CN202509637U - Cantilever type cover plate deformation joint structure of roofing for people to climb - Google Patents

Cantilever type cover plate deformation joint structure of roofing for people to climb Download PDF

Info

Publication number
CN202509637U
CN202509637U CN2011205527569U CN201120552756U CN202509637U CN 202509637 U CN202509637 U CN 202509637U CN 2011205527569 U CN2011205527569 U CN 2011205527569U CN 201120552756 U CN201120552756 U CN 201120552756U CN 202509637 U CN202509637 U CN 202509637U
Authority
CN
China
Prior art keywords
cover plate
deformation joint
wall
roofing
joint structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205527569U
Other languages
Chinese (zh)
Inventor
贾世鹏
王朝华
周越
樊小华
李志文
陈小平
帅品峰
章敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd filed Critical JIANGXI ZHONGLIAN CONSTRUCTION GROUP CO Ltd
Priority to CN2011205527569U priority Critical patent/CN202509637U/en
Application granted granted Critical
Publication of CN202509637U publication Critical patent/CN202509637U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a cantilever type cover plate deformation joint structure of roofing for people to climb, wherein a side wall body of the deformation joint is combined with a cantilever plate into a whole by cast-in-place, the other side wall body is a back brick wall, a flashing portion is of an R angle, and the top of the back brick wall is filled and nestled with fillers. The top of the cantilever plate is provided with a cover plate, and two ends of the cover plate are provided with downward dripping lines. The cantilever type cover plate deformation joint structure of the roofing for people to climb can avoid leakage at the deformation joint of the roofing to the largest extent under the circumstance of ensuring functions of the deformation joint.

