CN210685019U - Anti-bank structure with stagnant water steel sheet - Google Patents
Anti-bank structure with stagnant water steel sheet Download PDFInfo
- Publication number
- CN210685019U CN210685019U CN201921579573.9U CN201921579573U CN210685019U CN 210685019 U CN210685019 U CN 210685019U CN 201921579573 U CN201921579573 U CN 201921579573U CN 210685019 U CN210685019 U CN 210685019U
- Authority
- CN
- China
- Prior art keywords
- water stop
- steel plate
- stop steel
- water
- floor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 67
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 59
- 239000010959 steel Substances 0.000 title claims abstract description 59
- 230000000875 corresponding Effects 0.000 claims abstract description 4
- 239000004568 cement Substances 0.000 claims description 6
- 210000000282 Nails Anatomy 0.000 claims description 5
- 230000002522 swelling Effects 0.000 claims description 4
- 239000003292 glue Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000007789 sealing Methods 0.000 abstract description 2
- 239000004567 concrete Substances 0.000 description 32
- 238000010276 construction Methods 0.000 description 8
- 238000003466 welding Methods 0.000 description 4
- 210000004209 Hair Anatomy 0.000 description 3
- 102100000672 SMPX Human genes 0.000 description 3
- 108060007673 SMPX Proteins 0.000 description 3
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 238000009499 grossing Methods 0.000 description 2
- 108010068370 Glutens Proteins 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive Effects 0.000 description 1
- 230000001680 brushing Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 235000021312 gluten Nutrition 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
- 238000007788 roughening Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
- 238000009736 wetting Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Abstract
The utility model discloses an anti-bank structure with a water stop steel plate, wherein the water stop steel plate is pre-embedded at the position of a floor slab corresponding to an anti-bank, the water stop steel plate is a closed rectangle, and the cross section of the water stop steel plate is in an L shape; the vertical end of the water stop steel plate is exposed out of the floor slab by 35-40 mm; the vertical end of the water stop steel plate is located at the lower central position of the inverted ridge section. The utility model has the advantages that: because the water stop steel plate is arranged in advance and is higher than the floor slab by a certain distance, the leakage of the joint of the reversed ridge and the floor slab is avoided, the bonding strength of the reversed ridge and the floor slab is enhanced, and the sealing effect is better.
Description
Technical Field
The utility model relates to a building field, a reverse bank structure specifically says so.
Background
In traditional house concrete structure work progress, the anti-bank of 200 high concretes in bathroom generally needs the secondary to pour into a mould, should the old concrete face carry out the chisel hair and handle before the secondary concretes, nevertheless because there are some chisel hairs insufficient in the workman work progress, phenomenon such as concrete vibration is not closely knit has left the seepage hidden danger for concrete construction joint department.
Disclosure of Invention
In order to reduce the seepage risk of the anti-bank construction joint department of concrete, the utility model aims at providing an anti-bank structure of bathroom is through reserving stagnant water steel sheet, using the machinery chisel hair, ensures that the anti-bank construction joint of concrete does not leak. The specific technical scheme is as follows:
a water stop steel plate is embedded in a position, corresponding to a reverse ridge, of a floor slab in advance, the water stop steel plate is a closed rectangle, and the cross section of the water stop steel plate is L-shaped; the vertical end of the water stop steel plate is exposed out of the floor slab by 35-40 mm; the vertical end of the water stop steel plate is positioned at the lower central position of the inverted ridge section; the horizontal end of the water stop steel plate is positioned in the closed area of the reverse ridge.
One side of the water stop steel plate is arranged below the shear wall.
One edge of the water stop steel plate is connected with the shear wall into a whole through a water swelling water stop strip.
The water-swelling water stop strip is fixed between the water stop steel plate and the shear wall by cement steel nails or catching groove glue.
The utility model has the advantages that: because the water stop steel plate is arranged in advance and is higher than the floor slab by a certain distance, the leakage of the joint of the reversed ridge and the floor slab is avoided, the bonding strength of the reversed ridge and the floor slab is enhanced, and the sealing effect is better.
Drawings
Fig. 1 is a schematic structural view of a water stop steel plate and a reverse sill when a shear wall is poured at the rear;
FIG. 2 is a top view of FIG. 1;
FIG. 3 is a schematic cross-sectional view taken at location A-A of FIG. 1;
FIG. 4 is a schematic position diagram of the shear wall and the water stop steel plate after casting;
fig. 5 is a top view of fig. 4.
