects allowable variation usually and is not more than 3 millimeters).
The guiding ruler that the utility model is built the usefulness of plastering is derived from the mechanization plastering engineering, can use the technique for grinding in the mechanized construction.This guiding ruler operation does not need a large amount of plastering technique personnel, and ordinary manpower workman can carry out the work.This is to the very important effect of wideling popularize of mechanized construction.The grinding technology of utilization guiding ruler has fundamentally reduced a large amount of plastering technique personnel, also can large tracts of land, the construction of polishing on a large scale, really improved the original mechanical efficiency of construction effectively, and shortened construction speed.
The utility model is built the guiding ruler of the usefulness of plastering, and has abandoned the floating technical method of traditional manual work during construction operation, only needs after the mechanization whitewashing finishes, can realize under the mortar leather hard.Because under the mortar initial set state, internal moisture also fully is not in harmonious proportion with cement, mortar plasticity is very strong, carries out any plastering construction and all occurs hollowing easily; And in the autonomous condensation process of mortar, As time goes on, slurry can lose plasticity gradually, becomes the state closely that can not flow, and after this intensity of slurry increases gradually, to the last can become the stone shape solid with suitable intensity; So through drying of half a day or whole day, mortar is half-dried hardening state closely, does not promptly also have complete stone shape state, carries out artificial guiding ruler polishing this moment again and can reach the effect of getting twice the result with half the effort.Importantly, the natural coagulation of mortar can effectively solve the hollowing phenomenon in the process of plastering, and the guiding ruler technique for grinding can improve the planeness of wall plastering.
Claims (10)
1. the building guiding ruler of usefulness of plastering is characterized in that, comprises that one is provided with the saw blade (30) of sawtooth and the clamping part (20) that is connected with said saw blade (30) along its length.
2. the plaster guiding ruler of usefulness of a kind of building according to claim 1 is characterized in that the shape of cross section of said clamping part (20) is approximately isosceles triangle, and open at its drift angle place is the clamping plate (21) of two clamping saw blades (30).
3. the plaster guiding ruler of usefulness of a kind of building according to claim 2 is characterized in that said clamping plate (21) and saw blade (30) are fastening with bolt (10).
4. the plaster guiding ruler of usefulness of a kind of building according to claim 3 is characterized in that said clamping part (20) is suitable with saw blade (30) length.
5. the plaster guiding ruler of usefulness of a kind of building according to claim 4 is characterized in that at least two bolts (10) binding clips (21) and saw blade (30).
6. the plaster guiding ruler of usefulness of a kind of building according to claim 5 is characterized in that said bolt (10) has two, is separately positioned on clamping part (20) two ends, and one near sawtooth, and one away from sawtooth.
7. according to the plaster guiding ruler of usefulness of any described a kind of building of claim 1 to 6, it is characterized in that the length of said saw blade (30) is 1.7 meters to 2.3 meters, width is 0.1 meter to 0.2 meter, and thickness is 1 millimeter.
8. according to the plaster guiding ruler of usefulness of any described a kind of building of claim 2 to 6, it is characterized in that said sawtooth is 30 millimeters to 70 millimeters apart from the distance of clamping plate (21) approach end end.
9. the plaster guiding ruler of usefulness of a kind of building according to claim 8 is characterized in that the width that said saw blade (30) is held part is 40 millimeters to 60 millimeters.
10. according to the plaster guiding ruler of usefulness of any described a kind of building of claim 2 to 6, it is characterized in that said clamping part (20) is 2 centimetres away from the end face width of saw blade (30).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201416862U CN202530722U (en) | 2012-04-06 | 2012-04-06 | Guiding rule used for plastering building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201416862U CN202530722U (en) | 2012-04-06 | 2012-04-06 | Guiding rule used for plastering building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202530722U true CN202530722U (en) | 2012-11-14 |
Family
ID=47131916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201416862U Expired - Lifetime CN202530722U (en) | 2012-04-06 | 2012-04-06 | Guiding rule used for plastering building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202530722U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088533A (en) * | 2015-07-14 | 2016-11-09 | 杭州正量建设劳务有限公司 | The construction method of a kind of building decoration gray line and constructing device |
-
2012
- 2012-04-06 CN CN2012201416862U patent/CN202530722U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106088533A (en) * | 2015-07-14 | 2016-11-09 | 杭州正量建设劳务有限公司 | The construction method of a kind of building decoration gray line and constructing device |
CN106088533B (en) * | 2015-07-14 | 2018-02-27 | 杭州正量建设劳务有限公司 | A kind of construction method and constructing device of building decoration gray line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102644362B (en) | Method for architectural decoration plastering construction | |
CN107143111A (en) | A kind of construction method of abrasion-proof terrace | |
CN109138215A (en) | A kind of construction wall integral construction method | |
CN202530722U (en) | Guiding rule used for plastering building | |
CN210597982U (en) | Composite copper plate structure with back bolt on floor | |
CN209837621U (en) | Ash leveling device for building construction | |
CN100572718C (en) | The plastering vitrified brick at positive angle job practices | |
CN205637501U (en) | Can carry out plastering unit that plasters with wall keeping parallelism | |
CN109537822A (en) | Gutter construction technology | |
CN202370227U (en) | Zigzag scraper | |
CN202012184U (en) | Wall polishing filing board | |
CN102605895B (en) | Installation and construction method of ceiling board heat insulation mortar prefabricated block | |
JP4268676B1 (en) | Surface makeup method | |
CN202509637U (en) | Cantilever type cover plate deformation joint structure of roofing for people to climb | |
CN218092147U (en) | Waterproof leaking stoppage tool for cast-in-place concrete construction joint | |
CN2585930Y (en) | Smoothing tool | |
CN211850666U (en) | Multifunctional portable napping trowel | |
CN104179308B (en) | One utilizes the special wall surface construction technology of cement mortar moulding | |
CN202248798U (en) | High-efficiency vibrating plasterer | |
CN113738068B (en) | Gypsum line foot construction process | |
CN109516740A (en) | The dedicated clay of the levelling integrated construction of floor tile paving and its construction method | |
CN217975251U (en) | Reinforcing steel bar protection layer treatment smearing device | |
RU85522U1 (en) | UNIVERSAL STONE TOOL (OPTIONS) | |
CN202899562U (en) | Paving structure of thin-type floor decorative materials | |
CN218667015U (en) | Automatic concrete plastering and compacting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20121114 |
|
CX01 | Expiry of patent term |