Description

Accessible roof cantilevered cover plate deformation joint structure
Technical field
The utility model relates to a kind of covering plate structure, is applicable to the covering of accessible roof deformation joint, roof panel and body of wall junction, particularly accessible roof cantilevered cover plate deformation joint structure.
Background technology
The conventional way of present traditional deformation joint of roof is with iron sheet and concrete cover plate; Prove through engineering practice for many years; Adopt this way cost high, and seepage occurs at seam crossing easily, as: seepage appears to the concrete cover plate in easy of crack at the longitudinal seam place; Iron sheet get rusty easily receive crowded, step on the back crack at seam crossing, cause seepage.And, cause water percolation of wall because influences such as sedimentation, temperature deformation cause cover plate destruction in various degree, and both influenced result of use, influence attractive in appearance again.
Summary of the invention
The purpose of the utility model is to provide a kind of construction equipment less investment, and construction technology is simple, need not to customize deformable cover-plate, and seam crossing is not cracked and seepage, deformation joint good endurance, not easy to crack, the deformation joint structure destroyed.
For realizing above-mentioned purpose, the technical scheme that the utility model is taked is accessible roof cantilevered cover plate deformation joint structure; Deformation joint one side wall body and cantilevered plate are that one is cast-in-place; The opposite side body of wall wall of laying bricks after being, the flashing position is " R " angle, after the wall top of laying bricks fill out embedding with filler.
The top of said cantilevered plate is provided with cover plate, and the two ends of cover plate are provided with downward drip.
Said filler is pitch flax silk mixture or hard polyurethane foam.
The utility model can be under the situation that guarantees the deformation joint function; Adopt the board-like deformation joint of cantilever; One side wall body and cover plate put in order water, build brick wall by laying bricks or stones, carry out flashing both sides waterproof again at opposite side; And fill out embedding with the pitch flax silk at the masonry walls top, at utmost avoid the deformation joint of roof place seepage phenomenon to occur.
Description of drawings
Fig. 1 is the utility model structural representation.
Among the figure: 1, cantilevered plate, 2, after the wall of laying bricks, 3, filler, 4, the flashing position, 5, cover plate, 6, drip.
The specific embodiment
Combine accompanying drawing and embodiment that the utility model is described further at present; Referring to Fig. 1; Accessible roof cantilevered cover plate deformation joint structure, deformation joint one side wall body and cantilevered plate 1 are that one is cast-in-place, the opposite side body of wall wall 2 of laying bricks after being; Flashing position 4 is " R " angle, after wall 2 tops of laying bricks fill out embedding with filler 3.The top of cantilevered plate 1 is provided with cover plate 5, and the two ends of cover plate 5 are provided with downward drip 6.Filler 3 is pitch flax silk mixture or hard polyurethane foam.
Embodiment:Accessible roof cantilever cover plate deformation joint structure; Deformation joint one side wall body and cantilevered plate 1 are that one is cast-in-place, and the opposite side body of wall is a brick wall 2, and body of wall is 12 single walls that clay solid brick is built by laying bricks or stones; Mortar adopts waterproofing mortar; Mix ratio of mortar is: 32.5Mpa cement: lime: medium sand: water: waterproof agent is 5:1:20:180:1, will guarantee when building a wall that mortar joint is full, and body of wall is generally built by laying bricks or stones apart from bridging piece lower limb 5-6cm.Flashing position 4 is " R " angle, and the concrete job practices of employing is: adopt with roof protecting layer and make " R " angle with the fine-stone concrete of proportioning, highly >=250mm." R " angle adopts the 1/4PVC pipe to be compression molded into circular arc.The top of cantilevered plate 1 is provided with cover plate 5; Purpose is that the lines roughness control is in 2mm/2m in work progress for the stereoeffect of outstanding bridging piece, and the bridging piece cornice is made the eagle mouth with cement mortar; Inboard embedding plastics row culture drip 6; Guarantee that rainwater can not flow to the wall body, outside body of wall waterproof roll is taped against bridging piece cornice place, pushes down with press strip.Filler 3 is selected pitch flax silk mixture or hard polyurethane foam for use.
The steps include:
1, deformation joint of roof one side embedded bar;
At first propose the conception plans of deformation joint construction, arrangement of reinforcement, construction size, the concrete strength of bridging piece are adjusted, and provide detailed technical relation list.When building roof panel, bury reinforcing bar in advance underground in deformation joint one side.
2, measure unwrapping wire
According to the single requirement of contact, utilize tape measure and ink fountain to eject center line and sideline, both sides (formwork is used) of reinforcing bar one side wall body.
3, install side template on one side
When template is installed, interim with propping up according to the earlier upright side template in sideline, with the plumb bob calibration template vertically, fix with leading thick stick then, fix with diagonal brace again.
4, colligation body of wall and bridging piece reinforcing bar
1) cement mortar or the plastic cushion used of prepare control concrete cover.The body of wall topping adopts plastics latch closure cushion block, and reinforcing bar gets into card chamber (because plastics latch closure cushion block is flexible) from Ka Zui during use, can make the size in card chamber can adapt to the variation of bar diameter.
When 2) assembling reinforcement (marking the reinforcement location line), the structure position of colligation complex forms, should study earlier, and coordinate the sequencing of formwork and assembling reinforcement, to reduce the colligation difficulty with the form fixer by the root reinforcing bar order in place of shuttling back and forth.
5, cleaning basic unit
After reinforcing bar binding was good, inspection basic unit perhaps existed the basal plane of loose concrete will cut a hole hair to the smooth concrete face of platform and handles, utilize steel brush that basic unit is cleared up after finishing.
6, install the another side side template