Detailed Description
The present invention is specifically described below with reference to the accompanying drawings, as shown in the drawings, a water stop steel plate 4 is pre-embedded in a position of the floor slab 1 corresponding to the inverted ridge 3, the water stop steel plate 4 is a closed rectangle, and the cross section of the water stop steel plate is L-shaped; the height of the vertical end of the water stop steel plate exposed out of the floor slab is 35-40 mm; the vertical end of the water stop steel plate is positioned at the lower central position of the section of the reversed ridge 3; the horizontal end of the water stop steel plate is positioned in a closed area of the reversed ridge, and the closed area is an area of a toilet.
When the shear wall is poured, one edge of the water stop steel plate is arranged below the shear wall.
If the shear wall 2 is poured, one edge of the water stop steel plate is connected with the shear wall into a whole through a water swelling water stop strip 5. The water-swelling water stop strip 5 is fixed between the water stop steel plate and the shear wall by cement steel nails or catching groove glue.
The utility model discloses a construction method as follows:
(1) processing of water-stop steel plate
Selecting the type of angle steel: and L50 and 50 are used as raw materials of the water stop steel plate, angle steel is processed in advance according to the size of a back sill of the toilet, and a closed rectangular box is formed.
The water stop steel plate is processed into a closed rectangular form for standby, four angle-divided horizontal welding seams and four angle-divided vertical welding seams are respectively subjected to full welding, the quality of the welding seams is noticed, and water cannot be leaked.
(2) Placing and fixing of miniature water stop plate
The position of placing of stagnant water steel sheet is confirmed according to the position of anti-bank, ensures that the vertical limit of stagnant water steel sheet is in the position placed in the middle of anti-bank cross-section, and stagnant water steel sheet position is fixed well back, carries out welded fastening to stagnant water steel sheet and concrete structure board gluten according to a meter interval.
If the shear wall is poured, the reverse ridge is provided with a vertical construction joint which is in contact with the shear wall surface, and the construction joint stops water in a mode of fixing the water-swelling water stop strip.
The scheme selects a PZ product type water swelling water stop strip with the cross section size of 10 multiplied by 25mm, and the water stop strip is fixed at a construction joint by cement steel nails or a catching groove in an adhesive manner.
(3) Roughening treatment:
although the water stopping measures are provided at the concrete construction joint, before the concrete reversed ridge is poured, the scabbling is still required to be carried out according to the standard requirement, and the scabbling quality is required to meet the requirement. And after the chiseling is finished, cleaning floating ash on the surface of the concrete, and watering and wetting the old concrete surface before pouring the concrete.
(4) Supporting and reinforcing method for inverted ridge template
The reverse sill pouring quality of one project can very reflect the management level of the whole project, the erecting quality of the reverse sill template directly influences the concrete forming quality, the reverse sill template needs to select a high-quality template, and the erecting must be firm and the size is accurate. One wood purlin must be placed up and down on the outer side of the template to serve as a back ridge, and the inner side of the template can be subjected to size positioning through steel nails or pre-buried positioning steel bars. The sizing clamps are arranged one meter apart.
(5) Concrete pouring and vibrating
(1) Concrete transportation
① the concrete mixer truck is to be transported to the pouring site by a tip lorry, a hand truck or a bucket in time after being unloaded.
When transporting concrete, the loss of cement paste should be prevented.
② the time from discharging the concrete with the mixer to pouring is not more than 90min when the air temperature is higher than 25 deg.C.
(2) Pouring and vibrating concrete
① cutting the root of the concrete, brushing plain cement paste or dry-scattering JS concrete waterproof agent before pouring, ② pouring method, namely shoveling the concrete into a mould by a spade, ③ concrete vibrating, wherein when vibrating and cutting the concrete, the vibrating rod forms an oblique angle with the concrete surface and vibrates obliquely, ④ surface smoothing, namely, when the concrete is cut to a section after vibrating, a wooden trowel is used for compacting and smoothing immediately, no loose concrete is needed on the surface, 3, when the concrete is cured and poured by the concrete curing agent for 12h, the concrete is covered and watered for curing, at least twice a day at normal temperature, and the curing time is not less than 7 d.