1) after should waiting the reinforcing bar subsurface work acceptance qualified before the opposite side template is installed, after finishing, treatment of construction joints installs.By above-mentioned mold method the opposite side template is installed.
2) wall body bulging in order to prevent to build concrete, available 8 ~ No. 10 galvanized wire drawknot two side templates, spacing is not more than 1m, and galvanized wire will be arranged in length and breadth, and not high like body of wall, thickness is little, also can get final product at the two side templates joining seam wood that nails on suitable for reading.
In order to prevent wall form root spillage, produce " mashed root " phenomenon, before the wall mould is installed, paste sponge strip according to the unwrapping wire size in the side plate bottom, to accomplish smoothly, accurate, bonding is firmly and note the installation quality of screw rod through walls.
7, build concrete
1) before building concrete, the stability that the inspection template supports and the driving fit situation of form joint.Shine the moistening template of water, but do not allow ponding.
2) in work progress, the bottom should be filled out the thick cement mortar identical with the concrete proportioning with 10mm earlier, adopts the plug-in type vibrating head, and whenever shaking a little vibrates should make the concrete surface present laitance no longer to sink continuously.Build and leave standstill in the process at concrete, the crack of should taking measures to prevent to produce.Concrete should be revised before concrete final set because of the external crack of the unstructuredness of sedimentation and drying shrinkage generation.
8, maintenance and stripping
1) concrete curing: build the back heat and moisture preserving maintenance of carrying out concrete in 12 hours that finishes at concrete; Adopt the covering layer of plastic film to add the gunnysack maintenance again, the necessary strictness of covering work is conscientiously sturdy, and overlap joint is no less than 100mm between the film breadths; Covering curing is no less than 3 days, and water seasoning is no less than 7 days.
2) after concrete reaches certain intensity, can form removal.On the template dismounting date, should confirm by the intensity that design feature and concrete are reached.When removing side form, concrete strength will reach 1.2Mpa, guarantees that its surface and angle are not damaged because of stripping.
3) in time clear up foreign material such as the surperficial wood chip of concrete, iron wire, local spillage, honeycomb are repaired.
9, cleaning basic unit
What this cleaning basic unit was directed against is the cleaning of opposite side distortion tape edge concrete face under the cantilevered plate.Earlier surperficial rubbish is cleaned, water washes then, and the concrete face loose to the part will cut.
10, build the opposite side body of wall by laying bricks or stones
1) should flooring be cleaned out before building by laying bricks or stones, to shine water moistening, guarantees to have good caking property.Measure unwrapping wire on request.
2) lay bricks to clear up after finishing and build the residual mortar in place, position, foreign material etc. by laying bricks or stones, and carry out corresponding jointing and handle.
11, do angle, flashing position " R "
The flashing position of both sides body of wall and roofing handing-over is adopted with roof protecting layer and is made " R " angle with the fine-stone concrete of proportioning, highly >=and 250mm." R " angle adopts the 1/4PVC pipe to be compression molded into circular arc.
12, whitewash body of wall
1) cement mortar of proportioning is whitewashed the both walls body on request.When basic unit is concrete, should scrape plain-water slurry before plastering earlier together, before brick wall basic unit plastered, the suitable water of solarization earlier was moistening, watered and should carry out in the previous day of plastering, and metope is apparent when plastering swims.
2) whitewash thickness and should be controlled at 5~7mm every time, after one deck floated coat condenses before should treating, can whitewash back one deck, and carry out water seasoning.
3) after moulding is carried out, whenever cut shrinkage joint (width 2~3mm, the degree of depth is a depth of plastering) with cutting machine and link up up and down, prevent that the large tracts of land crack from appearring in rendering layer at a distance from 1~2m.
13, brush JS water-repellent paint
1) processing base level: remove construction rubbish with instruments such as spades, brooms, need use solvent clean like spot, basic unit has damaged or runs the sand phenomenon, needs finishing newly, and the negative and positive angular position is done in the arc-shaped when levelling.
2) be coated with primer: when Base Smoothness was relatively poor, (general ratio was the liquid material to an amount of water of fusion in the liquid material: after water=1:1.4) stirs, spread upon substrate surface and do primary coat.
3) polymer cement-base waterproof coating preparation: earlier water-repellent paint (according to the weight ratio of liquid material: powder=1:0.7) is prepared; Be stirred to evenly trickle with agitator; The mixture that does not contain granule can use; The labour that batching quantity was arranged according to engineering face and deadline decides, and the material for preparing should use up in 40 minutes.
4) covering libation at an ancient wedding ceremony material should be even, requires all around repeatedly brush to roll evenly, can not deposition be arranged the part, and facade, inclined-plane brushing should be prevented fluid stopping bob or blocked up from top to bottom.
5) big face layering is coated with and scrapes the JS water-repellent paint: divide in length and breadth direction to be coated with and scrape the JS water-repellent paint, back one coating should be at last coating surface drying but construction when not doing solid work (generally speaking, two-layer between about 4~8 hours) be as the criterion to refer to not touch stickingly.
14, roofing flashing position construction of waterproof layer
The construction of roofing flashing position should be added carcass material and strengthen by design or code requirement brushing JS water-repellent paint enhancement Layer in the middle of the coating.Receipts head place adopts the multipass brushing or obturages with encapsulant.
15, fill out embedding filler pitch flax silk
For the packing material at position, space, preferably adopt pitch flax silk (density is little, compressive strain is big, little) to fill out the embedding space, to guarantee waterproof effect to the malformation resistance.
16, external coating water-repellent paint
In order to strengthen waterproof and aesthetic, brushing chromatic waterproofing paint structurally, the concrete operations requirement is identical with step 13.