Claims (4)
1. The utility model provides an anti-bank structure with stagnant water steel sheet which characterized in that: embedding a water stop steel plate in advance at a position, corresponding to the inverted ridge, of the floor slab, wherein the water stop steel plate is a closed rectangle, and the cross section of the water stop steel plate is L-shaped; the vertical end of the water stop steel plate is exposed out of the floor slab by 35-40 mm; the vertical end of the water stop steel plate is positioned at the lower central position of the inverted ridge section; the horizontal end of the water stop steel plate is positioned in the closed area of the reverse ridge.
2. The inverted sill structure having a water stop steel plate as set forth in claim 1, wherein: one side of the water stop steel plate is arranged below the shear wall.
3. The inverted sill structure having a water stop steel plate as set forth in claim 1, wherein: one edge of the water stop steel plate is connected with the shear wall into a whole through a water swelling water stop strip.
4. The inverted sill structure having a water stop steel plate as set forth in claim 3, wherein: the water-swelling water stop strip is fixed between the water stop steel plate and the shear wall by cement steel nails or catching groove glue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921579573.9U CN210685019U (en) | 2019-09-23 | 2019-09-23 | Anti-bank structure with stagnant water steel sheet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921579573.9U CN210685019U (en) | 2019-09-23 | 2019-09-23 | Anti-bank structure with stagnant water steel sheet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210685019U true CN210685019U (en) | 2020-06-05 |
Family
ID=70893069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921579573.9U Expired - Fee Related CN210685019U (en) | 2019-09-23 | 2019-09-23 | Anti-bank structure with stagnant water steel sheet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210685019U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112196267A (en) * | 2020-09-28 | 2021-01-08 | 安徽中擎建设发展有限公司 | Non-traditional secondary construction method for water stop ridge of toilet |
CN112459266A (en) * | 2020-10-14 | 2021-03-09 | 北京首钢建设集团有限公司 | Secondary construction method of water-stop reverse beam |
-
2019
- 2019-09-23 CN CN201921579573.9U patent/CN210685019U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112196267A (en) * | 2020-09-28 | 2021-01-08 | 安徽中擎建设发展有限公司 | Non-traditional secondary construction method for water stop ridge of toilet |
CN112459266A (en) * | 2020-10-14 | 2021-03-09 | 北京首钢建设集团有限公司 | Secondary construction method of water-stop reverse beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210685019U (en) | Anti-bank structure with stagnant water steel sheet | |
CN103266767A (en) | Construction method for preventing and treating cracks between concrete structure and filler wall | |
CN102758456B (en) | Construction method of basement waterproofing projects | |
CN105484391A (en) | Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks | |
CN102518216A (en) | Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure | |
CN110644538A (en) | Basement side wall extra front and back pouring belt periphery protection structure | |
CN102352660A (en) | Gypsum block masonry and construction method thereof | |
CN110409600A (en) | Unit-combination type cesspool construction method | |
CN206844138U (en) | A kind of bar construction of domatic isolated footing | |
CN112081493A (en) | Water-stopping anti-ridge component of bathroom shower room and construction method thereof | |
CN215055299U (en) | Prevent mashed angle steel of root of concrete and seal thick liquid structure | |
CN108442704A (en) | The outer insulation integrated non-dismantling formwork construction method of cast-in-place concrete structure | |
CN108086363A (en) | Underground waterproof shear wall post-pouring zone construction process | |
CN105649222A (en) | Treatment and construction method for connecting part of roof waterproof structure deformation joint and external wall | |
WO2021142990A1 (en) | Imprinting material, and roughening construction method for new and old concrete joint surface | |
CN206655379U (en) | It is a kind of to construct the building block for leading wall | |
CN208534032U (en) | A kind of formwork reinforcement system | |
CN202509637U (en) | Cantilever type cover plate deformation joint structure of roofing for people to climb | |
CN201915557U (en) | Reinforced concrete beam slab based on preset cast-in-place construction of thermal-insulation plate at bottom of beam slab | |
CN102605895B (en) | Installation and construction method of ceiling board heat insulation mortar prefabricated block | |
CN112302045A (en) | Construction method of foundation beam side vertical face waterproof structure | |
CN215055615U (en) | Clear water column body spiral stirrup reinforced structure | |
CN213898201U (en) | Horizontal post-cast strip protection and maintenance integrated structure | |
CN217630130U (en) | Novel protection apron of waterproofing membrane connects racking reservation section | |
CN218438229U (en) | Cast-in-place anti-bank structure of aluminium mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200605 Termination date: 20210923 |
|
CF01 | Termination of patent right due to non-payment of annual fee |