Claims (2)

1. accessible roof cantilevered cover plate deformation joint structure; It is characterized in that deformation joint one side wall body and cantilevered plate (1) are that one is cast-in-place, the opposite side body of wall wall (2) of laying bricks after being; Flashing position (4) is " R " angle, after wall (2) top of laying bricks fill out embedding with filler (3).
2. accessible roof cantilevered cover plate deformation joint structure according to claim 1 is characterized in that the top of said cantilevered plate (1) is provided with cover plate (5), and the two ends of cover plate (5) are provided with downward drip (6).
CN2011205527569U 2011-12-27 2011-12-27 Cantilever type cover plate deformation joint structure of roofing for people to climb Expired - Fee Related CN202509637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205527569U CN202509637U (en) 2011-12-27 2011-12-27 Cantilever type cover plate deformation joint structure of roofing for people to climb

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205527569U CN202509637U (en) 2011-12-27 2011-12-27 Cantilever type cover plate deformation joint structure of roofing for people to climb

Publications (1)

Publication Number Publication Date
CN202509637U true CN202509637U (en) 2012-10-31

Family

ID=47062129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205527569U Expired - Fee Related CN202509637U (en) 2011-12-27 2011-12-27 Cantilever type cover plate deformation joint structure of roofing for people to climb

Country Status (1)

Country Link
CN (1) CN202509637U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518216A (en) * 2011-12-27 2012-06-27 江西中联建设集团有限公司 Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure
CN107489204A (en) * 2017-07-21 2017-12-19 马明才 A kind of new water blocking tape of falling beam construction method work method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518216A (en) * 2011-12-27 2012-06-27 江西中联建设集团有限公司 Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure
CN107489204A (en) * 2017-07-21 2017-12-19 马明才 A kind of new water blocking tape of falling beam construction method work method

Similar Documents

Publication Publication Date Title
CN102518216A (en) Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure
CN109838065B (en) Floor tile ground paving construction method
CN106677440A (en) Roofing parapet water-floating structure and construction method thereof
CN104018598A (en) Outer wall structure and construction and installation method
CN101565997A (en) Construction method for large-area irregular floor tile
CN106193624A (en) A kind of wall of aerated concrete block cracking-proof construction technology of improvement
CN102400525B (en) Thin-layer plastering method for autoclaved aerated concrete block wall bodies
CN103821296A (en) Wall plastering technique for aerated concrete block filler wall
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN108797929A (en) Ecological stone material construction
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
CN105970880A (en) Expansion joint structure with several waterproof guards and construction method of expansion joint structure
CN104532987A (en) Construction method of bare concrete wall internally provided with heat insulation layer
CN104120847A (en) Construction method for whitewashing-free puttying processing of concrete porous brick wall
CN202509637U (en) Cantilever type cover plate deformation joint structure of roofing for people to climb
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN107574936A (en) A kind of heat preserving exterior wall construction technology
CN210597982U (en) Composite copper plate structure with back bolt on floor
CN210685019U (en) Anti-bank structure with stagnant water steel sheet
CN106759979A (en) A kind of external wall exterior heat preserving construction technique
CN107476448A (en) A kind of construction method for waterproof at toilet doorway
CN104612343A (en) Method for constructing extruded polystyrene board molding of building outer wall
CN105649222A (en) Treatment and construction method for connecting part of roof waterproof structure deformation joint and external wall
KR20130113568A (en) Concrete crack repair method and repair mortar manufacturing method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121031

Termination date: 20141227

EXPY Termination of patent right or utility model